Loading...
2001-7225 G/INoText NoText _. ENGINEERING SERVICES DEPARTMENT fR V:v, 1 CZ �I o f J J Capital Improvement Projects Encinitas D strict Support Services Field Operations Sand Replenishment /S ormwater Compliance Subdivision Engineering June 8, 2004 (2" Revision) Traffic Engineering Ross Boucher 2361 Cambridge Ave. Encinitas, CA 92024 Re: Case 99 -316 DR /CDP 2351 and 2353 Cambridge Avenue \�s) Grading Application 7225GR [Grading /Erosion Control] f Improvement Application 72251R [Public Road /Drainage] [ r � A.P.N. 261-094-39 (� Permit issuance requirements This correspondence shall serve to briefly summarize the Engineering Permit process for Drawings 7225 -G and 7225 -I. The Drawings will remain valid for three years. In order to obtain the necessary Engineering Permits to construct per these Drawings, you will need to satisfy the following requirements: �� (1) Obtain all plan approvals. Then provide 4 blueline copies of each approved Drawing and �\` two copies of the "Preliminary Soils Investigation, Proposed Duplex Development 2300 Block of Cambridge Avenue, prepared by North County Compaction ngineering te �� March 28, 2000. / /�� / /7 � l� (2) Post Security Deposits as follows: y (a) GRADING PERMIT in the amount 66 417.00 to guarantee performance of earthwork, site retaining walls, private drain ge ' provements, and erosi n control. (b) PUBLIC IMPROVEMENT PERMITS in th amount of $35 to guarantee performance of public road and drainage improvements. �_GO Up to 80% of the amount in 2(a) and 100% of the amounts in 2(b) may be in the form of a Performance Bond, and, in the case of deferred monuments, a Labor and Materials Bond, issued by a State of California licensed surety company. Twenty percent of the amount in 2(a) has to be in the form of cash, certificates of deposit, a letter of credit, or an Ll assignment of account. Any financial instrument's format is subject to approval. q (3) Pay non - refundable Inspection Fees and an Inspection Deposit, as follows: (a)GRADING PERMIT... of $3321.00, (b)IMPROVEMENT PERMIT... of $1,794.00 and, I I (4) Pay a Flood Control Fee of 283.00. The rate is $0.21/SF, and is assessed on the impervious surface area of the site including the paved private street. (5) Provide the name, address, telephone number, and state license number of the construction contractor. ff�n O 99 -316 7225 G &I Cambridge Ellis.doc TEL 760 - 633 -2600 / FAX 760 -633 -2627 505 S. Vulcan Avenue, Encinitas, California 92024 -3633 TDD 760- 633 -27 00 recycled paper Construction and repair of public improvements and installation of the sewer lines are restricted to qualified contractors. Depending on the work to be done, the contractor will need to possess as follows either a valid: (a) Type "A" General Engineering, any work, (b) Type "C -8" Concrete, apron, curb, gutter, and sidewalk, (c) Type "C -12" Grading & Paving, any surface improvement, (d) Type "C -32" Parking & Highway Improvement, signage and striping, o (e) Type "C -34" Pipeline, any sanitary sewer and storm drainage, state license, and meet the minimum insurance requirements as stated on the accompanying handout. (6) Provide a work schedule. (7) Sign the Permits and Right -of -way Standard Conditions. Any authorized epresentative of the property owner may sign. Permits are valid for no more than one year and may expire earlier due to expirations on letters of credit and /or insurance policies. (8) Any work in the public right of way requires one million - dollar liability insurance with the City of Encinitas named as additional insured on file with the City of Encinitas and a completed Engineering Development Application. Once the Engineering Permits are issued, advance notice of 48 hours must be given prior to you or your contractor scheduling the mandatory pre - construction conference. See Grading Note #9 and Improvement Note #15. Informal phasing of the project may necessitate more than one such conference. Trench repair for public water improvements and installation of the sewer mains and laterals shall be improved under a permit from approved engineered drawings and according to City of Encinitas standard drawings. The pipe and pipe zone are the jurisdiction of the San Dieguito Water District, by separate arrangement, and Encinitas Sanitary Division, per a Sewer Construction Permit. Please make the appropriate contact. A separate Right -of -way Construction Permit will be required for any work in the public right -of -way. Typically, this work may include excavation, backfill, and resurfacing to install electric, gas, telephone, and cable television services. A Permit Fee of $150.00 per application and a site plan, preferably that drawn by the public utility will be required. The contractor license and insurance requirements will remain unchanged. Permits must be issued at least 48 hours in advance of the start of work. Haul Routes, the Traffic Engineering Division handles Traffic Control Plans, and Transportation Permits. An acceptable Traffic Control Plan may be required prior to the start of any work within the public right -of- way. A typical plan shows all delineation, tapering, advance signage, temporary striping, barricades, flagman positions, and provides a schedule of operations. Contact Raymond Guarnes, Engineering Technician, at (760) 633 -2704. Construction changes, prepared by the Engineer of Work, should be submitted to the Engineering Services Department as redlined mark -ups on 2 blueline prints of the approved Drawing. Charges are subject to approval prior to field implementation. Substantial increases in valuation due to the proposed changes may be cause for assessment and collection of additional inspection fees and security deposit. Prior to issuance of any Building Permit, a rough grading approval will be needed from the assigned Engineering Inspector. At a minimum, rough grading is defined as certified pad preparation, soil compaction, substantial completion of improvements, and safe access. 99 -316 7225 G &I Cambridge Ellis.doc As- builts of Drawing 7225 -G and Drawing 7225 -I, prepared by the Engineer of Work and approved by the Engineering Services Department, will be required prior to Final Inspection of the Grading Permit and Acceptance Inspection of the Improvement Permit. Satisfactory completion of Final Inspections is a prerequisite to full release of the Securi Deposits. Building Permit final inspections are a separate from engineering final inspections. After final acceptance by the Engineering Inspection Division of the public improvements, 75% of the public improvement securities may be released. A retention of 25% of the security will be held for a one- year warranty period and will be released only after satisfactory completion of the final wmTanty inspection. It is applicant responsibility to schedule the warranty inspection after the expiration of the warranty period. During the Building Permit process, you will need services and be subject to regulation fiom as follows: the Planning Division, Building Inspection Division, Fire Prevention, San Dieguito Water District, all of the City, and the Encinitas Union School Districts, separate public agencies. Please inquire at their respective counters. Additional engineering requirements will be forthcoming during the Building Permit pro ess, including, but not necessarily limited to, coordination of the building site plan with the grading plan resolution of any outstanding public improvement issues, and assessment and collection of flood control, sanitary sewer, and traffic mitigation fees. Should you have any questions, please contact me at (760) 633 -2783, or you may wish to visit the Engineering Counter at the Civic Center. Sincerely, Duane Thompson Associate Civil Engineer Subdivision Engineering cc Pasco Engineering, Inc., Engineer of Work Greg Shields, Senior Civil Engineer Masih Maher, Senior Civil Engineer Debbie Geishart, Engineering Tech. Permit/file Enc. Right -of -way Construction Permit Standard Conditions Requirements for Proof of Insurance Security Obligation Agreements (various) Trench resurfacing std. drawing Engineering Development Application 99 -316 7225 G &I Cambridge Ellis.doc ENGINEERING SERVICES DEPARTMENT City Of Capital Improvement Projects ? District S pport Services EWinitas F ield Operations Sand Replenishment/Stormwa ter Compliance Subdivision Engineering _ Tra fic Engineering June 16, 2004 Attn: Insco Insurance Services, Inc. 17780 Fitch Suite 200 Irvine, California 92614 RE: John and Gaylee Ellis 2361 -65 Cambridge Avenue TM 99 -316 Improvement Plan 7225 -I Final release of security (replaced by new owner) Permit 7225 - 1 authorized earthwork, storm drainage, and erosion control, Eill needed to build the described project. Performance Bond 8282955, in the amount of $35,874.00, is hereby fully exonerated. The document original is enclosed. Should you have any questions or concerns, please contact Debra Geisha at (760) 633- 2779 or in writing, attention this Dgpartment. Since ly, Masih Maher J f Le bach Senior Civil Engineer inance Manager Financial Services Cc: Jay Lembach, FinanceManager John and Gaylee Ellis Debra Geishart File Enc. TEL 760- 633 -2600 / FAX 760- 633 -2627 505 S. Vulcan Avenue, Encinitas, California 92024 -3633 TDD 760 -633- 700 (J,,� recycled paper ENGINEERIN G SERVICES DEPARTMENT - -- _ CZtyOf Capital Impro ement Projects -District Support Services Encinitas F eld Operations Sand Rep lenishment/Stormwat er Compliance Subdivision Engineering . Traffic Engineering ,Tune 16, 2004 Attn: Insco Insurance Services, Inc. 17780 Fitch Suite 200 Irvine, California 92614 RE: John and Gaylee Ellis 2361 -65 Cambridge Avenue TM 99 -316 Grading Plan 7225 -G Final release of security (replaced by new owner) Permit 7225 -G authorized earthwork, storm drainage, and erosion control, all needed to build the described project. The property is being sold and new owners replaced bonds with cash deposit. Therefore, release of the bond is merited. Performance Bond 8282945, in the amount of $53,134.00, is hereby fu ly exonerated. The document original is enclosed. Should you have any questions or concerns, please contact Debra Geish at (760) 633- 2779 or in writing, attention this Department. Sinc ly, Masih Mahe y L bach Senior Civil Enginee Finance Manager Financial Services Cc: Jay Lembach, FinanceManager John and Gaylee Ellis Debra Geishart File Enc. TEL 760 -633 -2600 / FAX 760- 633 -2627 505 S. Vulcan Avenue, Encinitas, California 92024 -3633 TDD 760 -633- 700 � recycled paper CITY OF ENCINITAS APPLICANT SECU RITY DEPOSIT RE EASE Depositor Name: Vend r No. Address: Phone No. State Zip DEPOSIT DESCRIPTION: 1. MEMO PROJECT NUMBER S / 2. RELEASED AMOUNT: 3. D SIT BALANCE: $ , Notes: AUTHORIZATION TO RELEASE: Project Coo ina Date / op Supervisor Date 2 b V Department Head Date DEPOSIT BALANCE CONFIRMED: Finance Dept Date GENERAL PROJ. # BRIEF DESCRIPTION AMOUNT LEDGER # (25 Characters limit) 101- 0000 - 218.00 -00 ------ Security Deposit - TOTAL I HEREBY CERTIFY THAT THIS CLAIM REPRESENTS A APPR VED FOR PAYMENT JUST CHARGE AGAINST THE CITY OF ENCINITAS PROCESSED BY DEPARTMENTAL APPROVAL FINANCE DATE OF REQUEST DATE CHECK REQUIRED Next Warrant DATE CITY OF ENCINITAS ikPPLICANT SECURITY DEPOSIT RELEASE �;����,�� Vendor No. DepositorNarne i Address: Addr Phone No. C l � � �� ill State Zip DEPOSIT DESCRIPTION: 1. MEMO PROJECT NUMBER 2. RELEASED AMOUNT: $ 3. DEPOSIT BALANCE: lo Notes: U/ � �✓ G � J AUTHORIZATION TO RELEASE: Project Coordinato Date Supervisor Date jf 0 Department Head Date DEPOSIT BALANCE CONFIRMED: Finance Dept Date GENERAL PROJ. It BRIEF DESCRIPTION AMOUNT LEDGER # (25 Characters limit) 101- 0000 - 218.00 -00 - - - - - - Security Deposit - TOTAL $ I HEREBY CERTIFY THAT THIS CLAIM REPRESENTS A APPROVED FOR PAYMENT JUST CHARGE AGAINST THE CITY OF ENCINITAS PROCESSED BY DEPARTMENTAL APPROVAL FINANCE DATE OF REQUEST DATE CHECK REQUIRED Next Warrant DATE CITY OF ENCINITAS APPLICANT SECU RITY DEPOSIT RE EASE DepositorNarne: C, Vend rNo. Address: 0 Phone No. State Zip DEPOSIT DESCRIPTION: 1. MEMO PROJECT NUMBER 2. RELEASED AMOUNT: Z3.DOSIT BALANCE: $ Notes: 4�11 IC. e (_a_ AUTHORIZATION TO RELEASE: Project Coor inat r Date �J�O Supervisor Date 3 Department Head Date DEPOSIT BALANCE CONFIRMED: Finance Dept Date GENERAL PROJ. # BRIEF DESCRIPTION AMOUNT LEDGER # (25 Characters limit) 101- 0000 - 218.00 -00 - - - - - - Security Deposit - _ _ _ _ _ _ TOTALS I HEREBY CERTIFY THAT THIS CLAIM REPRESENTS A APPR WED FOR PAYMENT JUST CHARGE AGAINST THE CITY OF ENCINITAS PROCESSED BY DEPARTMENTAL APPROVAL FINANCE DATE OF REQUEST DATE CHECK REQUIRED Next Warrant DATE CITY OF ENCINITAS APPLICANT SECURITY DEPOSIT RELEASE DepositorName: 7 Vend Dr No. Address: c-C��` J� �/n� �� Phone No_ 0 State Zip DEPOSIT DESCRIPTION: 1. MEMO PROJECT NUMBER /J Za- 2. RELEASED AMOUNT: 3. DEPqSIT BALANCE: $ • �� Notes: r AUTHORIZATION TO RELEASE: Project Coordinat �Date Supervisor A Date �- Department Head Date DEPOSIT BALANCE CONFIRMED: Finance Dept Date GENERAL PROJ. # BRIEF DESCRIPTION AMOUNT LEDGER # (25 Characters limit) 101-0000-218.00-00 ------ Security Deposit - TOTALS I HEREBY CERTIFY THAT THIS CLAIM REPRESENTS A APPROVED FOR PAYMENT JUST CHARGE AGAINST THE CITY OF ENCINITAS PROCESSED BY DEPARTMENTAL APPROVAL FINANCE DATE OF REQUEST DATE CHECK REQUIRED Next Warrant DATE ncDD� cF i�,- R /IQ /OR t NORTH COUNTY COMPACTION ENGINEERING, INC. I PRELIMINARY SOILS INVESTIGATION FOR PROPOSED DUPLEX DEVELOPMENT 2300 BLOCK OF CA14BRIDGE AVENUE CARDIFF, CALIFORNIA APN NO. 261-094-39-00 i t { PREPARED FOR J. E. ZANE CONSTRUCTION CO. P. O. BOX 2809 RANCHO SANTA FE, CA 92067 a MARCH 28, 2000 PROJECT NO. CE -6064 3 Y N x NORTH COUNTY COMPACTION ENGINEERING, INC. j March 28, 2000 Project No. CE -6064 J. E. Zane Construction P. O. Box 2809 Rancho Santa Fe, CA 92067 SUBJECT: Preliminary Soils Investigation Proposed Duplex Development _ 2300 Block of Cambridge Avenue Cardiff, California APN #261 - 094 -39 -00 Dear Mr. Zane: In response to your request, we have performed a Preliminary Soils Investigation for the subject project. The purpose of our investigation was to evaluate the suitability of the site or the proposed development and make recommendations with regard to site grading and foundation design. Briefly, our investigation revealed favorable soil conditions and in our opinion, the site is suitable for the proposed development, provided recommendations set forth in the attached report are adhered to. If you have any questions, please do not hesitate to contact us. This opportunity to be of service is sincer-ly appreciated. Respectfully submitted, North County oQ ,OFESS/ ! COMPACTION ENGINEERING, INC. e`` oP�� R . RFG���F� "? 2 0 713 G) 1 z _ /30/01 m Ronald K. Adams Dale R. R C) �p President Registered \ Geotechnical e l A 3 RKA:paj ` -- cc: (3) submitted (2) filed P. O. BOX 302002 * ESCONDIDO, CA 92030 * (760)480 -1116 FAX (760)741 -6568 NORTH COUN TY COMPACTION ENGINEERING, INC. TABLE OF CONTENTS Page 1.) Purpose anal Scope 1 1, 2.) Location and Description of Site 1 3.) Field Investigation 1 4.) Soil Conditions 2 5.) Laboratory Soil Testing 2 6.) Recommendations and Conclusions 2 A.) Grading 3 B.) Foundations 4 C.) Slopes 5 D.) Retaining Walls 5 E.) Estimated Paving Section 6 F.) Review of Grading Plan 7 7.) Seismic Design Considerations 7 8.) Uncertainty and Limitations 7 APPENDIX Appendix A: Exploration Legend & Unified Soil Classification Chart 1 Plate No. One Test Pit Location Plan Plate No. Two & Three Exploration Logs j Plate No. Four Tabulation of Test Re alts Appendix B: Recommended Grading Specifications NORTH COUNTY COMPACTION ENGINEERING, INC. roject No. CE -6064 age l i 1. PURPOSE AND SCOPE l The purpose of the investigation was to determine if the site is suitable for the proposed duplex unit. 1 The scope of the investigation was to: A. Determine the physical proYerties and engineering characte sties of the i surface and subsurface soils. B. Provide design information with regard to grading, site preparation, and foundation design of the proposed structure(s). j 2. LOCATION AND DESCRIPTION OF SITE The site is located at within the 2300 block of Cambridge Avenue, in Card ff (City of Encinitas), California. I The 50 foot X 99 foot rectangular shaped lot is bordered by single family dwellings to the northwest and southeast, an alley to the northeast and Cambridge Avenue W the southwest.. Site topography consists of a predominantly flat lot with the exception of a four foot high elevation change that parallels a 16 foot wide strip along the outside shoulder of Cambridge Avenue. The total difference in elevation at the property is approximately 4 feet and varies. t between 164 feet and 169 feet (MSL). The upper elevation along Cambridge avenue is retained by a four foot hig masonry garden wall with steps and a concrete driveway that remains from past developme it. A 6 foot high vertical cut descends along the southeast property line and is presently retained by a distressed stone wall. Site vegetation consist of moderate to heavy native grasses, gr undcover and shrubs. A 40 foot high star pine tree is also present on the south quadrant of the property. 3. FIELD INVESTIGATION The field investigation was performed on March 14, 2000 and included an inspection of the site and the excavation of two exploratory trenches, with a backhoe to depths of 9 feet. Location of test pits are shown on the attached Plate No. One, entitled "Test Pit Location Plan ". As excavation proceeded, representative bulk samples were collected. In p ace natural densities and moisture contents were determined at different depths in the excavations and are included on Plate No.'s Two and Three. Subsequent to obtaining soil samples, our exploratory 1 excavations were backfilled. NORTH COUNTY COMPACTION ENGINEERING, INC. Project No. CE -6064 1 Page 2 i 1 4. SOIL CONDITIONS Loose surficial soils (silty- sands) consisting of old fill/plowed ground wem found to be 4 feet - and 2 feet in depth in Test Pit No.'s One and Two, respectively. Underlying native soils to depths explored were medium dense to dense silty- sandstones and slightl clayey- sandstones. j On -site soils were found to have an expansion of less than 10 and are clan ified as being ' { low" in expansion potential. Groundwater was not encountered at the time of our investigation, nor did caving of exploratory trenches occur. In addition, due to the dense nature of the underlying sandstone formation at the site, it is our opinion, soil liquefaction is unlikely to occur in the event grading, is performed in accordance with the recommendations set forth in this report. 5. LABORATORY SOIL TESTING All laboratory test were performed on typical soils in accordance with acc pted test methods of the American Society for Testing and Materials (ASTM). Tests conducted include: A). Optimum Moisture & Maximum Density (ASTM D -1557) B). Direct Shear (Remold) (ASTM D -3080) C). Sieve Analysis (ASTM D-421) D). Field Density & Moisture (ASTM D -1556) E). Expansion Potential (FHA Standard) Test results are tabulated on the attached Plate No.'s Two through Four, entitled "Exploration Log" and "Tabulation of Test Results ". 6. RECOMMENDATIONS AND CONCLUSIONS - General It is our understanding, the foundation for the proposed duplex unit will consist of a shallow basement (4 feet below grade) with slab floorings that will support a two-story wood frame construction above. In addition, two detached single story garages with slab on grade foundations will be constructed on the northeast portion of the property. Elue to limited lot space to accommodate the proposed development, the existing 6 foot verti al slope along the southwest property line will need to be retained. .. NORTH COUNTY 6T _ _ _ 2 7 COMPACTION ENGINEERING, INC. Project No. CE -6064 Page 3 i ' In our opinion, the site is suitable for the proposed duplex development. Recommendations presented in this report should be incorporated into the planning, design, and construction phases of the subject project. 1 F 6A. Grading 4 General Grading at the site will be performed primarily to excavate for the proposed basements, remove and recompact loose topsoils and slightly alter the existing topography to a commodate the proposed duplex and surface improvements. All grading should be performed in accordance with the City of Encinitas rading Ordinance and the Recommendations /Specifications presented in this report. Subsequent to site demolition, loose surficial soils (plowed ground/old fill), as indicated on the attached Plate No's Two and Three, should be undercut or removed to fi native ground and recompacted in accordance with the attached Appendix `B' entitled "Recornmended Grading .�j Specifications ". Firm native ground may be determined as undisturbed soi I having an insitu density of greater than ninety percent (90 %) of maximum dry density. We should be contacted to document firm native ground is exposed and properly prepared prior to filling. It is recommended all loose surficial soils be removed and recompacted throughout the site prior to excavating the proposed basements. Prior to constructing fill slopes, shear keys should be excavated a minimurn of 2 feet into firm native ground, inclined back into slope, and have a minimum width of 15 f et. We should be contacted to document keyways were properly constructed prior to placing fill. All fill soils generated from earthwork construction should be placed in conformance with the attached Appendix `B' entitled, "Recommended Grading Specifications ". Should soils be imported, they should be non - expansive (less than 2% swel) and granular by nature, having strength parameters equal to or greater than the prevailing oil-site soils. We should be contacted to inspect an/or test imported soils prior to hauling the on -site to assure they will be suitable for the proposed construction. 1 Particles of asphalt and concrete debris, having a diameter of greater than 6 inches, will not be suitable fill material and should be separated from fines during grading and hauled off -site. If encountered, leach lines and/or pipes should be removed. Concrete pipes may be crushed in place. Trench lines should be recompacted in accordance with Appendix 'E'. i NORTH COUNTY COMPACTION ENGINEERING, INC. Project No. CE -6064 Page 4 The proposed duplex unit and detached garage may be traversed by a trans'tion from cut to fill. j Therefore, to reduce structural damage occurring from foundations bearing on two different soil types, the following measure should be employed: It is recommended the cut side of the transitional areas be removed to a de th of 1 foot below the bottom of the deepest proposed footing and brought back to grade with properly compacted { fill. This will alloy: the proposed structure to bear entirely on a compacted fill mat, thus reducing the probability of differential settlement. The removal area should extend rider and a minimum of 5 feet beyond the proposed building footprints. This may not apply for 1he proposed duplex unit if the basement will protrude through compacted fill and bear entirely into native formational soils. We should be contacted to evaluate the condition of basement subgrade soils subsequent to excavating for the basement to determine if over - excavation of native soils will be required with regard to differential settlement. All retaining wall backfill soils should consist of non - expansive granular soils compacted to a minimum of 90% of maximum dry density. Prior to backfilling walls, the should be waterproofed and provided with subdrains behind and at the base of the wall. For basement walls we recommend miracL -ain 6000 or its equivalent be installed per the manufactures specifications. All backfill soils should be tested for a minimum of 90% soil compaction. On- site soils will be suitable for backfill. 6B. Foundations General On -site soils are comprised of non - expansive silty -sands and slightly clayey-sands. Therefore, conventional foundations may be utilized, provided the aforementioned Grading Recommendations are adhered to. For One -Story Construction: i Continuous footing having a minimum width of 12 inches and founded a minimurn depth of 12 inches below lowest adjacent grade will have an allowable soil bearing pressure of 2000 pounds per square foot. For Two -Story Construction: Continuous footings should have a minimum width of 15 inches and be f6t nded a minimum depth of 18 inches below lowest adjacent grade. NORTH COUNTY COMPACTION ENGINEERING, INC. Project No. CE -6064 Page 5 Isolated square footings having a diameter of 18 inches and founded a minimum depth of 18 inches below lowest adjacent grade will have an allowable soil bearing p ssw of 2000 pounds per square foot. All continuous footings are to be reinforced with one 95 bar top and bottom. Steel should be positioned 3 inches above bottom of footing and 3 inches below top of footing. t Slabs should be a minimum of 4 inches thick and reinforced with #3 bars on 18 inch centers both ways at mid -point of slab thickness. Slab underlayment should consist of 4 inches of washed concrete sand wi a visqueen moisture barrier installed at mid -point of sand (2 inches sand, visqueen, 2 inches sand). Sand should be tested in accordance with ASTM D -2419 to insure a minimum sand equivalent of 30. i Prior to pouring of concrete, North County COMPACTION ENGINEERING, INC. should be contacted to inspect foundation recommendations for compliance to those set forth. a During placement of concrete North County COMPACTION ENGINEERING, INC. and/or a qualified concrete inspector should be present to document construction of foundations. 6C. Slopes Cut and compacted fill slopes constructed to maximum heights of 10 feet with maximum slope ratios of 2:1 (horizontal to vertical units) will be stable with relation to deep seated failure, provided they are properly maintained. During grading, positive drainage away from top of slopes should be provided. Subsequent to completion of grading, slopes should be planted as soon as possible with light groundcover indigenous to the area. 6D. Retaining Walls • For static conditions, the prevailing soils will have an allowable equivale t passive fluid j pressure of 256 psf, increasing 256 psf per foot in depth. Allowable pressures assume walls are j backfilled with a non - expansive sand a distance behind the wall equivale t to two - thirds the retained height. 1 Allowable active pressures may be assumed to be equivalent to the pressure of a fluid weighing 42 pcf for unrestrained walls. These values assume a vertical, smooth wall, and a level, drained backfill. Should these conditions not be met, we should be contacted for new values. j NORTH COUNTY COMPACTION ENGINEERING, INC. Project No. CE -6064 Page 6 R Allowable active pressures for restrained walls may be assumed to be equ valent to the pressure I of a fluid weighing 42 pcf, plus an additional uniform lateral pressure of SH. 1I= height of retained soils above top of wall footing in vertical feet. Allowable active pressures for retaining walls with 2:1 inclinations of sloping surcharge may be assumed to be equivalent to a pressure of fluid weighing 60 pcf. The coefficient of friction of concrete to soil may be assumed to be .31 for resistance to horizontal movement. i 6E. Estimated Paving Section Structural section for asphaltic paving for the proposed driveways and par Jng area are based on an estimated R -Value of 45. The following section is provided for bid purposes only. Actual sections should be determined subsequent to completion of grading operations. Assumed Traffic Index = 4.5 (Light Vehicular Traffic) 2 %2 inches of asphaltic paving on 4 inches of select base coarse on 6 inches of recompacted native subgrade. All materials and construction for asphaltic paving and base should confoim to the Standard Specifications of the State of California Business and Transportation Agericy, Department of Transportation, Sections 39 and 26, respectively. Class 11 base material should have a minimum R -Value of 78 and a sand equivalent of 30. All materials should be compacted to a minimum of ninety -five percent (95 %). Rigid Concrete Paving: 4 inches of concrete reinforced with 93 bars on 18 inch center, b th ways, on 1 4 inches of Class H base material on 1 6 inches of recompacted native subgrade soil. NOTE: All concrete should have a minimum compressive strength of 3250 psi. All subgrade and base materials should be compacted to a minimum of ninety -five percent 95 %). 'l NORTH COUNTY COMPACTION ENGINEERING, INC. Project No. CE -6064 Page 7 i 6F. Review of Grading Plan i Approved site and grading plans were not available at the time of our invc stigation. Therefore, upon their completion, we should review them to assure compliance with the recommendations presented in this report. 7. SEISMIC DESIGN CONSIDERATIONS (Soil Parameters) i A.) Soil Profile = SD (Table 16 -J of the 1997 Uniform Bu lding Code) B.) Type `B' Fault (Rose Canyon) C.) Distance = 3 km California Department of Conservation, Division of Mines and Geology [maps] in conjunction with Tables 16-S and 16 -T of the 1997 Uniform Building Code.) 8. UNCERTAINTY AND LIMITATIONS Surface and subsurface soils are assumed to be uniform. Therefore, should soils encountered during construction differ from those presented in this report, we should be contacted to provide their engineering properties. It is the responsibility of the owner and contractor to carry out recommendations set forth in this report. During our investigation of the subject site, evidence of faulting was note countered. Subsequent to review of available geologic literature, we feel any faulting in the vicinity of the site may be classified as inactive. However, it should be noted that San Diego County is located j in a high seismic area with regard to earthquake. Earthquake proof projec s are economically ! unfeasible. Therefore, damage as a result of earthquake is probable and we assume no liability. We assume the on -site safety of our personnel only. We cannot assume liability of personnel other than our own. It is the responsibility of the owner and contractor to insure construction operations are conducted in a safe manner and in conformance with regulations governed by CAL -OSHA and/or local agencies. i 's I NORTH COUNTY COMPACTION ENGINEERING, INC. Project No. CE -6064 Page 8 Should you have any questions, please do not hesitate to contact us. This pportunity to be of service is sincerely appreciated. Respectfully submitted, North County COMPACTION ENGINEERING, INC. , Q? O E S S ON R. ��, O Chi Fc Cl) No. 71 z C7 m E 9/30 01 M Ronald K. Adams Dale R. Regli s� , President Registered Civ r3gI Geotechnical Engi 7 RKA:paj cc: (3) submitted (2) filed j NORTH COUNTY COMPACTION ENGINEERING, IN EXPLORATION LEGEND UNIFIED SOIL CLASSIFICATION CHART SOIL DESCRIPTION � �JUP SYMBOL TYPICAL NAMES ' I. COARSE GRAINED: More than half of material is larger than No. 200 sieve size. Gf rAVELS CLEAN GRAVELS GW Well graded gravels, gravel -sand More than half of coarse fraction mixture;, little or no fines. is larger than No. 4 sieve size, but smaller than 3 ". GP Poorly 1,Taded gravels, gravel sand ! mixtures, little or no fines. i GRAVELS WITH FINES GM Silty gravels, poorly graded gravel- (Appreciable amount of fines) sand-sill mixtures. GC Clayey gravel poorly graded gravel-sand, clay mixtures. SANDS CLEAN SANDS SW Well graded sand, gravely sands, More than half of coarse fraction little or io fines. is smaller than No. 4 sieve size. SP Poorly aded sands, gravely sands, little or io fines. SANDS WITH FINES SM Silty sar ds, poorly graded sand and (appreciable amount of fines) silt mixtires. SC Clayey lands, poorly graded sand - and cla mixtures. II. FWE GRAINED: More than half of material is smaller than No.200 sieve size. SILTS AND CLAYS ML Inorgan c silts and very fine sands, rock flo r, sandy silt or clayey- silt-sanc mixtures with slight plastici . Liquid Limit CL Inorgan,c clays of low to medium less than 50 plastici , gravely clays, lean clays. OL Organic silts and organic silty clays �i of low plasticity. SILTS AND CLAYS MH Inorg c silts, micaceous or diatomar,eous find sandy or silty f soils, elastic silts. I Liquid Limit CH Inorgan c clays of high plasticity, greater. th= 50 fat clays. OH Organic clays of medium to high plasticir j HIGHLY ORGANIC SOILS PT Peat and other highly organic soils. US - Undisturbed, driven ring sample or tube sample CK - Undisturbed chunk sample PG - Bulk sample V - Water level at time of excavation or as indicated APPENDIX `A' NORTH COUNTY COMPACTION ENGINEERING, INC. I SOIL TESTING S INSPECTION SERVICES TEST PIT LOCATION PLAN PROPOSED DUPLEX UNIT CAMBRIDGE AVENUE ' CARDIFF, CALIFORNIA t o N CY n ,5.0' Nj 3596'n .so Approx. Scale = - - .. 01 1 = 20' i n CItIV_n..,Y 7tivCM`! Mi n �ARK:N6 I I ►AIKiNb I R CG v ARLA ARAG� 6'�4A5: A!!:'A o� o� r.. n la -O. i Ic Test Pit _ i L. b _p• .16. G. b- •NIA•. r_ .. ...... . . 1 r :.$ r ry ( �5�7CN:•C I I � t5_ -NGC : I n Y LOT I LCT i ^i I Test Pit I No. 2 ........... A ? ` ` ... �.....• I I ..t�0. b� -T- MIS.! G ._ r INb OvC ►• ^o � I I /CALL -TINS MALL f` p'.p• NISN C.-V T! Rr TAININS !� •ink "ALL I - so3.•.. :s.� w� -��: - n :sc I I �o t PROTECT NO CE -6064 PLATE NO. ONE 1 NORTH COUNTY COMPACTION ENGINEERING, INC. EXPLORATION LOG PROJECT NAME: CAMBRIDGE CARDIF DATE LOGGED: 03/14/00 a ELEVATION: EXISTING GRADE (164 MSL)— TEST PIT NO. ONE Depth Sample Dry Moisture Passing Sample Soil Descriptior & Ikernarks (Fact) Type Density Content #200 Depth Classi- (pct) M Sieve fication SM ORANGE BROWN, MOIST, LOOSE, SILTY -SAND I- (FELT. / PLOWED GROUND) (REMOVE AN RECOMPACT) 1 2- BG 20.1 2' 3- 4- CK 114.3 3.4 4 1 --------------------------------- ------------------------------- SM TAN BROWN, IS 101ST, MEDIUM DENSE, SILTY - SANDSTONE 5- (FIRM NATIVE- 6- (COSTAL TERRACE DEPOSIT) s 7- (STATUMS OF SILTY-SANDSTONE a AND SLIGHT11Y CLAYEY- SANDSTONE) 8 - - --- - - - - -- ---- - - - - -- ------ - - - - -- ---- - - - - -- ---- - - - - -- ---- - - - - -- --------------------- ------------------------------ j BOTTOM OFT ST PIT PROJECT NO. E -6064 PLATE NO. TW NORTH COUNTY COMPACTION ENGINEERING, INC. EXPLORATION LOG PROJECT NAME: CAMBRIDGE. CARDIFF DATE LOGGED: 3 /14/00 ELEVATION: EXISTINIG GRADE (] 64 MSL) TEST PIT 1 O. T"'O Depth Sample Dry ?Moisture Passing Sample Soil Description & R marks (Feet) Type Dcnzity Content H2O0 Depth Classi- (pef) ( %) Sieve fication SM GOLD-YELLOW BROWN, MOIST, i LOOSE, SILTY-SAND ]- (FILL. / PLOWED GROUND) (REMOVE AND COA 2 - ----- - - - - -- ---------------- - - - - -- ------------------------------ SM GOLD - YELLOW MOIST, DENSE, SILTY- SANDST :'N'E 3- «� (SLIGHTLY CLA YEY) 4- CK 122.1 13.6 25.3 4' (FIRM NATIVE ORMATION) 5- (BECOMES OLI - GREY -GOLD 6- (CONSOLIDATE:)) 7 8- CK 121.0 14.3 8' 9- --- - - - - -- --- - - - - -- ----------------- — ----- ---- - - - - -- --- - - - - -- --------------- - - - - -- ----------------------------- BOTTOM OF TEST PIT PROJECT NO. E -6064 PLATE NO. THREE 'a NORTH COUNTY COMPACTION ENGINEERING, INC. j TABULATION OF TEST RESULT Q PTIMUM MOISTURE/MAXIMUM DEN, E i S OIL DESCRIPTION TYPE MAX. DRY DENSITY OPT. MOISTURE LB FTC °/f, ° DRY �M Orange Brown Silty-Sand PI @ 2' 127.9 09.3 Gold Yellow, Silty- Sandstone (Slightly Clayey) P2 @ 4' 115.7 14.5 i EXPANSION POTENTIA SAI PLF, No. PI @2' P2 @ 4' CONDITION Remold 90% Remold 90% INITIAL MOISTURE ( %) 9.1 14.4 AIR DRY MOISTURE ( %) 3.1 5.0 FINAL MOISTURE ( %) 13.6 21.0 DRY DENSITY (PCF) 115.1 104.1 LOAD (PSF) 150 150 SWELL ( %) .000 .8 EXt'ANSION INDEX 0 8 DIRECT SHEAR SAMPLE No. P 1 P2 2 4' ! CONDITION Remold 909% Remold 90% ANGLE INTERNAL FRICTION 33 25 COHESION INTERCEPT (PCF) 180 300 s PROJECT NO. CE -6064 PLATE NO. FOUR NORTH COUNTY COMPACTION ENGINEERING, INC. RECOMMENDED GRADING SPECIFICAT ONS (General Provisions) 1. INTENT i t The intent of these specifications is to provide procedures in accordance ith current standard practices regarding clearing, compacting natural ground, preparing areas tD receive fill, and placing and compacting of fill soil to the lines , grades, and slopes delineated on the project plans. Recommendations set forth in the attached "Preliminary Soils Investigation" report or special provisions are a part ofthe "Recommended Grading Specification. " and shall supersede the provisions contained hereinafter in case of conflict. 2. INSPECTION & TESTING A qualified Soils Engineer shall be employed to inspect and test the earthwork in accordance with these specification and the accepted plans. It will be necessary that the Soils Engineer or his representative be allowed to provide adequate inspection so that he may certify that the work was or was not accomplished as specified or indicated. It shall be the responsibility of the contractor to assist the Soils Engineer and to keep him appraised of work chedules, changes, new information and dates, and new unforeseen soils conditions so that he may make these F certifications. If substandard conditions (questionable soils, adverse weather, poor moisture control, inadequate compaction, etc.) Are encountered, the Soils Engineer will be empowered to either stop construction until conditions are remedied or recommend rejection of the • ork. Soil tests used to determine the degree of compaction will be performed in accordance with the following American Society for Testing and Materials (ASTM) test methods: x *Maximum Density & Optimum Moisture Content (ASTM D-155 * Density of Soil In -Place (ASTM D -1556 or ASTM D -2922 & 30 7) i 3. MATERIALS j Those soils used as fill will have a minimum of forty percent (40 %) passin a #4 sieve. They will be free of vegetable matter or other deleterious substances and contair no rock over 6 inches in size. Should unsuitable material be encountered, the Soils Engine er will be contacted to provide recommendations. APPENDIX `B' NORTH COUNTY COMPACTION ENGINEERING, INC. 1 4. PLACING AND SPREADING OF FILL The selected fill material shall be placed in layers which when compacted will not exceed 6 inches in thickness. } Each layer shall be spread even) and shall be thoroughly blade mixed du in the s readin to } Y P Y g Y g P g insure uniformity of material in each layer. When moisture content of the fill material is below that recommended by the Soils Engineer, water shall then be added until the moisture content is as specified to assure thorough bonding during the compacting process. When the moisture content of the fill materials is above that recommende I by the Soils Engineer, the fill material shall be aerated by blading or other satisfactory methods until the i moisture content is as specified. A 5. COMPACTION After each layer has been placed, mixed, and spread evenly, it shall be th oughly compacted to not less.than ninety percent (90 %) relativ:; compaction. Compaction shall be by sheepsfoot - rollers multiple -wheel pneumatic tired rollers or other types of rollers. Rolling shall be accomplished while the fill material is at the specified moisture content. Rolling each layer shall be continuous over it's entire area and the roller shall maI e sufficient trips to insure that the desired density has been obtained. The fill operation shall be continued in 6 inch compacted layers, or as spe ifred above, until the fill has been brought to the finished slopes and grades shown on the proje t plans. 6. WALL BACKFILL Backfrll soils should consist of non - expansive sand, Compaction should b achieved with light nand -held pneumatic tampers to avoid over compaction and hence cause s ructural damage. Wall backfill should be compacted to a minimum of ninety percent (90 %) of maximum density. 7. TRENCH BACKFILL 1 All trench backfill located within structural areas should be compacted to 1 minimum of ninety percent (90 %) of maximum density. APPENDIX `B' NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText