2000-6599 G ENGINEERING SERVICES DEPARTMENT r City Of Capital Improvement Projects District Support Services Encinitas Field Operations Sand Rep lenishment/Stormwater Compliance Subdivision Engineering Traffic Engineering July 22, 2002 Attn: Federal Insurance Company John Burnham Insurance Services 750 B Street, Suite 2400 San Diego, California 92101 Attn: Dale Harshaw RE: Grant, James and Kimberly APN 264 - 091 -30 Grading Permit 6599 -G 3434 Lilac Summit Final release of security -labor and materials Permit 6599 -G authorized earthwork, storm drainage, and erosion control, all needed to build the described project. The Field Operations Division has approved the rough grading. Therefore, release of the security deposit is merited. Performance Bond 8183- 30 -00, in the amount of $37,404.00, is hereby fully exonerated. The document original is enclosed. Should you have any questions or concerns, please contact Debra Geishart at (760) 633- 2779 or in writing, attention this Department. Sincerely, Masih Maher L she Suelter Senior Civil Engineer Financial Services Manager Financial Services Cc: Leslie Suelter, Financial Manager Grant, James and Kimberly file enc. TEI. 760- 633 -2000 FAX - 60- 633 - 2627 W5 S. Vulcan Avenue, Encinitas. California 92024 - 3633 TDD 7(i0 633 -2700 �� recycled paper CITY OF ENCINITAS APPLICANT SEC URI Y DEPOSIT RELEASE Depositor Name � A r Vendor No. Address: /% Phone N State Zip DEPOSIT DESCRIPTION: L MEMO PROJECT NUMBER 2. RELEASED AMOUNT: 3. DEPOSIT BALANCE: $ Not ' / AUTHORIZATION TO RELEASE: Project Coordinate r ate - Q� Supervisor Date Department Head Date DEPOSIT BALANCE CONFIRMED: Finance Dept Date GENERAL PROJ. # BRIEF DESCRIPTION AMOUNT LEDGER # (25 Characters limit) 101-0000-218.00-00 ------ Securi tY Deposit osit - TOTAL $ I HEREBY CERTIFY THAT THIS CLAIM REPRESENTS A APPROVED FOR PAYMENT JUST CHARGE AGAINST THE CITY OF ENCINITAS PROCESSED BY DEPARTMENTAL APPROVAL FINANCE DATE OF REQUEST DATE CHECK REQUIRED Next Warrant DATE DEPRLSE.doc 8/19/98 ENGINEERING SERVICES DEPARTMENT c ity of Capital Improvement Projects Encinitas District Support Services Field Operations Sand Replenishment/Stormwater Compliance Subdivision Engineering Traffic Engineering November 7, 2000 James Edward Grant Kimberly A. Grant 2514 La Golondrina St. Carlsbad, CA 92009 Re: Tract 88 -183 (TM) "Wildflower Estates: Lot 7 Grading Application 6599GR (Modify driveway @ 3434 Lilac Summit} A.P.N. 264- 091 -30 -00 Permit issuance requirements This letter shall serve to briefly summarize the Grading Permit process. Drawing 6599 -G has been approved by the Director of Engineering Services, effective November 7, 2000, and will remain valid for three years. In order to obtain a Grading Permit to construct per this Drawing, you will need to satisfy the following requirements: (1) Post a Security Deposit in the amount of $46,755.00 to guarantee performance of earthwork, storm drainage, site retaining walls, surfacing, and erosion control. Up to eighty percent of the amount may be in the form of a performance bond issued by a State of California licensed surety company. Twenty percent has to be in the form of cash, certificates of deposit, a letter of credit, or an assignment of account, any of which may be used for the full amount. Any financial instrument's format is subject to approval. Complete the Security Obligation Agreement. (2) Pay a non - refundable Inspection Fee of $2,338.00 and a Flood Control Fee of $756.00 (3) Provide 4 blueline prints of the approved Drawing 6599 -G. Once a plan is approved, it becomes public property and can be only released to the Engineer of Work for revisions or an approved reprographics (i.e., blueprint) company for duplication. (4) Provide the name, address, telephone number, and state license number of your construction contractor. (5) Provide a work schedule. (6) Sign the Permit. Any authorized representative of the property owner may sign. Permits typically expire no later than one year from the date of issuance. Once the Grading Permit is issued, advance notice of 48 hours must be given prior to you or your contractor scheduling the mandatory pre- construction conference. See Grading Note #9. Construction changes, prepared by the Engineer of Work, should be submitted to the Engineering Services Department as redlined mark -ups on 2 blueline prints of the approved Drawing. Changes are subject to approval prior to field implementation. MM /dt/j sg /f: grading /grnew /gr65 99 i.doc 1 TEL 760-633-2600 / FAX 760 - 633 -2627 505 S. Vulcan Avenue, Encinitas, California 92024 -3633 TDD 760- 633 -2700 � recycled paper Received 9/ 8 /00 4:20PMJI ; GRANT GENERAL CONTRACIOR; flag'_ 2 Sent By: ADKAN ENGINEERS; 909 688 0599 Sep -8 -00 4:17PM; Pagk� 2/2- ad i .ffl MMMqft in l kez _ C IVIL E - SURVEYING • PLA 6 820 AIRPORT DRIVE, RIVERSIDE, CA 92504 TEL: (909) 688 -0241 - FAX: (909) 688 -0589 E -MAIL: adkanOearthlink.net September 8, 2000 Mr. Alan D. Archibald CITY F ENCINITAS CITY ENGINEER 505 S. Vulcan Avenue Encinit s, CA 92024 Regard ng: Lot 7, Tract No. 12882 Subject On -Site Hydrology Dear M i . Archibald: Please accept this letter as a. response to a request for a hydrology study on the above referenced lot. The lot exist as a rough graded pad and the elevations and facilities, as proposed on the rough grading plan, have bet n .field checked and verified. The drainage facilities, as constructed, are adequate for the propo5cd residence, as that was the original intent for the lot. The only proposed grading, per this plan, is the relocation of the driveway and precise grading, typical for residential construction. Il is ass ed that the original study, prepared for the Project, was for the intended for residential use. With that in mind, we arc of the opinion that the proposed plan submitted for lot 7 exceeds the original intent fo the lot and that the facilities are adequate as constructed. Thank -y u for your consideration. Please contact me if you have any questions or need any further informa on. Respect ally, ad an EA tG11 V1 7t S K_ � C ARl 'A LEACH, P.E- Vice Pre ident '' h x No: C 2S .m F. H Mr. & Mrs. Grant 2514 La Golonrina St. Carlsbad, CA 92009 Subject: Update Letter & Seismic Design Considerations Proposed Single Family Dwelling Lot No. 7 of Wildflower Estates Olivenhain, California Reference: 1.) "Preliminary Soils Investigation" prepared by North County Compaction Engineering, Inc., stated July 8, 1996 2.) "Report of Certification of Compacted Fill Ground" prepared by North County 'Compaction Engineering, Inc., dated May 6, 1997 3) "State%gent of Soil Liquefaction", Lot No.'s 1 through 22 of Wildflower � , r - Estates, prepared by North County Compaction Engineering, Inc. dated August 24,'1998x„ Dear Mr. & Mrs Grant Pei the request of Jo Beny, Project Architect, we have visited the subject protect for e purpose.of updating a above ieference' soil reports: `In addition we are providing herein soil parameters for seisiniedesign considerations required by the 1997 Uniform Building Code. Our site inspection of June 9, 2000 revealed the existing building pad and soils conditions remain as presented in Reference No.2. Therefore, all foundations should be designed and constructed in accordance' with Recommendation ` .'6B2 Foundations" of Reference No. 1 Seismic Design Considerations (Soil Parameters) A.) Soil Profile ° SD (Table 16 -J of the 1997 Uniform Building Code) B.) Type `B' Fault (Rose Canyon) f ; C) Distance i p lan (California Department of Conservation, Division of Mines . }. and Geology [maps] in conjunction with Tables 16 -S and 6-T of the 1997 + mf La Code /A' rya' -^ l t > a d e' hr. y ay, .ac •� .t "} , tG k ' - O x .rR -gage In summary, recommendation in above referenced soils reports should be considered valid and additional information presented herein should be incorporated into the design and construction phase of the subject project. If you have any questions, please do not hesitate to contact us. This opportunity to be of service is sincerely appreciated. Respectfully submitted, North County e?E R A / ��'�l COMPACTION ENGINEERING, INC. FC�� Fy No. 713 c� Z w x 9/30 /Q1 O GQ' Ronald K. Adams Dale R Re President Registered Ci gh 3 Geotechnical Ef veer . 0713 . pal cc: (3) submitted r . I r � y � r � P I 1 � �.. "f•� . S �� .,�a r ji y �,. Y�.+%e* � ° ,; r ! - v a NORTH COUNTY COMPACTION ENGINEERING, INC. PRELIMINARY SOILS INVESTIGATION for PROPOSED SINGLE FAMILY DWELLING Lot No_ 7 of Wildflower Estates Encinitas, California Prepared for Al Mayo 1772 Kettering Irvine, CA 92714 - July 8, 1996 Project-No. CE -5251 P.O. BOX 302002 • ESCONDIDO, CA 92030 (619) 480 -1116 r NORTH COUNTY COMPACTION ENGINEERING, INC. TABLE, OF CONTENTS Page 1. Purpose and Scope 1 2. Location and Description of Site 1 3. Field Investigation 1 4. Soil Conditions 2 5. Laboratory Soil Testing 2 6_ Recommendations and Conclusions 3 A. Grading 3 B. Foundations 5 C. Estimated Settlement 7 D. Slopes 8 E. Estimated Paving Section 8 E. Review of Grading Plan 9 7. Uncertainty and Limitation 9 APPENDIX Appendix A: Exploration Legend & Unified Soil Classification Chart Plate No_ One Test Pit Location Plan Plate No. Two & Three Exploration Log Plate No. Four Tabulation of Test Results Appendix B: Recommended Grading Specifications NORTH COUNTY COMPACTION ENGINEERING, INC. July 8, 1996 Project No. CE -5251 Page 1 1. PURPOSE AND SCOPE The purpose of the investigation was to determine if the site is, suitable for the proposed single family dwelling. The scope of the investigation was to: A. Determine the physical properties and engineering characteristics of the surface and subsurface soils. B. Provide design information with regard to grading, site preparation and foundation design of the pro- posed structure(s). 2. LOCATION AND DESCRIPTION OF SITE The site is located off Lilac Summit Drive in the City of Encinitas, California and has been designated as Lot No. / of the Wildflower Estates subdivision. 7 The 1.51 acre trapazoidal shaped lot is bordered by vacant subdivision Lot #6 to the west, Lot #8 to the east., Lilac Summit Drive to the south, and the subdivision boundry to the north. Site topography consists of a moderate hillside sloping downhill to the north and northwest. The total difference in elevation at the property is approximately 72 feet and varies between elevation 330 feet (MSL) and 268 feet (MSL). Vegetation consists of recently disced native grasses and brush. Particles of fractured rock and rock outcroppings are apparent throughout the site and adjacent properties. An existing sewer easement parallel the north property line. 3. FIELD INVESTIGATION The field investigation was performed on June 6, 1996 and included an inspection of the site and the excavation of two exploratory trenches with a backhoe to depths of 5 feet. Location of test pits are shown on the attached Plate No. One, entitled "Test Pit Location Plan ''. NORTH COUNTY COMPACTION ENGINEERING, INC. July 8, 1996 Project No. CE -525 Page 2 As excavation proceeded, representative bulk samples were collected. in dace natural densities and moisture contents w.7 re determined at different depths in the excavations and are included on Plate No. 's Two & Three. Subsequent to obtaining soil samples, our exploratory excavations were backfilled. 4. SOIL CONDITIONS Loose surfiCiai soils ((_-1, =iyey- gavels and clayey - sands) consisting of plowed ground and alluvium were found to be 3 feet and 2.5 feet, in depth in Test Pit No. 's 1 & 2, respectively. Underlying native soils to depths explored were dense gravelly sands, and clayey - sands succeeded by very hard bedrock with little or no fines. Hard bedrock with little or no fines refused deeper exploration in Test Pit No. 2 at 5 feet in depth. Expansive soils possessing low to moderate swell potential were encountered in both test pit excavations. The on -site calyey -sands and clayey - gravels were found to have an expansion index of 40. Groundwater was not encountered at the time of our investigation, nor did caving of exploratory trenches occur. 5. LABORATORY SOIL TESTING All laboratory tests were performed on typical soils in accordance with accepted test methods of the American Society for Testing and Materials (ASTM). Tests conducted include: A) Optimum Moisture & Maximum Density (D -1557) B) Direct Shear (Remold) (D -3080) C) Sieve Analysis (D -422) D) Field Density & Moisture (D -1556) E) Expansion Potential (UBC 29C) Test results are tabulated on the attached Plate No.'s Two through Four, entitled ''Exploration Log & Tabulation of Test Results ". NORTH COUNTY COMPACTION ENGINEERING, INC. July 8, 1996 Project No. CE -5251 Page 3 6. RECOMMENDATIONS AND CONCLUSIONS "enera1 It is our understanding, wood frame construction with slab on grade foundations are planned. Furthermore, a future pool may be incorporated into the proposed residence. In our opinion, the site is suitable for the proposed single family residence. Recommendations contained in this report should be incorporated in the planning, design and construction phase of the subject project. 6A. Grading General it. is gilt liT1d it tnd1T "1g Cut /till 'art7lwi ConstruCtlOi1 W? 11 be performed to create a level building pad to accommodate slab on grade construction. Due to concerns with regard to the prevailing expansive soil conditions in conjunction with the displacement of oversize rock particles, our initial recommendation is the building pad be graded to the point of rock demolition or lack of fill -fines, then elevated and capped with a minimum of 48 inches of non - expansive imports soils. The cap should be constructed under and a mir:im:a.rn - 10 feet beyond the proposed building footprint. In our opinion, the cap will be beneficial for the following reasons= 1). Reduce structural damage from the effects of expansive soils. 2). Provide a uniform bearing cap, thus reducing structural damage occurring from differential settlement. 3). Generate less oversize rock that will need to be disposed of and reduce rock demolition. 4) . Provide uniform trenching for plumbing and foundation excavations. 5). Increase the allowable soil bearing pressure. All grading should be performed in accordance with the City of Encinitas Grading Ordinance and the Recommendations /Specifications presented in this report. NORTH COUNTY COMPACTION ENGINEERING, INC. July 8, 1996 Project No. CE -5251 Page 4 Subsequent to site demolition, loose surficial top soils (plowed ground and alluvium) , as indicated on the attached Plate No.'s Two & Three, should be undercut or removed to firm native ground and recompacted in accordance with the attached Appendix 'B' entitled, "Recommended Grading Specifications ". Firm native ground may be determined as undisturbed soil having an insitu density of greater than 90 per -cent of maximum dry density. We should be contacted to document firm native ground is exposed and properly prepared prior to filling. Prior to constructing fill slopes, shear keys should be excavated a minimum of 2 feet into firm native ground, inclined back into slope and have a minimum width of 10 feet. We should be contacted to document keyways were properly constructed prior to placing fill. Natural terrain steeper than an inclination of 5:1 (horizontal to vertical units) , should be benched (stair- stepped) to provide stable bedding for subsequent fill. Sizing of benches should be determined by the soils engineer or his representative during grading. All fill soils generated from earthwork construction should be Placed in conformance with the attached Appendix, 'B' entitled, ''Recommended Grading Specifications ". Oversized rock particles with a diameter greater than 12 inches should be sorted out of structural fill material and disposed of in special non - structural fill areas designated by the soils engineer or his representative at the time of grading. Oversized rock Particles should be mixed with a substantial amount of fines, well watered and mechanically compacted to minimize the probability of subsidence. No rock should be nested, nor particles of rock greater than 36 inches in diameter be utilized in non - structural fills. Particles of rock greater than 36 inches should be hauled off -site and /or used above grade for landscape purposes. All non - structural fill placement should be supervised by the soils engineer or his representative. No structure should be built within 15 feet of any designated non - structural area. Soils to be imported should be non- expansive (less than 2% swell) And granular by nature, having strength parameters to adequately support the proposed loads. We should be contacted to inspect and /or test imported soils prior to hauling them on -site to assure they will be suitable for the proposed construction. NORTH COUNTY COMPACTION ENGINEERING, INC. July 8, 1996 Project No. CE -5251 Page 5 In the event it is decided to construct a non - expansive bearing cap, the contact between the cap and the native clay soils should be graded to drain a minimum of 2 percent fall to daylight. In our opinion, this will reduce the probability of water build up and /or becoming trapped between permeable sandy material and an imperm- eable clayey material. In the event 2 percent fall cannot be achieved, subdrains may be required to provide a well- drained cap. We should be contacted to inspect drainage and /or drains prior to placing and compacting cap materials. In the event a non - expansive bearing cap is not constructed, it is highly probable the proposed structure will be traversed by a transition from cut to fill. Therefore, to reduce structural damage occurring from foundations bearing on two different soils types, the following measure should be employed. It is recommended the cut side of the transitional areas be removed to a depth of 1 foot below the bottom of the deepest proposed footing and brought back to grade with properly compacted fill. This will allow the proposed structure to bear entirely on a compacted fill mat, thus reducing the probability of differential settlement. The removal area should extend under a minimum of 10 feet beyond the proposed dwelling. Thought should be given to the depth and location of the future pool. It is recommended during grading operations (when larger equipment is available) the pool pad be over- excavated to a depth of 1 foot below the pool bottom and brought back to grade with compacted fill soil. This will allow easy excavation during construction of the pool. Pool decks, hardscape, etc. should be capped with a minimum of 2 feet of non - expansive soil. The pool will most likely protrude into on -site expansive soils and should be designed accordingly. 6B. Foundations General In the event the building area is capped with non - expansive imported soils and in accordance with the aforementioned grading recommendations, the following foundation design criteria may be utilized. N ORTH COUNTY COMPACTION ENGINEERING, INC. July 8, 1996 Project No. CE -5251 Page 6 For One -Story Construction: Continuous footings having a minimum width of 12 inches and founded a minimum depth of 12 inches below lowest adjacent grade will have an estimated allowable soil bearing pressure of 2000 lbs. per square foot. For Two -Story Construction: Continuous footings should have a minimum width of 15 inches and be founded a minimum depth of 18 inches below lowest adjacent grade. Isolated square footings having a diameter of 18 inches and founded a minimum depth of 18 inches below lowest adjacent grade will have an estimated allowable soil bearing pressure of 2000 pounds per square foot. All continuous footings are to be reinforced with one #4 bar top and bottom. Steel should be positioned 3 inches above bottom of footing and 3 inches below top of footing. In the event structures will be founded on fill soils in excess of 15 feet in depth, steel should be increased to a minimum of one #5 bar top and bottom and /or per the recommendation of the project structural engineer. Slabs should be a minimum of 4 inches thick and reinforced with #3 bars on 18 inch centers (both ways). Steel should be positioned at mid height of slab thickness. Slab underlayment should consist of 4 inches of washed concrete sand with a visqueen moisture barrier positioned at mid -point of sand (2 inches sand, visqueen, 2 inches sand). Sand should be tested in accord -ante with ASTM D -2419 to insure a minimum sand equivalent of 30. 6B2) Foundations (First Alternative) General_ -� In the event it is decided not to construct a non- expansive bearing cap, the following recommendations should be employed with regard to low to moderate expansive soils to reduce the probability of structural damage occurring from excessive foundation and subgrade movement. NORTH COUNTY COMPACTION ENGINEERING, INC. July 8, 1996 Project No. CE -5251 Page 7 Continuous footings having a minimum width of 12 inches and founded a minimum of 24 inches below lowest adjacent grade will have an allowable soils bearing pressure of 1500 pounds per square foot. All continuous footings are to be founded a minimum of 24 inches below lowest adjacent grade and reinforced with one #5 bar top and bottom. Steel should be positioned 3 inches above bottom of footing and 3 inches below top of footing. Interior slabs should be a minimum of 4 inches thick and reinforced with #3 bars on 18 inch centers both ways. Steel should be Positioned at mid - height of slab thickness. Slab underlayment should consist of visqueen installed within a 4 inch sand barrier (2 inches sand, visqueen, 2 inches sand). Sand should be tested in accordance with ASTM D -2419 to insure a minimum sand equivalent of 30. Clayey soils should not be allowed to dry prior to placing concrete. They should be watered to insure they are kept in a very moist condition or at a moisture content exceeding optimum moisture content by a minimum of 5%, 6B3) Post - Tension Slab & Foundation (Second Alternative) An alternate construction method to the above expansive soils recommendations would be to have the slab designed as a post- tension concrete system. The design should be performed by a licensed engineer engaged in this type of design and who has a minimum of 5 years experience. A post - tension design may prove to be cost - effective. Continuous footings having a minimum width of 12 inches and founded a minimum of 24 inches below lowest adjacent grade will have an allowable bearing pressure of 1500 pounds per square foot. Prior to placing concrete, clayey subgrade soils should be watered to insure they are kept in a very moist condition or at a moisture content exceeding optimum moisture content by a minimum of 5 %. 6C. Estimated Settlement Preliminary consolidation tests performed randomly on neighboring lots within the subdivisionon indicate that total and /or differential settlement should be within tollerable limits. NORTH COUNTY COMPACTION ENGINEERING, INC. July 8, 1996 Project No. CE -5251 Page 8 However, due to uncertainties with regard to the proposed fill depth and settlement characteristics of soils to be imported, settlement of fill soils cannot be accurately calculated at this time. Therefore, upon further consolidation testing of soils to be imported, our firm will determine estimated settlement and whether or not a settlement monitoring program will be required upon completion of grading. 6D_ Slopes Cut and compacted fill slopes constructed to maximum heights of 25 feet with minimum slope ratios of 2:1 (horizontal to vertical units) will be stable with relation to deep seated failure, Provided they are properly maintained. During grading, positive drainage away from top of slopes should be provided. Subsequent to completion of grading, slopes should be planted, as soon as Possible, with light groundcover indigenous to the area. It should be noted, out of slope slip planes are common to the area. Although potential slip planes were not encountered during our investigation, further inspection of cut slopes during grading will be warranted to assure adverse slope bedding planes do not exist. (Clay seems comprised of slicken sided siltstone or clay stone) 6E_ Estimated Paving Section Structural section for asphaltic paving for the proposed driveways and parking area are based on an estimated subgrade R -value of 10. The following section is provided for bid purposes only. Actual sections should be determined subsequent to completion of grading operations. Assumed Traffic Index = 4.5 (Light Vehicular Traffic) 3 inches of asphaltic paving on 8 inches of Class II base on 8 inches of recompacted native subgrade. All materials and construction for asphaltic paving and base should conform to the Standard Specifications of the State of California Business and Transportation Agency, Department of Transportation, Sections 39 and 26, respectively. All materials should be compacted to a minimum of ninety -five percent (95 %). NORTH COUNTY COMPACTION ENGINEERING, INC. July 8, 1996 Project No. CE -5251 Page 9 6F. Review of Grading Plan Approved site and grading plans were not available at the time of our investigation. Therefore, upon their completion, we would like to review them to assure compliance with the recommendations presented in this report. 7. UNCERTAINTY AND LIMITATION Surface and subsurface soils are assumed to be uniform. Therefore, should soils encountered during construction differ from those presented in this report, we should be contacted to provide their engineering properties. It is the responsibility of the owner and contractor to carry out recommendations set forth in this report. During our investigation of the subject site, evidence of faulting was not encountered. Subsequent to review of available geologic literature, we feel any faulting in the vicinity of the site may be classified as inactive. However, it should be noted that San Diego County is located in a high seismic area with regard to earthquake. Earthquake proof projects are economically unfeasible. Therefore, damage as a result of earthquake is probable and we assume no liability. We assume the on -site safety of our personnel only. We cannot assume liability of personnel other than our own. It is the responsibility of the owner and contractor to insure construction operations are conducted in a safe manner and in conformance with regulations governed by CAL -OSHA and /or local agencies. Should you have any questions, please do not he to contact US. This opportunity to be of service is si 0��$j� iated. Respectfully submitted �Q.flG ERRS F� North County czi COMPACTION ENGINEERING, INC. w N .G E713 Ronald K. Adams Dale R. e \G��2 President Register 19393 Geotechnic 000713 RKA: kla cc: (3) submitted • 1 NORTH COUNTY COMPACTION ENGINEERING, INC. EXPLORATION LEGEND UNIFIED SOIL CLASSIFICATION CHART SOIL DESCRIPTION GROUP SYMBOL TYPICAL NAMES I. COARSE GRAINED: More than half of material is larucr than No. 200 sieve size. GRAVELS CLEAN GRAVELS GW Well graded gravels, gravel -sand More than half of coarse fraction mixtures, little or no fines. is larger than No. 4 sieve size, but smaller than 3 ". GP Poorly graded gravels, gravel sand mixtures, little or no fines. GRAVELS WITH FINES GM Silty gravels, poorly graded gravel - (Appreciable amount of fines) sand -silt mixtures. GC Clayey gravels, poorly graded gravel -sand, clay mixtures. SANDS CLEAN SANDS SW Well graded sand, gravely sands, More than half of coarse fraction little or no fines. is smaller than No. 4 sieve size. SP Poorly graded sands, gravely sands, little or no fines. SANDS WITH FINES SM Silty sands, poorly graded sand and (appreciable amount of fines) silt mixtures. SC Clayey sands, poorly graded sand and clay mixtures. II. FINE GRAINED: More than half of material is smaller than No.200 sieve size. SILTS AND CLAYS ML Inorganic silts and very fine sands, rock flour, sandy silt or clayey - silt- sand mixtures with slight plasticity. Liquid Limit CL Inorganic clays of low to medium less than 50 plasticity, gravely clays, lean clays. OL Organic silts and organic silty clays of low plasticity. SILTS AND CLAYS MH Inorganic silts, micaceous or diatomaceous find sandy or silty soils, elastic silts. Liquid Limit CH Inorganic clays of high plasticity, greater than 50 fat clays. OH Organic clays of medium to high plasticity. HIGHLY ORGANIC SOILS PT Peat and other highly organic soils. US - Undisturbed, driven ring sample or tube sample CK - Undisturbed chunk sample BG - Bulk sample V - Water level at time of excavation or as indicated APPENDIX `A' NORTH COUNTY COMPACTION ENGINEERING, INC. SOIL TESTING & INSPECTION SERVICES TEST PIT LOCATION PLAN PROPOSED SINGLE FAMILY DWELLING Lot #7 of Wildflower Estates Encinitas, California — _Sewer Easement G Approx. Scale 50t (LOT #6) (LOT #7) (LOT #8) r 1 P Test Pit Lilac Summit Road PROJECT NO. CE -5251 PLATE NO. ONE NORTH COUNTY COMPACTION ENGINEERING, INC. SOIL TESTING & 1NSPECIION SERVICES EXPLORATION LOG PROJECT NAME LOT #7 WILDFLOWER ESTATES DATE LOGGED 06/06/96 ELEVATION 318 MSL TEST PIT NO. ONE 0 0 ° a - 0 - Description & Remarks a E o s E cn o d U o � m SC BROWN, DRY, LOOSE, SILTY- CLAYEY- SAND WITH ROCK FRACTURES. 1_ (PLOWED GROUND /ALLUVIUM) 2- (12" DIAMETER ROCK PARTICLES) BG 30.5 2.5 3 GP GRAY, DRY, VERY DENSE SILT-SAND- GRAVEL MIXTURE. 4- I (NATIVE) (BEDROCK WITH LITTLE FINES) I i BOTTOM OF TEST PIT. I I i I PROJECT NO. CE -5251 PLATE NO. TWO NORTH COUNTY COMPACTION ENGINEERING, INC. SOIL TESTING & INSPECTION SERVICES EXPLORATION LOG PROJECT NAME LOT #7, WILDFLOWER ESTATES DATE LOGGED 06/06/96 ELEVATION 274 MSL TEST PIT NO. TWO CD O -- a a � o ° - �, � o - Description & Remarks t n c � ° . ° > cn a E o Cu a 0 4 E U BG 35.3 6" GC GRAY BROWN, DRY, LOOSE, CLAYEY - GRAVEL. 1- (PLOWED GROUND) (24" DIAMETER ROCK PARTICLES) 2- GP GRAY, DRY, VERY DENSE, SILT -SAND- 3- GRAVEL MIXTURES. (WEATHERED) (NATIVE) 4- (24" DIAMETER ROCK PARTICLES) 5- BOTTOM OF TEST PIT. (BACKHOE REFUSAL- VERY DENSE BEDROCK WITH LITTLE OR NO FINES.) PROJECT NO. CE -5251 PLATE NO. THREE NORTH COUNTY COMPACTION ENGINEERING, INC. TAB ION OF TEST RESU OPTIMUM MOISTURE /MAXIMUM DENSITY SOIL DESCRIPTION TYPE MAX. DRY DENSITY OPTIMUM MOISTURE (lb /cu. ft. ) (% dry wt) Brown Silty- Clayey- Sand with Gravel P1 @ 2.5' 132.0 10.0 EXPANSION POTENTIAL SAMPLE NO. P1 @ 2.5' CONDITION Remold 90% INITIAL MOISTURE ( %) 9.6 AIR DRY MOISTURE ( %) 5.1 FINAL MOISTURE ( %) 17.0 FINAL DRY DENSITY (pcf ) 118.8 LOAD (psf) 150 SWELL ( %) 4.0 EXPANSION INDEX 40 DIRECT SHEAR SAMPLE N0. Pl @ 2.5' CONDITION Remold 90% ANGLE INTERNAL FRICTION 26 COHESION INTERCEPT (PCF ) 310 PROJECT NO. CE -5251 PLATE N0. FOUR NORTH COUNTY COMPACTION ENGINEERING, INC. RECOMMENDED GRADING SPECIFICATIONS (General Provisions) 1. INTENT The intent of these specifications is to provide general procedures in accordance with current standard practices regarding clearing, compacting natural ground, preparing areas to receive fill and placing and compacting of fill soil to the lines, grades and slopes delineated on the project plans. Recommendations set forth in the attached "Preliminary Soils Investigation" report and /or special provisions are a part of the "Recommended Grading Specifications" and shall supersede the provisions contained hereinafter in the case of conflict. 2. INSPECTION & TESTING A qualified soils engineer shall be employed to inspect and test the earthwork in accordance with these specifications and the accepted plans. It will be necessary that the soils engineer or his representative be allowed to provide adequate inspection so that he may certify that the work was or was not accomplished as specified or indicated. It shall be the responsibility of the con- tractor to assist the soils engineer and to keep him appraised of work schedules, changes, new information and dates, and new unfore- seen soils conditions so that he may make these certifications. If substandard conditions (questionable soils, adverse weather, poor moisture control, inadequate compaction, etc.) are encount- ered, the soils engineer will be empowered to either stop con- struction until conditions are remedied or recommend rejection of the work. Soil tests used to determine the degree of compaction will be performed in accordance with the following American Society for Testing and Materials (ASTM) test methods: • Maximum Density & Optimum Moisture Content - ASTM D- 1557 -78 • Density of Soil In -Place - ASTM D -1556 or ASTM D- 2922 & 3017 3. MATERIALS Those soils used as fill will have a minimum of 50% passing a #4 sieve. They will be free of vegetable matter or other deleterious substances and contain no rock over 12 inches in size. Should unsuitable material be encountered, the soils engineer will be contacted to provide recommendations. APPENDIX 'B' i NORTH COUNTY COMPACTION ENGINEERING, INC. 4_ PLACING AND SPREADING OF FILL The selected fill material shall be placed in layers which when compacted will not exceed 6 inches in thickness. Each layer shall be spread evenly and shall be thoroughly blade mixed during the spreading to insure uniformity of material in each layer. When the moisture content of the fill material is below that recom- mended by the soils engineer, water shall then be added until the moisture content is as specified to assure thorough bonding during the compacting process. When the moisture content of the fill material is above that recom- mended by the soils engineer, the fill material shall be aerated by blading or other satisfactory methods until the moisture content is as specified. 5. COMPACTION After each layer has been placed, mixed and spread evenly, it shall be thoroughly compacted to not less than ninety percent (90 %) relative compaction. Compaction shall be by sheepsfoot rollers, multiplewheel pneumatic tired rollers or other types of rollers. Rolling shall be accomplished while the fill material is at the specified moisture content. Rolling of each layer shall be con- tinuous over its entire area and the roller shall make sufficient trips to insure that the desired density has been obtained. The fill operation shall be continued in 6 inch compacted layers, or as specified above, until the fill has been brought to the finished slopes and grades shown on the project plans. 6. WALL BACKFILL Backfill soil should consist of nonexpansive sand. Compaction should be achieved with light hand -held pneumatic tampers to avoid over compaction and hence cause structural damage. Wall Backfill should be compacted to a minimum of ninety percent (90 %) of maximum density. 7. TRENCH BACKFILL All trench Backfill located within structural areas should be compacted to a minimum of ninety percent (90 %) of maximum density. APPENDIX 'B'