Loading...
7358 POLE SCHEDULE FUTURE IMPROVEMENT CONDUCTOR SCHEDULE COMA T SIZE RUN STANDARD SIGNAL MOUNTING PP8 PLACEMENT REMARKS F' INSTALL TRAFFIC SIGNALS. SAFETY LIGHTING, AND ASSOCIATED EQUIPMENT Log R _ AN CO AWG CIRCUIT 3'C 3"C 3' 3'C 2 - 3' TO PERFORM THE FUNCTIONS SHOWN AND CALLED OUT ON THESE PLANS. y PIED A TYPE HEIGHT SIM M.A. LUM. M.A. VEHICLE P PHASE 8 T HIS BASSED ON DATA BY�T�HE CUT OFF AND INSPECTED BY THE CITYS RESIDENT ENGINEER. FOR GARDEN EXISTING TO FUTURE CONSTRUCTION, LOCATION 01= FACILITIES MUST BE SPECIFICATIONS OA 26 -4 -70 30' 55' 10' 180W MEW ROAD 3 -MAS SV -1 -T SP -2 -T 2&8 EXIST. EXIST. _ REMAIN Y VERIFIED IN THE FIELD. : # _ _ _ _ CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS O 15 30' - 10' 180W - - SV -1 -T SP -1 -T 2 EXIST. EXIST. EXISTING TO �.; _ _ DATED JULY 1992. STANDARD SPECIFICATIONS FOR PUBLIC WORKS REMAIN _ _ _ _ _ CONSTRUCTION (1991 EDITION) /+ © 24 - -70 30 35' 10' 180W GARDEN VIEW ROAD 2 -MAS SV -2 -T - - EXIST. EXIST. SEE NOTE 1 G AS -BUILT MAFTIN>G fi SYSTEMS ASSOCIATES, INCA _ _ - 3 STANDARD PLANS / DRAWINGS / PROCEDURES Ik MANUALS @ 19-2-70 30' 30' - - EL CAMINO 1 -MAS SV -2 -T SP -1 -T 8 EXIST. EXIST. SEE NOTE 2 / _ _ _ L � /Z //0 7 #14 CALIFORMA DEPARTMENT OF TRANSPORTATION STANDARD' PLANS DATE 24 -5--70 30 55' 10 180W GARDEN 3 -MAS SV -1 -T - - 16' 7' SEE NOTE 3 GA _ E' _ _ _ _ JULY 1992. CALIFO DEPARTMENT OF TRANSPORTATION. 'MANUAL OF MEW ROAD ANDREW F 3� CHtP�..- DATE _ _ TRAFFIC CONTROL FOR CONSTRUCTION AND MAINTENANCE WORK ZON 29 -5-70 31Y 50' _ _ EL CAMINO 1 -MAS SV -1 -T - - 17' 7' SEE NOTE 4 _ - 2 (1990 EDITION) REAL - O 1A 1 0' - - - - - SV -1 -T SP -1 -T g 25' 3' SEE NOTE 6 DETAIL 48 _ - - - z CAUFO DEPARTMENT OF TRANSPORTATION TRAFFIC MANUAL TION COMMON , 4 SECTIONS R. S. N. S. = REFLECTIVE STREET NAMES (DIAMOND GRADE) GENERAL NOTES CONTINUED: - 41 } GENERAL NOTES - _ - _ 1 TYPICAL POLE PLACEMEN� 2 ALL STRIPING AND PAVEMENT MARKING REMOVAL IS TO BE DONE BY 8 6 1. TRAFFIC SIGNAL CAN BE TURNED OFF BETWEEN THE HOURS OF 9 AM AND CONTRACTOR BY SANDBLASTING. - TYPE - - - - 4 3:30 PM DURING CONSTRUCTION. ALL-WAY STOP AND STOP AHEAD SIGNS 3. ALL SALVAGE MATERIAL SHALL BE DEUVERED M THE CITY OF ENCINlITAS 8 - - - SHALL BE IN PLACE WHEN SIGNAL IS OFF. MAINTENANCE YARD AS DIRECTED BY THE CITY ENGINEER. - OLC - - ANY TIME THE EXISTING SIGNAL IS TO BE TURNED OFF, TRAFFIC AND THE CITY - 17 TRAFFIC ENGINEER ENFORCEMENT PERSONAL (POLICE) SHALL BE NOTIFIED 48 4. DAMAGED DETECTOR LOOPS SHALL BE REPLACED PER CALTRANS STANDARD _ = A HOURS IN ADVANCE AND BE PRESENT TO DIRECT TRAFFIC AS MAY BE REQUIRED SPECIFICATIONS (JULY 9. 1992) AND CALTRANS STANDARD n0 IN ORDER TO AVOID EXCESSIVE TRAFFIC DELAYS. 5. THE CITY TRAFFIC ENGINEER SHALL BE CONTACTED AT LEAST FIVE SI JA RMIYNT992). - `�� m T WORKING DAYS PRIOR TO ANY DISRUPTION OF NORMAL _ E - 6. ALL DETECTOR LOOPS. CONDUIT AND SIGNAL POLES. SHALL 9 • - - - - - __41 NOTE: PROPOSED CONSTRUCTION SHOWN DARK REPLACED AND OPERATIONAL WITHIN FIVE WORKING DAYS FROM ��� I SERVICE 2 2 - - 2 t EXISTING CONSTRUCTION SHOWN LIGHT OR DASHED INITIAL REMOVAL AND DISRUPTION 25' I T REFERENCE: DRAWING No. TM. 425'5 -1 SHEET 7 OF 8 (COUNTY OF SAN DIEGO) r - - - - - - - I T I 17' 2 "C, 2DLC s DETAIL A „ ' 30 , - 2 "C, 6oLc INSTALL 2 0 C, WITH 12 PAIR 119 INTERCONNECT 1 16 1 D1 t 2 "C, 1DL I EM ERGENCY VEHICLE PRE - E M P TI 0 N CABLE TO CONTROLLER CABINET AT EL CAMINO ( _ _ NOTE EXACT LOCATION �I'IY OiOMVEER DETECTOR ASSEMBLY R pft APPROX. 2 oo 0FT. _ -- - -___- _- -_ - - -_ AC BER g GAL. STEEL NIPPLE _ _ _ - - _ OE E DETECTOR ASSIGNMENT 3/4 L. REQUIRED - II RL P _ 08 (4 SECTION) s ©1 1 12 "C, 2D LENGTH 1 -5" 3/4" GAL. DETECTOR C � � _ C B _ _ _ _ _ - _ D /NC 3 . LC © ;� 1 1 /2 - C 1 DLC DETECTOR FIELD TERMINAL 1 _ J _ �� , B B AB PHA SLOT CONNECTIONS STEEL REDUCER EL { - - - - - - - - - - - - - - - _ _ NO. x-06 I N j \ \ I - I pp_ SIGNAL HEAD HOUSING S ( N T 9 8 - T ,e {_- i -- - -- - -- - - -- -- _ At 2 BACKPLATE _ _ - _ - EVPE +5 V6E 01 +6 I AB 1Z 1Z 1Z f� S 0 co J2U e CONSTRUCTION NOTES: - - - 1-- - - 7' L ! L C - _ I - �.� 255' TO 365' - 1. AT LOCATION C - ___ - -- _ - __- - -- IN�� I 13 13 49 13 � LIMIE LIMI REMOVE AND &WAGE EXISTING STANDARD AND ABANDON - - - - _ - - - - - N_ - T LINE - _ _ _ _ _ - _ _ _ - - _ _ - - - - - - - - - - - - - - - - - - _ & I EXISTING FOUNDATION. REUSE EXISTING SI AL HEADS,E.V.P.E.. - _ ��� _ - - - -- 7 - 7 - I Im - 14 � - - 1 - 28 - - - -- - - -- ---------- - - - - -- _ 11 k R.S.N.S. AND LUMiNAIRE ON STANDARDS Ct AS SHOWN. - - - _ - - - - 7 _ _ _ _ _ _ _ _ _ _ _ _ - - _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - w - _ -� N 2. AT LOCATION . - - - . 255' TO I 1 - REMOVE ANDS WAGE EXISTING STANDARD AND ABANDON - TO L MIT LINE �2 0 e M3 I CD EXISTING FOUNDATION, REUSE EXISTING SIGNAL HEADS, PED �\ LIMIT LINE I <2) -- - - -- - __��- N - -- - -- -- - + - PUSH LITTON, E.V.P.E. AND R.S.N.S. ON STANDARDS C1 < 1 v _ _ S S I I 2 - Cl .AND �E \i 1 _ _ _ - _ I 02 5 1 ti I I 3. AT LOCATION < A WARD 2 _ - •2 INSTALL NEW ON NEW FOUNDATION. REINSTALL < 1 _ _ _ - - - - I W EXISTING SIGNAL HEADS, LUMINAM E.V.P.L, AND R.S.N.S. FROM \i 1 _ _ _ - _ _ ► ¢2 4 4 4 1 STANDARD ©.REINSTALL EXISTING SIGNAL HEAD FROM STANDARD < 2 ^ 1 I T I T I I � DO ON NEW MAST ARM. < 1 1 2 �I 1 I L,r � R/W / v �1 11 A_C BERM 3 3 _ _ 3 _ I g 01 ( n, I PHASE DIAGRAM 4. AT LOCATION I r _ _ - , I INSTALL NEW AbARD ON NEW FOUNDATION. REINST EXISTING I _ - - - - _ _ _ _ T I� 1 _ _ - ''_ s � I 1 - SIGNAL HEAD E.V.P.E. AND R.S.N.S. FROM STANDARD D INSTALL _ - - - _ - � _ _ _ - - - _ NEW 4-12" (R. Y. G. GA) SIGNAL HEAD FOR PHASE 8 NEW MAST - - B _ _ E 2 3 4 I _ _ ARM AS SHOWN. _ _ - - - _ 1 ri I �� -90 B \ -a - _ I t° I �/ O i EXISTING 3 "C, WITH INTERCONNECT CABLE UWJSED UWJSED 5. AT LOCATION& ARD I - I - - 11 -.I I TO CONTROLLER CABINET AT EL CAMINO 5 8 7 8 INSTALL NEW ON NEW FOUNDATION. REINSTALL EXISTING - _ _ - EXIST. 1 O I - - REAL AND WOODLY/HOME DEPOT ACCESS. SIGNAL HEAD, PED HEAD, PUSHBUTTON FROM STANDARD OD . / " I I I 5 I 1 1/2 2DLC 1 1 2 C, 4DLC I 1 I II , - _ - _ J PER DRAWING NO. 3425 I. SCALE: 1 " =20' 8. INSTALL 18--W X d' LOOP DETECTORS FOR PHASE 2 AND 1 - 4' X 6' 1 1/2 "C, 1DLC EXIST. BIKE LOOP FOR PHASE INSTALL 4 X 6' LOOP DETECTOR FOR - 1 1/2 4DLC I I I 17> 1< I I GENERAL NOTES CONTINUED: PHASE 5. INSTALL 5 -d LOOP DETECTORS FOR PHASE 8. INSTALL EXIST. 12 -6' X d' LOOP DETECTORS AND 1 -4'Xd' BIKE LOOP FOR PHASE S. INSTALL = ADD 4DLC I I I I \4. I \/ I 13. THE CONTRACTOR IS FOR THE LAYOUT AND INSTALLATION OF LOOP FLA�MN�Ki OPERATION .SHALL RED M ALL PHASES." "'X6' LOOP DETECTORS FOR PHASE 1 AS SHOWN. ALL DETECTOR LOOPS 1 1 /2 - C, 4DLC I I I � I ' - _ ADD 2DLC DETECTORS, TRAFFIC STRIPING, PAVEMENT MARKINGS, PARKING REMOVAL AND TRAFFIC SHALL BE INSTALLED IN ACCORDANCE WITH STANDARD PLANS ES -5A AND ES -58. GENERAL NOTES CONTINUED: ADD 5 DLC 1 I I N I I . - I TO EXIST. SIGNING AS SHONM ON THESE PLANS AS ARE NECESSARY FOR THE SAFE AND EFFICIENT GENERAL NOTES CONTINUED: CONTRACTOR SHALL LAY OUT LOCATIONS OF LOOP DETECTORS. LOOP I I I II - ' I I CONDUIT MOVEMENT OF VEHICULAR TRAFFIC AND PEDESTRIANS. LOCATIONS SHALL BE APPROVED BY TRAFFIC ENGINEERING PRIOR TO 7. LOCATION OF ALL EXISTING UNDERGROUND UTILITIES SHOWN ARE APPROXIMATE. S W 1 ^ EM 20. PAVEMENT MARKING REMOVAL AND TRAFFIC STRIPING REMOVAL SY 1 17 a I< 1d I I A) REFLECTIVE PAVEMENT MARKERS SHALL BE INSTALLED dr ALL LANE ONES AND SANDBLASTING SHALL BE DONE BY CONTRACTOR. SAW - CUTTING. SEE DETAIL ALL LOOPS SHALL BE CENTERED IN TRAVEL THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATIONS AND VERIFY ALL I CENTERLINE STRIPING ON ALL NEW STREETS, AS WELL AS ON EXISTING STREETS LANES UNLESS SHOWN OTHERWISE. THE CONTRACTOR SHALL PRODUCE CONDITIONS ON THE JOB SITE. 1 I I I u 1 I u I 1 WHERE REPLACEMENT OF PAVEMENT MARKERS IS NECESSARY. 21 ALL CONDUIT SHALL BE 3' UNLESS OTHERWISE NOTED. ALL THE NECESSARY TRAFFIC CONTROL DURING LOOP MARK -OUT. I I Z I II I I I 1 8. ALL POLES, CONDUIT, PULI90XES, STRIPING AND LOOP DETECTOR LOCATIONS I I I I I I i I 14 THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN. SUBMIT TRAFFIC CONTROL 22 CONTRACTOR SHOULD BE REQUIRED T'0 PULL NEW CABLE CONDUCTORS IN 7. EXISTING TYPE 170 CONTROLLER TO REMAIN. CONTRACTOR SHALL SHOWN ON THESE PLANS ARE APPROXIMATE. ACTUAL LOCATIONS SHOULD BE I 1 W I m I I ' I I 1 PLAN TO THE TRAFFIC ENGINEER (5) FIVE DAYS PRIOR TO START OF WORK. THE MOOTED CONDUIT RUNS. VERIFY ALL EQUIPMENT IN THE CONTROLLER AND PROVIDE ALL THE DETERMINED BY FIELD CONDITIONS AT THE TIME OF CONSTRUCTION AND AS c14 NECESSARY ACCESSORIES TO PROVIDE THE PHASING AND ALL FUNCTIONS DIRECTED BY THE CITY OF ENCINITAS. I 1 I I I I I I � 1 15. CONTRACTOR SHALL NOT ERECT ANY SIGNAL STANDARDS MIIORE THAN 3 WEEKS PRIOR INDICATED Q I 1 1 I I ^ TO SCHEDULED TRAFFIC SIGNAL TURN ON. NDICATED ON THESE PLANS. ALL CONTROLLER EQUIPMENT SHALL BE QFSSJ I N THE CURRENT STATE OF CALIFORNIA OLLER Q PRODUCTS LIST". 9. ROUTING AND LOCATIONS OF UNDERGROUND ELECTRICAL SYSTEM IS I I I i I < 10 I I 16. THE ELECTRICAL CONTRACTOR SHALL NOT INSTALL ANY PARKING REMOVAL, A MMMN E Q� DIAGRAMMATIC AND SUBJECT TO APPROVAL OF THE ENGINEER. UNDERGROUND 17 y ELECTRICAL LINES AND SUBSURFACE STRUCTURES MAY BE RELOCATED IF I I I 1 v v I I OF 15 WORKING DAYS AFTER APPROVAL, SO THAT ADVANCE NOTICE TO ADJACENT P-8 F INSTALL P . I W PROPERTY OWNERS CAN BE MADE BY 1HE TRAFFIC ENGINEERING DIVISION. REMOVE AND RELOCATE EXISTING SERVICE METER. CONTRACTOR SHALL NECESSARY TO CLEAR OTHER EXISTING UNDERGROUND FACILITIES �4' VERIFY SERVICE LOCATION AND REQUIREMENTS WITH SAN DIEGO GAS AND 1 ROVIDE BY: O'DAY CONSULTANTS 0 ELECTRIC COMPANY. 10. CONTRACTOR SHALL PROVIDE ALL CABLING AND CONDUCTORS NECESSARY TO I I I I i 1 ►- z 17. ALL TREES AND SHRUBS SHALL BE TRIMMED OR REMOVED AS DETERMINED BY r- m AMC TR SIGNAL PLAN BY: PERFORM ALL FUNCTIONS SHOWN ON THESE PLANS. I I I I I I 1 1 b t - THE CITY RESIDENT ENGINEER AS REQUIRED TO MAINTAIN SIGNAL HEAD EXP AN SYSTINItS ASSOCIATE'S, fRC. 1 0 2 VISIBILITY AND SIGHT DISTANCE. s oww " si i . (619) SW - 4911 9�. PEDESTRIAN BARRICADE TYPE 1 PER STANDARD PLANS ES -5F. 11. PULLBOXES SHALL BE N0. S UNLESS OTHERWISE SHOWN. I I I 1 0S I 08 1 1 CN 4s r `G C i I I 1 18. ANY DELAY IN OBTAINING PUBLIC AGENCY APPROVALS AND/OR CONSTRUCTION �� A F n` w P s�cxu�u - R �f 11"" O .. 12. THE CONTRACTOR SHALL OBTAIN THE APPROVAL OF THE TRAFFIC DIVISION I I I I I 14 14 1 I OF SIGNAL OR STRIPING PLANS MAY REQUIRE REDESIGN DUE TO CHANGES IN �� 1 441 INSTALL TYPE GOVERNMENTAL REQUIREMENTS/STANDARDS. -- e@yE{�. -{ 22 12 OF THE STRIPING, PAVEMENT MARKINGS, PARKING REMOVAL AND SIGN LOCATION PRIOR I I I , II 12 22 1 I SIGN _ TO PANTING OR INSTALLATION. I �� 19. ALL PED SIGNALS SHALL BE TYPE SH K " 00 �� IN SYM BOLS. ANDREW P. SCHLAEFLI - T. t. 1930 DATf DESIGNED BY I DRAWN BY CHECKED BY APPROVALS CITY OF ENCINIT ENGINEERING DEPARTMENT DRAWING NO. REVISIONS APPROVED DATE REFERENCES DATE BENCH MARK SCALE w I I APS A - P OV DESCRIPTION: 11. 11 PLANS PREPARED UNDER SUPERVISION OF RECOMMENDED A TRAFFIC SIGNAL PLAN FOR: TM 94 -066 • -- HORIZONTAL AS SHOWN DATE: 8-15-95 BY: BY: EL CAM WX AX GARDEN VO RM 3957 -I LOCATION: RECORDED n RECORDED FROM VERTICAL AS SHOWN ANDREW P. SCHLAEFU R.C.E. N0: 15964 OATS: -- Zq, q5 DATE: _` 'm ^q ELEVATION: DATUM: REGISTERED CIVIL ENGINEER EXP: 6 - 30 - 97 T.M. NO. 94 - 066 CALFORMA CITE mDE7f No. 326 - 1683 Ts SHEET 1 4 OF DRAWING FILE NAME: ELC -GAR U.S.A. 002894 -S AT 9 -14 -95 RD # 284A - 0/ AS -BUILT /►'IODz a r POLE WORK TO BE DONE PLACEMENT PO �E� TYPICAL POLE DETAIL 'A* L " � ��TOR SCHEDULE INSTALL mAmc smAL% SAFETY UCtmr, AID J SSMATED PMENT STANDARD LUMINAIRE ItSKS SIGNAL MOUNTING PPB PLACEMENT REMARKS EMERGENCY VEHICLE PRE- EMPTION te' = = T RUN " TO PERFORM THE FUNCTIONS SHOWN AND CALLED OUT ON THESE PLANS. TYPE HEIGHT SIG. M.A. LUM. M.A. HPSV LEGEND HEH KXE PED PHASE A B A Y AWG CIRCUIT 3" 3 3" 2 -3 SPECIFICATIONS SSEMEL A SPECIAL 30' 60' 15' 250W HPSV 1✓iu>� 3 -MAS SV -1 -T SP -1 -T 10' 4' " " " " O - p L1.1 L2 ' L3 ' L4 ' CALIFORNIA DEPARTMENT OF T�f1t1iSPOtT1►TFON STANDARD SPECi�TCATTON 29 -5 -70 Dr A S R 01 3 3 3 6 DATED JULY 1992. STANDARD SPECIFICATIONS FOR PUBLIC WORKS O 26 -4 -70 30' 45' 15' 250W HPSV EL REAL NO 1 -MAS SV -2 -T SP -2 -T 2 &4 ,0' 7' d, 3/4" GAL. STEEL NIPPLE • 5 5 CONSTRUCTION (1991 EDITION) m LENGTH AS REQUIRED © 1A 7' - - - - - - TP -2 -T 4&6 �k �k TEMPORARY POLE 1 -5" 3/4" GAL. DETECTOR y 07 3 3 3 STANDARD PLANS l DRA"N sGS & MANUALS STEEL REDUCER • 3 CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD PLANS DATED ' O SPECIAL 30' 60' 15' 250W HPSV To�.nntc. 3 -MAS SV -1 -T SP -1 -T 4 15' 4' PLACEMENT FROM 0 2 -5 -70 of FUTURE CURBLINE 3 4 4 1 t •6 3 3 JULY 1992. CALIFORNIA DEPARTMENT OF TRANSPORTATION. "MANUAL OF 1 - EL CAMINO . PLACEMENT FROM • PED TRAFFIC CONTROL FOR CONSTRUCTION AND MAINTENANCE WORK ZONES 24A -4 -70 35' 35' 15' 250W HPSV REAL MAS SV -1 -T 6 15' 7' FUTURE CURBLINE - G Ith SIGNAL HEAD HOUSING _ 07 PED 4 (1990 EDITION) 1A 10' - - - - - TV -2 -T 2 10' 7' S •6 PED - 0 _ r PUSHBUTT N 1 1 CALIFORNIA DEPARTMENT OF TRANSPORTATON TRAFFIC MAWAL _ TV -1 -T PLACEMENT FROM GA 07 PUSHBUTTON 1 1 1 (, 1A 10' - - - - TV- 2- T(FUT. SP -, -T 6 15' 7' FUTURE CURBLINE BACKPLATE - - PUSHBUTTON 1 1 1 1A 10' - - - - - TV -1 -T SP -1 -T 15' 7' PLACEMENT FROM NOTE: DXACT LOCATKN BY CITY ENGINEER PUSHBUTTON COMMON DETECTOR ASSIGNMENT O FUTURE CURBLINE ' SP AL 3 TE S 3 3 6 1 1 08 1 1 08 DETECTOR FIELD TERMINAL THIS RECORD DRANRdO SFIbWS THE FAGL1TlES AND THEIR R. S.N.S. = REFLECTIVE STREET NAMES (DIAMOND GRADE) * = SEE PLAN GENERAL NOTES I i I I 1 A� • S 1R 01 LC N0. PH ASE SLOT CONNECTIONS - = A+��► PuS+Ngw�rv�t 1. TRAFFIC SIGNAL CAN BE TURNED OFF BETWEEN THE HOURS OF 9 AM AND _ _ _ _� 1 I 1 I I NIL LOCATION DOSED ON DATA FURNISHED BY THE CONTRACTOR p�D o C 5 5 & 3:30 PM DURING CONSTRUCTION. ALL-WAY STOP AND STOP AHEAD SIGNS Ir I I ^ I ^ N I NSPECTEDBY THE CfTYS RESIDENT ENGINEER. FOR FUTURE o8 DLC I T - SHALL BE IN PL ACE WHEN SIGNAL IS OFF J i(< 19 >, � Z0 \ \ , CONSTRUCTION, LOCATION OF FACILITIES MUST BE VERIFIED N TYPE 07 LC 3 3 3 I T2 - 9 & 10 2. ALL STRIPING AND PAVEMENT MARKING REMOVAL IS TO BE DONE BY I v I \/ I \ 'A , THE F . 05 C 4 13 T2 - 11 & 12 CONSTRUCTION NOTES CONTRACTOR BY SANDBLASTING. 1 I 1 m W \ v AS BUILT L)RAFTING IADAN SYSTEMS AS'90C,IAT1 , INC DLC os 2 14 T4 - 1 2 1. AT LOCATION B REMOVE AND SALVAGE EXISTING STANDARD. REUSE ALL I' I �I \ l� /d �7 T TA - 3. ALL SALVAGE MATERIAL SHALL BE DELIVERED TO THE CITY OF ENCINITAS I II I I \ \ AND�yy P SCl•N AFFLI L MINAIRE 2 2 7 5 1 T3 - 3 & 4 HEADS, HEADS, PUSHBUTTONS, EVPE AND LUMINAIRE. MAINTENANCE YARD AS DIRECTED BY THE CITY ENGINEER. I I1 I 1 I DATE f10 SIGNA COMMON 1 1 1 8 U T5 - 5 & 6 FGNAL EE CONST. NOTE 10) 1 I 1 '� 19 > >1 I \� - - - TRAFFIC SIGNAL EASEMENT TOTAL J 3 9 T5 _ 7 & 8 2. AT LOCATION ©: REMOVE AND SALVAGE EXISTING TYPE 1A ANDARD REMOVE 4. DAMAGED DETECTOR LOOPS SHALL BE REPLACED PER CALTZANS STANDARD I I J v u \ 10 7 T7 11 12 AND RELOCATE PED HEADS AND PUSHBUTTONS TO LOCATION AND �D . SPECIFICATIONS (JULY 9, 1992) AND CALTRANS STANDARD PLANS (JULY 1992). I I _ F - ` I W I \ DOC. No. 94- 0655278 TYPE B VP CABLE , 1 3 ^ - Q DATED 11/10/94 3. AT LOCATION REINSTALL EXISTING PED HEAD AND PUSHBUTTON FOR PHASE 5. THE CITY TRAFFIC ENGINEER SHALL BE CONTACTED AT LEAST FIVE - I Y t � E ( \ INTERCONNECT ABLE 1 1 QD : J �� i � ^ I- 1 ^ m � WORKING DAYS PRIOR TO ANY DISRUPTION OF NORMAL SIGNAL ( EXISTING I 119 >' �� �� \ 2 "c,9 14,31 0 14 6 L T3 - 11 & 1 6 AND 7 RESPECTIVELY FROM POLE ©. OPERATION. ES„ 1 3 "C, 1 ( n W I y AND ONE EVPE NOTE: PROPOSED CONSTRUCTION SHOWN DARK 15 s 4 T5 _ 1 & 4. AT LOCATION E : EXISTING (NO CHANGE). S. ALL DETECTOR LOOPS, CONDUIT AND SMAL POL SHALL BE 1 4 /8 I II v I I v ' ,, 16 1 11 T 1 & 5. AT LOCATION F : EXISTING (NO CHANGE). REPLACED AND OPERATIONAL WITHIN FIVE WORKING DAYS FROM ADD S 6 ,� 1 � 1 `3 JI 1 I4 I i �;\ , -I EXISTING CONSTRUCTION SHOWN LIGHT OR DASHED. 18 1 J T - 9 & 0 ,�- 1 I 6. AT LOCATION G REINSTALL EXISTING PED HEAD AND PUSHBUTTON FROM POLE INITIAL REMOVAL AND DISRUPTION. EXISTING F N I I I I I 3 DRAWKNG N0. 3428 L SHEET tO OF i13 19 5 - 11 & 1 © FOR PHASE 7 AND 6 RESPECTIVELY. INSTALL NEW 3-12" (R, Y G) SIGNAL - PED FENCE i ` I`�'��� �' I ° I °' R 873-3 I DD 514 ' �8 I EXISTING E: 1'520' I ' 0 PB 11 T7 - 1 T8 - 4 & 2 OM I-L j � _ _ EXISTING 3 "C, 1DLC &INTERCONNECT CABLE HEAD FOR PHASE 7, AND CHANGE MOUNTING TO TV -2 - EXISTING 3 "C WITH SAN / 2Pk � v v v I R61 6.1 - - 1 3 "C, 7DLC & INTERCONNECT CABLE 11 T8 - 5 & OM 6 INTERCONNECT CABLE r- - - 7�rT - - _ _ __ _ _ _ _ _ P V. 6+ 1 12E T8 _ 7 &COIN 9 -- c: _ �__�_ - D- T_ = - - -- - - - -- - -- }_� - -_ _ __ + 1 U - 4 M _ _ - - - - - - - - - -�- = - - - - � � }�-IE z - - - - - T - - - - - - - - - - - - - - - - - _ V.P.E. 8 1 L - & M _ _ _ _ _ _ _ - _ - - _ - _ - - _ _ - - _ - _ - _ _ - �_ _ _ _ _ _ =�_ - ' - - - - - - - - - - i ** _� _ _ _ _ _ _ _ - - - - - - - - - - - - - - - - - - - - - - - - _ _ _ _ _ _ _ _ V.P. 7 13U 9 - & OM 9 - - - - - - - .7 I _ - - I _ _ _ _ - _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7 (SEE (SEE DETAIL "d" ML 2 I� l���< i �+ n n - - - - - - - - - - - - - _ _ _ _ - - - - - - - - _ I EXIST. •� + `, 2> - /��___-' - - - - __ - - - -- , I ) T 1 2> <2>' �` = ___ - _ 1 J_ T - t� - EXIS EVPE I I v _ _LEAH# -v - - -v - 4� 4L v - - - - - - - - - _ - - - - - - - - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - -L - - - - - - - - -- -f 7 1 - - -- , - - - �J -I ~ ff - - - - - - - - - - - - - - - - - - - - - - - - - - EXISTING 3 "C WITH - I I n1 I II n n /II - 111 n _ INTERCONNECT CABLE � OK3> <3>uf OK3> - - - - - -- 1 I >02 - - -- - EL CAMINO REAL - -- -1-9 >2 '- ' _ ,, L"- - -_ -# - 02 ---------- - - - - - - - - - - - - - - - - - - - - - I - - - - - - - - I i I i i In1 II I1 i\ nll II -,� - - - - _ 1 n 4 1K4> <4�' 1K4> �...�02 _ I 1, >0 - - - - - - - - - 1 2 I I ` _ I_ v - - v ' -v ` v - - - - - - - 1 I I I I ^ - -- - -- - -- - - - ' - -- -E XIST. EVPE ``'' n 73 R73 - - +{� I 02 +5 1 1 510 5 > < 5 7 l < 5 > EXISTING _ _ _ i� I >o 74 - - - - - - - - - - - - - - - - - - - = = = = = = ­% 72 I 1- 1 - -� - - u - - - / - u 1"C, 4X110 2 _------------ - - - - -- -J III + �5 I V I I^ ^ - -- '71----------------- - - - - -- 76 L <17> <17� f <17> 4;1 �> 1 I I __ „ - I _ „ 69 l * 1 _� / \ v , �J - \ I 1 i - i\ rte - _ - ^- - - - - - - - - - - - - - - - - - - - - - _25o'_TO___ - - -- - -- - - - -- -__ �� -tom - - =7, I - I- 1 7`> <7> �1� / <7> <7� -- -- X -WALK <16> <16> <16� 4,1j I 2 � \ I I 1 - ��,Xz�l�t =a=-------------- - - - - -- 1 0 1 � ___v_ u v - uJ -- 1 ADD1 #14 \ 1 1 1l��Qt _ CJ --- - - - - -- ------ - - - - 250 _TO X -WALK - - - - - - - - - - - - - - - - - - EXISTIN - - -- I - 2'C.2DLC 1 I 1 �PV- - _____ _ ` ®" 15 1 15 15 iS T. VPE _ _ - U6 1 C, 4 #1 I �I 01 6 �!:� � ---- - - - - -- Os 11 __- I _ ,� 14 � 14 1 1 ! _ - ��, 1 � 3- PHASE DIAGRAM 06 11 1 3 1 1 I I f I - - � J -- - - - - - - 1 2 3 4 _ - - t- - - -- - __ - r _ - - - - - - - - 06 mmoll'. -- - - - - - - - - - I Jr_ 5 1 �41 3- ISTI G� ------- - - - - -- - - - - -- -- - - - - - - - - - - - F � 06 - - -- --- _ - __ x ` _- 1 141 _ L __ - - -- _ _ -- - - - - - - - - - - - - - - - - - -� I (SEEDETAII "B" > 1DLC -- - - - - -- 1 I _ - -- - - - - -- �` - �`� -� -------- - --JJ_ -_ - - __-- _ -__ -_ _ UNUSED UNUSED __ - -_ +x -_ -- EXISTING 06 ��--- - - - - -- - - -- - - -- 5 - -- 5 s 7 8 06 Cr 1DLG - - - �` XIST. EVPE 16� .�`C� I I 1 + 6c I - TRAFFIC SIGNAL EASEMENT PROP. CURBLINE �► I � ��� EXISTING BERM ®EXISTING �Fi� - -- _ � GENERAL M070 ����. EXISTING BERM FLASHING OPERATION SHALL BE RED IN ALL PHASES. PROP. CURBLINE 3"C, 5DLC C } _ y „ dp GENERAL NOTES CONTINUED: CONSTRUCTION NOTES CONTINUED: 2 "C, 1DLC 2 " C, 7DLC ��\ II - I 13. THE CONTRACTOR IS RESPONSINI.E FOR THE LAYOUT AND INSTALLATION OF LOOP 1 20. PAVEMENT MARKING REMOVAL AND TRAFFIC STRIPING REMOVAL BY E ` x DETECTORS TRAFFIC STRIPING, PAVEMENT MARKINGS TRAFFIC SIGNAL EASEMENT � ' R73 I - 7P , , PARKING REMOVAL AND TRAFFIC 7. AT LOCATION (H� : INSTALL NEW 3-12" (R. Y. G) SIGNAL HEAD FOR PHASE 6 AND I I ( DETML • B') SIGNING AS SHOWN ON THESE PLANS AS ARE NECESSARY FOR THE SAFE ANA EFFICIENT SANDBLASTING SHALL BE DONE BY CONTRACTOR. CHANGE MOON G TO SV -3 -TB. © EXISTING I I 1 R II 1 � I 2 "C. 3DLC MOVEMENT OF VEHICULAR TRAFFIC AND PEDESTRIANS. 21 ALL CONDUIT SHALL BE 3r UNLESS OTHERWISE NOTED. GENERAL NOTES CONTINUED: PED FENCE 1 t A) REFlEC11VE PAVEMENT MARKERS SHALL BE INSTALLED ON ALL LANE LINES AND • I 11 1 CENTERLINE STRIPING ON ALL NEW STREETS, AS WELL AS ON VMTIHNG STREETS 22 CONTRACTOR SHOULD BE REQUIRED TO PULL NEW CONDUCTORS IN THE & AT LOCATION I INSTALL NEW STANDARD TYPE 17 -3-70 WITH 20 MAST ARM 6 I I 10 9 BBLUI 7. LOCATION OF ALL EXISTING UTILITIES SHOWN ARE APPROXIMATE. W II 8 I WHERE REPLACEMENT OF PAVEMENT MARKERS IS NECESSARY. BACK OF CUR NE. REINSTALL EXISTING SIGNAL HEADS FOR PHASE 7 ON MAST 0 I 4 MODIFIED CONDUIT RUNS, THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATIONS AND VERIFY ALL ARM AND ON POLE. REINSTALL PE AN D HEAD FOR PHASE 7 AND PUSHBUTTON FOR CONDITIONS ON THE JOB SITE. 1 I II 1 1 I 14. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PL. SUBMIT TRAFFIC CONTROL PHASE 2. REINSTALL STING EVPE FOR PHASE 7 AND EXISTING LUMINAIRE AND II 1 PLAN TO THE TRAFFIC ENGINEER (5) FIVE DAYS PRIOR TO START OF WORK. MASTARM FROM POLE B . S. ALL POLES, CONDUIT, PULLBOXES„ STRIPING AND LOOP DETECTOR LOCATIONS I I I I 1 13. CONTRACTOR S HALL NOT ERECT ANY SIGNAL STANDARDS MORE THAN 3 WEEKS PRIOR SHOWN ON THESE PLANS ARE APPROXIMATE. ACTUAL LOCATIONS SHOULD BE I I I TO SCHEDULED TRAFFIC SIGNAL TURN ON. 9 . AT LOCATION QJ : INSTALL NEW STANDARD TYPE 1A (10') 6' BACK OF CURBLINE. DETERMINED BY FIELD CONDITIONS AT THE 71M OF CONSTRUCTION AND AS 11 Ot II 10 9 $ 2 "C, 3DLC DEER DIRECTED BY THE CITY OF ENCINITAS. W I I 16. THE ELECTRICAL CONTRACTOR SHALL NOT INSTALL ANY PARKING REMOVAL, A M PftUM Q� REINSTALL EXISTING PED HEAD. PUSHBUTTON FOR PHASE 7. 2 AND EXISTING 1 1 I I PROPERTY OWNERS CAN BE MADE BY THE TRAFFIC E NGINEER ING DIVISION. OF 15 WORIONG DAYS AFTER APPROVAL, 90 THAT ADVANCE NOTICE TO ADJACENT ��� 1? vI DE BY: O'DAY CONSULTANTS y O SIGNAL HEAD FOR PHASE 1 FROM LOCATION (B). INSTALL NEW 3- SECTION 9. ROUTING AND LOCATIONS OF UNDERGROUND ELECTRICAL SYSTEM IS 4, 3 - 12 - (Y, G) SIGNAL HEAD FOR PHASE 2. (AAA Pv5 ppw7 5) DIAGRAMMATIC AND SUBJECT TO APPROVAL OF THE ENGINEER. UNDERGROUND 7 - 11 "� Q� AMC SIGNAL PLAN BY ELECTRICAL LINES AND SUBSURFACE STRUCTURES MAY BE RELOCATED IF t i Iii II 17. ALL TREES AND SHRUBS SHALL BE TRIMMED OR REMOVED AS DETERMINED 8Y TR �+ N SYSTEMS ASSOCIATES, INC. 10. INSTALL 20 -6'X6' LOOP DETECTORS FOR PHASE 6. 12 -6'XG' LOOP DETECTORS FOR NECESSARY TO CLEAR OTHER EXISTING UNDERGROUND FACRJTIES. I I V 10 1 9 THE CITY RESIDENT ENG VEER AS REQUIRED TO MAINTAIN SIGNAL HEAD �•+ � , 433 REANY M" moo, SWE is II 8 VISIBILITY AND SIGHT DISTANCE EXP N WW, CA 02 ,'2A (611) 560 - 4V 11 PHASE 7. 10. CONTRACTOR SHALL PROVIDE ALL CABLING AND CONDUCTORS NECESSARY TO 1 I I P R. U - E. 115964 ALL DETECTOR LOOPS SHALL BE INSTALLED IN ACCORDANCE WITH STANDARD PERFORM ALL FUNCTIONS SHOWN ON THESE PLANS. 1 I Z II I I& ANY DE LAY IN OBTAINING PUB LIC AGEN AP PROVALS AND/OR CONSTRUCTION � �' PLANS ES-5A AND ES-5B. CONTRACTOR SHALL LAY OUT LOCATIONS OF LOOP 11. PULLBOXES SHALL BE NO. 5 UNLESS OTHERWISE SHOWN. 1 l 311 IR PINQUIREMENTS/STANDARDS. GN DUE TO CHANGES IN '��AA GOVERNMENTAL DETECTORS. LOOP LOCATIONS SHALL BE APPROVED BY TRAFFIC ENGINEERING O11 OF AL PRIOR TO SAW - CUTTING. SEE DETAIL ALL LOOPS SHALL' BE CENTERED IN 12. THE CONTRACTOR SHALL OBTAIN THE APPROVAL OF THE TRAFFIC 0KNNEERMG DIVISION 1 1 ii � 19. ALL NEW VEHICLE SIGNAL HEADS SHALL BE Ir WITH BACK PLATES AND GLASS LENSES. �. TRAVEL LANES UNLESS SHOWN OTHERWISE. THE CONTRACTOR SHALL PROVIDE ALL OF THE STRIPING. PAVEMENT MARKINGS, PARKING REMOVAL AND SIGN LOCATION PRIOR THE NECESSARY TRAFFIC CONTROL DURING LOOP MARK - OUT. TO PAINTING OR INSTALLATION. I I 11 * 7 07 ALL PED SIGNALS SHALL BE TYPE • G DISPLAYING INTERNATIONAL SYMBOLS ANDREW P. SCHLA£FLI - T.E. 1930 DATE DESIGNED BY DRAWN BY CHECKED BY APPROVALS CITY OF ENCINITAS ENGINEERING DEPARTMENT DRAWING NO. REVISIONS APPROVED DATE REFERENCES DATE BENCH MARK SCALE my RT BPS ,� - O UIL.T 1 2-9- 9 "1 PLANS PREPARED UNDER SUPERVISION OF RECOMME A OV TRAFFIC SIGNAL PLAN FOR: TM 94 -066 DESCRIPTION: y �f HORIZONTAL A5 SHOWN DATE: 8-15-95 BY: / BY: EL MM REAL AND TOWN CENTER DR. 3957 - I LOCATION: RECORDED FROM VERTICAL AS SHOWN ANDREW P. SCHLAEFLI R.C.E. NO: .15964 DATE: 4- 2p��� DATE: �Z�'k ELEVATION: - DATUM: REGISTERED CIVIL ENGINEER EXP: B -30 -97 T.M. NO. 94 -066 CAUFORNLA COORDNATE ,NDEX No 326 -1683 SHEET 1 5 OF 58 DRAWING FILE NAME: ELC -W00 U.S.A. 002894 -S MV 9 -14 -95 AT RD # 276 TS -.. 6) /z I A S BUILT MOD1