1989-9109 G (Plans) " GRADING PLAN LEU�I�ID a ' All areas to be 'filled 'shall be prepar to be 4. Cut and
fill slopes shall be cut and trimmed to e
WORK TO BE DONE
PROPERTI LII�It: -- filled and fill shall be placed in accordance finish grade to
produce smooth surfaces and
A. �Xtcd[. RAVE COLITOUR i - with standard specifications. All vaget&*kA uniform cross
sections. The slopes of �
G !_ �Z ---�_� h ' matter and ,objectionable material shall bs excavations and embankments
shall be shaped,
1. All work shall be Hone in accordance with these G BADE G+470L removed by the contractor from the surface 1
planted and trimmed as directed by the engineer 1 .
plans, the standard specifications for public FILL• SfbT LEVA'TIOWi? + lr7 �_ which the UIl is to be placed.
Loose gill ` f of work and left in a neat and orderly
F alluvial solla'Shall be removed to suitable f condition. All stones, roots and other
waste
works construction, the desi constr Son _ ` I3S rxl 5C!'� - LitLOG natural ground.. The exposed soils shall
lba ,
standards Oi f ity►
C ef' RACE Elaris and t S ;ri PAD GL•G•VAT1W _ C � I/ fiN 0 ( scariflid to a Qepth of 6" and then -
' gmt-ted b s' slopes matter exp or excavation or embankment
which are liable to become loosened shall
Diego area "regional standard drawings. Any DA`{LITE ullE F G
changes Or revisions therefrom shall be __ - -___ ___�. _ a mtMwm of 90 percent. It shall be
t1rA be removed and disposed of. The toe and top of
approved by the City Engineer prior to any \ ,.I T6P contractor's responsibility to place, spreadIS
all slopes shall be rounded in accordance with
1 water and compact the fill in strict accordance the Grading Ordinance.
request far inatpeOtion SLDPE6 (Z -1 MAX. uT bOTTOM
witihA.peoifications.
2. The soils report titled ` prepared by BrRM OR 5WALr. -� �i�/���t� �"�J 5. All .trees,
brush, grass, and other
V" LAI dated b shall be G OL1G. DKIVE (G 14.1) objectionable material shall be collected,
considered as a part of this grading plan. All piled or otherwise disposed of off the site by
grading shall be done in accordance with the TYM A -� I the contractor so as to
leave the areas th
recommendations and specifications contained in x
have been cleared with a neat and finish:;
said report. F_x. WOOD PbNC:� Jx - ,a appearance free from unsightly debris. Approval
_ A•G PAVEM1! ( of location of debris fill shall be secured from
3. Approval of this plan does not constitute is �M \ i _- the soils
engineer and City Engineer prior to
approval of sizes, location and type of drainage I the disposal of any such material.
facilities, nor of improvements within street
right -of -ways. Separate approvals and permits % D. LANDSCAPING
for these shall be required in conjunction with p
improvement plans. h y�. �; 1. All slopes shall be planted and irrigated in
Wi 46,1- 121 accordance with plans approved by the City
4. Written permission shall be obtained for an y Engineer. Plans shall conform to
the City of
Encinitas Grading Ordinance and all ado
off -site grading. I T e G. 23 -1G 4 adopted
tsd
0 0l ° oli landscape and irrigation standards.
5. Contractor shall take any necessary precautions Q-
required to protect adjacent properties during r ' II 4 ' E %!S u - 2. Finish grading and
planting shall be
grading operations. Anything damaged or • F� p - X T -� W OOp F _ accomplished on all slopes
p
destroyed shall be replaced or z repaired to I _ -- -'_ x _ .- -_ '� 7EL X_ k
immediately upon completionof slopes e
graded
co exisng rior to grading. ."" Ja -_ _ " � ( -0' ►.__D�715 - -- - - - -- x between October 1 and
April 15.
6. The developer shall be responsible that any r ^< I t Zc1 SLOP>D - N C s r + " '1�. E.
EROSION CONTROL
I / q3-i� SWgLE �� 1 A� r!�
monument or bench mark which is disturbed or , : 1 1 ! 1 y t14 J 1
destroyed shall be re- established and replaced 3 IRON PIPE 1 I 1 � ' , 1 T_ 2q,Mt�lo ' G / 4l -- I( JI 1
. In caele l em a� enc work is required, contact
by a registered civil engineer or a licensed x f . ,,, teL-
land surveyor. {� uy`, fl +q56 ��' !
'"�- /• 2. Equipment and workers for emergency work shall
7. The contractor shall desi n construe d A.E .�� 1 ° "j ( "I� ? 1 be mad
necessa
season. e available at all times during the rainy
All
maintain all safety devices g includin shorin -� ry materials shall be
Y ' g g' - ! �' _
100 _ ! stockpiled on site at convenient locations to l
and shall be responsible for conforming to all Q.j '�' �. J �_ 11( t
�E 1 - -- facilitate rapid construction of tempora
local, state and federal safety and health +qtly u► devices when rain is eminent.
standards, laws and regulations.
,
14 vow fW4*
,�- ` - -- - u +
S} !' �,, :.:
8. Grading mile of a structure fo in5 perating within oe half A f �? A SIN. R. EL �! modified
without the 1 ! o '' t v 3. Devices shown on plans shall not be moved or
a
(1/2) r human occupancy �IN�N FLoaQ o v approval of the Engineering
- a - Inspector. {
shall not be conducted between the hours of 5:30 - - - 40 � _ ,. •• I r I i o , . "- • ,� �
p.m. and 7 :30 a.m, nor on.Saturdays, Sundays j V s'' Nr `- 1' 1 rI QG - 3 4.- The Contractor
shall restore all erosion control
and City recognized holiday IO x
I (a To u i ) a1 -
y 93 °- FAV P, 13 �, � �_ � devices to working order to the satisfaction of
B4; . NOTIFICATIONS c J �m (o91tGU� Tn �'o) � x� the City Engineer after each
run -off producing
11 101 _ �i *q4o� A - r �; + Y` a rainfall.
1. The existence and location of underground I 1 j +9�y
utility shown , w z RSf+ 5. The contractor shall install additional erosion
ti 1 control measures as may be required by the City
h 1 s s uncompleted
plane wer structures a available Engineer due to leted
a / g x g p grading operation or
records.. To the bast of our knowledge there are unforeseen circumstances which may arise.
no existing utilities except as shown on these
1
plans, however: 1 /• V ; ±. I -- - S - i -100
i1
6. The contractor shall be responsible and shall
The contractor, is re iced to take due take necessary precautions to prevent public
fteo rt0 4CAQ6 �' trespass onto areas when impounded waters create
precautionary measures to . protect any P rovided Per the
t i e �,
existing utilities or structures located at X ,I I � j x - - -__ _ 1JG�M SONG i a hazardous
condition.
the work site. It is the C e t]cACtp ;'s
-?10 7. All
0 1- -- - - -- -. erosion control measures
_ ; • ` +�3 R I ��( 5. g_y _ _ _ _ _ _
res onsibilit to contact the follows ) t � � ~ ~ y q , 1 � x x- l eXt - >T1K161 GtRA _
o:c ed grading plan shall be incorporated
ownrs of sa es id utilities or structur !!! >�',' I =� �. _ hereon
prior to any excavation, for verification r*
and location of utilities and notification ,. -_ FI,ApE 9 - ?fi fa11flN(E EQ(�, 8. Graded areas around the
project perimeter must
of commencement of work: r / h � - T��N _ " conclusion of each work dayg of slope
at the
a. Sewers^ I filGAi IA WA G
r � drain a from the '
r
r f ;:. a - ill IDI
b. Gas & Electric •5T E 4 G -7 1 .7
in removable protective devices shown she be
lace at the end of each w
� 3 , , «. p n h orkinq day when
I
the five
•• ( 5 ) day ra n probability forecast
h(
c. water - 14%4410 Al 1f)(, 153 - G4GL- � " - exceed p ercent (40 %). Silt and
other
i
s fort Y P
r \ debris shall be removed after each rainfall.
d. Telephone - '?A& if L fU. AI - W -7
V -� 10. Should germination of hydroseeded slopes fail to
e. Cable T�7 - G'A,llf.VK161j qZ•2 - k •• ^ BENCUPIARK TOP 4" SU6D1VIS10Ll CORLiR - EL. IDO •,ASSUMED i
provide effective coverage of graded slopes (90t
" i1 ,:•, % coverage) prior to November 15, the slopes shall
2. Contractor shall notify the City Engineer's _ _ " be stabilized with punched straw installed
in
office 48 hours prior to beginning any work< •DECLARA ON ! RESPONSIBLE CHARGE accordance with Section 35.023 of
the Erosion s
on this project. Phone: (619) 944 -5070 \ o q and Sediment Control Handbook of the
State of
'VICIN MAP I hereby' declare that I am the Engineer of Work for this California Department of Conservation.
3. The contractor shall give 24 hours notice ?' IR04 PIPE pso)eCt• that I have exercised responsible charge
over the
on calls for inspection. Phone: (619) 944 NO SCALE I ; 'F de ign of the project as defined in Section 6703 of
the
5070. All work performed without benefit I~ &Mainess and Professions Code, and that the design is
j
of inspection will be subject to rejection Ag11�1atspt.wlth current.'akandacda. #
and removal.
N a = understand that the check of project drawings and
C. GRADING ----------- s pecifications by the City °C o! Entlnitq _ is
conllned to a ENVItZo�MgN (l�f, MVIf.W AO'Tl;
review only and does hot relieve me, as Engineer rk,
1. All grading shall be inspected and tested by a WOOVD/hID DR" illy Lesponsibilities foe project:. design. .
I, aWITM OF CUT clli0 G,Y,,
qualified soils engineer or under his / , I gJAN(!TJ OF SILL CICjD
G•`(
direction. He shall inspect and test the p PLA TN O A y
excavation placement and compaction of fills and
SITS -� '' !'11c7i ,",�1.dt�Li - GN11, b►1l�nJt4RndLi q, G�
7 � A!-E - = 2b - 0 f . -iTF0FhT 'w"xu- P2oQ�0 C F U IN
backfills and compaction of trenches. He shall CRpRR1T0 < to
submit soils reports as required and will Addressr - JZ1 ►1. tip( 101 -- ac 3 " . WILL
6 46 , 11R: 6`7d
determine the suitability of any fill material. W y
Upon completion of grading operations he shall o City, St. -Shc� hid F) . GA - 3, M YJROM
VWT64 > FK( of "-�"T Q
state that inspections and tests were made by a MAXINUM Vir.IK"jlGAl, NI QT Op FILL,
% Q
him or under his supervision and that in his > ° Telephone _� ,6l.G ^1
opinion, all embankments and excavations were _ (A- VOwMt OF GU's _ 1c'rL O A`IG 9>;
° f 8Z _ t
ENUNITAS �wD. oc - -� _ _ 1_ 1.7 =
constructed in accordance with the approved � iY- Date .� 21 � p '::;O io �
grading plans and that all embankments and
excavations are acceptable for their intended 1; �, 704 F ' ._ ame o T (b} VOWM>K O1� Flu, 1
5996 27 = 1 - Ay PEFM 0f IU,''r '
use. re coalpi f 1� study recom�mnctationaa� has A.C.s. 110. i $Z Z AKE/k °� TILL 6 4'
C .
bgan sup,mittAcl to thq', offige of the y , E ging6r,
2. The contractor shall properly grade all 1 � ! ` i'
ltKtha , .have< reviewed these grading pleas celt}i °, KO (,r ; RApIN WIU, FIO TN
excavated surfaces to provide positive drainage , G ({ T PEE( {I�l UNjIL AF AXIZI(,, {�j
SOILS ENGINEERS CERTIFICATE t21pt t c aridatians" lnaluded i n the soils ra fb; lthif •,; C7V�Nf.2 ���MITT>:•fe:
ST
and prevent ponding of water. He shall control d IkuQ WILL rAQ N0 (,A (IkI- Twxo ne, #3EK
Project have been`'''khcorporated in the grading plans: `an` -� 1
surface water and avoid damage to adjoining i, Y,Q6EQT J• RANDa�� a regist istered civil an ineer in the - MAfZCjb2f
- �>b4rI (-STEPN6� �jL/aG�h11<1�) ° �42 -4142 f
properties or to finished work on the site and g g apacificatio>�s, " � / J �. 1
State of California rind all doin business in the field of - nW a1o'
principally Y g ./ {'f i F ke, 218 VIQ OEL GI;RRITa
shall take remedial measures to prevent erosion
applied soil mechanics certify that a sa and C ✓'4�t- w� ,
of freshly graded areas until such time as
Y Y P g SIGNED: t(.Ly �s e Ol IVEFIFIAIN GA `1 L02s�
Pp ' hereby T-r' �s w v •.,
study of the soil conditions prevalent within this site was
permanent drainage and erosion control measures made by me or under my direction between the dates JUaE 8, R4' 1 � 1 �E 70'/ �
C 04p385 ( �i
have been installed.
cc
EXP. DAVE:
F09 LOT 27, `54" I'S1404 OF (Zp,NGqo ADS ENCIN! - rA4
MAP 96, 948
i AV 2`1 -231-
REVISIONS 1 A"ROVED DATE REFERENCES Wn BENCM MARK SCALE SPECIAL D ORM APPFiC�I" rTY c>?! #IBLiG WORKS
DEPARTMENT OR
r •�, PL REP ED UNDER SUPERVISION OF RECOMMENDED APPROVED
p -•' r t Y iY p M v 4 sk
., ..#'�- , r . � �9 1 _ __, ..... BY: FIN ; n . I 'i� IR 9 � 1 :I ^ ' �' I w {:
• , r „,, , s .
-
HORIZONTAL I s S , _ �_�. ATE SYi 1x-
Y
'+{ .�z.5
�ftQEJ ; - �{j1»rD VERTICAL DATEi 3S DATE: as,IE., ,,+r
NOINEER EXP. G -3 o' R.C)r. R.C.E. PROJECT NO. ! 1 ,. �;• * SHEET
I - .���
24 X 3. PRINTED ON NO. 1000N CLEARPRINT.