Loading...
1988-8306 R (Plans) WATER NOTES SEWER NOTES GENERAL NOTES WORK 1. WATER MAINS, LATERALS AND APPURTANCES SHALL BE CONSTRUCTED 1. ALL WORK SHALL BE IN ACCORDANCE WITH THE LEUCADIA COUNTY ACCORDING TO THE STANDARD SPECIFICATIONS OF THE SAN DIEGUITO- WATER DISTRICT (L.C.W.D.) STANDARD SPECIFICATIONS. IMPROVEMENTS CONSIST OF THE FOLLOWING WORK TO BE DONE 1. A PERMIT SHALL BE OBTAINED FROM THE CITY DEPARTMENT OF WATER DISTRICT. THE CONTRACTOR SHALL AND HEREBY DOES ACCORDING TO THESE PLANS; THE CURRENT SAN DIEGO COUNTY PUBLIC WORKS FOR ANY WORK WITHIN THE STREET RIGHT -OF -WAY. GUARANTEE ALI, WORK FOR A PERIOD OF ONE YEAR AFTER THE DATE 2. THE CONTRACTOR SHALL SECURE A PERMIT FOR CONSTRUCTION PRIOR DEPARTMENT OF PUBLIC WORKS STANDARD SPECIFICATIONS AND OF ACCEPTANCE. TO ANY CONSTRUCTION. SPECIAL PROVISIONS FOR IMPROVEMENT OF SUBDIVISION 2. THE STRUCTURAL SECTION SHALL BE IN ACCORDANCE WITH CITY STREETS AND STANDARD REFERENCE DRAWINGS. OF F/VCJN/TA 3 STANDARDS AND AS APPROVED BY THE CITY 2• UNLESS OTHERWISE NOTED, ALL CONNECTIONS TO EXISTING MAINS 3. THE CONTRACTOR MUST SECURE APPROVAL FROM THE L.C.W.D. EN6 /NEER. WILL BE MADE BY THE CONTRACTOR, UNDER THE SUPERVISION -OF SAN INSPECTOR PRIOR TO BACKFILLING OVER ANY SEWER 'Y'S. DIEGUITO WATER DISTRICT, AFTER PAYMENT OF THE ESTIMATED COST 3. APPROVAL OF THESE IMPROVEMENT PLANS AS SHOWN DOES NOT BY THE DEVELOPER. CONTRACTOR SHALL COORDINATE WITH DISTRICT 4. THE DRAWINGS AND THE DATA HEREON ARE HEREBY MADE A PART OF CONSTITUTE APPROVAL OF ANY CONSTRUCTION OUTSIDE OF THE ALL ARRANGEMENTS FOR HIGH- LINING, TEMPORARY SERVICES, ETC., THE SPECIFICATIONS. PROJECT BOUNDARY. PRIOR TO SHUTDOWN. 5. NO REVISIONS SHALL BE MADE TO THESE PLANS WITHOUT THE LEGEND 4. ALL UNDERGROUND UTILITIES WITHIN THE STREET RIGHT-OF -WAY 3. WHERE ELEVATIONS AND GRADES ARE NOT SHOWN ON THE WATER MAIN APPROVAL OF THE L.C.W.D. ENGINEER. SHALL BE CONSTRUCTED, CONNECTED AND TESTED PRIOR TO PROFILE, TOP OF PIPE PROFILE IS 48 INCHES BELOW CENTER LINE CONSTRUCTION OF BERM, CURB, CROSS GUTTER, AND PAVING. FINISH GRADE. OF STREET. 6. APPROVAL, OF THIS PLAN BY L.C.W.D. DOES NOT CONSTITUTE A ITEM STD_. DWG. _x_ SYMBOL REPRESENTATION AS TO THE ACCURACY OF THE LOCATION OF, OR THE 5. THE EXISTENCE AND LOCATION OF EXISTING UNDERGROUND 4. ALL SERVICES TO BE CONSTRUCTED CLEAR OF DRIVEWAYS. EXISTENCE OR NON- EXISTENCE OF, ANY UNDERGROUND UTILITY, PIPE LOT LINES ............. ............................... FACILITIES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF I OR STRUCTURE UNDERGROUND UTILITY, PIPE OR STRUCTURE WITHIN THE AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE, THERE 5. CONTRACTOR TO FURNISH ONE INCH COPPER WATER SERVICE AND THE LIMITS OF THIS PROJECT. SUBDIVISION BOUNDARY .. ............................... ARE NO OTHER EXISTING FACILITIES EXCEPT AS SHOWN ON THESE METER BOX FOR EACH RESIDENTIAL LOT. PLANS. HOWEVER, THE CONTRACTOR IS REQUIRED TO TAKE 7. ALL LATERALS AND MAINS SHALL BE TESTED AFTER CONSTRUCTION PAVING OF STREETS ..... ............................... PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING FACILITY 6. CONTRACTORS SHALL ACQUIRE TRENCHING PERMIT FROM THE OF ALL OTHER UTILITIES AS SPECIFIED IN L.C.W.D. SEWER SHOWN HEREON' AND ANY OTHER WHICH IS NOT OF RECORD OR NOT CALIFORNIA DIVISION OF SAFETY FOR ALL TRENCH WORK. SPECIFICATIONS. TYPE "A" A.C. DIKE ............... G- 5................. SHOWN ON THESE PLANS. 7. INSTALL FIRE HYDRANTS 2 FEET FROM FACE OF CURB, IF NO 8. CONTRACTOR SHALL NOTIFY L.C.W.D. 48 -HOURS IN ADVANCE OF EXIST. EDGE OF PAVEMENT .............................. -„r_ 6. LOCATION AND ELEVATION OF EXISTING IMPROVEMENTS TO BE MET BY SIDEWALK EXISTS, OR 7 FEET FROM FACE OF CURB WHERE SIDEWALK BEGINNING WORK SO THAT INSPECTION CAN BE PROVIDED. WORK TO BE DONE SHALL BE CONFIRMED BY.FJELD MEASUREMENTS WILL BE CONSTRUCTED. EXIST. WATER MAIN ..... ............................... W 1 PRIOR TO CONSTRUCTION OF NEW WORK. CONTRACTOR WILL MAKE 9. ALL MAINS AND LATERALS SHALL BE CONSTRUCTED WITH A 48 -INCH . ^ EXPLORATORY EXCAVATIONS AND LOCATE EXISTING UNDERGROUND 8. PROVIDE AIR RELEASE ASSEMBLIES-AT ALL HIGH POINTS IN WATER MINIMUM COVER. ALL LATERALS SHALL BE CONSTRUCTED CLEAR OF WATER SERVICE CONNECTIONS ........ B- 1.1,B -1.2 * *...... FACILITIES SUFFICIENTLY AHEAD OF CONSTRUCTION TO PERMIT MAIN. DRIVEWAYS. REVISIONS TO PLANS IF REVISIONS ARE NECESSARY BECAUSE OF EXIST. SEWER MAIN: ................................... S ACTUAL LOCATION OF EXISTING FACILITIES. 9. CONTRACTOR SHALL OBTAIN ENCROACHMENT PERMIT FROM THE CITY OF 10. ALL LOTS SHALL BE SERVED BY 4 -INCH V.C.P. LATERALS SET AT A ENCINITAS FOR ANY EXCAVATION WITI4IN EXISTING CITY RIGHTS -OF- MINIMUM GRADE OF 2.0% WITH A MINIMUM DROP OF 0.3 FEET, AND P.V.C. SEWER MAIN ................ S- 4 * ................ 7. THE CONTRACTOR SHALL NOTIFY THE SAN DIEGO GAS 6 ELECTRIC WAY. AN INVERT DEPTH OF' 5.5 MINIMUM FEET BELOW TOP OF CURB AT COMPANY PRIOR TO STARTING WORK NEAR COMPANY FACILITIES AND PROPERTY LINE, UNLESS OTHERWISE APPROVED BY L.C.W.D. SEWER CLEANOUT ................... S- 3 *................ SHALL COORDINATE HIS WORK WITH COMPANY REPRESENTATIVES. 1.0. THE DISTRICT REQUIRES THAT COMPACTION TESTS BE TAKEN WHERE WATER LINES ARE INSTALLED WITHIN EXISTING COUNTY RIGHTS -OF- 11. STANDARD SPCIFICATIONS OF L.C.W.D. FOR SEWER CONSTRUCTION SEWER LATERAL....... ............... S-A 3* ...... S NQTICE: ALL ELECTRICAL AND GAS SERVICES WITHIN THIS WAY, CITY OF ENCINITAS RIGHTS -OF -WAY, PRIVATE EASEMENTS, AND ARE AVAILABLE AT THE DISTRICT OFFICE. PROJECT ARE "UNDERGROUND INSTALLATIONS ". FOR THE RESULTS APPROVED BY THE CITY OF ENCINITAS, BEFORE THE SPOT ELEVATIONS ....... ............................... LOCATION OF ELECTRICAL CABLES AND GAS PIPING WATER LINES ARE ACCEPTED AND A COPY SENT TO THE SAN DIEGUITO 12. ALL CONCRETE TESTING REQUIRED BY THE DISTRICT WILL BE AT THE AND APPURTENANCES, CONTACT SAN DIEGO GAS 6 WATER DISTRICT OFFICE. EXPENSE OF THE CONTRACTOR. ELECTRIC COMPANY, TEL.: 800- 422 -4133 PARCEC 11. PRIOR TO AWARDING WATER LINE CONTRACT, OWNER SHALL ADVISE 13. JOB MIXING OF CONCRETE WILL NOT BE ALLOWED WITHOUT THE .LOT NUMBERS ............ ............................... 8. THE CONTRACTOR SHALL NOTIFY THE PACIFIC TELEPHONE PROSPECTIVE CONTRACTORS TO OBTAIN AND REVIEW CURRENT SAN PERMISSION OF THE DISTRICT. -' COMPANY PRIOR TO STARTING WORK NEAR COMPANY FACILITIES AND DIEGUITO WATER DISTRICT'S SPECIFICATIONS. DIRECTION OF DRAINAGE . ............................... ----- low ---- SHALL COORDINATE HIS WORK WITH COMPANY REPRESENTATIVES. 14. ALL, PIPES SHALL HAVE 4 -INCH MINIMUM CRUSHED ROCK BEDDING, 12. THE CONTRACTOR SHALL NOTIFY THE DISTRICT'S INSPECTION SHOWN ON L.C.W.D. STANDARD DRAWING S -12. NOT ALL TELEPHONE SERVICES WITHIN THIS PROJECT DEPARTMENT 48 HOURS IN ADVANCE OF BEGINNING WORK TO ARRANGE BOUNDARY ARE "UNDERGROUND INSTALLATIONS ". FOR FOR INSPECTION OF PROJECT. LOCATIONS OF CABLES AND APPURTENANCES, 15. INSPECTOR SHALL BE FURNISHED THREE SETS OF CUT SHEETS. 40' f1V CONTACT THE PACIFIC TELEPHONE COMPANY, 13. FILL AREAS MUST BE COMPACTED TO 90 %, PRIOR TO PIPE 16. WHERE TRENCHES ARE WITHIN EASEMENTS, SOILS REPORTS SHALL BE TEL.: 800 - 422 -4133 INSTALLATION. SUBMITTED TO THE EINGINEER OF WORK AND THE DISTRICT ENGINEER R BY A QUALIFIED SOILS ENGINEER WHICH CERTIFIES THAT TRENCH + 9. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO 14. APPROVAL OF THIS PLAN BY S.D.W.D. DOES NOT CONSTITUTE A BACKFILL WAS COMPACTED AS DIRECTED BY THE SOILS ENGINEER IN g - CONTACT THE UTILITY AGENCIES, ADVISE THEM OF THE PROPOSED REPRESENTATIVE AS TO THE ACCURACY OF THE LOCATION OF, OR THE ACCORDANCE WITH ON -SITE EARTHWORK SPECIFICATIONS AND IMPROVEMENTS AND BEAR THE COST OF RELOCATIONS, IF NEEDED. EXISTENCE OR NON- EXISTENCE OF, ANY UNDERGROUND UTILITY, PIPE DISTRICT SPECIFICATIONS. h OR STRUCTURE WITHIN THE LIMITS OF THIS PROJECT. 10. ALL TELEVISION SERVICES WITHIN THIS PROJECT ARE 17 REQUIRED LATERAL INFORMATION SHOWN IN PLAN VIEW ON SHEET *2. R "UNDERGROUND INSTALLATIONS ". FOR LOCATION OF CABLES AND 15. ALL EXISTING FACILITIES WHICH MAY EFFECT FINAL DESIGN, I.E., R APPURTENANCES, CONTACT T.M. CABLEVISION, TEL.: 436 -3693 LINE CROSSING, LINE PARALLELING OR PROPOSED CONNECTION OR I Q WITHIN 10 FEET OF PROPOSED WATER MAINS SHALL BE SHOWN ON �'1:" + I� IMPROVEMENT PLANS. ELECTRICAL AND SEWER TO CROSS UNDER 11. THE CONTRACTOR SHALL NOTIFY AND OBTAIN APPROVAL OF THE WATER MAINS UNLESS GIVEN WRITTEN PERMISSION BY WATER 18. THE CONTRACTOR SHALL CONFORM TO LABOR CODE SECTION 6205 ENGINEER PRIOR TO MAKING CHANGES IN THE FIELD. DISTRICT. BY SUBMITTING A DETAILED PLAN SHOWING THE DESIGN OF SHORING, BRACING, SLOPING OR OTHER PROVISIONS TO BE 12. POWER SOURCES AND RUNS SERVING STREET LIGHTS SHALL BE SHOWN ON THE "AS- 16. WATER CONNECTIONS TO COMMERCIAL DEVELOPMENTS SHALL HAVE A MADE FOR WORK PROTECTION FROM THE HAZARD OF CAVING BUILT IMPROVEMENT DRAWINGS. ALL SOURCES SHALL BE LOCATED WITHIN THE APPROVED BACKF'LOW DEVICE INSTALLED TO THE DISTRICT'S GROUND DURING THE EXCAVATION OF SUCH TRENCH OR TRENCHES DEDICATED RIGHT -OF -WAY, OR WITHIN EASEMENTS DEDICATED TO THE COUNTY OF SATISFACTION. BACKFLOW DEVICES ARE TO BE INSTALLED DIRECTLY_ OR DURING THE EXCAVATION OF SUCH TRENCH OR TRENCHES OR OUTSIDE EUC44YPTI/S AYENUE SAN DIEGO. OUTSIDE CITY OR COUNTY RIGHT -OF -WAY OR OUTSIDE WATER DURING THE PIPE INSTALLATION THEREIN. THIS PLAN MUST DISTRICT EASEMENT. REPAIR, MAINTENANCE AND ANNUAL TESTING BE PREPARED FOR ALL TRENCHES FIVE FEET OR MORE IN DEPTH NO T rO 5CAL E OF BACKFLOW DEVICES ARE RESPONSIBILITY OF OWNER. AND APPROVED BY THE OWNER PRIOR TO EXCAVATION. IF THE 13 NO PAVING SHALL BE DONE UNTIL EXISTING POWER POLES ARE RELOCATED OUTSIDE PLAN VARIES FROM THE SHORING SYSTEM STANDARDS THE AREAS TO BE PAVED. ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, THE PLAN SHALL BE PREPARED BY A REGISTERED CIVIL OR STRUCTURAL ENGINEER AT THE CONTRACTOR'S EXPENSE. SO'PR/VATEJlt'>r1DEASAAEV VAR /ES F/ggy yA/� /ES F,�M o'ro zc � 0' roe Z CEA?T /rY 77447 77-1E PRIV4TE 2040 /MPEOVE1-1EA/75 45 SHOWN OAJ Tr415 FY.4A1 54T15f /CS 774E AZEGXJIQEM AJT5 AS ST4TCD /A/ 7HC P/AJ46 AJOTICE OF APMACN0C- Poe PM 86 - 068 401.10 T.IE 97WA104205 PL-)R PRIV47E 04 T " IT IS AGREED THAT FIELD CONDITIONS MAY REQUIRE CHANGES TO DECLARATION IBLE_CHARGE 6"7YPE 21 0 SE M 3 "A•C. oVERG "A. e. mm. (TYP. ) R!0 O , E. 5 37 THESE PLANS. t:)-we 5000. G - r1J5PECT /DAJ BY j,EA/G /AJCE2 O r K O e , L DC /7Y I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR T H I S PR/I//4TE OR/I/E6i/lJY IT IS FURTHER AGREED THAT THE OWNER (DEVELOPER) SHALL HAVE A PROJECT. THAT I HAVE EXERCISED RESPONSIBLE CHARGE OVER THE 2EV1&WED AC C0A1A:)kCf44A10E W1714 PRIV4TE 5T/ZE6T5 ST41J04AZOS: REGISTERED CIVIL ENGINEER MAKE SUCH CHANGES, ALTERATIONS OR DESIGN OF THE PROJECT AS DEFINED IN SECTION 6703 OF THE BUSINESS NOT rD ALE ' By: ADDITIONS TO THESE PLANS WHICH THE DIRECTOR OF PUBLIC WORKS AND PROFESSIONS CODE AND THAT THE DESIGN IS CONSISTENT WITH AR N. 216-053-17 ����� i- 11�s1� DETERMINES ARE NECESSARY AND DESIRABLE FOR THE PROPER COM- CURRENT STANDARDS. ,l0 Kr NKJ�E',2CA/ R.C.E. 9B/4 1'a4TE C /Ty E A / G / A I E E a PLETION OF THE IMPROVEMENTS, I UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND SPEC I F I - � 0�✓NER /PERM /T TEE I FURTHER AGREE TO COMMENCE WORK ON ANY IMPROVEMENTS SHOWN CATIONS BY THE CITY OF ENCINITAS IS CONFINED TO A REVIEW ONLY ON THESE PLANS WITHIN EXISTING CITY RIGHT -OF -WAY WITHIN 60 AND DOES NOT RELIEVE ME, AS ENGINEER OF WORK, OF MY RESPONSI- DAYS AFTER ISSUANCE OF THE CONSTRUCTION PERMIT AND TO PUR- BILITIES FOR PROJECT DESIGN. MARK HO►RR150N SUE SUCH WORK ACTIVELY ON EVERY NORMAL WORKING DAY UNTIL 617 -4 l,IESTLAKE STREET COMPLETED, IRRESPECTIVE AND INDEPENDENT OF ANY OTHER WORK BY:___ _ __� .0 1' _______ E/VC /N /TA S, CA 9tot4 ASSOCIATED WITH THIS PROJECT OR UNDER MY CONTROL. - - ---- DATE_ T� � ExP. s /s/ /S/ WAYNE P CO - py 78 C619) 944 -73 R.C.E. 29577 T SITE OWNER = A N N w�, ADDRESS in Wow o"�O&VO N PRIVATE CONTRACT W CA 1VO-5-4W ASSESSOR'S PARCEL tl&. 065 - /7 PERMITS l ry or Ec / A Z T= DEPARTMENT NIA 1 1 I � + REZONE PERMIT NO. N N /A PL'AN5FORTIIEI/4PR04EJWAIT3 OF: C � N SPECIAL USE PERMIT NO. Z ` IN TENTATIVE MAP NO. dB- ova T PM 88-068 FIRE AGENCY SAN D/EG U /TO MATER DISTRICT L EUC,4D /A C0V#TY !✓ATER D ISTRICT C I TY AF PP OVEO CHAP GM BENCHMARK MARK I CALIFORNIA COORDINATE INDEX 330-/677 4k) ENCINITAS FIRE PROTECTION AGENCY !A/gTER A/E N'' Oss"Fas11 � riii4 h °i' &VASS 014W STANPED O.C. 45 h PASCO ENGINEERING DEECRN'TION: /T / % \\ (Olt) 258 -8212 SAN Dle'60 CO- SCACM MARK / .9640. SBC11eTtflc�t,TMs N t sas Ho. HIGHWAY 10+ LOCATION: /00'EAST. OF Ti IAT.OFA/AT101�LA CGIfTAA/E /A+ r# E r !� c i APPROVED BY: I eokANA KACH, CA 02075 C OAL• l O"M4r Or SW.,CQII, QF r116 - A. r. �S.F W 4R /D66 Enp off k: A/,l a CAKk.d by: Lai WCw�...._ /� -1• G r► RECORD FROM: a C UAYTY !�J a �- �flc� B��R DATE: O ' ���� 51ON4TWI , L) 0,4rE 8/ .4T!/191E DATE ELEVATION: 55 t .3G DATUM: NICAN.fsA LLYEL A c. c. 2.9577 A..•...�..+. TPM 88- A10 SCAI W FILE M0. PE- 231 r , : r 1 I I I I -- r Ir : I F , r. ,� I i , I I t - t • 1 . 1 �� f T i - - - r - { fi fi t t l 1 r -� - +- -t -- r -- - - t T I - t tt - - -- - : - - 4�F I - - i - 1 } } 1 I I fi !t�t � I - -- r r , r r 1 , 1 I � t ( 1 � I 1} i ! I i I r ! -- ; r: r t I � r I � � I 1 t I - - i - -- - I - - -- - - - - - - 1f f }�� � t { } { }t$ 1- f - -, ff -- i ', , ', } I - t t - - - - -�- I 1 - - - - - i i - 1- -- - - _ - - + r I t- r 1 t r r l I I � I 14 ' I I �� I � : - - - - -. I I I11 , I t 1 1 i - -- -- 1- _ I _— ; - r I , 1 ; , r I I , i I -- - - -- - - - - - i r r - 1 1 � - - - -- t t ♦ r t t t t- - r r 45 lid i - - - I 1 - - f G C - - - -- - - - - t - � + � + � � � } } t � t- � 1 - ♦ t - .- } - i i I t r } + - - - f - Ott} �� ��,{ I��1 - -� - - __ -, . -� - I} } � - t r • f : • ! i { - - - - - } } - - } } 1 I : : r _ _ : : : : I I — Y " m t -._ o +oo 4- 00 ti C UR43 DAT SCgCcc W v N0. A OR BEARING RADIUS LENGTH REMARKS `? N 15 47 Gi0 W — 11.40 C TYPE A BERM Q � ti QE 2 15 45' 30" 1(00.00' 4401' C0 "TYPE'A "GERM Q 3 8(0° 15' 4/" 2000 3O.If' DCC arP4YEMENT V J 4i EP E.P. t, 4 Al 79 ?3'17 — 41.11 DGE OFPAYErIIENT N 79 °23' 17 # 6 — 39.63 ecar PAYENEN 2*1 M IN. O V Q JV v / D,�4 (a g4 49 43' 20.00 29. �Ol' 06E OFPAYENE Q �P 4 7 N /5 ° 47 00 W 6.631 OF PAVEMENT DIN. O W �� Or w9 ' PARCEL I S °� . Q�. o W S IN DA TA SEWER LATERAL CONNECTION DETAIL 6y p �" t y�jh Q . W h N0. AORBEAR /N6 RAD /U EN S LGTH NO SCALE 35'�S Io $ � �? 1 8 N15 ° 47'010 " W — 10.31' 2 15 ° 45' 30" 172 00' 47.31' SE!✓ER LATERAL S 9.1700 55.0/ /. E. (6i� �) ti ..• .., •� w -- _ --- Ir - - RE/`JOYE AND PC UG 6X1 5T 004.1c 4" SEWER LA TERAL + EX /ST. __ RENOYE EX /ST. CAP � ��• LA TERAL - CONNECT NElJ 8" HA /Y EUCAL YP TUS A 1/E QgOFESS/p " n E Ni — F- - - - - -- a_PP mo w ~ ' 3 Q NE P9 cc, h F6Z Y / n h Oa / y �1: �` i rrs�. R/W 0 Q ! oelvewgy No. 29577 U W j a CRADE AND GAY A/C TO Q t6 kWh PROD /DE FLUSH MATCH All TH E 0/ � �►�� n h p EXIST /N6 ROAD SURFACE pF \f0� PRIVATE CONTRACT W D,FkrL0r°EQ r0 SEA0 THE COST pf ALL wAr z /MRCO SHEET DEPARTMENT E- n/r 5. C ENC /N /TAS 2 v NOM DEVELOP4R To MAKE ARRAN6EMGNrS Wirth /TV OF WArEQ aorw�er SHEETS TO 0040eArE 66R✓.rE Fae /905 AWAL0^16/5 FF00M AND.CEW TO 2 PUBLIC WORKS 1 . . �Itf//TV5 /N COM&WAT /O/V wl TWO NEW wwr C ,�eoc46 PLANS FOR THE /NPROYEMENTS OF: V �ooVjWQj 0jfACr (OC rIOn/ TO 6E DET�M /n/E.O dY WA Me V N DYSTR /CT /N F14aO, 6YI- 6.0. ON 45LcAG✓n -&5 TO 6E h w .46AN00N � NEW 50. -ec SD•IV0• P- -4 M AE &V- AT 6 -1/N6 E ~ o. T P M 8 8 — X 6 8 cz N C / TY APPROVEO CHANGES BENCH MARK No. OtWipbon Approved by Dale CA41FORN14 COORD /NAT INDEX 330 PASCO ENGINEERING DESCRIPTION 86 D /5A'STAN /Ty EN6 /N PED QC. 145 EE _ I�i� (619) 280 - 0212 SAN D1E60 CO. BENCH MARK /964. socoorowiRs,b11At� i 636 NO. HIGHWAY 101 LOCATION. �'EASTOFTNE OFN!✓1'f01ILACOSTAAYE, 1N OAT N imc cm SICK ANA 89ACH. CA s *07 THE COX. A(41XWAY OF S.W COR.OF TNEA•T.4'5.F. RR BR /AiE E p ,°°, °I ,,.,, : ,4y c yyx Cnacw.° by W = kg RECORD FROM: 3AN DIEGO COUNTY A /L,,,�, 53OC - O = 2c ELEVATION: 59.368 DATUM MEAN .SEA C.EYEC. E,YP 31/91 R C e 2 -1577 App. °., ea ." TPM 8 -048 = C* t W � FILE N0. PE-231