Loading...
1990-65573 15 63 f*90 0655,13 ~ oFFF;~ r~,:,d' ) • Recording Requested By: ~ . C3.ty of Enainitas ~ 50 FEF3 - 6 AM 2 I When Recorded Mai1 To: j COU'r • City Engineer CITX OF ENCINITAS j SPACE ABOVE FOR 527 Encir.itas Boulevard, Suite 100 RECORDER' S USE ~ncini~as ~alxforr.ia 92024 i1 CITY dF ENCINITAB, CAI,IFORIdIA NOTICL OF CQI~iPLl~i6O ET~IO~N To all Subcantractors, LaMorer, Material 22en and Every Qther Parson Interested: ublic YOIJ WIL•L PLEASE TAKE NOTICE that on December 8, 1989, P warks project number PW090, "Canstruction of Median Isl.and on kiighiaay 101 at Leucadia Boulevard", on which J. M. Proctor. Cons't.ruction was the cantractor and the Martin G. Moore Agency was the surety, was completed. The work consisted in general of removal of existing A.C. pavement, conarete curhs, and guard rail and installing new concrete curbs, A.C. pavement, gri-ding median island area for future landscapinq, and installing conduit and meter/pull boxes for future electrical and water services for Highway 101 Median Island between Zeucadia }3oulevard and J4sper Street. CyPX dF ErT INITAS i Robert A. Warren City Engineer VERIFICATI()N nF CITY CLERK I the undersigned, say: I am the City Cler)c of the City of Encinitas; the City Council nf said City of F,Ie i,v r accepted the above described work as campleted and ordered that an Notice of Completicn be fiZea. I declare under penalty of perjury that the fo.regoing is true and correct. ~ at Encinitas, Califc.rnia. Executed on CITY OF ENCINITAS .L•ct-. ~ Cit lerk SW/jm/PN3-284wp5 (12-26-89) rj ~