1990-65573
15 63 f*90 0655,13
~
oFFF;~ r~,:,d'
) •
Recording Requested By: ~ .
C3.ty of Enainitas ~ 50 FEF3 - 6 AM 2 I
When Recorded Mai1 To:
j COU'r •
City Engineer
CITX OF ENCINITAS j SPACE ABOVE FOR
527 Encir.itas Boulevard, Suite 100 RECORDER' S USE
~ncini~as ~alxforr.ia 92024 i1
CITY dF ENCINITAB, CAI,IFORIdIA
NOTICL OF CQI~iPLl~i6O ET~IO~N
To all Subcantractors, LaMorer, Material 22en and Every Qther Parson
Interested:
ublic
YOIJ WIL•L PLEASE TAKE NOTICE that on December 8, 1989, P
warks project number PW090, "Canstruction of Median Isl.and on
kiighiaay 101 at Leucadia Boulevard", on which J. M. Proctor.
Cons't.ruction was the cantractor and the Martin G. Moore Agency was
the surety, was completed.
The work consisted in general of removal of existing A.C.
pavement, conarete curhs, and guard rail and installing new
concrete curbs, A.C. pavement, gri-ding median island area for
future landscapinq, and installing conduit and meter/pull boxes for
future electrical and water services for Highway 101 Median Island
between Zeucadia }3oulevard and J4sper Street.
CyPX dF ErT INITAS
i Robert A. Warren
City Engineer
VERIFICATI()N nF CITY CLERK
I the undersigned, say:
I am the City Cler)c of the City of Encinitas; the City Council
nf said City of F,Ie i,v r accepted the above described
work as campleted and ordered that an Notice of Completicn be
fiZea.
I declare under penalty of perjury that the fo.regoing is true
and correct.
~ at Encinitas, Califc.rnia.
Executed on
CITY OF ENCINITAS
.L•ct-. ~
Cit lerk
SW/jm/PN3-284wp5 (12-26-89) rj
~