Loading...
1997-5372 G Street Address ~/10 I 6t13& .0 Serial # Category 7P(J1 q7-~7t/ Name Description Year Plan cl<. # I I I I I I I I I I I I I I I I I I BARRY AND ASSOCIATES GEOTECHNICAL ENGINEERING P,O, Box 230348 Encinitas, CA 92023-0348 (760) 753-9940 November 2, 1998 San Elijo, LLC P.O. Box 22562 San Diego, California 92122 Att: Mr. Josh Addison Subject: FINAL GRADING REPORT Proposed Duplex Condominium San Elijo Avenue Cardiff, California 92007 References: PRELIMINARY GEOTECHNICAL INVESTIGATION Proposed Duplex Condominium San Elijo Avenue Cardiff, California 92007 12/12/97 RETAINING WALL FOOTING EXCAVATION Prepared by Barry and Associates, Dated 7/30/98 EAST RETAINING WALL FOOTING EXCAVATION Prepared by Barry and Associates, Dated 9/10/98 Dear Mr. Addison, In response to your request, we have observed the grading operation and performed field density tests for the proposed duplex condominium on the above referenced property. The results of our density testing and laboratory testing are presented in this report. Based on the results of our testing, it is our opinion that the fill was placed in an adequate manner and compacted to a minimum of 90 percent of the laboratory maximum dry density. If you have any questions, please contact us at 760.753.9940. This opportunity to be of service is appreciated. submitted, I I I I I I I I I I I I I I I I I I I ROUGH GRADING REPORT Proposed Duplex Condominium San Elijo Avenue Cardiff, California 92007 Prepared for San Elijo LLC P.O. Box 22562 San Diego, California 92122 November 2, 1998 W.O. G- 1539 Prepared by: BARRY AND ASSOCIATES P.O. Box 230348 Encinitas, California 92023-0348 I I I I I I I I I I I I I I I I I I I November 2, 1998 W.O.# G-1539 Page 1 INTRODUCTION This report presents the results of our observations and field densi ty testing of the grading proj ect for the proposed duplex condominium. The project consisted of cutting and filling of the westerly facing natural slope in order to create split level building pads while removing approximately 2 feet of loose surficial soil and re-compacting east of the garage area. Compaction tests were taken in pad areas and retaining wall backfill. Results of our density testing are presented on Table 1. LABORATORY TEST DATA The laboratory standard for determining the maximum dry density was performed in accordance with ASTM D 1557-92. Field density tests were performed in accordance with ASTM D 1556. The results of the laboratory maximum dry density, for the soil used as compacted fill on the site, is summarized below: Description Maximum Dry Density (p.c. f.) 125.2 Optimum Moisture (%) Brown silty sand 10.5 EXPANSIVE SOILS Pad grade soils have an expansion potential in the low range. DISCUSSION The following is a discussion of the grading operations, as they I I I I I I I I I I I I I I I I I I I I November 2, 1998 w.O.# G-1539 Page 2 were performed on the site: 1. The south property line was shored with steel H beams inserted in a drilled hole and back filled with 3000 lb. concert below the garage floor elevation and a slurry mix to grade. 2. The garage area was excavated to grade and the second and third levels prepared by removing and re-compacting approximately 2 feet of surface soil and creating level building pads. 3. Retaining walls were backfilled with crushed rock and native soil 4. Fill soil was placed in lifts of approximately 6.0 to 8.0 inches thick. 5. The soil was moistened as required to achieve optimum moisture content, and compacted with track mounted earth moving equipment. 6. The fill was placed to a minimum of 90 percent of the maximum dry density, as indicated by our test results. INSPECTIONS All structural footings excavations were probed with a steel probe and approved by this firm. I I I I I I I I I I I I I I I I I I I November 2, 1998 w.O.# G-1539 Page 3 LIMITATIONS This firm assumes no responsibility for any alterations made without our knowledge and written approval to the slope or pad grade on the lot, subsequent to the issuance of this report. If you have any questions, please do not hesitate to contact us at (760) 753-9940. This opportunity to be of service is greatly appreciated. Respectfully A. R. BARR ~!?{!;y Principal Engin I I I I I I I I I I I I I I I I I I I w.o. # G-1539 San Elijo Avenue Cardiff, CA APPENDIX "A" LABORATORY TEST RESULTS TABLE I Field Dry Density and Moisture Content Test ~ Test Location Elev. Moisture Content % Dry Density (pcf) Relative % Compaction 1 Retaining wall grade-2' 11.2 113.7 91 Retaining wall grade-1' 10.0 114.3 91 Retaining Wall grade-2 11.7 113.0 90 Middle Level grade-6" 12.1 114.4 91 Upper level grade 11.5 113.9 91 2 3 4 5