GEOTECHNICAL INVESTIGATION
RHYNER PROPERTY
A.P.N. 259-231-75
WEST OF RANCHO SANTA FE ROAD
ENCINITAS. CALIFORNIA
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
rll
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
WESTERN
I
SOIL AND FOUNDATION ENGINEERING, INC.
PHONE 746-3553
AREA CODE 619
423 HALE AVENUE
ESCONDIDO. CALIFORNIA 92025
June 19, 1989
San Dieguito Engineering
4407 Manchester Avenue, '105
Encinitas. California 92024
Attention: Sandy Stewart
Project:
Job No. 89-52
Rhyner Property
A.P.N. 259-231-75
West of Rancho Santa Fe Road
Encinitas. California
Ms. Stewart:
In accordance with your request. we have completed a geotechnical
investigation for the proposed project. We are presenting,
herewith, our findings and recommendations.
The findings of this study indicate that the site is suitable for
the proposed development provided the special site preparation and
foundation recommendations presented in the attached report are
complied with.
If you have any questions after reviewing the findings and
recommendations contained in the attached report. please do not
hesitate to contact this office. This opportunity to be of
professional service is sincerely appreciated.
Respectfully submitted.
WESTERN SOIL AND FOUNDATION ENGINEERING, INC.
Vi~~St~~ist
~~~. ~--//~:
{. ~~ _Y--.v---~~
Dennis E?,/ 1RUnerman CE 26676 GE 928
VG/DEZ:pl
Attachments
Distribution: (4) Addressee
( 2) Bill Cover
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
,
GEOTECHNICAL INVESTIGATION
RHYNER PROPERTY
A.P.N. 259-231-75
WEST OF RANCHO SANTA FE ROAD
ENCINITAS, CALIFORNIA
Prepared For:
SAN DIEGUITO ENGINEERING
4407 MANCHESTER AVENUE, '105
ENCINITAS, CALIFORNIA 92024
JOB NO. 89-52
JUNE 19, 1989
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE OF CONTENTS
Introduction and Project Description
Project Scope
Findings
Page
1
1
2
Site Description
Subsurface Conditions
Groundwater
2
3
5
Recommendations and Conclusions
Site Preparation
Foundations
Field Explorations
Laboratory Testing
Plan Review
Limitations
Plate Number 1
Plate Number 2
Plate Numbers 3 through 8
Plate Number 9 & 10
Plate Number 11
Plate Number 12
Plate Number 13
APPENDIX I
6
6
Existing Soi I
Expansive Soil
Imported Fill
Surface Drainage
Earthwork
Cut and Fill Slopes
Rippabil i ty
6
6
7
7
7
8
9
9
General
Transition Areas
Lateral Resistance
Retaining Walls
Footing Observations
9
10
10
11
12
12
13
13
14
ATTACHMENTS
Site Plan
Unified Soil Classification Chart
Trench Logs
Laboratory Test Results
Plasticity Index/Liquid Limit
Table One
Fill Slope Key
Specifications for Construction of
Controlled Fills
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
GEOTECHNICAL INVESTIGATION
RHYNER PROPERTY
A.P.N. 259-231-75
WEST OF RANCHO SANTA FE ROAD
ENCINITAS, CALIFORNIA
INTRODUCTION AND PROJECT DESCRIPTION
This report presents the results of our qeotechnical
investiqation performed on the above referenced site. The
proposed proiect will be a 2 lot residential subdivision. Each
lot will contain a one or two story sinqle family dwellinq. It
is anticipated that the construction will be wood-framed. The
foundations will be slab-on-qrade with continuous footinqs.
Approved qradinq plans were not available at the time of our
investiqation. However. it is anticipated that any earthwork
performed will result in elevation chanqes of less than 10 feet.
Should any future development deviate siqnificantly from
these assumptions, we should be consulted for further
recommendations.
The site confiquration and exploratory trench locations are
shown on Plate No.1.
PROJECT SCOPE
This investiqation consisted of a surface reconnaissance,
subsurface exploration, obtaininq representative samples,
laboratory testinq, analysis of the field and laboratory data and
preparation of this report.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-1-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Specifically, the intent of this analysis was to:
a) Explore the subsurface conditions to the depths
influenced by the proposed construction,
b) Evaluate, by laboratory tests, the pertinent
enqineerinq properties of the various strata which
will influence the development, includinq their
bearinq capacities, expansive characteristics and
settlement potential,
c) Develop soil enqineerinq criteria for site
qradinq,
d) Determine potential construction difficulties and
provide recommendations concerninq these problems,
and
e) Recommend an appropriate foundation system for the
type of structures anticipated and develop soil
enqineerinq desiqn criteria for the recommended
foundation desiqn.
FINDINGS
SITE DESCRIPTION: The property site is located approximately 360
feet west of Rancho Santa Fe Road on a paved private road ;ust
south of W,,,,," Wind Drive. Encinitas. California. It is leqally
described as "Parcel 4 of P.M. No. 15145 in the City of
Encinitas, State of California, accordinq to Map thereof File
2-16-88 as F/P 88-071136." It is further identified as
Assessor's Parcel Number 259-231-75.
W.c:STERN
SOIL AND FOUNDA nON ENGINEERING, INC.
-2-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
The property is nearly rectangular in shape encompassing
1.28 acres. It is bounded on all sides by single family
residences. A private road and utility easement runs along and
inside the eastern and southern property lines.
Grading has previously been performed on the property. A
cut/fill pad exists across the western half. It sits at an
elevation of roughly 135+ feet (M.S.L.). From the top of this
pad the topography falls at a moderately steep angle across the
eastern half of the site. A 2:1 cut slope exists behind the pad
at the northwest corner and a cut/fill slope runs along the
western property line. In addition, a fill slope encroaches onto
the property from the ad;acent parcel to the north.
A drainage swale flows to the east along the paved private
road at the south end of the site. It varies from a depth of 8
feet in the vicinity of the existing pad to 2 feet at the
southeast corner. It drains to a concrete inlet by the paved
private road.
Vegetation on the site consists mainly of scattered low
growing wild grasses and brush. These occur on the slopes and
swale area. The pad is basically clear of vegetation.
SUBSURFACE CONDITIONS: The subiect site is underlain by the
Eocene age sediments of the Del Mar Formation and Torrey
Sandstone.
The Del Mar Formation is the most prevalent on this site.
Locally, it is composed of dark areen waxy siltstone and sandy
siltstone interbedded with dark green to yellowish-green silty
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-3-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
fine to medium grained sandstone. The siltstone is very stiff to
hard but fractured. especially near the surface. It has a hioh
moisture content and shrinks and cracks when exposed to air. It
is moderately plastic and expansive. and therefore. unsuitable
for lot capping material.
The sandstone beds are made up of subangular grains of
guartz, feldspar and both dark and light micas. This material is
moderately to well cemented and in a dense condition.
Within the southwestern portion of the site, the siltstone
of the Del Mar Formation is conformably overlain by the Torrey
Sandstone. In this area. the Torrey Sandstone consists of medium
to light brown fine sand. Its mineral constituents are
predominately an~ular to sub-rounded grains of quartz and
feldspar. Near the contact with the underlYing Del Mar Formation
it grades to a dark brown clayey sand. In the area of
exploratory trench T-4, it is medium dense to dense and
moderately well ceme~ted. In trench T-6, it is less dense and
poorly cemented.
The Eocene sediments are covered by colluvium and fill soil.
The colluvium varies from dark brown very clayey medium sand
to light brown slightly silty very fine to fine sand. This
variance is dependent upon the formational source. The colluvial
soils are very moist. poorly consolidated and compressible. They
are typically in a 1 to 2 foot thick layer.
Fill soil occurs in the vicinity of exploratory trenches T-1
throuQh T-4. It ranQes in thickness from 2 feet in trench T-3 to
11.5 feet in trench T-l. The material is comDosed of
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-4-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
interlavered brownish-qreen silty clay and olive qreen sandy
clay. It is poorly compacted and in a very moist to saturated
condition.
A sample of this clay was returned to our laboratory to
determine its expansive potential. Test results indicate this
material to have a medium expansive potential with an expansion
index of 70 (please see laboratory results, Plate 9).
As mentioned in the "Site Description", a fill slope
encroaches from the adiacent property to the north. Field
density tests taken in this fill failed to meet or exceedd 90\
relative compaction.
No obvious qeoloqic hazards were observed in any of our
subsurface explorations. The main concern on this particular
site will be the proper treatment of compressible and expansive
soil material as outlined in this report.
GROUNDWATER: Free qroundwater was not encountered in any of our
subsurface explorations. However, fluctuations in the level of
qroundwater may occur which were not evident at the time of our
investiqation.
RECOMMENDATIONS AND CONCLUSIONS
SITE PREPARATION
EXISTING SOIL: We recommend that any existinq fill, topsoil.
colluvium, and low density soil be removed to firm natural qround
from beneath proposed fill pad areas, so that structures will be
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.
supported on firm material.
Based on the findings of this study. the depth of removal
will range from 1 to 11.5 feet. Table Number One at the back of
this report presents anticipated removal depths in the area of
our exploratory trenches.
This soil may be replaced, if desired, as a properlv
controlled fill densified to at least 90% relative compaction.
All delet rious materials and oversized debris encountered in
this fill should be removed and leqally disposed of off-site.
The horizontal limits of these recommendations should
include the area within the perimeter of 10 feet beyond the
buildinq exteriors. All areas to receive asphaltic or concrete
pavements, slabs. or sidewalks should be treated similarly and be
included within this perimeter.
If groundwater is encountered during the removal and
recompaction of the soil or difficulty is encountered in
achieving a minimum of 90 percent relative compaction, then this
office shall be consulted for further recommendations.
EXPANSIVE SOIL: All expansive soils shall be kept at least 3
feet below proposed finish subgrade. Expansive soil occurrinq on
cut lots within 3 feet of finish pad grade shall be completely
removed and replaced with qranular non-expansive soil compacted
to a minimum of 90% relative compaction.
Granular soil suitable for lot cappinq material was
encountered in exploratory trench T-6. This light brown. fine
qrained sand appears to exist within the southwest quarter of the
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-6-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
property,
IMPORTED FILL: Imported soils, if required at this site, should
be examined by our office to determine their suitability prior to
importinq these materials.
SURFACE DRAINAGE: Surface drainaqe should be directed away from
structures. The pondinq of water or saturation of soil should
not.be allowed adiacent to their foundations.
EARTHWORK: All earthwork and qradinq contemplated for site
preparation should be accomplished in accordance with the
attached Specifications for Construction of Controlled Fills.
All special site preparation recommendations presented in the
sections above will supersede those in the standard
Specifications for Construction of Controlled Fills. All
embankments, structural fill, and fill should be compacted to a
minimum of 90\. All utility trench backfill should be compacted
to a minimum of 90\ of its maximum dry density. The maximum dry
density of each soil type should be determined in accordance with
A.S.T.M. Test Method D1557-78.
Prior to commencement of the brushinq operation, a
preqradinq meetinq should be held at the site. The Developer.
Owner, Surveyor, Gradinq Contractor. and the Soil Enqineer should
attend. Our firm should be qiven at least 48 hours notice of the
meetinq time.
rI
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-7-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CUT AND FILL SLOPES: We recommend that all slopes be constructed
with a slope ratio of 2.0:1.0 (horizontal:vertical) or flatter.
to a maximum heiqht of 10 feet.
Fill slopes shall be keyed into dense natural qround. The
key should be a minimum of 2 feet deep at the toe of slope and
fall with 5% qrade toward the interior of the proposed fill areas
(please refer to Plate Number 13).
All keys should be inspected by the Soil Enqineer or his
representative in the field prior to placinq compacted soil
therein.
The existinq fill slope which encroaches from the ad;acent
northern property is not compacted to a minimum of 90% relative
compaction. However, stability calculations usinq the Janbu and
Sinqh methods indicate it to be stable from deep seated failure
provided development does not occur on or within ten feet of the
toe or top of slope. If it is decided that this area will be
cut. filled or developed, then remedial procedures to this slope
will be required.
Slopes should be planted as soon as feasible after qradinq.
Slope erosion includinq slouqhinq, rillinq. and slumpinq of
surficial soils may be anticipated if the slopes are left
unplanted for a lonq period of time. especially durinq rainy
seasons. Erosion control and drainaqe devices should be
installed in compliance with the requirements of the controllinq
aqencies.
RIPPABILITY: All soils encountered in the exploratory trenches
WESTERN
SOIL AND FOUNDA nON ENGINEERING, INC.
-8-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
are rippable bv conventional means to the depths investiqated.
FOUNDATIONS
GENERAL: The structures shall be supported on continuous
footinqs, bearinq in on-site soil material recompacted in
accordance with the recommendations contained in this report.
Footinqs should be desiqned with the minimum dimensions and
allowable dead plus live load bearinq values qiven in the table
below.
CONTINUOUS FOOTING PARAMETERS
Minimum Minimum Soil Load
Number of Depth Width Bearinq Value
Stories (inches) (inches) (P.s.f.)
1 12 12 2000
2 18 15 2500
The minimum depth qiven shall be below finish subqrade
(bottom of sand cushion). All continuous footinqs should contain
at least one .5 reinforcinq bar top and bottom to provide
structural continuity and to permit spanninq of local
irreqularities,
The soil load bearinq values presented above may be
increased by one-third for short term loads. includinq wind or
seismic.
Settlements under buildinq loads are expected to be within
tolerable limits for the proposed structures.
Concrete slabs-on-qrade may be supported on compacted
WESTERN
SOIL AND FOUNDA nON ENGINEERING, INC.
-9-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.
on-site soil or dense natural around. Four inches of clean
washed concrete sand should be placed beneath the slab for
curina. Slab reinforcina should be provided in accordance with
the anticipated use of and loadinas on the slab.
In areas where moisture sensitive floor coverinas are to be
utilized and in other areas where floor dampness would be
undesirable, we recommend consideration be given to providinq an
impermeable membrane beneath the slabs. The membrane should be
covered with two inches of sand to protect it durinq
construction. The sand should be liqhtly moistened iust prior to
placina the concrete. Care should be taken not to puncture the
visaueen. All ioints (laps) in the visqueen should be a minimum
of 6 inches in width and sealed with an approved sealer.
TRANSITION AREAS: Foundations supported partially on cut and
partially on fill are not recommended. The tendency of cut and
fill soils to compress differently can freauently result in
unequal structural support and subsequent crackinq to portions of
the structure. Therefore, in transition areas, we recommend that
the entire cut area be overexcavated and replaced with soils
compacted to a minimum of 90%. This overexcavation or
undercuttina should be carried to a depth of 2 feet below the
bottom of the deepest proposed footinq.
LATERAL RESISTANCE: Resistance to lateral loads may be provided
by friction at the base of the footinq and by passive pressure
aqainst the adiacent soil. For concrete footinqs on compacted
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-10-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
soil, an allowable coefficient of friction of 0.35 may be used.
An allowable passive uniform pressure of 200 pounds per square
foot actinq aqainst the foundation may be used in desiqn.
If footinqs are proposed ad;acent to slope areas, we
recommend that the footinqs be deepened to provide a minimum
horizontal distance from the outer edqe of footinqs to the
ad;acent slope face equal to one-half the heiqht of the slope.
This horizontal distance should be no less than 6 feet and no
more than 12 feet.
RETAINING WALLS: Retaininq walls must be desiqned to resist
lateral earth pressures and any additional lateral loads caused
by surcharqe loads. We recommend unrestrained walls be desiqned
for an equivalent fluid pressure of 30 pounds per cubic foot
(pcf) where backfill is level. We recommend restrained walls be
desiqned for an equivalent fluid pressure of 30 pcf plus an
additional uniform lateral pressure of 6H pounds per square foot
where H = the heiqht of backfill above the top of the wall
footinq in feet. Wherever walls will be subiected to sur-harqe
loads, they should be desiqned for an additional uniform lateral
pressure equal to one-third the anticipated surcharqe pressure in
case of unrestrained walls. and one-half the anticipated
surcharqe in the case of restraininq walls.
The precedinq desiqn pressures assume there is sufficient
drainaqe behind the walls to prevent the build-up of hydrostatic
pressures from surface water infiltration. Adequate drainaoe may
be provided by means of weep holes with permeable material
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-11-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
installed behind the walls or by means of a system of subdrains.
Expansive soils (greater than 3.0 percent swell or an
expansive index of 30) shall not be used as retaining wall
backfill material.
Backfill placed behind the walls should be compacted to a
minimum degree of compaction of 90\ using light compaction
equipment. If heavy equipment is used. the wall should be
appropriately temporarily braced.
FOOTING OBSERVATIONS: All footinq excavations should be
inspected by the Soil Enqineer prior to placinq reinforcinq steel
and concrete.
FIELD EXPLORATIONS
Six subsurface explorations were made at the locations
indicated on the attached Plate Number 1 on May 31. 1989. These
explorations consisted of trenches excavated by a Ford 550
backhoe. The trenches were carefully loqqed when made. The
field work was conducted under the observation of our qeoloqy and
soil enqineerinq personnel.
The loqs are presented on the followinq Plate Numbers 3
throuqh 8. The soils are described in accordance with the
Unified Soils Classification System as illustrated on the
attached simplified chart on Plate Number 2. In addition. a
verbal textural description. the wet color. the apparent moisture
and the density or consistency are presented. The density of
WESTERN
SOIL AND FOUNDA nON ENGINEERING, INC.
-12-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
granular material is given as either very loose, loose. medium
dense, dense or very dense. The consistency of silts or clays is
given as either very soft. soft. medium stiff. stiff. very stiff
or hard. Samples of typical and representative soils were
obtained and returned to our laboratory for testing.
LABORATORY TESTING
- Laboratory tests were performed in accordance with the
generally accepted American Society for Testing and Materials
(A.S.T.M.) test methods or suggested procedures. Test results
are shown on Plate Numbers 9 through 11.
PLAN REVIEW
Western Soil and Foundation Engineering, Inc. should review
the grading plans prior to the start of gradinq.
.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-13-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
LIMITATIONS
The recommendations presented in this report are contingent
upon our review of final plans and specifications. The soil
engineer should review and verify the compliance of the final
plans with this report and with Chapter 70 of the Uniform
Building Code.
It is recommended that Western Soil and FOImdation
Engineering, Inc. be retained to provide continuous soil
engineerinq services during the earthwork operations. This is to
observe compliance with the design concepts, specifications or
recommendations and to allow design changes in the event that
subsurface conditions differ from those anticipated prior to
start of construction. Western Soil and Foundation Engineering,
Inc. will not be held responsible for earthwork of any kind
performed without our observation, inspection and testinq.
The recommendations and opinions expressed in this report
reflect our best estimate of the pro;ect requirements based on an
evaluation of the subsurface soil conditions encountered at the
subsurface exploration locations and the assumption that the soil
conditions do not deviate appreciably from those encountered. It
should be recoqnized that the performance of the foundations
and/or cut and fill slopes may be influenced by undisclosed or
unforeseen variations in the soil conditions that may occur in
the intermediate and unexplored areas. Any unusual conditions
not covered in this report that may be encountered during site
develor~ent should be brouqht to the attention of the soil
WESTERN
SOIL AND FOUNDA TlON ENGINEERING, INC.
-14-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
enqineer so that he may make modifications, if necessary.
This office should be advised of any chanqes in the pro;ect
scope so that it may be determined if the recommendations
contained herein are appropriate. This should be verified in
writinq or modified by a written addendum.
The findinqs of this report are valid as of this date.
Chanqes in the condition of a property can, however, occur with
the passaqe of time, whether they be due to natural processes or
the-work of man on this or ad;acent properties. In addition,
chanqes in the state-of-the-Art and/or Government Codes may
occur. Due to such chanqes, the findinqs of the report may be
invalidated wholly or in part by chanqes beyond our control,
Therefore, this report should not be relied upon after a period
of one year without a review by us verifyino the suitability of
the conclusions and recommendations,
We will be responsible for our data, interpretations, and
recommendations, but shall not be responsible for the
interpretations by others of the information developed. Our
services consist of professional consultation and observation
only, and no warranty of any kind whatsoever, express or implied,
is made or intended in connection with the work performed or to
be performed by us, or by our proposal for consultina or other
services. or by our furnishinq of oral or written reports or
findinqs.
It is the responsibility of the Client or the Client's
representative to ensure that the information and recommendations
contained herein are brouqht to the attention of the enqineer and
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-15-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
architect for the pro;ect and incorporated into the pro;ect's
plans and specifications. It is further his responsibility to
take the necessary measures to ensure that the contractor and his
subcontractors carry out such recommendations durinq
construction.
WESTERN
SOIL AND FOUNDA TlON ENGINEERING, INC.
-16-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ATTACHMENTS
WESTERN
SOIL AND FOUNDA nON ENGINEERING, INC.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SITE PLAN
(In Back Pocket)
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SUBSURFACE EXPLORATION LEGEND
SOIL DESCRIPTION
UNIFIED SOIL CLASSIFICATION CHART
GROUP SYMBOL TYPICAL NAMES
I. COARSE GRAINED, More than
half of material is larger
than No. 200 sieve size.
GRAVELS CLEAN GRAVELS
More than half of
coarse fraction is
larger than No. 4
sieve size but
smaller than J"
GW
Well graded gravels, gravel-
sand mixtures, little or DO
fines.
Poorly graded gravels, gravel-
sand mixtures, little or DO
fines.
Silty gravels, poorly graded
gravel-sand-silt mixtures.
Clayey gravels, poorly
graded gravel-sand, clay
mixtures.
GP
GRAVELS WITH FINES
(Appreciable amount
of fines)
GK
GC
SANDS CLEAN SANDS
More than half of
coarse fraction is
smaller than No. 4
sieve size. SANDS WITH FINES
(Appreciable amount
of fines)
SW
Well graded sand, gravelly
sands, little or DO fines.
Poorly graded sands, gravelly
sands, little or no fines.
Silty sands, poorly graded
Rand and silt mixtures.
Clayey sands, poorly graded
sand and clay mixtures.
SP
SM
SC
II. FINE GRAINED, More than
half of material is smaller
than No. 200 sieve size.
SILTS AND CLAYS
KL
Inorganic silts and very
fine sands, rock flour, sandy
silt or clayey-silt-sand
mixtures with slight plast-
icity.
Inorganic clays of low to
medium plasticity, gravelly
clays, sandy clays, silty
clays, lean clays.
Organic silty and organic
silty clays of low plasticity
Inorganic siltys, micaceous
or diatomaceous fine sandy
or silty soils, elastic
silts.
Inorganic clays of high
plasticity, fat
Organic clays of medium
to high plasticity.
Peat .and other highly
organic soils
Liquid Limit
less than 50
CL
OL
SILTY AND CLAYS
KH
Li'luid Limit
greater than 50
CH
OR
RIGHLY ORGANIC SOILS
PT
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
PLATE NUMBER 2
I
I - Z >- >!
~ ILl 0 TRENCH NUMBER T-1 >- .
ILl 0. ~ILI ~u ~ wi)! w
>- ~ -
w ~ <t ELEVATION 125:t za: ZZ "'_ a:- >z
... ...J U ILl;:) ILl ILl ZLL ;:)~ -0
I - ILl a:~ a:~ ~z ~-
LL lLIu <t~
J: ...J 0 SAMPLING ~~ <t~ 00. "'W ...Ju
~ 0. '" '" 0.", - -~ ILI~
0. :IE '" METHOD Ford 550 Backhoe 0.0 o.z >- Oz
ILl <t <t <t:IE <to a: ~ 0 a::IE
I p en ...J U 0 U 0
u DESC RIPTION u
- Brownish-Green Silty Clay Interlayered Very Medium -
I - -- with Olive Green Slightly Sandy Clay Moist Stiff
1 - B -- 99.6 15.6 81. 2-
- -
f- --
I 2 - CH- -
- f---- -
l-
I 3- ~ with Sporadic Chunks of Asphalt 103.3 13.9 84.T
- ~- -
4 - =-- -
:==
I - -'-'--'-'- -
-
5 - -- Soft -
I - -'- to -
-- Medium
6 - Stiff 93.4 15.3 76.1
- -- -
I -- I
7- -...... I -
-- Increasing Occurrence of Asphalt and
- --- -
I 8 - . Clay Pipe Pieces -
...\,;t..
- -
---
I 9 - ~-- -
- --- -
10- I- -- -
I '---
- -
---
11- -
I --- (Fill )
'Gi..~ Brownish-Yellow Very Clayey Medium Sand Very Medium i
1r ?(oi, Dense t -
to Sandy Clay Mar Formation) Moist ,
I ........ (Del Stiff
13- Bottom of Trench -
- -
I 14- --
B = Bulk Sample
- -'
I 15- -
- -
I JOB NUMBER DATE LOGGED LOGGED BY
89-52 RHYNER PROPERTY 5-31-89 V.G.
I SUBSURFACE EXPLORATION LOG PL ATE NO. 3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
- Z >- :.!
I- W 0 TRENCH NUMBER T-2 >- - 0
W 0. I- W 1-1.) I- W :.! W
>- I- - 0
W I- <l ELEVATION 128:1: Zo:: ZZ 1Il_ 0:: >Z
lL I.) W :> ww ZlL :>1- -0
- ..J 0:: 0::1- Z 1--
W I- WI.) l- I-
:r ..J 0 lL SAMPLING ~ III <l~ Oil. Ill"'" <ll,.;
l- ll. III (J) Ford 550 Backhoe o.(J) - - I- ..J<(
0. ::!i (J) METHOD 0.0 o.z 0 Z wll.
<l <l <l ::!i <l0 >- ::;: 0 0::::;:
W 0::
Cl III ..J I.) 0 u 0
<. DESC RIPTION I,.;
- -.- Olive-Brown Sandy Clay Interlayered with -
r Brownish-Green Silty Clay with Sporadic
1 - -- Chunks of Asphalt Very Soft -
Moist to
- CH -- Medium -
2 - Stiff 91.4 16.0 74.7
:' --.-
- -
-,... -'-
" (Fill )
3- --- -
- ',.
..~ Loose t
"",,,,: I
4 - SC ',.:, Dark Brown Very Clayey Medium Sand Very Medium -
'7.:,., ,
......... (Colluvium) Moist ,
," . ,
',1.1.' Light Brown Fine San.u..-- I
5 C -:::_- 105.6 14.3 , -
1-:'-_'-'.'- Sandy I -
- MH- Light Green Siltstone Very Very
t-'..:.':-~ I
6 - C Moist Stiff 120.7 13.6 i -
,
to '.~ grades to
- - -- i -
, ,
'- I -
7- SM'c Dark Green Silty Fine to Medium Sand, Very Dense i
- " Well Cemented with Lenses of Iron-Oxide Moist to I -
-
C it~~y Stained Medium Sand Very I -
8 - Dense
..... . -
- i
..'-
9 - -
~'"..,
:,.0'..... i
- ..-.~:g (Del Mar Formation) , -
;.:.......:....
10 ..' '.
- Bottom of Trench -
11- -
- -
I -
12 - I I
- C = Chunk Sample I -
13- I -
- -
14 - -
- -
15 - -
- -
JOB NUMBER DATE LOGGED LOGGED BY
89-52 RHYNER PROPERTY 5-31-89 V.G.
SUBSURFACE EXPLORATION LOG
PLATE NO. 4
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
- z ~
I- UJ 0 TRENCH NUMBER T-3 ~ >-
UJ 0. I- I-u I- UJ >! UJ
~ I- UJ - .
UJ I- < ELEVATION 13S:t z a: zz "'- a: >z
.... ...J U UJ ;:) UJUJ Z ;:) I- -0
- a: a: I- .... z 1--
UJ I- UlU I- <(l-
X ...J 0 .... SAMPLING it <~ UJ
'" c a. '" ...Ju
I- 0. '" '" Ford 550 Backhoe 0.", - I- Ul~
a. ::! '" METHOD a. 0 a.z >- 0 Z
UJ <( < < ::! <0 a: :::;: 0 Ir:i!
0 l/') ...J U U 0
u DESCRIPTION c U
~ Olive Brown Sandy Clay Interlayered
- -
, ~-'= with Brownish-Green Silty Clay Very Soft
1 - CH=-: Moist -
to
- '=-=:, (Fill) Medium
-
Contact dips east Stiff n.L
2 ....L.:;:,. 94.7 21.5
'-
I-<-'-~ Dark Green Waxy Siltstone, Very
3 - ' - , Fractured
MH- -
- ~~..=L Very Very
Moist Stiff -
fLL..
4 - B/ -r' grades to 21.0 14.2 -
-- to
- C -- -
--,
5 - T-- Hard -
'--
-=--:
- -'--,- but -
,,- -,-
-- Fractured
6 - " ~ Dark Green Very Fine Sandy Siltstone -
-=- -=-.: with Interbedded Waxy Siltstone
- ML S -
r -- at
7- C I-'--.:-=.:~ u 113.2 17.6 -
r
1--,.,- at I
- 1-'-_'--.:.- -
8 ~ r_- - ed I -
I-'::.~c (Del Mar Formation) I
- ~..,-= -
':::.~
9 ..:.....:.:..
- -' Dark Green Silty Fine to Medium Grained -
-,- Sandstone with Iron-Oxide Stained Very Dense
10- "'SM ',' Lenses of Medium to Coarse Sand Moist -
- ::;~.~" -
11- #~~~f~. grades to -
", '"
.....,...,...
. -:~
- ts.f -
12 - Light Yellowish-Green Silty Fine to -
, SW ' Medium Grained Sandstone Moderately
- -
.... ," Well Cemented
13- '- -
- .,:: 1-' (Del Mar Formation) -
"",.'"
. . ~ '"'.
14 ;'..;,
- Bottom of Trench -
15- -
- -
JOB NUMBER DA TE LOGGED LOGGED BY
89-52 RHYNER PROPERTY 5-31-89 V.G.
SUBSURFACE EXPLORATION LOG
PLATE NO.5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
- Z >- ~
~ ILl 0 TRENCH NUMBER T-4 >- 0
0. ~ILI ~ wo.!
ILl >- ~ ~u - W
LoJ ~ ~ ELEVATION 135:1: Zo: zz If)_ 0:- >Z
... u ILI~ ILILL1 Z... ~f- -0
- ...J o:f- ~ Z f--
ILl - o:~ LL1u ~f-
:I: ...J 0 ... SAMPLING ~!!? ~!!? 00. If)w ...Ju
~ 0. If) If) Ford 550 Backhoe o.lf) - - ~ w~
0. 2: If) METHOD 0.0 o.z >- o Z
ILl ~ ~ ~2: ~o 0: ~ 0 a::::e
I'=> If) ...J U 0 U 0
u DESC RIPTION U
--
- =-= Olive Green Silty Clay -
-- -
1 - - S Soft
-- at
- to -
u
2 - _CH~ r Medium -
at Stiff
- - ed -
---
3 - B 97.6 27.1 79.:;-
- - -
--- (Fill)
4 - -
1-__
- I -
1-' -
5 ~ I
I- 97.6 5.6 I 79.S-
Moist Loose
6 Light Brown Slightly Silty Very Fine
C ...(',.," to Fine Sand (Colluvium)" i
7 :................. Medium Brown Very Fine to Fine Grained ,Very Medium I -
- C Moderately Cemented Sandstone Moist Dense 115.0 6.6 194.0-
8 - grades to to -
',SW". Dense
- ..... Dark Brown Clayey Fine to Medium -
'<:'.' Grained Moderately Well Cemented I -
9 - :.:": Sandstone ,
- ;SC; Very Dense I -
(Torrey Sandstone) Moist
10
"~:".:.:Lo.'
- -:""--7 Olive Brown To Olive Green Sandy, -
",',.;:,:::;;:-
- Clayey Silt with Thin Lenses of Light Very Medium -
ll-
- - Brown Fine Sand Moist Stiff
- MIl: -
-
12 ISa
.;.'~:..-
'-~ Dark Green Sandy Sil tstone -
- ~~.: t Very
r- ~ u Stiff
r -
13 - c-ML~ at to
- IE";:' (Del Mar Formation) ed Hard , -
I
14 I"c':-'-
- Bottom of Trench -
15 - I -
- -
JOB NUMBER DATE LOGGED LOGGED BY
RHYNER PROPERTY 5-31-89 V.G.
89-52
SUBSURFACE EXPLORATION LOG
PLATE NO. 6
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
- Z ~
I- lIJ 0 TRENCH NUMBER T-5 >- >- - .
Q. I-lIJ I- ~
lIJ >- I- I-u - lIJ . lIJ
lIJ I- <I: ELEVATION 1351 Zo:: ZZ "'- 0:: >z
lL .J U lIJ::> lIJlIJ Zu.. ::l I- -0
- 0::1- Z 1--
lIJ 0::1- lIJu I- <1:1-
:r .J 0 lL SAMPLING ~~ <I:~ lIJ
OCl. '" .Ju
I- Cl. '" '" Ford 550 Backhoe Cl.lJ) - I- l.LJ~
Cl. ~ '" METHOD Cl. 0 Cl.z >- 0 Z
lIJ <I: <I: <I: ~ <1:0 0:: ::; 0 O:::l;
P '" .J U U 0
u DESCRIPTION 0 u
,. .,
- j~',- Dark Green Very Fine Sandy Waxy S Very -
,:-_ "'::L
- . MIl- Siltstone at Stiff -
1 -'---' u to
'~.......;. r
- '-'.~.':: a Hard -
t
2 - ;J.::'"L ed but -
:-~~~-=. fractured
- ~.,-T- -
3 - ~':~. -
:,.,,-.~
- c. .-:-.~_ grades Less Waxy with Increasing -
4 - ;-:~''- Very Fine Sand -
- ,",~..:. -
._-........
5 - ~:-:-::-:': -
:::'-.2:
- 7.-'"''';. -
"-,7.
6 - . ......,:..... -
".
;'"~ (Del Mar Formation) !
- ",,'.-":':': -
~~.
7 . '..
I
- Bottom of Trench I -
8 - I -
- I -
i
,
9 - I -
- i -
10- -
- -
I
11- -
- -
12- I -
,
- -
13- -
,
- I -
14 - -
- -
15- -
- -
JOB NUMBER DATE LOGGED LOGGED BY
89-52 RHYNER PROPERTY 5-31-89
V.G.
SUBSURFACE EXPLORATION LOG
PLATE NO. 7
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
- Z ~
I- W 0 TRENCH NUMBER T-6 ~ ~ - .
W l1. I- w I-u I- UJ~ III
~ I- -
W I- <( ELEVATION 135:1: za: ZZ "'_ a: >z
I.L u w::> ww Z I.L ::> I- -0
- w -' a: I- a: I- I- Z 1--
I.L IIlU <(I-
:I: -' 0 SAMPLING ~~ <(~ 0l1. ",Ill -'U
I- l1. '" '" Ford 550 Backhoe l1.", - - I- 1Il~
l1. ~ '" METHOD l1.0 l1.z >- 0 Z
III <( <( <(~ <(0 a: " 0 a:~
p II' -' U 0 U 0
u DESC RIPTION u
, Medium
- '...........".".,... Brown Fine Sand Very -
Loose
1 - ....':':.'; grades to Moist -
- SW< Light Brown Fine Sand to -
2 - r,',:,. -
r grades to Medium
- .......,. Dark Brown Very Clayey Fine Sand to Dense -
3 - B ......::"'-: Sandy Clay -
- r-- ~SC, (Torrey Sandstone) -
4 - r:: ~ , 92.5 75.6-
r,~'-' 9.7
~..~
- ",-,',.c,',-" -
Cn,
5 - ~':':'~ Dark Green Very '" "'n -
c.:.,-,-~: Fine Sandy Waxy Siltstone ~-
- c-~~- ~ -
S--
6 - -
,::",~, at -- --
- ~":'c: (Del Mar Formation) u Very r-- -
r
~"~'-, a Stiff r----
7 t
e"
- Bottom of Trench
8 - -
- -
9 - -
- -
10- -
- -
11- -
- -
12- ! -
i
- I -
13 - -
- -
14 - -
- -
15- -
- -
JOB NUMBER DATE LOGGED LOGGED BY
89-52 RHYNER PROPERTY 5-31-89 V.G.
SUBSURFACE EXPLORATION LOG
PLATE NO, 8
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
LABORATORY TEST RESULTS
MAXIMUM DENSITY/OPTIMUM MOISTURE
Maximum Optimum
Sample Density Moisture
Location Description (pcf) (Percent)
T-l @ 1.0' Oli ve Green Sandy Si It y Clay 122.7 12.5
T-6 @ 3.0' Liqht Brown Fine Sand 122.3 10.5
DIRECT SHEAR
Anql e of
Sample Cohesion Internal Friction
Location (psf) (deqrees)
*T-l @ 1. O' 200 19
**T-6 @ 3.0' 160 3?
* Sample remolded to in-situ density and moisture.
** Sample remolded to 90% of maximum dry density at 3% over
optimum moisture content. All samples saturated prior to
testinq.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
PLATE NUMBER 9
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
H!1:CHA1'UCAL SIEVE..ANALYSIS
Sample
LQ!;:ilUo~ ...J4 00 140 1100 '200
T-6 @ 3.0' 100 99.9 90.5 38.7 23.9
Percent Passing U.S. Standard Sieve
,EXrhlfS1.Q.N. .J.lfDEl( *
Sample
I.pg;l.J;j Q~
Expansion
_..1.~ci.~1!__.
Expansion
PQ.!;"mt:!.!il
T-1 @ 1.0'
70
Medium
* Test performed per U.B.C. method.
WESTERN
SOIL AND FOUNDA nON ENGINEERING, INC.
PLATE NUMBER 10
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PLASTICITY INDEX/LIQCID LIMIT
Liquid Limit 42
Plastic Limit 26
Plastic Index 16
Sample T-3 @ 4.0'
60
50
x
'" 40 CH or Oil
""
:z
H
....
r-o 30
H
U
H
r-o
'" 20
-<
....:J
~ MIl or OH
10
OL
0
0 10 20 30 40 50 60 70 80 90 100
LIQUID LIMIT
W.BT&RN
.alL ANa ",aUNCATlaN .NOIN..RINO INC.
PLATE Nl':'ffiER 11--
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
'l'ABJ,~ Ofi.E
TRENCH DEPTH OF
TRENCH SOIL REMOVAL BELOW
ff!1M_B~_REl( I ST I NGGRADE (FEET)
'1'-1 11.5
'1'-2 4.5
'1'-3 3.0
'1'-4 7.0
'1'-.5 1. 0
'1'-6 3.0 to 6.0
NOTE: It should be recognized that variations in soil
conditions may Occur between exploratory trenches
that will require additional removal.
Exploratory trenches encountered in the ,emoval
process should be recompacted an additional 2 feet
below the depths shown in the above table.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
PLA TE NUMBER 12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
FILL SLOPE KEY
PROJECTED PLANE
I TO I IlUlKIMUM FROM
"ATURAL GROlIiO SLOPE TO APPROVED
FILL
-----
-
-
- --
-
-
- -
- -
-- 2' S"" 1IIIN''''UtI
- - ~
- ~- M'NIIlIUM
- WIDTH --.I
BASE KEY
15'
- ....
-..",. "
..","'" ~1'~\..,.,'
-"" .~--'
...",-' i. t..~" -,'
.- -- ~91\~"~__""""--
E.\l -
..E....~ _ - - 8' .....~ IlENCH
--
-
--
-
--
--
--
TYPICAL BENCH
(HEIGIfT VARIES)
JlNMUM DOWNSLOPE
KEY DEPTH
COIIIPETENT EARTH
MATERIAL
IlACICDRANl MAY BE REQUIRED PER
RECOMIiIIENDATlONS OF SOILS ENGINEER
RHYNER PROPERTY
JOB NO.
89-52
DATE
June 19 1989
WESTERN
PLATE NO.],
.OIL AND FOUNDATION .NGIN..RING INC.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
APPENDIX I
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
WESTERN
SOIL AND FOUNDA nON ENGINEERING, INC.
PHONE 746-3553
AREA CODE 619
423 HALE AVENUE
ESCONDIDa. CALIFORNIA. 92025
SPECIFICATIONS FOR CONSTRUCTION OF CONTROLLED FILLS
GENERAL DESCRIPTION: The construction of controlled fills shall consist of
ade~uate preliminary soil investigations, and clearing, removal of existing
structures and foundations, preparation of land to be filled, excavation of
earth and rock from cut area, compaction and control of the fill, and all
other work necessary to complete the grading of the filled area to conform
with the lines, grades, and slopes as shown on the accepted plans.
CLEARING-AND PREPARATION OF AREAS TO BE FILLED:
(a) All fill control projects shall have a preliminary soil investigation or a
visual examinstion, depending upon the nature of the job, by a ~ualified soil
engineer prior to grading.
(b) All timber, trees, brush, vegetation, and other rubbish shall be removed,
piled and burned, or otherwise disposed of to leave the prepsred area with a
finished appearance free from unsightly debris.
(c) Any soft, swampy or otherwise unsuitable areas, shall be corrected by drainage
Dr removal of compressible material, or both, to the depths indicated on the plans
or as directed by the soil engineer.
(d) The natural ground which is determined to be satisfactory for the support
of the filled ground shall then be plowed or scarified to a depth of at least
six inches (6") or deeper as specified by the soil engineer, and until the sur-
face is free from ruts, hummocks, or other uneven features which would tend to
prevent uniform compaction by the e~uipment to be used.
(e) No fill shall be placed until the prepared native ground has been approved
by the soil engineer.
(f) Where fills sre made on the hillsides with slopes greater than 5 (horizontal)
to 1 (vertical), horizontal benches shall be cut into firm undisturbed natural
ground to provide lateral and vertical stability. The initial bench at the toe
of the fill shall be at least 10 feet in width on firm undisturbed natural ground
at the elevation of the toe stake. The soil engineer shall determine the width
and fre~uency of all succeeding benches which will vary with the soil conditions
and the steepness of slope.
(g) After the natural ground has been prepared, it shall be brought to the proper
moisture content and compacted to not less than 90% of maximum density, A.S.T.H.
D1557-78.
I
I
(h) Expansive soils may re~uire special compaction specifications as
directed in the preliminary soil investigation by the soil engineer.
I
(i) The cut portions of building pads in which rock-like material exists may
re~uire excavation and recompaction for density compatibility with the fill as
directed by the soil engineer.
I
MATERIALS: The fill soils shall consist of select materials graded so that at
lesst 40 percent of the material passes the No.4 sieve. The material may be
obtained from the excavation, a borrow pit, or by mixing soils from one or more
sources. The material used shall be free from vegetable matter, and other del-
eterious substances, and shall not contain rocks or lumps greater than 6 inches
in diameter. If excessive vegetation, rocks, or soils with unacceptable physical
characteristics are encountered, these materials shall be disposed of in waste
areas designated on the plans or as directed by the soil engineer. If soils
are encountered during the grading operation which were not reported in the
preliminary soil investigation, further testing will be re~uired to ascertain
their engineering properties. Any special treatment recommended in the prelim-
inary or subse~uent soil reports not covered herein shall become an addendum to
these specifications.
I
I
I
I
No material of a perishable, spongy, or otherwise unstable nature shall be used
in the fills.
I
PLACING, SPREADING AND COMPACTING FILL 'MATERIAL:
(a) The selected fill material shall be placed in layers which shall not exceed
six inches (6") when compacted. Each layer shall be spread evenly and shall be
thoroughly blade-mixed during the spreading to insure uniformity of material"and
moisture in each layer.
I
I
(b) When the moisture content of the fill material is below that specified by
the soil engineer, water shall be added until the moisture content is near optimum
as determined by the soil engineer to assure thorough bonding during the com-
pacting process.
I
(c) When the moisture content of the fill material is above that specified by
the soil engineer, the fill material shall be aerated by blading and scarifying,
or other satisfactory methods until the moisture content is near optimum as
determined by the soils engineer.
I
I
(d) After each layer has been placed, mixed and spread evenly, it shall be
thoroughly compacted to not less than the specified maximum density in accord-
ance with A.S.T.M. D1557-78. Compaction shall be by means of tamping or sheeps-
foot rollers, multiple-wheel pneumatic-tired rollers, or other types 01 rollers.
Rollers shall be of such design that they will be able to compact the fill to
the specified density. Rolling of each layer shall be continuous over its entire
area and the roller shall make sufficient passes to obtain the desired density.
The entire area to be filled shall be compacted to the specified density.
I
I
I
I
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
I
-2-
I
I
I
(e) Fill slopes shall be compacted by means of sheepsfoot rollers or other
suitable e~uipment. Compacting operations shall be continued until the slopes
are stable but not too dense for planting and until there is no appreciable 8aOUnt
of loose soil on the slopes. Compacting of the slopes shall be accomplished by
backrolling the slopes in increments of 3 to 5 feet in elevation gain or by other
methods producing satisfactory results.
I
I
(f) Field density tests shsll be made by the soil engineer for approximately each
foot in elevation gain after compaction, but not to exceed two feet in vertical
height between tests. The location of the tests in plan shall be spaced to give
the best possible coverage and shall be taken no farther than 100 feft apart.
Tests shall be taken on corner and terrace lots for each two feet in elevation
gain. The soil engineer may take additional tests as considered necessary to
check on the uniformity of compaction. Where sheepsfoot rollers are used, the
tests shallcbe taken in the compacted material below the disturbed surface. No
additional layers of fill sball be spread until the field density tests indicate
that the specified density has been obtained.
I
I
I
(g) The fill operation shall be continued in six inch (6") compacted layers, as
specified above. until the fill has been brought to the finished slopes and grades
as shown on the accepted plans.
I
SUPERVISION: Supervision by the soil engineer shall be made during the filling
and compacting operations so that he can certify that the fill was made in accord-
ance with accepted specifications.
I
The specifications and soil testing of subgrade, subbase, and base materials for
roads, or other public property shall be done in accordance witb specifications
of the governing agency.
I
I
SEASONAL LIMITS: No fill material shall be placed, spread, or rolled during
unfavorable weather conditions. When the work is interrupted by heavy rain,
grading shall not be resumed until field tests by tbe soil engineer indicate
that the moisture content and density of the fill are as previously specified.
In the event that, in the opinion of the engineer, soils unsatisfactory as
foundation material are encountered, they shall not be incorporated in the
grading and disposition will be made at the engineer's discretion.
I
I
I
I
I
I
I
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-3-
.
.
.
AUGUST 8, 1990
WGAN ENGINEERING
465 First Street, Suite A
Encinitas, CA 92024
619-942-8474
HYDROLOGY STUDY
FOR
T.P.H. 89-058
DESCRIPTION:
PARCEL 4 OF P.M. 15145
CITY OF ENCINITAS
RESOLUTION NO. OL-89-010
ARCHITECT:
MR. KASPER RHYNER
C/O LOGAN ENGINEERING
465 FIRST ST, STE. A
ENCINITAS, CA 92024
ENGINEER:
LOGAN ENGINEERING
465 FIRST ST., STE. A
ENCINITAS, CA 92024
619-942-8474
10F4
R.C.E. 39726
EXP. DATE 12-31-~3
.
~~f4
· ~. tt-lPRO!.oGY"9fllPi
-~IGJ CRI1"ERtA
- ~ UPoJ I/?"p. "De5I6J J 'PRo~ui?f,~~~'1
- Q-= ~A (RMlot-.!At.)
- UJD U~6 ~ 7"/JC;!--f f1fNtll.--f 12E3fV&.l11kt-
"~,, c.;;; o.r~'7
1).~.t I
AI";; 1.0M..
. 1:::: 14.0 MI,J.
.1 -= 3. t) ,oJ /I-lR
.l:l H:" 1101 L:: 0"-0 I
~ = 0.11
Owo -;; ().6(j{~.Cj)(2/1):; ~:z. ~~
1/,~4t 1-
At--= (J.g k
1L.:= 6.t) M1J
l' ~ 6.b 'J~R
lJ~:; 317' l/ Z<70'
~:: tJ./4
a,oo -= D.Gc;{r;.b){D,e}: 2.; CKS
.
?of4
e1[. ~J~MJLIC. MM..~\$
-t.f.4E~k ~A-c.rr-j ~r:E')(I~T. ~'T12Ue-rtRe>.
n~1 ( t)IO'::: tb,~tFs~
- EYI<S1' 1*.13" 13ROl..\ 1)1"f6JJ @
10- -goh
Diameter (inches) ...
24
Mannings n
...... .
.016
Slope (ft/ft) .......
depth (ft) ..........
0.1030 Q (cfs) ...........
6.20
0.44 depth/diameter ...
0.22
Velocity (fps)
Area (Sq. Ft.)
..... .
12.18
Velocity head ....
2.30
..... .
0.51
Critical Depth
..... .
0.88
Critical Slope ...
0.0071
e
Critical Velocity...
4.65
Froude Number
3.87
.
. ..
tkPAtlT'i ()~ 'Bi?ow "'D'~C.H l~ kDE&LlA1E.
- eYls,,-: &,ICA'1tP IJ LET J 'tJ'I Cwtp.
tl% -= 0.1 .-.. ~ ulr~'& =' ~.1 (Z-) :: I.J I
.. . I
+{ VJ t1\X,d -=- (I g -11;;.0/ ~ "L ~
+lvJt:v~;\ > flJ r~J (), k. ~-
.
4o{4
.
-1). "P. t 1. ( Q 100 :: Z./3 CFs ')
.
.
- C-H~tr< CAf~T-I ()~e,clST.1 e.'tCMP,
t+w jp ~ O. b
..". +lJ(Vjld~ ~,t{t.'7) ~ l1."7'
+iw~"tiil-:; /(e-llb,4b~ 1.t7'
+tWtlVlJ > HvJ redJ ~. K. ~
C-oJ CLUSIOJ ':
- AJ kl-f) 15 /,,1 PIc.A1t5 f')( l"5i. -PRAtJ A6E ~12U~T()jZE5
1D 13f A-'()E&JA-"It;. '1'~ i-VE1<'E toN s'T1<0~leV
I~ -(.HE C,IT-I 1'<JK'SJA,..\-r'lD ?LA,.JS J Ar-lAL-+SI5
"PRFPA'Ktl) 'B-1 M/(, lJA-t~'f "PA-sc.o FoR. -rHE'
61<\ 61~ A1.... "PA'KCtL Mitt:' (-t 1'71.4-0).
- '"FER CorJDI1IQ.j ( Dr '/~~ fuDW'fIDJ)
1'+-l€ A-Pf>UcM f .u AS' CLEAt-t~ 6Ju'l 11I~fY t<7T .
WMtJMf <S7STEM5 .'1~tvr ws<S ~L"ED Dv'E'R.,
r( I'S M-I C5PINIO,J 1tfWl DNtt: 1'HE 6RADI~6 IS
CDMPL€"fR) ~ L.MDSa?/JG IN,STAu~ / :;!LTA-Tlo,J
bf ~~ ?-i'S'TtM 5" WILL. ,..Lo L,D~6f"g 'BE A
Wo'13LFM .
.....:)
;~~_. .
:~;;'
e;
.
~8LE 2
IIUNOF~ COEmCIENTS (MnOMLflETHOD)
NOTES:
. . (I) Soil' Croup lIa!?s are available at t:he offices of the Department of " Public Works..
. {2>Wh~re actual conditions. deviate significantly from the'tabulated l~erVious-
ness values of 80% or ~, the values given for coefficient C, ~y be revised
by IllUltlplying 80% or ~ by the ratio of actual llllpervious,nen to the
tabulated Imperviousness. However, In no case shalt the final coefficient
be less than O.SO.For eXlIGIpler' 'Conslder c:oanerclal property on D soi I.croup.
Actual I.pervlousness
-50%
Tabulated I~ervlousness - 80%
. .
levlsed C -~'x 0.85.0.53
. .....
.
IV.,,-,
~
APPENDIX IX-8
b.v.5/1l
- ,- --,
-.r" ".~~'~ _. . __ .. . .' _ ..
~. ..~ - >0' -- - 1 . . ..'1.,....__:.
......'-:-.~ .. ",' ". ", oO,!,._., I/> 4... ',_ .
:.......,.~. '~"'I"~""'_'...'.. .0 "~~.~:-.:....' .... ',' ":-~Ir.:'f"'&;':"
........... - --........... -- --.--.- ..----..'. ............-..-"..:--i".........
L,..---;--. .. - _-'~~ -:. .. _ ._.:\:..__.....,._"t:r:...&...~'~',.l~.. ~.( ~~ ~.:--
-'"1:.:..., . ~~a.~-_~-=-..a::=:~~ ~-_ "-F - ..o-=--_"~ i&~-r
.......:: :. ~.,....:-~. ...~~~~..__.---""=-....~. . . ~~
...-. .~
-
-
-
-:0
A
.;.
.;
-
.~
..
~
C!
-
-
.
J..
..
:;;
i
~
.,
.
,j
-
-
"
.>
...
.'
.:
-.
...
:..
-
-
...
...
'OJ'
-t:
/'!:.
~
'"
e
:..
~
....
.i
.
:Ii
"'!:
...
.,
....
i
::
--
~
.
.y
:.:
i.
.
t
:a
~
~
..
f
.
~
.
.
"1
?'
l"
-i
.,.
..
ICCO
aco
100
;
.
II.
S
.
u
c
=
..
! .coo
.
.
.
.
..
'II
"
.
'l:
Ci)-~
zoo
l>R'BA.J
'bRA I,.J Ac..E.-d""
4J
11MEOFCDNCENIIUTlON
Ii g -
- .. _.
L_
.5 ~.
I I I' I
.II
..
.' ,
I I
, I
80
.
.
i
5
s
'ii
.
.
t=
40'0
.
~
'II
c
:1-
-
.
&
.
.
.
""". ~'D 0vwtancI 11m. 0I_..ph.
.'
, -
.. .::
...-: .~
. ..
,.11:,...
.
I
I
J
.,
.1.
i
I
.
'1
.,
.
.
i
.
.:~:
:-:'
.
.'
.....
0::
<:
x
u
2:
c:J
-
V>
<oJ
C
'Z:
.j
-
.....
~
5
.
>-
.....
-
V>
%
w
I-
:z:
-
'" ---- ,
-
>,..c:
"'.... GI I-
0 a.... ..c: 0
"0 ~e: "'0 ... ....
r: . 0.... ell GI ~I
III >,L -..~ "0 0 GI .,
U"O"O >Oil") .0 .... ... >
_c>.,cu I- <0 ... ... I-
I-eII:1:"O ... U ~ :s ~ c:
.c :s :s "'0.... ... GI U '0
C"b~ "'....... ~ .... ....
00.. U .. "- CI .... e: 0>
t..c:r: u... c- ..- OD 0 . . ..
.~~..... tal In ,,; l- t.. .... .. r: ...
c 0 c_ OD .. .a..tDfo.N-
......-c;,u '" .. ell 0. ... ...
EeII C. ........ 0 .c ... s..
...,. fa . """0::: ... .. :s . ell
. UJ:: E......... -- .... r: "0 . ~~l ~ '"
~.,... .... .. c - I "0 ell
GI... _., C CI 0 0 >.e11 C
"O..es..:. oc . 0. "N
"'..->tc _...c c ....>. 0
.. ... ... "'1-0 a ell "'~ ~ ...
c CLCU -0 0::' ... - - s:: COD ~
a E!..c:..o ... ell ... .. .. Gle: . GI
- . ......,... cu _..c:... ... ...... IN . t.. ....
.. C I- 0.... ... .. ..c: e . ..,. C ..c: .0
.. C L_-c :J .... .... .... 01 .... 01 >. N - ..... ...
U QOLc"'CI u ~ 0- Co :s e U 0.. E C U
.... -.....c.c cu ..-.... .... 0 GI.... C .... -
.... ... U s....c: U U s.. ..c: .. GI . ~
a. to '" cue 0 c.... GI '" s:: . ....0 '" . . c-
o. ~""L....') s.. ....... l- . .. '" .. r:r c . 0..
<: .... e: OD c.. .3:0. a..... GI ",e E- GJ -, .., <
a.", - l- I- GlC ....0 . I- 0..
I- -OtttO"'CI ..c: III .- . ... c.... - 0 LL. <l" . ....
.e U E c....- c: - 1-.... I-S:: -~ GI.... LL. 0
cu to -a_ 'IS <0 ..c: I- ..c: U ~ C... "D . "0 Z
I- E .... GI "D .... U C GJ N GI ..
on Do. _ c: ..,-~'" \0 .. ..... ~O 0 .... ....
C S-lUraOl on N .. ..c: .... ~ - U '"
0 E.s::. '" =>>_ "'.... 0 ........ ;;:.... '" ... .. u '" .
.... 0 ,m c '" ....,'" '" n "'0 - .. '" ~ ..... .
.... s...q--C I'CII OJ -o..c.s::. 0 ~.... I-~ s::..c: U GI \0 "D U
U .....Nr-::::C <~.....~ 0..0 o Co ........ .... en 0.. <: ... ....
.. ~
l- e.
.... - - - - - e. - - - - -
C> .... N M - on <: C> .... N .... ....
...
><
><
....
Cl'"
ill'
...1
~i:
6-Hour Precipitation (inches)
OU'110 ""Oll") 0 U')
.. .. .. .. ..
"
o ll")
o
..:..-_.~_. -.
....
..,
: ,...
c
i: ...
"-
,..... c
. 0
.. ...
x ..
.'" ..... .. ,.....
,..,. . .. "
,'" c ... e .
. ... Po ... .
, "- ... :E , . ,
u "- '11 , ,
Cl >, 0
.. .. C 1.:1 " !"
.., ... "" 0
... III ... :"1.,
~ c, ...
.... CI .. ..'
Jg .... ... x ....
I c '"
... ... .., CI
~ . . .
! ..,
... ... D. Cl
J 'r
.'
.-.
-~.
e ~~
0
...
...
l:1 ..
"
I- "..
"t:: '"
l-
.- ... .
an
....
l")
N
,....
0
an
0
....
0
CO)
0
N
an
. , ,....
I:
r-
I'..., "
..,
b',
.,.....;
-~
- ';
.t...
..' .
.,. ,
_l. . .
,.:: ,
.., ,.'
;.;. ',': ,
. .. 1'.11 , , I I
..... ,l' It ,
,;1,1;; '!.I I I
I 0
-
IV.:).-14
+-!
, ,
"
,..:
.
..
" ,
.+
" ,
~"'......
" I
... ~-_ PI. .,. ~
(.'"0111 ~alpui) .<'~~su"~UI
,
"'l
.. ,
APPENDIX XI
,:
..
.,
'"
.
-
I .. -! G
.
:z: Z'
0 ~
...
I ...
o~
c... ../
I&IZ-
.~~ I ,
I . " , ,
Z"-....
<00
." -=
~E~ -
In -
. .::- 0
E~'" -
.... In
rr:a
5::0
",0
uo~;
I.
.....
>;;" I
.,_.:-:,-,
. .
I
j"
- I
I
I
I
.1
. I
I
I
I
I
.
.00
~:=.
o
-
...-
c::
...-
-
Co.
-
c..,:)
. &.:oJ
. t::::
C1.
I
~
N
c::
c::
Ll.J
>-
I
o
CJ
.....
. c::
:;l
(:)
:;::
.
oc:t"
N
c::
c::
LU
>-
.
C_6
-
o
-
..::-
o
o
..--
--
1..~_
o
en
...J
c:.::
S
:::l
...J
C-
o
c,,}
-
II
II
S
II:
..
-
'\
c::>
c--..
~
.
II:
!!
z;:
".
~:
...
101 ...
~ i~
hi i~
~ ~:
""
QUO;
U ;0
~ Co.!!~
.0 EO
.. _:
Lo""
I:.J ~=
.. !.~
. z.
c..
C 11-
1Io -~
III Po"
_ cO 0
_.. f'I'\
.,;Xii
~ ~R
_ C C
z.
o.
r;-
c!!
ai
..
~
.
..
-
!
..
I
l
/
.,
..
In
.::-
..
....
....
'-
.
~.
-
-
,
:~:~~~
':_.___'C
'tr.
_.~~
.c
r-.,
-
"-.
.
.....
-
..-.
..
c
'""
-
.."
.-:
.
c:
-
-
II-A- r3
APPENDIX
OF CULVERTS
175
Poge
I.
t
I
liar Corrugated Metal Pipe Projming
..................................... .188
Jlar Corrugated Metal Pipe Propng
........................... ......... ..189
uhu Corrugated Metal Pipe Headwall
.................................... ...190
liar Cor-rugated Metal Pipe. Headwall .
.................................... ..191
ulOir Corrugated Metal Pipe Headwall
........... .192
:ul\'crts Flowing Full. n = 0.024. . . . . . . . . .19!
CHART
l
I.
II.
III
01.
".-
1.- l.aIlPLE:
".- ...I.....'U"-"
'.- ........
0.- .,' ..
...
'.- '" ... u
1,_ ., I.. ,..
II ... '"
.......
'.-
100
II)
ISI
.00
'IS!
I.
~
I
I.
..
o.
.
o.
01.
o.
'01
..
..
)hs for Circular Corrugated Metal
-Structural Plate
!c Circular Corrugated Metal Pipe.
.......... .... ..194
II: Circular Corrugated Metal Pipe,
................. .... ..195
_ .~~r.c~.t~~ .~~~~~~~ .~.e.~~ .~i~:. . . . . . .196
.. Circular Corrugated Metal Pipe.
r..............,..,...,.,. ........ .....197
ugated Metal Pipe Culverts FJowing Full,
.......................... ........... ..198
..
..
10
----1-:-
100
so.
...
...-
-"
.......-
.......-
",...V
,,~
.......- .
I" /
.......-
.......-
-'.-'
"
I.
n
..
..
z
u
!!
!!
...
I.'
I.'
..
~
.
i
.......-..
.. /' :
/ ;:
01 u
..
..
I.
I.'
I
I
t
I ..
~
~
a
~
100
..
I.
10 MW
40 -s-: SCAL[
'0 III
I.. f..
["TRANCE: I,.
TYPE "
.. .. ,.
.............. i
-, ,.
....... -. ..
.. ..
--, " .1
.-... .1
.......1...
.. ..
..
~phs for Corrugated Metal Pipe-
Culverts
-e - Arch Culvcru with Inlet Control. . . . . .199
rrugated M('tal Pi~ - Arch. Projecting
...................................... ..200
rrugalM Metal Pi~ - Arch. Projecting
"........................... .......... ..!OI
.rrugaled Metal Pipe - Arch. HcadwaU
".......................... .............lO2
,rrugated Metal Pipe - Arch. HcadwaU
"........................... ........... .!O!
- Arch Cu1vrrts Flowing Full. n = 0.024. . .204
rugatcd Metal Pipe - Arch Cul~.
; Full. n = 0.0527 to 0.0506. . . ... . . . .. . . . .205
"
..
..
.
..
Ii
so
IS
SO
I. '"
...
IT
..
a
"......'
.........., ......11I.
_ ........., ..1;_ _ .........
....... .......-.....
-.......
I
o
II
.1
.1
.
2:
I
01
Ith for Various Discharges
(rapm whell outlet ia uhlublDC:lJCd)
......... ............... ................106
. Horizontal. Critical Dtpth. . . . . . . . . , .', . . .fIYI
s Vertical. Clitial Depth.... ..._....... ...P
riuat Depth.......................... ...1D9
b, Critical Depth..,.... ..................110
.1
.1
..
La
II
HEADWATER DEPTH FOR
CONCRETE .,.IPE CULVERTS
WITH INLET CONTROL
_.......-.c........_
.
.
--- gJPIJ
-:1'1..111
consulting
. .
Fr S'lIrL ~ bN;" ""
engineers and geologists
June 27, 1988
Mr. John Cover
Cover Brothers Development Co.
264 Rancho Santa Fe Road
Olivenhain, CA 92054
SF-955
RE: REPORT OF SUBGRADE PREPARATION AND COMPACTION
WOODWIND LANE (6TH STREET) AND PRIVATE ROAD EASEMENT TO
WOODWIND LANE
AND ALSO PARCELS 2 & 4 OF T.P.M. 18550
OLIVENHAIN, CALIFORNIA ,
Dear Mr. Cover:
Submitted herewith please find the report of subgrade preparation
and compaction for the Woodwind Lane and private road easement to
Woodwind Lane road improvements. The approximate location of the
subject road improvements are shown on the enclosed key map. The
accompanying report summarizes our observations and the results
of our field and laboratory tests. Ground preparation and
subgrade compaction for the areas worked was completed during the
period between October 7 to October 26, 1987. The approximate
location of field density tests are shown on the enclosed plates,
(enclosed plates have been reproduced from the plans provided by
Pasco Engineering). Our testing and engineering observations was
limited to the easterly portion of Woodwind Lane from Station
10+00 to Station 13+00, and southerly and westerly private roads
to Woodwind Lane from Stations 1+00 to Station 7+00 and also
parcels 2 and 4 of T.P.M. 18550.
Our services were only limited to the following:
*
Periodic observation of the compaction operations of the
natural subgrade soils and filled ground.
Taking field density tests on the compacted, reworked
natural subgrade soils and placed artificial fills.
*
"^.~~~'~tt?/;. :) .
J"?1',~" <; ~,.
,~i'C;~'~~ ,;',
"'~':!'::,:':'f""
"''''';t'
;);,,~:';':~: ~
.4 . ':;~'~i:~r't:'~i~,,;':,
<:-' ~ t ,d.t-.It' ",
: "'" 1"~'."._,
'>t.'I::~jt:-;'\
.""::r,f~t~~i~~:l~;"',
11080 Roselle Street, Suite A . San Diego,CA 92121 . ~7~,!!1' .
;:i:j;,:
: ,i~i)
-";i'F'.',,,!:
.,,;..;.,," ':.~.i_
- '>_~~'~~\_::,,~':~'~',.':~K:~!,:ioi"i ,~ ,-,~B";)i<
.
.
SF-955
Page 2
* Performing laboratory standard tests on different soil
types.
* "R", value testing and pavement design.
Please note that we were not provided with a grading plan for the
development of the subject road improvements. Therefore, the
elevations reported herein have been produced from physical
measurements at the site.
This opportunity to be of service is sincerely appreciated. If
there are any questions, please do not hesitate to contact the
undersigned.
Sincerely,
'5-
e-_
Dr. V. Dakshanamurthy, P.E.
Senior Engineer
For Santa Fe Soils, Inc.
,
BR/vC
'Ni.i:~:'''J." '~m:~___,__ "._ "" ':;'_~,..it,M'CK"..." .-..'.>..".";:'.:nv.f.......".,',...",-...:':"":'.:~-~.~,:""'~':::';'..
~,~~,'-;:.';.#,;>~:i.!i:~~~,l:>:*',f' i':.;:il-t,;~j,i:'if~'i.,~'::~~:,~;""/''"~-F,,,,:lf-4W'\:f!~~:;:F~~~1/,~.."f',:~,~~~'f,,~:,_HJi'. ':"~~'"""': -:'" 7'_;,~.IO~J"':,,~"'.(:F~'::;::- , ',' '-"_ -~ ,.,...-..p, ",,' ".,_."','" ,
.
.
SF-955
Page 3
REFERENCES
"Pavement Design for Woodwind Lane and the Southerly Private
Street Perpendicular to Woodwind Lane",. prepared by Santa Fe
Soils, Inc., dated October 22, 1987.
"Structural Section Requirements for Private Road Easement to
Woodwind Lane, TPM 18550", issued by the County of San Diego,
Department of Public Works, dated November 9, 1987.
LABORATORY TESTING
The maximum dry density and optimum moisture content of different
soil types were determined in accordance with the ASTM D 1557-78
method. The test results are summarized in Table I.
"R" value tests were performed on representative soil samples
obtained from the rough finish subgrade. The test results and
approximate test locations are summarized in Table II.
PAVEMENT DESIGN
,
Pavement design for the proposed road improvements was completed
based upon the "R" value test results obtained on the rough
finished subgrade soils. The layered design of the road
improvements structural section was submitted. to the County of
San Diego for review and approval. Subsequently, a report
. providing structural section requirements for the planned road
improvements was issued by the County (see references). Sutlgrade
,".+ .' '.." '.,
" .~'"
compactions reported herein were completed to . CP!1l' .
f: " .' ~'" ' ,.' , .' , "',' ...'" ,~' ;y,;-ti..
County requirements. . ., ,> " ,":}"
,..... "",~41-.r'\lI:;.:",.(,,{fT;^<-4!.';.'>; ,\~;' -.',;;";:"";"':':
;,...,....-"i-..,h.,,_.
";Co
.
.
SF-955
Page 4
GROUND PREPARATION AND COMPACTION
Woodwind Lane, {Station 10+00 to Station 13+00);
Subgrade preparation and compaction procedures for this portion
of Woodwind Lane was completed in compliance with the structural
section requirements approved and at forth by the County of San
Diego, Department of Public Works (see references).
At least 12 inches of the native subgrade soils beneath the
subject areas was reworked, moisture conditioned to the near
optimum moisture contents and compacted. A Muller vibratory
tumping foot roller was used for compaction. Field density tests
were performed in accordance with the ASTM D 1556-82 as the
subgrade soils were being compacted. Areas of low compaction, as
determined by the laboratory testing, were brought to the
attention of the contractor, reworked, recompacted and retested.
The test locations and final test results are summarized in
Compaction Test Results, Table III.
The results of our field density and laboratory tests indicate
that at least 12 inches of the natural subgrade soils beneath the
subject areas were compacted to a minimum 95 percent of maximum
dry density, at the test locations.
Our services were limited to compaction testing of natural
subgrade soils only. Verification of materials, thickness and
compaction of the overlying pavement structural layers were
beyond the scope of our services.
Road Easement to Woodwind Lane, (Station 1+00 to Station 7+00):
We were not. provided with a gradi~gl>lan. fO:r:>:!iI1~:new
~:~~~~:~:n::~gr~~: :::~tc~~~~t~~...~~:~.~~:P~~~~~~~;~~7_~J~~it'(;'...
, "".:,,,' ,,-' :\'\",,,: i.-" ~,'. :'::(l'., "';:,;;-" . ,i' '''::r::~~:~{::A:-';;-:~xj:,~~'l~'':,~,1.,:'' t,jZ~~~ ):, '
i''', .,,' ., . ' '.\;.,...': i! ""..'.: "."';'_,"';<' "~":<." 'C.. ..~' ;..' .
'! '-~ ~~-', -:.:~-:"~~:;z~:S~~~'.;:;::~:r,/';:?:z:"
..;;~t';(t.;;q;I~"~~~t~: ",
.. ~-; :'('>"'I~:,~'.~1"~~ii
~,.--;~:,i,\i'1J(':';,,2iJ.i;~i'r~: ,
"'-,.,',....-'">'
.
.
SF-955
Page 5
The previously existing old asphalt surface was ripped and broken
to fragments not greater than six inches, reworked and compacted.
Additional fills were then placed in the subject areas to the
level of the desired elevations. The fill materials were
moisture conditioned to near optimum moisture contents and placed
in lifts, with each lift being compacted and tested. A Muller
vibratory tumping foot roller was used for compaction. According
to our observations, approximately up to six feet of fills were
placed between Stations 2+00 and 5+00. The maximum fill slope is
approximately 1 horizontal to 1 vertical.
Field density tests were performed in accordance with the ASTM D-
1556-82 as the _ fill was placed. Areas of low compactions, as
determined by the field density tests, were brought to the
attention of the contractor. These areas were reworked and
retested.
The test elevations and final test results are
summarized in Compaction Test Results, Table IV. According to
the field and laboratory t-est results, fills placed below the
upper one foot of the final finished subgrade elevations were
compacted to at least 90 percent of maximum dry density, at the
test locations. The results of our field and laboratory testing
further indicate that upper 12 inches of the subgrade soils
beneath the su~ject road improvements were compacted to a minimum
95 percent of maximum dry density, at the test locations.
Compaction of the upper 12 inches of thesubgrade soils were
completed to meet the County requirements for the structural
section of the proposed road improvements. Our services were
limited to compac~ion testing of the fill and subgrade soils
only. Verification of materials, thickness and compaction of the
. ' .' ,
overlying pavement structural laye;rs ~ere l:l~)r~~~{ ;1ih~:- scogEl:,,!f~~14~~7';Yrfrt'i"-
i _: '. "I, .,..." ...., ',m -.' ""-'>';""'-;~."'i~~F.... '; ..,'{....,......ft-:'
serv ces. '~:".:: u 'i-',' i'''' ,',.,-". ,"d' "1. "', ,
" ..0..,.....",.., -,,'g,
.-~~_.._-_..-,..._-..--::.-.._...." -~- -,
,':~ .';"t<-'~<~,~.-,
.
.
17 .. ':. . (2 ')
C:P
...
~O-l:1-~
f~L~(J~)
Page 6
SF-955
CULVERT LIFE
Based on the tested Ph = 9.5 and resistivity = 4000 Ohm-cmms, the
anticipated life of the 18" CMP culvert was calculated at 57
years for a 16 gauge thickness.
""=
'l
.0,"
PARCELS 2 & 4 OF T.P.M. 18850
Compaction tests were performed on fills placed on Parcels 2 and
4 of T.P.M. 18850.
The results of these tests are summarized on plates included with
this report.
SLOPE PROTECTION
To enhance the potential for future favorable performance of
slopes, these areas should be landscaped at the completion of
grading. Slopes left unplanted will be subject to erosion. The
irrigation system should be installed in accordance with the
county requirements. Water should not be allowed to flow over
the slope in an uncontrolled manner. Until landscaping is fully
;0." ,~. , ;,,j~;;i::"
established, P~.El~~iC s~e~ting ShOUld.~,..~~~~~ accessible to
protect the slopes frOm periods of prQ.~R9'''d and/or heavy
rainfall. . . ....LJ
F"
..ij
..
;'"
"'~""':""i":;"""'~:ip;;,!it,;.J"..";'?;;:'::,~'!:'!Illnjili~..!I\l,r'll It"lll!., _~'iW(lrnw _ .....~"jlT~~ ~<,;;
.
.
SF-955
Page 7
LIMITATIONS
Our description of grading operations, as well as observations
and testing services herein, have been limited to those grading
operations performed under our observations. The conclusions
contained herein have been based upon our observations and
testing as noted. No representations are made as to the quality
or extent of materials not observed and tested. The reader
should be aware that variation in relative compaction should be
expected upon retesting due to variations in soils and testing
procedures.
It should be noted that as-compacted composition of fill may
change due to post-construction changes such cycles of drying and
wetting, water infiltration, applied loads, environmental
changes, etc. These changes can change fill composition in
regard to strength behavior, compressibility behavior, volume
change behavior, permeability behavior, etc.
Respectfully submitted,
Santa Fe Soils, Inc.
r~d\\v\ "
V'L~ ~L.----2~
Dr. V. Dakshana Murthy, P.E.
Senior Engineer
VDM/vc
j .","'
;'"
cc: Daniel Wiegand ..
Gary M. Travis,. County of San Diego Dept. of 'Public Works
~,
Soil
~
1
2
3
4
5
6
.;. ., '; '("1~~:Slll'll!I'("~""U~aillli'l.'l!II'*;i_~~~~:il;P
.
.
TABLE I
Laboratory Standards
Description
Optimum Moisture
Content (%)
Maximum Dry
Density (lbs/ft
Gray brown silty fine
to medium sand (key
noise berm Rancho Santa
Fe Road)
10.5
121. 7
Brown clayey fine to 12.0 121. 5
medium sand (E Street
& Carolyn Place)
Silty fine to medium 10.7 123.0
sand (E Street STA 34+00
38+00)
Olive green sandy clay 14.7 116.8
(Woodwind Lane area house
pads)
Light green brown clayey 10.2 121. 2
fine to medium sand
(Woodwind Lane area)
Silty fine to medium sand 10.3 122.5
(Woodwind Lane subgrade
STA 10+00 - 13+00)
TABLE II
UR" Value Test Results
Street Approximate "R"
Name . Location Value
Private Road Easement to Woodwind Lane Station 5+85 24
Private Road Easement to, Woodwind Lane Station 2+85 22
Woodwind Lane Station 1+43 72
."1'..
"".::, "~-'(F;'.;;;~~
.
Test Date of Location
No. Test Station
~-,,",-!~"'--"'II 'I. ,......IIiIi'I-"'''~.~',''"
":-,:c~;::t"~"4~'~~~1?">~!~"'"F'.'t'i:':~,_\"',:~4:i~,,,~ ,.,,~ l'.~~'''II'''''J!IlI'~'-'~il,~.~-1l;_~~"
", , "",.~
.
TABLE III
Compaction Test Results
Elevation
of Test
(Feet)
Moisture
Content
(%)
Dry Unit
Weight
(lbs/ft)
Soil
~
Relative
Compaction
(%)
Woodwind Lane (6th Street)
52 10-7 STA 10+20 FSG 7.2 109.5 6 89
53 10-7 STA 11+60 " 9.3 113.1 6 92
54 10-7 STA 12+50 " 6.9 109.1 6 89
100 10-26 STA 10+60 " 8.1 114.8 6 94
(Retest #53)
101 10-26 STA 12+50 " 9.6 111. 7 6 91
(Retest #54)
102 10-26 STA 12+60 " 10.8 116.9 6 95
(Retest #101)
103 10-26 STA 10+50 " 11.1 119.2 6 97
(Retest #100)
104 10-26 STA 11+50 " 11.4 119.1 6 97
(Retest #53)
* FSG = Finished Subgrade
NOTE:
Discontinuation of test numbers sequence indicated that
testing was done on other areas of the site.
.
Test Date of Location
No. Test Station
TABLE IV
Compaction Test Results
Elevation
of Test
(Feet)
Moisture
Content
(%)
Dry Unit
Weight
(lbs/ft)
Soil
~
Relative
Compaction
(%)
Southerly and Westerly Road Easements to Woodwind Lane:
55 10-9 STA 2+10
56 10-9 STA 3+15
57 10-9 STA 3+00
~1~~~, 913 ~ 10-9 STA 2+20
~~t}::'~i~~5f;1~',:?~:"';';<';": :j" "
',"
-5' 9.3 104.7 5 86
:-5' 9.9 105.7 5 87
-5' 11.1 U2,,1, 5 92
(Retest #56)
-5' 9.0 '
;""'.,"
<.q..._,>;,
.
.
,. _,:e: ;~,'A..._~."~,..~.,:,,,,"'J:';i'/-,""".
.
~"."'-.:-,~
TABLE IV CaNT.
.
Compaction Test Results
Test Date of Location
No. Test Station
Elevation
of Test
(Feet)
Moisture
Content
(%)
Dry Unit
Weight
(lbs/ft)
, ~....
Soil
~
Relative
Compaction
(%)
84
10-17
Southerly and Westerly Road Easements to Woodwind Lane:
85
87
10-17
10-17
88
10-17
95
10-20
10-20
96
98
99
10-21
10-21
3+00
3+80
6+10
5+50
6+95
6+95
6+90
7+00
NOTE:
FSG = Finished Subgrade
"
"
"
"
-3'
-3'
-2'
FSG
18.0
15.6
14.6
10.0
10.8
11.1
12.3
11.1
111.0
112.2
118.8
116.5
106.8
109.5
112.3
116.0.
4 95
(Retest #80)
4
96
6 97
(Retest #82)
6 95
(Retest #83)
5
83
5 90
(Retest #95)
5
5
93
96
Discontinuation of test numbers indicates that other
tests were performed on other areas of the site.
,.
'S
,,:~
["it
~'r" ..
,
fo~,
i
. ,
~'I I
It1 .
:'J~~~~:~ft~t'itt'rl,j"':1~~~1t"~~:Fl\;;.'1'iii;!!l{~,n:-'",~, ....,.,,)!n'~.'(.,,~~""li~"~~r,r"~,,~ ,'I~I(
, '<.
~
'. .... :'; .
\D \D
... ...
....
\C Qj 00 ....,J -..J -...J
o\CO\~'Wf\J
W ftr"J tv 1\,) l\J
o \C Qj ...... Q"l
~.
()
t\I
I:""
...
ZI'll
OUl
-I
au
WI
.1
If
II
.,1
"
i
Ii i
Iii:
:,. :
11
.... .... .... .... \D
0 = = 0 = = = 0 = = 0 = = = = I
I I r I '"
'" .... .... .... <J1
0 \D ... 0
....
'"
>-3
"C 0
:3: l>
......
.... fTlfTl
CD (J)
U1 "'0
U1 "
o
r
o
n
l>
...
....
o
Z
,. I
."Willl
,1111
~
'J'i'
i ,;,1
!',', ...-f',i'.
II
1\
)B
(J)
c
0 ~
"J fTl3:
"J .... fTl Zl>
= .... = = = = = = = = = = = = = = ::> or (J):n
::> .... ....-<
.... I I I en "l]fTl ...
< -<0
en .... .... ....::r -l l> "l]
::r .... .... '" w w ... <J1 '" ... <Xl CD <Xl 0 '" ... fTl ... ...
-G) (J) .... fTl"l]
G) '1 -l 0 (J)H
'1 '" Z
'" 0. -IfTl
0. CD r
:no
fTl
(J)....
cz
r I
n::: "'ll
(J)r
.... .... .... .... .... .... .... .... .... .... .... .... '" '" .... .... 00 l>
'" .... w ... U1 W W W .... .0 U1 \D '" '" CD ... \D z.... n
"'(J) fTl
fTl...
w 0 '" w '" '" 0 w .... <J1 ... <Xl ... ... ... '" '" zc:
-l:JJ
fTl
~
,.
~
,
...k.......!;
,r~;
J1,
i::
p:~
O't
Pi'
.~
n
y,
III
:I~:- ':
MlI.
"~ii
It;';:''
~
II;
It
. ~ 0
-I :n
... -<
.... .... .... .... .... .... .... .... .... .... .... .... .... .... N .... ....
0 0 .... 0 0 0 0 .... 0 0 0 0 0 0 0 0 0 ~ c:
... \D 0 W ... \D W 0 \D \C ... CD '" 0 ... CD W ... Z
. . IT ...
w U1 !=> ... 0 '" U1 <II .... .... .... 0 U1 ... N -J Ul III -I
. .....
...
<t.
... U1 U1 U1 ... U1 U1 U1 U1 U1 ... ... ... ... ... ... ... III
-< 0
1/...
I'll r
::0 ft "'::0
~.. ;",',',',":'.k: ,& ~
....,. ft- g
"" \D ~ \D CO '" III '" co "" "" "" "" "" CD co '",
.... 0 Ol 0 Ul ... 01 0 Ul 0 0 0 .... "'01 N -J Q\ .....
ft- . " ., (t.:. , , , , , tv'ft:.:' . , ~.. ',':-
CD IV ... 0 Q\ C) .... CD C) C) ... '" ",' CD N -J
...., ....... -..~
100" . QO N:
",,,:' ,<;.5::'~; '. "'. 00
,
" ",' "'"", """ "'. .':,,"~Ili',:ll~.~..,._, l~iIIiit"""~.R~1':'",.
IV
VI
IV IV
~ W
tv N N l-'
tv ~ 0 \0
...
(l) ...,
'" '" '"
: : : , : : : , ,
IV IV IV
~ W IV
:
....
::>
...'
Ill:::::
::>"
I I I I I
G) ~ f\J W >f:::o. 0'\
"
III
0.
C1l
:
'"
I--' t:-' I-' ..... I--' I--'
U'1 ~ W ~ -..] W
l"O \D 1..0 W ~ CO
IV
...
o
w
... ...
o ...
'" 0
>-' >-'
o 0
(l) (Xl
lJ1
>-' IJ1
IJ1 ...,
.e. ~ .e:. il:II> oI:rlo ~
\0 \Cl \0 \0 \Cl
W ~ IV W ....
. .
... 0'\ \0 .... U1
>-'
o
'"
>-'
o
'"
>-'
'"
= =
I ,
(Xl (Xl
>-' >-'
... ...,
o IJ1
....
o
IJ1
.
~
... ...
~
1lI1lO d'
ID' S. ~'lbi:"e
0'" tlFCl":;.j
>. .!A..--. --.
0) .--1"f'r-"'."'"'Clp....
...,
~ ...
....
G'I
1U
rt
C
"
1U
,>-'
":Gl
"
1U
0.
C1l
IV
>-'
IJ1
>-'
o
IV
'"
'"
(Xl
....
...
00 11"""
~':'~$A'~'
...., '
."."C;,.:~.:.s,;;,4:~
.,,", .,'~; 'i<Jt-.
,....... ........" 4,-'
....
'"
~
~
-j
zm
o Ill,
-j
...
~
..;
~
>-'
(Xl
IJ1
IJ1
o
o
)>
-j-j
fllfll
(fJ
-j0
"
r
o
n
)>
-j
H
o
Z
fll
or
"fll
<
-j)>
fll-j
(fJH
-j0
Z
n~
00
ZH
-j(fJ
fll-j
ZC
-j:n
fll
~
~
~
::;:0
-j:n
-<
~c
~Z
ITH
III -j
"-
"
".
-jlll
-<0
-0...
/Tll""
, I
I
I
(fJ
c
03:
fll3:
Z)>
(fJ:J)
H-<
-j
-<0
"
-j
fll"
(fJH
-jfll
r
:no
fll
(fJH
CZ
r,
-j"lJ
(fJr
)>
n
fll
. '/""",.., ,~,.
.
II
! .
a
~
Scale r' = 00'
A,
<<:
o
..:
~oo
10+.
r.<l
~
<<:
E-<
:z:
<<:
CIl
0'
:r:
u
:z:
<<:
<0:.
,,~\Jl:P~;.~.-'\I~'" ""!l'~I!lI!I:~I!I;!Jn"...._. .._.~"".., '" .._'''....>w
.
"
J
.,
WOODWIND LANE
( 6 'ill St. )
\ 1\
I~~I
"'1
.,
',",
.- :.-
~l!'ij .~
':':":'~~~ -"y~+::.:^,
,~ ';i,,;f~"'F:-~,~:,:'.,};,
~
\,; :~_C,?/:"","~._ ~'_:
.
.
Note: No grading plan available at this time
Site Plan is drawn from measurements
taken on site.
~
.> 0
'S-
~~
~
...
'"
~
'"
o
~
o
~
'"
'"
\ 1
>
~'."
,
f.,
,
\-
Scale I.. E 0Cl'
~
. ~
8~\
,I)
.. I
I'
--
"" \"
~.l'
t_:,,"',~ ' ~ -i _ ,,-- _,
. .i,;~>~.:i,,;#((
-~:.
....,..~;,;n-,.,
..
~~.,
~~L
oWl': -,; ;i;I'~"tJl": :__>~:
1l.0. ci)l';;' ."j....
'of'--
,"',.:,,'" .
"':"iCD,~,~.,_!.~,",~.,,,", .,.,.,,~,_,~,,11"
SITE
PLAN,
WOODWIND LANE
~
SCALE: 1" = 60'
120
120
II)
...
~
III
t')
-
~ !
, ,
g
125
PARCEL-2
LEGEND
,.....-130-- EXIST. CONTOURS
.
- -I~- CONTOURS PRIOR TO GRADING
--t!--.;;--DAYLIGHT LINE
PLAN IS REDUCED FROM GRADING PLAN
t. .,.J'i.,"\',," qji:,
;,;~;.~,:~, ,.;
.Ju ,pi.i;'Ncl;'" 'S .
'.:'.;'..,
Job No. '
-;,.",
By
';"<-'~-'?
',"
,,j,; .'':;,
.
/I,e/I hilgilleeriIl1/, iIII.-'.
CIVIL, GEOTECHNICAL, & QUALITY ENGINEERS
. STRUCTURAL ENGINEERING. LAND SURVEYING
. PERCOLA TlON & SOIL TESTING
. CONSTRUCTION MANAGEMENT & INSPECTION
5933 SEA LION PLACE, SUITE 100, CARLSBAD, CA 92008
CLIENT: CHUBBIC
619-431-8213 PROJECT: CHU192
DATE: 6 FEB. 1992
Mr. Steve Chubbic
1067 Neptune Ave.
Leucadia, CA. 920248
Subject:
Results of Compaction Testing and Inspection for the
lot located at 284 Rancho Santa Fe Rd.,
Encinitas, CA
(APN: 259-231-75).
Dear Mr, Chubbic:
Pursuant to your request, we have completed our Inspection
and Compaction Testing of the rough grading operations for the
subject parcel.
Locations of our Field Density Tests are shown on
Enclosure (1), and the results of these tests are detailed on
Enclosure (2).
Site preparation, compaction, and testing were accomplished
between January 6 and 31, 1992.
Based on our observations and
testing, it is our opinion that the work performed during that
period was in general conformance with the City of Encinitas
Grading Ordinance and the Approved Grading Plan 10472-GI
On 6 January 1992, grading began on the subject lot with the
contractor removing some surface vegetation.
,-\11 debris was
removed from the pad area.
The export operation which followed
consisted of the removal of the existing fill materials on the
east side of the lot.
These materials were hauled off site.
-1-
.
/1..,,/1 hilgillccrillg, ill"".
CIVIL ENGINEERING. LAND SURVEYING
ENGINEERING DATA MANAGEMENT & CONVERSION
GJ.s. . MAP/PLAN/DOCUMENT SCANNING
CLIENT: CHUBBIC
PROJECT: CHU192
DATE: 6 FEB. 1992
On January 16 1992, the contractor excavated for supporting
'.,;hear key at the toe of the Easterly facing fill slope for the
house pad I)y cutting a slot 20 feet wide into the firm natural
30il and tilting the bottom downward into the slope.
Fill
jll~lterial, SUIldy silty clay and siltstone genel'ated fronl cuts
:\Jong the Westerly side of the pad, was then watered arid
1'('I;ompacted Ofl the Easterly side of the hOllse pad.
Densit~. was achieved by the use of a D-6 Blllldozel'
Ll'ack,,'alLillg the soil as fill "'as placed in thin lifts.
Since
l~~-isting soil varied in moistllre content, the contI'actor had to
~pelld additional time and effort in his mixing operatiofl in order
tc ensure near-optimum moisture and proper compaction l.ll the fill
Illaterial.
As indicated by our Compaction Test Results, Enclosure (2),
d,nsity tests performed in the construction of the fill slope for
Ule house pad indicated over 90% relative compaction ,IS compared
'.0 ASTH Test Procedure D 1557-78.
In gerIeral, the native materials exposed near stlrface grades
{J'e considered to have a nloderate expansioll potential according
Lu Table 29-C of the Uniform Building Code.
FCJu.ndtttio[Js shall be
sized and constructed in accordance with the rccomnlcndations found
!l the latter part of this Report.
-2-
5933 SEA LION PLACE, SUITE 100, CARLSBAD, CA 92008
619-431-8213
FAX 619-431-6959
.
II..ell hilgillccrillg, illt:.
CIVIL ENGINEERING. LAND SURVEYING
ENGINEERING DATA MANAGEMENT & CONVERSION
G./.s. . MAP/PLAN/DOCUMENT SCANNING
CLIENT: CHUBBIC
PROJ ECT: CH\Jl92
DATE: 6 FEB. 1992
For foundation design purposes, an allowable bearing strength
of 2500 psf may be utilized for all continuous or spread footings
founded in dense native soils compacted to 90% relative compaction
per ASTM D 1557-78. This design bearing value is in accordance
with the recommendations of the Geotechnical Investigation by
Western Soil and Foundation Engineering, Inc., dated 6-19-89
It is recommended that the continuous perimeter foundations
and concrete slabs be constructed and reinforced in accordance
with the following minimum design criteria:
a. The continuous perimeter foundations shall extend a
minimum depth of 24 inches and a minimum width of 18 inches into
the compacted fill soils for a two story structure and a minimum
depth of 18 inches and a minimum width of 12 inches for a single
story.
The continuous foundations shall be reinforced with at
least four No. 5 steel bars, two bars shall be placed 3 inches
from the top of the foundation and the other bar shall be placed 3
inches from the bottom.
b. Footings which span from native material to compacted fill
soils shall be reinforced with an additional of two No.5 steel
bars top and bottom to control potential differential movement
extended 10 feet on either side of the daylight line.
Since the
building area of the pad was over-excavated to a depth of
approximately 36 inches, a transition lot condition is not
anticipated.
-3-
5933 SEA LION PLACE. SUITE 100, CARLSBAD, CA 92008
619-431-8213
FAX 619-431-6959
, .
.
11..,11 hilgillccrillg, ill"".
CIVIL ENGINEERING. LAND SURVEYING
ENGINEERING DATA MANAGEMENT & CONVERSJON
GJ,s. . MAP/PLAN/DOCUMENT SCANNING
CLIENT: CHUBBIC
PROJECT: CHU192
DATE: 6 FEB. 1992
c. Footings placed on or adjacent to fill slopes shall have a
minimum horizontal distance of eight feet (8' I from the edge of
the footings to the face of the slope.
d. All concrete slabs shall be a minimum of four inches in
thickness and reinforced with a minimum of No.3 rebars placed at
24 inches both ways.
In order to minimize vapor transmission, an
impermeable membrane (ie: visqueen) shall be placed over 4 inches
of non-expansive sand.
The membrane shall be covered with two
inches of sand to protect it during construction and the sand
should be lightly moistened just prior to placing concrete. All
concrete used on this project shall have a minimum compressive
strength of 2000 psi unless otherwise stated on the Grading Plan.
These foundation recommendations are minimum design
requirements, however actual foundations shall be designed for
the expected live and dead loads, and for wind and seismic loads.
Findings of this Report are valid as of this date; however,
changes in conditions of a property can occur with passage of
time, whether they be due to natural process or works of man on
this or adjacent properties.
In addition, changes in applicable
or appropriate standards occur whether they result from
legislation or broadening of knowledge.
Accordingly, findings of
this Report may be invalidated wholly or partially by changes
outside our control.
Therefore, this Report is subject to review
and should not be relied upon after a period of three years.
-4-
5933 SEA LION PLACE, SUITE 100, CARLSBAD, CA 92008
619-431-8213
FAX 619-431-6959
.
11..e:II'flilgilleerillg, illt:.
CIVIL ENGINEERING. LAND SURVEYING
ENGINEERING DATA MANAGEMENT & CONVERSION
G.I.S. . MAP/PLAN/DOCUMENT SCANNING
CLIENT: CHUBBIC
PROJECT: CHU192
DATE: 6 FEB. 1992
In the event that any changes in the nature, design, or
location of buildings are planned, the conclusions and
recommendations contained in this Report shall not be considered
valid unless the changes are reviewed and the conclusions of this
Report are modified or verified in writing.
This Report is issued with the understanding that it is the
responsibility of the owner or of his representative to ensure
that the information and recommendations contained herein are
are incorporated into the plans.
called to the attention of the project Architect and Engineer and
shall be taken to ensure that the contractor and subcontractors
carry out such recommendations in the field.
Further, the necessary steps
The Soil Engineer has prepared this Report for the exclusive
use of the client and authorized agents.
This Report has been
prepared in accordance with generally accepted soil and foundation
engineering practices.
No other warranties, either expressed or
implied, are made as to the professional advice provided under the
terms of this agreement, and included in the Report.
B & B Engineering Inc. and Associates appreciate this
opportunity to be of service.
Should you have any questions
regarding this project, please do not hesitate to contact us.
Sincerely,
./// ,-
j?:'''~ A.L.L7f-- l.-,-". "\,~'_
Ai-thur C. Beard
/"
RCE RQE RGE
.-\CB/DPB/emb
-5-
5933 SEA LION PLACE, SUITE 100. CARLSBAD, CA 92008
619-431-8213
FAX 619-431-6959
\''''
\"
'"
"
NoT TO SCALE ._
{\
/~,. \
"~!il "\ h
, ~ 'J \ \ :::-,
, ~~',
<, 'v
t'Ji}
q~1 .,I
'.,
~~ ~
I, C
~I \J
4)QI'
I
I
I
I
I
I
I
I
k
C\,j
I~"'::",,- !iAr."/ '
l.}~.... /j,,1 1,-
-,- r'tM;?ING/If.ilKNt 47 TH/S TIME OlIO?
Ix eX/STIN6 CON70l//?.f 70
~ REM4/NI15 I.f:) ~5EEW7EROF
/2 . APPROXIMATE LOCATION OF FIELD DENSITY TESTS
P LOT
OWNER: MR, Sle.Ve:;, C.l-\\J'\')'i';IC
LOCATION: 284- J2ArJ::J.lO SANTA FE: lZO,
ENC/ N lit6 I cA '
A. P . N. : 2'59 - :2 B 1- 75
PROJECT: ON /q-z, DATE: ~ee '12.
P LAN
IJ..erIJ I!lII!/illccrillg, ill"''.
CIVIL, GEOTECHNICAL, & QUALITY ENGINEERS
. STRUCTURAL ENGINEERING. LAND SURVEYING
. PERCOLATION & SOIL TESTING
. CONSTRUCTION MANAGEMENT & INSPECTION
5933 SEA LION PLACE, SUITE 100, CARLSBAD, CA 92008
619-431-8213
ENCLOSURE (1)
. . '/1.."II'}ilf/illccrillg, illl-'.
~ ~ CIVIL, GEOTECHNICAL, & QUALITY ENGINEERS
\ WI . STRUCTURAL ENGINEERING. LAND SURVEYING
,..:., '.~ ' . . PERCOLA nON & SOIL TESTING
. CONSTRUCTION MANAGEMENT & INSPECTION
5933 SEA LION PLACE, SUITE 100. CARLSBAD, CA 92008
619-431-8213
QIENT: C I-\UBP~lc.. fIDJEcr : cHu. 192- rn1E: Fe/? \992-
Test Test Test Test Sol1 Dry Dens 1ty, pcf Moisture, % Relative Retest
No. . Date Location El/Depth Type Field Maximum. Field Opt. Compaction No.
I 1/17 HOU,~6 ;.)AD A /05, I /15,5 /5.7 14,5 ql
Z II II 103,4- II /4,2 \1 qo
3 1/: I' II 104,7 " /6.4 \1 CJ/
""..
4 II if " /b7,Z II /7.2 I 93
0- I1 Ii I' II 106/ I' /0.& a",..
!i-
i' " 10.'3,3 II 14,0 :?,../
6 I !~'r , ';i-r
<-'"
7 II 104,2 " /<;,5 qo
"
8 " II /O~,'J 1\ 14,.8 , 12
1/-: .J 1\ /01,2 I' IS,&:' l' -
;; /-..,- " (/'?
" II /10,0 i' 14,;; [I /)r
10 "/?
/1 1/31 , 1\ /07,2- I, 15,Q , c~ -;.:"
. .
II II 107.7 'I /4-,f:; " C}3
I':'
"
.
-
COMPACTION CURVE DATA
SOIL TYPE AND DESCRIPTION OPTIMUM MAXIMUM DRY
MOISTURE % DENSITY (pef)
A. ~/2i::_Y - TAM Ct.-A VEY .5AtJO/SIC...TSTo/./E /4,~ 115.5
COMPACTION TEST DATA ENCLOSURE (2)