1997-5275 AC/CN/FM//G/I Street Address drl~{L_-- Category I ,,2/155 Serial # -;;11 1/,/1 B Name Description Plan ck, # Year I I I I I I I I I I I I I I I I I I I ~ REPORT OF ROUGH GRADING OLIVENHAIN MEADOWS ENCINITAS, CALIFORNIA JOB NO. 98-18 JUNE 24,1999 WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I J WESTERN SOIL AND FOUNDATION ENGINEERING, INC. PHONE: (760) 746.3553 FAX: (760) 746.4912 423 HALE AVENUE ESCoNoloo, CALIFORNIA 92029 June 24, 1999 Mr. Bob Booker Venture Pacific Development P,O. Box 231639 Encinitas, CA 92023-1639 Project: Our Job No. 98-18 Olivenhain Meadows Tract Map No. 91-198 Valleyside Lane Encinitas, California Subject: Report of Rough Grading Dear Mr. Booker: In accordance with your request, we have provided testing and observation services during grading of the proposed development. Our services were performed from December 11, 1998 to May 19, 1999, the date of our last observation and testing of compacted fill soils at the site. Our scope of services consisted of the following: . Observation of the grading operations, . Observation and testing during placement of compacted fill, . Performing laboratory tests on representative samples of on-site and import soil used for this project, and . Preparation of this rough grading report. I I I I I I I I I I I I I I I I I I I -- OIivenhain Meadows June 24, 1999 Our Job No. 98-18 Page 2 The scope of our observations and testing services did not include the responsibility for surveying. The locations and elevations of the tests were determined from stakes and hubs set by others. Our observations and testing services were provided in accordance with the recommendations presented in our Updated Geotechnical Report of August 10, 1998. The locations of the field density tests are presented on the Site Plan found in the back pocket of this report. The Site Plan was provided by Logan Engineering. Project Description The proposed project consists of the development of an eleven lot subdivision. Each lot will support a single-family residence and associated improvements. The residences will be one and two-story wood-frame structures with post-tensioned foundations. Observation and Testing The primary purpose ofthe grading was to provide relatively level pads for the proposed structures, and to perform remedial grading to mitigate the potential for damage due to settlement or lateral movement of the on-site soils. The earthwork at the site consisted of: WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I ..I Olivenhain Meadows June 24, 1999 Our Job No. 98-18 Page 3 . Removal of poorly consolidated material including colluvium and landslide debris, . Keying and benching of the fill soils into the undisturbed formational material, . Placement of compacted fill to achieve the final design grades for the building pads, driveways, slopes and Valleyside Lane, and . Construction of stability fills for the western slopes of lots I, 5 and 6. To achieve the final design grades, cuts and fills up to 22 feet were required. The subgrade soil exposed at the bottom of the clean-outs generally consisted of competent siltstones and sandstones belonging to the Eocene age Santiago Formation. Offsite grading was performed along the north property line, adjacent to Valleyside Lane, and a portion oflot 3. This offsite grading was necessary in order to establish the toe of the new northerly slope into competent soil. Landslide debris was encountered on lot numbers 1 and 2, and the westerly portions of lot numbers 3, 4, 5 and 6. This landslide debris was removed in its entirety and replaced with compacted fill during the earthwork operations. WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I ....I Olivenhain Meadows June 24, 1999 Our Job No. 98-18 Page 4 In addition, weak formational soils were encountered on the offsite property west of lot numbers 5 and 6 and along the west property line of lot I. These weak soils were supported with a stability fill constructed in compliance with the recommendations of our referenced reports and our field recommendations made during our observations of the grading operations. Subdrains were installed behind the reconstructed slopes of these stability fills. To reduce the potential for damaging differential settlement and to eliminate the cut/fill transitions beneath the structures, the existing soil was overexcavated to allow for the placement of at least 4 feet of compacted fill beneath the slabs. In addition, considering that the foundations will be post-tensioned, the pads were capped with at least two feet of non-expansive soil material. The compacted fill soils consisted of on-site and imported soils. The fill soils were generally mixed and compacted using heavy equipment, including D8 and D9 bulldozers, 637 scrapers, water trucks and loaders. To evaluate the degree of compaction of the fill soils, field density tests were performed in accordance with ASTM D1556-90, the sand cone method and ASTM D2922-81, the nuclear gauge method. The reported degree of compaction is defined as the ratio of the field density to the laboratory maximum dry density. The maximum dry density and the optimum moisture content of representative samples of the fill were determined in the laboratory in accordance with ASTM D1557-91. The results of both the laboratory compaction tests and the field density tests are presented at the end of this report. This report includes fill field density test numbers I through 329. WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I ....I Olivenhain Meadows June 24, 1999 Our Job No. 98-18 Page 5 The approximate area of fill tested, and the approximate location of the field density tests are shown on the Site Plan provided in the back pocket of this report. No observation or testing was performed beyond the limits depicted on the Site Plan. Recommendations Drainage Control: Adequate drainage must be provided and maintained to prevent water from ponding around or under the foundations. Positive drainage away from the structures should be provided. Minimum site gradients of at least 2% in the landscaped areas and of I % in the hardscaped areas are recommended in the areas surrounding buildings. We recommend that roof drains, rain gutters and area drains in all landscaped areas be installed. The rain gutters and area drains should discharge into a solid drain pipe. Low flow irrigation systems are recommended in areas around the structures. Water should not be allowed to flow in an uncontrolled manner over the top or face of any slope or excavation. All brow ditches, drainage swales and other drain systems, as shown on the project plans, shall be constructed in a timely manner. Periodic maintenance must be performed on all drainage systems, both surface and subsurface, to insure that they operate properly during the design life of the project. WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I Olivenhain Meadows June 24, 1999 Our Job No. 98-18 Page 6 Erosion control and drainage devices shall be installed in compliance with the requirements ofthe controlling agencies. Slopes: Permanent constructed slopes shall be finish graded to an inclination no steeper than 2 to I (horizontal to vertical). Slopes shall be planted as soon as possible after grading. Slope erosion including sloughing, rilling, and slumping of surface soils may be anticipated if the slopes are left unplanted for a long period of time, especially during rainy seasons. Drainage swales, earth berms or back -gradients are recommended at the top of permanent slopes to prevent surface water runoff from overtopping the slopes. Foundations: We recommend that foundations be constructed in accordance with the recommendations provided in our Updated Geotechnical Report, dated August 10, 1998. After completion of the footing excavations, the bottom of the footings should be hand-cleaned of any loose soil or debris. The bottom of the footing excavation should be approved by the geotechnical consultant prior to placement of reinforcing steel or concrete. WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I I I I I I I I I I I I I I I I I ~ Olivenhain Meadows June 24, 1999 Our Job No. 98-18 Page 7 If footings are proposed adjacent to slope areas, we recommend that the footings be deepened to provide a minimum horizontal distance of 10 feet from the outer edge of the footings to the adjacent slope face. Earthwork: It is our understanding that the rough grading for the subdivision is now complete. If additional fill or backfill is placed on this site, we must be notified prior to the commencement of any earthwork. Additional fill or backfill must be tested by our firm for minimum relative compaction requirements. Conclusions Based on our observations and test results, the preparation of natural ground and placing of compacted fill were performed in general compliance with the recommendations presented in our Updated Geotechnical Report. The results of our observations, field density and laboratory tests indicate that the fill, at the locations and elevations tested by us, was compacted to no less than 90% of its maximum dry density (ASTM DI557-91). WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I LI Olivenhain Meadows June 24, 1999 Our Job No. 98-18 Page 8 In providing professional geotechnical observations and testing services associated with the development of this project, we have employed accepted engineering and testing procedures and made every reasonable effort to ascertain that the soil-related work was carried out in general compliance to our recommendations and project plans and specifications. Although our observation did not reveal obvious deficiencies, we do not guarantee the contractor's work, nor do the services performed by our firm relieve the contractor of responsibility in the event of subsequently discovered defects in the contractor's work. Respectfully submitted, WESTERN SOIL AND FOUNDATION ENGINEERING, INe. , Dennis E. Zimmerman, C 26676, GE 928, Expires 3/31/00 Geotechnical Engineer Attachments: Test Results & Site Plan Distribution: (4) Addressee - DEZ:dg WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I Olivenhain Meadows June 24, 1999 Fill Soil Description Laboratory Compaction Test Results Maximum Dry Density (pct) Dark Brown, Sandy, Clayey Silt 121.0 Dark Brown, Sandy Clay 118.0 Pale Green, Slightly Clayey, Silty, Fine to Medium Grained Sand 115.0 Pale Brown, Clayey, Silty, Fine to Medium Grained Sand 117.5 Tan to Brown, Slightly Silty, Fine to Medium Grained Sand 118.0 Yellow Greenish-Brown, Silty, Clayey Sand (Import) 130.0 Greenish-Tan, Sandy, Silty Clay (Import from Reva Site) 114.5 Light Green, Silty, Very Fine Grained Sand (Import from Reva Site) 112.0 WESTERN SOIL AND FOUNDATION ENGINEERING, INC. Our Job No. 98-18 Page 9 Optimum Moisture Content ('Yo) 13.9 15.5 15.5 15.0 10.6 8.5 15.2 17.3 I I Olivenhain Meadows Our Job No. 98-18 June 24, 1999 Page 10 I I Fill Field Density Test Results I Height of Field Field Maximum Test Re- Fill T estedJ Moisture Dry Dry Relative Date Test Test Location Elevation Content Density Density Compaction I 1998 No. of No. of Test (ft.) (%) (pct) (pct) (%) I 12-11 1 Lot 8 +2.0 17.1 104.1 121.0 86.0 2 Lot 8 +2.0 15.6 110.2 121.0 91.1 I 3 Lot 7 +2.0 21.0 104.1 121.0 86.0 I 4 3 Lot 7 +2.0 20.9 106.6 121.0 88.1 5 1 Lot 8 +2.0 17.6 107.0 121.0 88.4 I 6 Lot 8 +2.0 18.0 111.6 121.0 92.2 I 12-12 7 4 Lot 7 +2.0 20.1 106.6 121.0 88.1 12-14 8 7 Lot 7 +2.0 19.0 109.1 121.0 90.2 I 9 5 Lot 8 +2.0 19.2 108.9 121.0 90.0 I 10 Lot 8 +3.5 18.0 106.9 ] 18.0 90.6 I 11 Lot 7 +3.5 17.9 107.3 118.0 90.9 12 Lot 7 +3.5 15.6 102.1 118.0 86.5 I 13 Lot 8 +3.5 16.9 100.3 118.0 85.0 I 12-15 14 13 Lot 8 +3.5 18.2 104.4 118.0 88.5 15 12 Lot 7 +3.5 17.4 99.6 118.0 84.4 I I I WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I 01ivenhain Meadows Our Job No. 98-18 June 24, 1999 Page 11 I I Fill Field Density Test Results I Height of Field Field Maximum Test Re- F ill Tested! Moisture Dry Dry Relative Date Test Test Location Elevation Content Density Density Compaction I 1998 No. of No. of Test (ft.) (%) (pcfl ( pcfl (%) I 12-15 16 14 Lot 8 +3.5 15.6 106.7 118.0 90.4' 17.8 106.4 90.2 17 Lot 7 +4.5 118.0 I 18 Lot 8 +4.5 18.2 107.1 118.0 90.8 I 19 15 Lot 7 +3.5 14.3 102.9 118.0 87.2' 20 Lot 7 +6.0 14.4 108.8 118.0 92.2 I 21 Lot 8 +6.0 15.8 101.5 118.0 86.0 I 22 19 Lot 7 +3.5 15.1 107.3 118.0 90.9 12-16 23 Lot 7 +5.5 14.7 113.6 118.0 96.2 I 24 Lot 7 +6.0 14.4 111.3 118.0 94.3 I 25 21 Lot 8 +6.0 17.2 107.0 118.0 90.6 I 26 Lot 8 +3.0 18.0 108.1 118.0 91.6 12-17 27 Lot 8 +8.0 15.8 103.6 121.0 85.6 I 28 Lot 7 +8.0 16.1 106.5 121.0 88.0 I 29 Lot 8 +8.0 14.9 109.1 121.0 90.2 30 Lot 7 +8.0 17.0 104.1 121.0 86.0 I I ' Test performed by the sand cone method. I WESTERN SOIL AND FOUNDATION ENGINEERING, INC. . I I Olivenhain Meadows Our Job No. 98-18 June 24, 1999 Page 12 I I Fill Field Density Test Results I Height of Field Field Maximum Test Re- F ill Tested! Moisture Dry Dry Relative Date Test Test Location Elevation Content Density Density Compaction I 1998 No. of No. of Test 1ft.) 1%) (pcf) Ipcf) 1%) I 12-18 31 Lot 9 +2.0 16.4 109.4 121.0 90.4 32 Lot II +2.0 15.3 114.2 94.4 121.0 I 12-23 33 27 Lot 8 +8.0 15.5 II 0.1 121.0 91.0 I 34 28 Lot 8 +8.0 14.7 109.9 121.0 90.8 35 30 Lot 7 +8.0 13.9 114.2 121.0 94.4 I 36 Lot 7 +8.5 17.3 110.6 121.0 91.4 I 37 Lot 9 +4.0 16.1 108.9 118.0 92.3 38 Lot 10 +4.0 15.9 108.6 118.0 92.0 I 39 Lot 11 +4.0 14.3 114.1 118.0 96.7 I 12-30 40 Offsite Area +1.5 17.4 101.8 115.0 88.5 I 41 Offsite Area +1.5 17.0 102.4 115.0 89.0 12-31 42 40 Offsite Area +1.5 17.2 105.8 115.0 92.0 I 43 41 Offsite Area +1.5 17.8 107.0 115.0 93.0 1999 I 1-04 44 Offsite Area +3.0 21.0 97.8 115.0 85.0 45 44 Offsite Area +3.0 20.8 97.4 115.0 84.7 I I I WESTERN SOIL AND FOUNDATION ENGINEERING, INC. . ----.-.-- I I Olivenhain Meadows Our Job No. 98-18 June 24, 1999 Page 13 I I Fill Field Density Test Results I Height of Field Field Maximum Test Re- Fill Tested! Moisture Dry Dry Relative I Date Test Test Location Elevation Content Density Density Compaction 1999 No. of No. of Test (ft.) (%) (pct) (pct) (%) I 1-04 46 45 Offsite Area +3.0 15.8 104.7 115.0 91.0 47 Offsite Area +3.0 16.7 104.2 115.0 90.6 I 48 Offsite Area +5.0 22.0 97.3 115.0 84.6 I 49 48 Offsite Area +5.0 19.0 105.0 115.0 91.3 50 Not Used I 1-05 51 Lot 5 +2.0 19.7 109.4 118.0 92.7 I 1-06 52 Lot 4 +2.5 17.1 110.0 118.0 93.2 I 53 Lot 6 +2.0 17.3 102.1 118.0 86.5 54 53 Lot 6 +2.0 21.0 107.2 118.0 86.6 I 55 Lot 5 +4.5 20.0 103.6 118.0 87.8 I 56 55 Lot 5 +4.5 18.1 107.2 115.0 93.2 57 54 Lot 6 +4.5 17.6 98.4 115.0 85.6 I 1-07 58 Lot 4 +3.0 18.1 105.8 115.0 92.0 I 59 57 Lot 6 +4.5 17.6 103.5 115.0 90.0 60 Lot 5 +6.5 17.2 105.4 115.0 91.7 I 61 Lot 6 +6.5 20.1 102.2 115.0 88.9 I I WESTERN SOIL AND FOUNDATION ENGINEERING, INC. . I I Olivenhain Meadows Our Job No. 98-18 June 24, 1999 Page 14 I I Fill Field Density Test Results I Height of Field Field Maximum Test Re- F ill T estedJ Moisture Dry Dry Relative Date Test Test Location Elevation Content Density Density Compaction I 1999 No. of No. of Test (ft.) (%) (pel) (pcf) (%) I 1-07 62 Lot 4 +5.0 22.9 97.8 115.0 85.0 63 62 Lot 4 +5.0 19.7 106.6 115.0 92.7 I 64 61 Lot 6 +6.5 17.4 104.2 115.0 90.6 I 1-08 65 Lot 6 +6.5 23.8 94.3 115.0 82.0 66 Lot 5 +6.5 22.2 105.8 115.0 90.0 I 67 Lot 4 +5.0 18.1 105.8 115.0 90.0 I 68 Lot 3 +2.0 20.0 107.3 115.0 91.3 1-09 69 65 Lot 6 +6.5 18.3 105.6 115.0 91.8' I 70 Lot 4 +5.0 19.0 106.2 115.0 92.4' I 71 Lot 3 +2.0 21.0 105.0 115.0 91.3' I 72 Lot 3 +4.0 23.9 99.0 115.0 86.1 ' 1-11 73 72 Lot 3 +4.0 21.3 106.4 115.0 92.1 I 1-12 74 Lot 3 +2.0 20.7 106.8 117.5 90.9 I 75 Lot 3 +2.0 20.7 107.5 117.5 91.5 1-13 76 Lot 3 +6.0 18.5 107.7 117.5 91.7 I I ' Test performed by the sand cone method. I WESTERN SOIL AND FOUNDATION ENGINEERING, INC. . I I Olivenhain Meadows Our Job No. 98-18 June 24, 1999 Page 15 I I Fill Field Density Test Results I Height of Field Field Maximum Test Re- F ill T ested/ Moisture Dry Dry Relative Date Test Test Location Elevation Content Density Density Compaction I 1999 No. of No. of Test ( ft.) ('Yo) (pcl') (pcl') ('Yo) I 1-13 77 Lot 3 +6.0 23.0 101.7 117.5 86.6 78 77 Lot 3 +6.0 19.5 103.5 117.5 88.1 I 79 Lot 3 +6.0 18.5 106.0 117.5 90.2* I 80 Lot 3 +6.0 19.0 106.2 117.5 90.4* 1-14 81 Lot 3 +6.0 22.7 98.6 117.5 83.9* I 1-15 82 81 Lot 3 114.0 16.8 109.3 117.5 93.0 I 83 Lot 3 114.0 17.1 106.9 117.5 91.0 1-16 84 Lot 2 116.0 16.0 103.2 117.5 87.8 I 85 Lot 2 116.0 19.0 104.7 117.5 89.1 I 86 84 Lot 2 116.0 19.6 106.3 . 117.5 90.5 I 87 85 Lot 2 116.0 20.1 106.6 117.5 90.7 88 Lot 2 118.0 18.8 106.5 117.5 90.6 I 89 Valleyside Lane 117.0 20.1 106.8 117.5 90.9 I 90 Lot 2 114.0 19.8 106.5 117.5 90.6 91 Lot 2 119.0 20.3 106.1 117.5 90.3 I I * Test performed by the sand cone method. I WESTERN SOIL AND FOUNDATION ENGINEERING, INC. . I I Olivenhain Meadows Our Job No. 98-18 June 24, 1999 Page 16 I I Fill Field Density Test Results I Height of Field Field Maximum Test Re- Fill T estedJ Moisture Dry Dry Relative I Date Test Test Location Elevation Content Density Density Compaction 1999 No. of No. of Test ( ft.) (%) (pcf) (pcf) (%) I 1-16 92 Lot 2 120.0 20.1 106.8 117.5 90.9 93 Lot 2 116.0 18.8 106.5 117.5 90.6 I 1-18 94 Lot 2 120.0 17.2 109.6 117.5 93.3 I 95 Lot 2 122.0 17.8 106.7 117.5 90.8 96 Lot 2 124.0 18.6 106.7 117.5 90.8 I 97 Lot 2 125.0 17.9 106.5 117.5 90.6 I 1-19 98 Lot 2 125.0 17.5 110.1 117.5 93.7" I 99 Lot 1 127.0 19.3 106.8 117.5 90.9" 1-20 100 Lot 2 138.0 23.0 99.3 117.5 84.5 I 101 100 Lot 2 138.0 22.4 99.0 117.5 84.3 I 102 Lot 1 142.0 21.0 104.0 117.5 88.5 103 102 Lot 1 142.0 21.0 101.0 117.5 86.0" I 104 103 Lot 1 141.5 22.1 100.0 117.5 85.1 I 1-21 105 104 Lot 1 140.0 24.2 101.8 117.5 86.6 106 101 Lot 2 138.0 22.9 103.8 117.5 88.3 I I " Test performed by the sand cone method. I WESTERN SOIL AND FOUNDATION ENGINEERING, INC. . I I Olivenhain Meadows Our Job No. 98-18 June 24, 1999 Page 17 I I Fill Field Densitv Test Results I Height of Field Field Maximum Test Re- F ill T ested/ Moisture Dry Dry Relative I Date Test Test Location Elevation Content Density Density Compaction 1999 No. of No. of Test (ft.) (%) (pct) (pct) (%) I 1-22 107 106 Lot 2 138.0 26.1 97.5 117.5 83.0 108 105 Lot 1 136.0 25.0 101.4 117.5 86.3 I 109 107 Lot 2 136.0 24.9 100.5 117.5 85.5 I 110 109 Lot 2 136.0 25.0 99.8 117.5 85.0* III 110 Lot 2 134.0 27.7 95.7 117.5 81.4 I 112 III Lot 2 133.0 21.2 105.8 117.5 90.0 I 113 108 Lot 1 134.0 26.1 97.5 117.5 83.0 I 1-23 114 113 Lot I 132.0 22.0 106.7 117.5 90.8 115 Lot 2 134.5 23.9 101.5 117.5 86.4 I 116 Lot 1 133.0 21.2 106.5 117.5 90.6 I 117 115 Lot 2 134.5 20.7 107.2 117.5 91.2 118 Lot 2 135.5 20.5 106.0 117.5 90.2 I 2-06 119 Lot 2 136.5 25.0 97.5 117.5 83.0 I 2-11 120 119 Lot 2 136.5 22.0 99.9 117.5 85.0 121 120 Lot 2 136.5 21.6 104.3 117.5 88.8 I I * Test performed by the sand cone method. I WESTERN SOIL AND FOUNDATION ENGINEERING, INC. . I I Olivenhain Meadows Our Job No. 98-18 June 24, 1999 Page 18 I I Fill Field Density Test Results I Height of Field Field Maximum Test Re- Fill Tested! Moisture Dry Dry Relative Date Test Test Location Elevation Content Density Density Compaction I 1999 No. of No. of Test (ft.) (%) (pcf) (pet) (%) I 2-11 122 121 Lot 2 136.5 21.3 106.0 117.5 90.2 137.0 20.6 106.7 117.5 90.8 123 Road & Canyon I 124 Road & Canyon 137.0 21.3 105.2 117.5 89.5 I 125 124 Road & Canyon 137.0 21.0 107.2 117.5 91.2 126 Lot2 137.0 20.8 106.5 117.5 90.6 I 2-13 127 Lot I 137.0 22.0 97.5 117.5 83.0 I 128 Lot 2 138.0 22.8 97.9 117.5 83.3 I 129 127 Lot 1 137.0 19.9 107.5 117.5 91.5 130 128 Lot2 138.0 20.6 107.2 117.5 91.2 I 131 Road & Canyon 138.0 21.3 108.5 117.5 92.3 I 132 Road & Canyon 138.0 20.6 106.5 117.5 90.6 133 Road & Canyon 138.0 19.8 107.5 117.5 91.5 I 2-15 134 Road & Canyon 139.0 20.5 106.5 117.5 90.6 I 135 Road & Canyon 140.0 21.2 105.9 117.5 90.1 136 Road & Canyon 141.0 20.6 107.2 117.5 91.2 I I I WESTERN SOIL AND FOUNDATION ENGINEERING, INC. . -- I I 01ivenhain Meadows Our Job No. 98-18 June 24, 1999 Page 19 I I Fill Field Density Test Results I Height of Field Field Maximum Test Re- Fill Tested! Moisture Dry Dry Relative I Date Test Test Location Elevation Content Density Density Compaction 1999 No. of No. of Test (ft.) (%) (pcf) (pcf) (%) I 2-15 137 Lot 1 139.0 20.9 106.6 117.5 90.7 138 Lot 2 140.0 20.3 106.1 117.5 90.3 I 139 Lot 1 140.0 21.4 107.3 117.5 91.3 I 140 Lot 2 141.0 20.5 106.1 117.5 90.3 2-16 141 Road & Canyon 142.0 21.6 107.6 117.5 91.6 I 142 Road & Canyon 143.0 21.2 106.7 117.5 90.8 I 143 Road & Canyon 144.0 20.7 105.9 117.5 90.1 I 144 Road & Canyon 145.0 21.1 106.6 117.5 90.7 145 Lot 1 141.0 21.4 106.2 117.5 90.4 I 2-17 146 Road & Canyon 143.0 21.4 107.3 117.5 91.3 I 147 Road & Canyon 144.0 19.6 107.0 117.5 91.1 148 Road & Canyon 145.0 22.3 105.9 117.5 90.1 I 149 Road & Canyon 146.0 20.8 107.5 117.5 91.5 I 2-18 150 Road & Canyon 144.0 22.3 106.5 117.5 90.6 I 151 Road & Canyon 145.0 20.9 106.0 117.5 90.2 I I WESTERN SOIL AND FOUNDATION ENGINEERING, INC. . I I Olivenhain Meadows Our Job No. 98-18 June 24, 1999 Page 20 I Fill I Field Density Test Results I Height of Field Field Maximum Test Re- Fill Tested! Moisture Dry Dry Relative Date Test Test Location Elevation Content Density Density Compaction I 1999 No. of No. of Test ( f1.) (%) (pcfl (pct) (%) 2-18 152 Road & Canyon 146.0 21.7 106.7 117.5 90.8 I 153 Road & Canyon 145.0 23.6 100.6 117.5 85.6 I 154 Road & Canyon 146.0 24.8 103.6 117.5 88.2 I 155 Road & Canyon 147.0 23.9 101.9 117.5 86.7 2-19 156 153 Road & Canyon 145.0 21.6 106.1 117.5 90.3 I 157 154 Road & Canyon 146.0 22.0 106.7 117.5 90.8 I 158 155 Road & Canyon 147.0 21.8 106.3 117.5 90.5 159 Road & Canyon 146.0 22.9 103.8 117.5 88.3 I 160 Road & Canyon 147.0 23.1 102.9 117.5 87.6 I 161 Road & Canyon 148.0 23.0 102.1 117.5 86.9 I 2-22 162 159 Road & Canyon 146.0 21.5 107.7 117.5 91.7 163 160 Road & Canyon 147.0 21.3 106.7 117.5 90.8 I 164 161 Road & Canyon 148.0 20.7 107.0 117.5 91.1 I 165 Road & Canyon 147.0 21.2 108.5 117.5 92.3 166 Road & Canyon 148.0 20.3 107.4 117.5 91.4 I I I WESTERN SOIL AND FOUNDATION ENGINEERING, INC. . I I Olivenhain Meadows OUf Job No. 98-18 June 24, 1999 Page 21 I Fill I Field Density Test Results I Height of Field Field Maximum Test Re- Fill Tested! Moisture Dry Dry Relative Date Test Test Location Elevation Content Density Density Compaction I 1999 No. of No. of Test ( ft.) (%) (pcf\ (pcf\ (%) 2-22 167 Road & Canyon 149.0 20.8 106.1 117.5 90.3 I 2-23 168 Road & Canyon 148.0 21.2 108.8 117.5 92.6 I 169 Road & Canyon 149.0 22.0 106.3 117.5 90.5 I 170 Road & Canyon 150.0 20.7 107.4 117.5 91.4 171 Road & Canyon 149.0 21.8 106.7 117.5 90.8 I 172 Road & Canyon 150.0 21.1 108.2 117.5 92.1 I 173 Road & Canyon 151.0 20.9 108.0 117.5 91.9 2-24 174 Road & Canyon 150.0 18.8 106.8 117.5 90.9 I 175 Road & Canyon 151.0 20.2 106.0 117.5 90.2 I 176 Road & Canyon 152.0 19.6 107.7 117.5 91.7 I 177 Road & Canyon 151.0 19.5 106.2 117.5 90.4 178 Road & Canyon 152.0 18.9 106.3 90.5 117.5 I 179 Road & Canyon 153.0 19.9 105.9 117.5 90.1 I 2-25 180 Road & Canyon 153.0 19.3 108.4 117.5 92.3 181 Road & Canyon 154.0 18.7 107.3 117.5 91.3 I I I WESTERN SOIL AND FOUNDATION ENGINEERING, INC. . I I Olivenhain Meadows Our Job No. 98-18 June 24, 1999 Page 22 I I Fill Field Density Test Results I Height of Field Field Maximum Test Re- F ill T ested/ Moisture Dry Dry Relative Date Test Test Location Elevation Content Density Density Compaction I 1999 No. of No. of Test (ft.) (%) (pet) (pef) (%) I 2-25 182 Road & Canyon 152.0 18.3 106.7 117.5 90.8 183 Road & Canyon 154.0 16.6 109.5 117.5 93.2 I 184 Road & Canyon 155.0 18.7 108.8 117.5 92.6 I 185 Road & Canyon 156.0 18.9 107.9 117.5 91.8 2-26 186 Valleyside Lane 157.0 19.6 107.7 117.5 91.7 I 187 Valleyside Lane 158.0 20.7 106.0 117.5 90.2 I 188 Valleyside Lane 159.0 19.2 108.5 117.5 92.3 189 Valleyside Lane 160.0 20.1 107.4 117.5 91.4 I 190 Valleyside Lane 161.0 18.9 106.8 117.5 90.9 I 191 Valleyside Lane 162.0 19.3 107.6 117.5 91.6 I 192 Valleyside Lane 163.0 19.8 107.5 117.5 91.5 2-27 193 Valleyside Lane 164.0 18.8 108.8 117.5 92.6 I 194 Valleyside Lane 165.0 20.6 107.7 117.5 91.7 I 195 Valleyside Lane 166.0 19.2 108.5 117.5 92.3 196 Valleyside Lane 167.0 19.7 106.5 117.5 90.6 I I I WESTERN SOIL AND FOUNDATION ENGINEERING, INC. . I I Olivenhain Meadows Our Job No. 98-18 June 24, 1999 Page 23 I Fill I Field Density Test Results I Height of Field Field Maximum Test Re- Fill Tested! Moisture Dry Dry Relative Date Test Test Location Elevation Content Density Density Compaction I 1999 No. of No. of Test ( ft.) (%) ( pcfl (pcfl (%) 2-27 197 Valleyside Lane 169.0 19.0 107.9 117.5 91.8 I 198 Valleyside Lane 171.0 20.3 108.6 117.5 92.4 I 199 Valleyside Lane 173.0 19.4 107.9 117.5 91.8 I 3-01 200 Lot 1 140.0 19.6 106.8 117.5 90.9 201 Lot 1 140.0 20.3 108.9 117.5 92.7 I 202 Lot 1 141.0 19.9 107.3 117.5 91.3 I 203 Lot 1 141.0 20.0 108.3 117.5 92.2 204 Lot 1 142.0 19.7 107.9 117.5 91.8 I 205 Lot 1 142.0 21.3 107.0 117.5 91.1 I 3-02 206 Lot 1 143.0 20.4 108.7 . 117.5 92.5 207 Lot 1 143.0 19.8 107.3 117.5 91.3 I 3-03 208 Lot 1 144.0 18.6 107.0 117.5 91.1 I 209 Lot I 144.0 19.2 108.6 117.5 92.4 I 210 Lot 1 145.0 20.0 109.5 117.5 93.2 211 Lot 1 145.0 19.6 107.7 117.5 91.7 I I WESTERN I SOIL AND FOUNDATION ENGINEERING, INC. . I I Olivenhain Meadows Our Job No. 98-18 June 24, 1999 Page 24 I I Fill Field Density Test Results I Height of Field Field Maximum Test Re- F ill Tested! Moisture Dry Dry Relative Date Test Test Location Elevation Content Density Density Compaction I 1999 No. of No. of Test (ft.) (%) (pcf) (pcf) (%) 3-04 212 Lot I 146.0 19.3 107.1 117.5 91.2 I 213 Lot I 146.0 19.8 106.8 117.5 90.9 I 214 Lot I 147.0 19.5 107.4 117.5 91.4 I 215 Lot 1 147.0 18.9 106.3 117.5 90.5 216 Lot I 148.0 19.7 108.5 117.5 92.3 I 217 Lot 1 148.0 19.2 107.6 117.5 91.6 I 3-05 218 Lot 1 149.0 19.2 108.8 117.5 92.6 219 Lot I 149.0 18.5 109.4 117.5 93.1 I 3-06 220 Lot I 150.0 18.7 107.3 117.5 91.3 I 221 Lot 1 150.0 19.3 106.7 117.5 90.8 I 222 Lot 1 151.0 19.0 108.8 117.5 92.6 223 Lot 1 151.0 19.4 108.2 117.5 92.1 I 3-08 224 Lot 1 152.0 20.2 107.2 117.5 91.2 I 225 Lot I 152.0 18.7 109.7 117.5 93.4 226 Lot 1 153.0 19.3 108.8 117.5 92.6 I I I WESTERN SOIL AND FOUNDATION ENGINEERING, INC. . I I Olivenhain Meadows Our Job No. 98-18 June 24, 1999 Page 25 I I Fill Field Density Test Results I Height of Field Field Maximum Test Re- F ill T estedl Moisture Dry Dry Relative Date Test Test Location Elevation Content Density Density Compaction I 1999 No. of No. of Test ( ft.) (%) (pcl) ( pct) (%) 3-08 227 Lot I 153.0 19.6 108.3 117.5 92.2 I 3-09 228 Lot 1 154.0 19.1 107.3 117.5 91.3 I 229 Lot 1 154.0 19.8 107.0 117.5 91.1 I 3-10 230 Lot 1 155.0 18.2 106.5 117.5 90.6 231 Lot 1 155.0 19.4 108.2 117.5 92.1 I 232 Lot 1 156.0 18.7 107.3 117.5 91.3 I 233 Lot 1 156.0 18.3 107.7 117.5 91.7 3-11 234 Lot 1 157.0 18.3 108.8 117.5 92.6 I 235 Lot 1 157.0 19.2 109.5 117.5 93.2 I 3-12 236 Lot 1 158.0 19.5 107.7 117.5 91.7 I 237 Lot I 158.0 19.1 107.2 117.5 91.2 3-13 238 Valleyside Lane 142.0 19.6 109.7 117.5 93.4 I 239 Valleyside Lane 154.0 19.0 108.2 117.5 92.1 I 240 Valleyside Lane 168.0 19.9 109.4 117.5 93.1 241 Lot 2 135.0 19.4 108.8 117.5 92.6 I I I WESTERN SOIL AND FOUNDATION ENGINEERING, INC. . I I Olivenhain Meadows Our Job No. 98-18 June 24, 1999 Page 26 I I Fill Field Density Test Results I Height of Field Field Maximum Test Re- Fill Tested! Moisture Dry Dry Relative Date Test Test Location Elevation Content Density Density Compaction I 1999 No. of No. of Test ( ft.) (%) (pct) (pct) (%) I 3-\3 242 Lot 2 \35.0 20.4 106.7 117.5 90.8 3-17 243 Lot 2 136.0 18.5 106.2 117.5 90.4 I 244 Lot 2 \36.0 19.2 106.7 117.5 90.8 I 245 Lot 2 \37.0 18.8 107.7 117.5 91.7 246 Lot 2 \37.0 19.6 107.0 117.5 91.1 I 247 Lot 1 158.5 19.3 108.6 117.5 92.4 I 3-18 248 Lot I 159.0 18.2 107.6 117.5 91.6 249 Lot 1 159.0 18.5 106.8 117.5 90.9 I 250 Valleyside Lane 150.0 18.4 109.7 117.5 93.4 I 251 Valleyside Lane 160.0 18.8 109.2 117.5 92.9 I 252 Valleyside Lane 170.0 18.3 109.4 117.5 93.1 253 Valleyside Lane 172.0 18.4 108.7 117.5 92.5 I 3-19 254 Lol2 \38.0 19.7 108.3 117.5 92.2 I 255 Lol2 \38.0 20.1 107.6 117.5 91.6 256 Lol2 \39.0 19.4 107.4 117.5 91.4 I I I WESTERN SOIL AND FOUNDATION ENGINEERING, INC. . I I Olivenhain Meadows aUf Job No. 98-18 June 24, 1999 Page 27 I Fill I Field Densitv Test Results I Height of Field Field Maximum Test Re- Fill Tested! Moisture Dry Dry Relative Date Test Test Location Elevation Content Density Density Compaction I 1999 No. of No. of Test (ft.) (%) (pcl) (pcf) (%) 3-19 257 Lot 2 139.0 19.0 106.7 117.5 90.8 I 258 Lot 3 122.0 18..9 108.5 117.5 92.3 I 259 Lot 3 123.0 19.7 107.0 117.5 91.1 I 260 Lot 3 124.0 19.3 107.6 117.5 91.6 3-22 261 Lots 5 & 6 +1.0 20.4 106.0 117.5 90.4 I 262 Lots 5 & 6 +2.0 21.3 106.0 117.5 90.2 I 263 Lots5&6 +4.0 20.9 106.7 117.5 90.8 264 Lots5&6 +4.0 21.8 106.3 117.5 90.5 I 265 Lots5&6 +6.0 21.5 106.0 117.5 90.2 I 266 Lots 5 & 6 +6.0 .20.7 106.8 117.5 90.9 267 Lots 5 & 6 +8.0 21.2 106.5 117.5 90.6 I 3-22 268 Lots 5 & 6 +8.0 21.6 107.2 117.5 91.2 I 269 Lots5&6 +10.0 20.8 106.7 117.5 90.8 I 270 Lots 5 & 6 +10.0 21.1 107.5 117.5 91.5 3-23 271 Lots 5 & 6 +12.0 19.9 107.3 117.5 91.3 I I WESTERN I SOIL AND FOUNDATION ENGINEERING, INC. . I I Olivenhain Meadows Our Job No. 98-18 June 24, 1999 Page 28 I Fill I Field Density Test Results I Height of Field Field Maximum Test Re- Fill Tested! Moisture Dry Dry Relative Date Test Test Location Elevation Content Density Density Compaction I 1999 No. of No. of Test (ft.) (%) (pcf) (pct) (%) 3-23 272 Lots5&6 +12.0 20.8 106.7 117.5 90.8 I 273 Lots 5 & 6 +14.0 20.2 107.6 117.5 91.6 I 274 Lots 5 & 6 +14.0 19.2 108.6 117.5 92.4 I 275 Lots 5 & 6 +16.0 20.0 107.5 117.5 91.5 3-24 276 Lots5&6 +12.0 19.4 106.5 117.5 90.6 I 277 Lots 5 & 6 +18.0 19.1 108.5 117.5 92.3 I 278 Lots 5 & 6 +14.0 19.6 107.7 117.5 91.7 279 Lots5&6 +20.0 20.1 107.2 117.5 91.2 I 280 Lots 5 & 6 +16.0 19.6 108.5 117.5 92.3 I 281 Lots 5 & 6 +22.0 19.9 107.5 117.5 91.5 282 Lots 5 & 6 +18.0 19.4 107.9 117.5 91.8 I 3-26 283 Desert Rose Way +2.0 19.1 106.5 117.5 90.6 I 284 Desert Rose Way +4.0 18.0 107.3 117.5 91.3 I 285 Desert Rose Way +6.0 18.6 107.8 117.5 91.8 286 Desert Rose Way +8.0 18.1 106.1 117.5 90.3 I I WESTERN I SOIL AND FOUNDATION ENGINEERING, INC. . I I Olivenhain Meadows Our Job No. 98-18 June 24, 1999 Page 29 I Fill I Field Densitv Test Results I Height of Field Field Maximum Test Re- F ill T estedl Moisture Dry Dry Relative Date Test Test Location Elevation Content Density Density Compaction I 1999 No. of No. of Test (ft.) (%) (pct) (pcf) (%) 3-26 287 Desert Rose Way +10.0 18.9 107.4 117.5 91.4 I 3-27 288 Lots 5 & 6 +22.0 21.6 107.7 117.5 91.7 I 289 Lots 5 & 6 +20.0 22.0 106.7 117.5 90.8 I 290 Lots 5 & 6 +24.0 21.3 108.3 II 7.5 92.2 3-29 291 Lots 5 & 6 +22.0 21.5 107.4 117.5 91.4 I 292 Lots 5 & 6 +26.0 20.5 106.8 117.5 90.9 I 293 Lots 5 & 6 +24.0 21.4 107.0 II 7.5 91.1 294 Lots 5 & 6 +26.0 19.2 108.5 117.5 92.3 I 295 Lots 5 & 6 +28.0 18.9 107.6 II 7.5 91.6 I 296 Lots 5 & 6 +28.0 19.2 106.8 117.5 90.9 I 297 Lots 5 & 6 +30.0 19.4 108.2 117.5 92.1 3-30 298 Lots 5 & 6 +30.0 18.5 107.8 II 7.5 91.7. I 299 Lots 5 & 6 +32.0 19.6 108.5 117.5 92.4. I 300 Lots 5 & 6 +34.0 19.2 107.0 117.5 91.1 · 301 Lots 5 & 6 +36.0 18.7 107.6 117.5 91.6. I · Test performed by the sand cone method. I WESTERN I SOIL AND FOUNDATION ENGINEERING, INC. . I I 01ivenhain Meadows Our Job No. 98-18 June 24, 1999 Page 30 I Fill I Field Densitv Test Results I Height of Field Field Maximum Test Re- Fill Tested! Moisture Dry Dry Relative Date Test Test Location Elevation Content Density Density Compaction I 1999 No. of No. of Test ( f1.) (%) (pe[) (pet) (%) 3-30 302 Lots5&6 +38.0 18.8 107.2 117.5 91.2 * I 4-01 303 Canyon 148.0 19.8 106.4 117.5 90.5* I 304 Canyon 154.0 19.2 106.7 117.5 90.8* I 4-21 305 Lot 1 159.0 14.0 98.7 114.5 86.2* 5-05 306 Lot 2 140.0 16.8 106.0 114.5 92.6* I 307 305 Lot 1 159.0 17.1 106.6 114.5 93.1* I 5-06 308 Lot 2 F.G. 16.0 107.1 114.5 93.5* 309 Lot 2 F.G. 16.5 109.5 114.5 95.6* I 310 Lot 1 F.G. 15.9 105.5 114.5 92.2* I 311 Lot 1 F:G. 16.3 105.2 114.5 91.9* I 312 Lot 3 F.G. 18.9 103.4 112.0 92.3* 313 Lot 3 F.G. 18.2 102.6 112.0 91.6* I 314 Lot 4 F.G. 13.9 109.9 118.0 93.2* I 5-06 315 Lot 4 F.G. 13.5 107.8 118.0 91.4* 5-19 316 Lot 5 F.G. 12.4 109.5 118.0 92.8 I * Test performed by the sand eone method. I WESTERN I SOIL AND FOUNDATION ENGINEERING, INC. . I I Olivenhain Meadows Our Job No. 98-18 June 24, 1999 Page 31 I Fill I Field Density Test Results I Height of Field Field Maximum Test Re- F ill T estedl Moisture Dry Dry Relative Date Test Test Location Elevation Content Density Density Compaction I 1999 No. ofNo. of Test ( ft.) (%) (pct) (pct) (%) 5-19 317 Lot 5 F.G. 13.5 110.0 118.0 93.2 I 318 Lot 6 F.G. 12.9 107.5 118.0 91.1 I 319 Lot 6 F.G. 12.0 108.3 118.0 91.8 I 320 Lot 7 F.G. 12.6 109.2 118.0 92.6 321 Lot 7 F.G. 13.1 110.1 118.0 93.3 I 322 Lot 8 F.G. 12.8 108.8 118.0 92.2 I 323 Lot 8 F.G. 13.4 109.9 118.0 93.1 324 Lot 9 F.G. 12.2 109.4 118.0 92.7 I 325 Lot 9 F.G. 10.6 121.7 130.0 93.6 I 326 Lot 10 F.G. 11.2 120.1 130.0 92.4 I 327 Lot 10 F.G. 10.8 118.7 130.0 91.3 328 Lot II F.G. 12.7 110.2 118.0 93.4 I 329 Lot II F.G. 12.3 109.6 118.0 92.9 I I I WESTERN I SOIL AND FOUNDATION ENGINEERING, INC. . I I I I I I I I I I I I I I I I I I I . OCT ,J": 199/ GEOTECHNICAL INVESTIGATION PROPOSED MILLER SUBDIVISION DESERT ROSE WAY ENCINITAS, CALIFORNIA JOB NO. 91-23 JUNE 17, 1991 WESTERN SOIL AND FOUNDATION ENGINEERING, INC. - I I I I I I I I I I I I I I I I I I I . GEOTECHNICAL INVESTIGATION PROPOSED MILLER SUBDIVISION DESERT ROSE WAY ENCINITAS, CALIFORNIA Prepared For: MR. DAVE MILLER C/O MR. GREG BROWN 770 RANCHO SANTA FE ROAD ENCINITAS, CALIFORNIA 92024 JOB NO. 91-23 JUNE 17, 1991 WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I . WESTERN SOIL AND FOUNDATION ENGINEERING, INC. PHONE 746-3553 AREA CODE 619 423 HALE AVENUE ESCONDIDO. CALIFORNIA 92029 June 17, 1991 Mr. Dave Mi 11 er c/o Mr. Greg Brown 770 Rancho Santa Fe Road Encinitas, California 92024 Project: Job No. 91-23 Proposed subdivision Desert Rose Way Encinitas, California Subject: Report of Geotechnical Investigation Mr. Miller: In accordance with your request, we have completed a geotechnical investigation for the proposed project. We are presenting to you, herewith, our findings and recommendations for the development of this site. The findings of this study indicate that this site is suitable for the proposed development provided that the special preparations and foundation recommendations presented in the attached report are complied with. If you have any questions after reviewing the findings and recommendations contained in the attached report, please do not hesitate to contact this office. This opportunity to be of professional service is sincerely appreciated. Respectfully submitted, WESTER~ SOIL AN~DATION ,/~ ~ Vin~G~~, St:ff Geolo ist ENGINEERING, INC. ~ ~ \\ rES S /OtY. 0> 1'( , ~ ~ to ZI!(I!("~ ~} ,---'vI ~ ~ ~\ G-J ' ~ ~ ~\' - <::::i .~ ;2:, ~ No. CE 26676 .J 6! ... (:-;<'p_ :3/3/f~ II J'~ C!V~_---<<~0f If OF C ~ \.. \\\;>"'? GE 928 Attachments Distribution: (4) Addressee I I I I I I I I I I I I I I I I I I I , Site Description Subsurface Conditions Groundwater Page 1 2 3 3 4 7 TABLE OF CONTENTS Introduction and Project Description Project Scope Findings Geologic Hazards Recommendations and Conclusions Site Preparation Foundations Field Explorations Laboratory Testing Plan Review Limitations Plate Numbers 1 Plate Number 2 Plate Numbers 3 through 6 Plate Numbers 7 through 13 Plate Numbers 14 through 18 Plate Number 19 Plate Numbers 20 APPENDIX I APPENDIX II 7 Faults and seismic Hazards 7 Liquefaction 8 Landslides and Slope Stability 8 Existing Soil Expansive Soil Earthwork Cut and Fill Slopes Rippability 9 9 10 11 12 12 14 14 14 16 16 17 General Transition Areas Lateral Resistance Retaining Walls 18 19 19 20 ATTACHMENTS Site Plan (In Rear Pocket) Unified Soil Classification Chart Trench Drawings Trench Logs Laboratory Test Results Fill Slope Key Buttress Slope Key Specifications for Construction of controlled Fills References WESTERN SOIL AND FOUNDATION ENGINEERING, INC.. I I I I I I I I I I I I I I I I I I I - . Mi 11 er June 17, 1991 Job No. 91-23 Page 1 GEOTECHNICAL INVESTIGATION PROPOSED MILLER SUBDIVISION DESERT ROSE WAY ENCINITAS, CALIFORNIA INTRODUCTION AND PROJECT DESCRIPTION This report presents the results of our geotechnical investigation performed on the above referenced site. The purpose of this investigation was to evaluate the existing surface and subsurface conditions from a geotechnical perspective in order to provide recommendations for your proposed development. The proposed project is an eleven lot residential subdivision as submitted by you in preliminary form on the site plan included as part of and shown on Plate No.1 of this report. Parcel 2 of Parcel Map 14489 was also included in this investigation. It is our understanding that the initial earthmoving operation will involve the remediation of existing detrimental soil conditions and the installation of roadway improvements. At a later (as of yet undetermined) date, custom grading will be performed on a lot by lot basis. This grading will be tailored to the individual design needs of each proposed residence. It is anticipated that the future proposed cuts and fills would not exceed 10 feet in vertical height. WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I - Mi 11 er June 17, 1991 Job No. 91-23 Page 2 It is anticipated that any new dwellings will be one or two story, wood-framed single family residences. The foundations will be slab-on-grade with continuous and pad spread footings. Should any future development deviate significantly from our understanding of the project as described above, we should be consulted for further recommendations. The site configuration and exploratory trench locations are shown on Plate No.1. PROJECT SCOPE This investigation consisted of a surface reconnaissance coupled with a detailed subsurface exploration. Representative surface and subsurface samples were obtained from the site and returned to our laboratory for testing. An analysis of the field and laboratory data collected is submitted in this report. Specifically, the intent of this analysis was to: a) Explore the subsurface conditions to the depths that could be influenced by the proposed construction. b) Evaluate, by laboratory tests, the pertinent engineering properties of the various soil and rock stratigraphic units which could influence the development of this land, including bearing capacities, expansive characteristics and settlement potential, WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I , Mi 11 er June 17, 1991 Job No. 91-23 Page 3 c) Develop soil engineering criteria for site grading, d) Determine potential construction difficulties and provide recommendations concerning these problems, e) Recommend an appropriate foundation system for the type of structures anticipated and develop soil engineering design criteria for foundation design. FINDINGS SITE DESCRIPTION: The project site is located on the east side of Desert Rose Way, in the community of Olivenhain, City of Encinitas, California. It can be found in the central southern half of grid D-3, page 25, of the Thomas Brothers Guide for San Diego County. The site is irregular in configuration and encompasses eight acres. It is bounded to the north, east and southwest by presently undeveloped property. Single family residences abut the property's southern corner. Approximately 415 feet front Desert Rose Way along the western property line. The project site is situated on the flank of an easterly facing hillside and into the western portion of a narrow alluvial basin. The topography is moderately to very steep across the western portion of the property. It then falls very gently across the alluvial basin, southeasterly toward a shallow arroyo. Elevations vary from 200 feet above mean sea level (M.S.L.) at WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I Mill er June 17, 1991 Job No. 91-23 Page 4 the southwest corner along Desert Rose Way to 100 feet above (M.S.L.) in the southeast corner of the property. Drainage is by sheet flow into the arroyo along the eastern property line which empties into Escondido Creek and eventually into the San Elijo Lagoon. No improvements were observed on site at the time of our investigation. Vegetation consisted mainly of wild grasses and chaparral. Scattered trees were growing in and along the arroyo at the eastern edge of the property. SUBSURFACE CONDITIONS: The subject site is underlain by Eocene age lagoonal siltstone with interbedded channel and barrier beach sandstone. These have been mapped by Eisenberg (1983) and Tan (1986) as belonging to the Del Mar Formation and Torrey Sandstone, respectively. However, the siltstone is more characteristic of that found within the Santiago Formation. The Eocene sedimentary succession is overlain by ancient landslide debris, older and recent alluvium and colluvium. Each of these units is described below from oldest to youngest. DEL MAR/SANTIAGO FORMATION UNDIFFERENTIATED: The majority of the project site is underlain by clayey and sandy siltstone with interbedded sandstone. The siltstone varies in color from olive to dark green. It is generally stiff to hard and often jointed and severely fractured. The siltstone is more prevalent on this WESTERN SOIL AND FOUNDA nON ENGINEERING, INC. - I I I I I I I I I I I I I I I I I I I Miller June 17, 1991 Job No. 91-23 Page 5 site with individual beds ranging from 2 to 8 feet in thickness. Although mapped as the Del Mar Formation, the thickness, texture and clayey nature of this unit makes it more similar to the Santiago Formation. The interbedded sandstone varies in color from white to pale yellow when clean to green and dark orange when silty or clayey. They are poorly to moderately well indurated and friable. Individual beds range from thick lenses which pinch out laterally to continuous beds 2 to 6 feet in thickness. The Eocene sediments on-site are generally flat lying to gently dipping towards the southeast. TORREY SANDSTONE: The highest elevations on site are adjacent to Desert Rose Way and are underlain by the Torrey Sandstone. In local outcrop the Torrey Sandstone consists of white to pale yellow to pale gray, medium to coarse grained sand. It is well indurated and moderately well cemented. off site to the west it forms steep sided natural slopes. The contact with the underlying Del Mar/Santiago Formation is a gradational facies change displaying interbedded sandstone and siltstone. LANDSLIDE DEBRIS: Landslide deposits on site are derived from ancient failures within the aforementioned Eocene sediments. These occur as dark green clayey silt with contorted interbeds of orange very silty sand to sandy silt. The contorted appearance WESTERN SOIL AND FOUNDATION ENGINEERING, INC. - I I I I I I I I I I I I I I I I I I I Miller June 17, 1991 Job No. 91-23 Page 6 of these materials suggests failure or movement soon after deposition, while the sediments were still in a semi-plastic state (soft sediment deformation). Also represented are rotated slump blocks. These display a severely titled and strongly deformed version of the normal stratigraphic sequence (Trench B, Plate No.4). These deposits lack the bold topographic expression typical of youthfull landslides. This, coupled with the complex internal deformation that characterizes these deposits, suggests that they were formed in a pluvial part of the pleistocene epoch. ALLUVIUM: The lowest portions of the site which occur within the basin are underlain by recent and older alluvium. The recent alluvium is very moist to wet and poorly consolidated. It consists of dark brown sandy to clayey silt and light brown very silty sand. The recent alluvium is underlain by more indurated alluvial deposits. These are composed of dark yellowish-brown sandy clay and pale yellowish-brown very clayey sand. COLLUVIUM: The slopes and base of slopes on site are mantled by colluvium. The term colluvium is used here to include both in- situ soil as well as redeposited soil and slope debris. At this site it is composed of dark brown silty to clayey fine grained sand and sandy clay. It is generally very moist and poorly consolidated. WESTERN SOIL AND FOUNDATION ENGINEERING, INC. - I I I I I I I I I I I I I I I I I I I Miller June 17, 1991 Job No. 91-23 Page 7 GROUNDWATER: Free groundwater was not encountered in any of our exploratory trenches. It has been reported by others that groundwater was observed at the lower elevations on an adjacent site at a depth of approximately 24 feet. However, the reader is cautioned that San Diego County is currently entering its sixth year of drought conditions. Therefore, fluctuation in the level and flow of groundwater may be anticipated on this site, especialy in low lying areas. GEOLOGIC HAZARDS FAULTS AND SEISMIC HAZARDS: There are no known active or potentially active faults on or in the immediate vicinity of the project site. There are, however, several faults located in sufficiently close proximity that movement associated with them could cause significant ground motion at the site. The table below presents the probable maximum earthquake magnitudes and accelerations anticipated at the site. These accelerations are based on the assumption that the maximum probable earthquake occurs on specific faults at the closest point on that particular fault to the site. WESTERN SOIL AND FOUNDATION ENGINEERING, INC. - I I I I I I I I I I I I I I I I I I I - Mi 11 er June 17, 1991 Job No. 91-23 Page 8 SEISMICITY OF MAJOR FAULTS Maximum probable probable Bedrock Distance Magnitude Acceleration* Fault (Miles) (Richter) (q) Rose Canyon 8 6.0 - 7.0 0.28-0.42 L L Elsinore 25 7.0 0.17 L San Jacinto 49 7.8 0.12 L San Andreas 74 8.5 0.08 L L = Local Magnitude * (From Schnabel and Seed, 1972). LIQUEFACTION: Saturated, loose, uniform fine grained sands and silts will not exist under building pads if the grading operation is performed in strict accordance with the recommendations contained in this report. Therefore, it is unlikely that liquefaction would affect the site. LANDSLIDES AND SLOPE STABILITY: Evidence of ancient landslides were observed within our subsurface exploration. This appeared as sheared and contorted bedding and rotated stratigraphy. The approximate limits of landslide debris are presented on Plate No. 1. WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I Miller June 17, 1991 Job No. 91-23 Page 9 Although these deposits are apparently related to ancient landslides, the potential for small scale, shallow seated failure is high. Therefore, recommendations addressing slope stability are presented in the following section titled "Cut and Fill Slopes." No evidence suggesting the presence of geologic hazards, other than those described above, were observed in our exploratory trenches. We did, however, encounter poorly consolidated and expansive soil material in the form of alluvium, colluvium and landslide debris. Recommendations concerning these conditions are presented in the following sections of this report. During the grading operation, a Registered Geotechnical Engineer from our firm must inspect the site for adverse geologic conditions. RECOMMENDATIONS AND CONCLUSIONS SITE PREPARATION The following recommendations address the initial site conditions. As stated above, custom home sites will probably be constructed later, on a case by case basis. At that time, specific recommendations shall be made to insure proper design. The Soil Engineer and Engineering Geologist must review the proposed design concept so that the proposed construction will not adversely affect the remedial steps being recommended herein. WESTERN SOIL AND FOUNDATION ENGINEERING, INC. - I I I I I I I I I I I I I I I I I I I Mill er June 17, 1991 Job No. 91-23 Page 10 EXISTING SOIL: We recommend that any existing fill, colluvium, alluvium, landslide debris and low density soil be removed to firm natural ground from beneath any proposed fill pad areas in their entirety, so that structures will be supported on firm material. Areas to receive asphalt or concrete pavements, slabs, driveways or sidewalks should be treated similarly. This soil may be replaced, if desired, as a controlled fill recompacted to at least 90% of its maximum dry density. All deleterious materials and oversized debris encountered in this fill must be removed and legally disposed of off-site. Based on the findings of this study the depth of removal will range from six to in excess of fifteen feet. In areas where competent materials exist at excessive depths (15 feet or more) the following alternative recommendations may be used: 1) Within the flat alluvial basin areas, removals shall extend to a depth of 8 to 10 feet. This will vary based on the in-place densities of the soils encountered. 2) On the sloping portions of the property, a buttress fill shall be constructed to stabilize soft and incompetent materials. The buttress shall be constructed in accordance with the diagram presented Plate No. 20 of this report. Refer to the recommen- dations contained in the section titled "Cut and Fill Slopes." WESTERN SOIL AND FOUNDATION ENGINEERING, INC. - I I I I I I I I I I I I I I I I I I I Miller June 17, 1991 Job No. 91-23 Page 11 EXPANSIVE SOIL: Expansive soils (expansion index of 51 or greater) were encountered in our subsurface exploration (Plate No. 15). These expansive materials included the clayey colluvium, alluvium and clayey siltstone observed in our exploratory trenches. All expansive material, must be kept at least four feet below finish subgrade. In addition, expansive soil occurring on cut portions of building pads within four feet of finish grade shall be completely removed and replaced with granular non-expansive soil. A limited amount of non-expansive material may be available on site in the sandy formational deposits. It is anticipated that selective grading to provide pads capped with non-expansive soil would be performed on an individual lot basis. Expansion index tests shall be performed on all soil material used for the building pad areas. IMPORTED FILL: Imported fill, if required at this site, shall be examined by our office to determine its suitability prior to importing. SURFACE DRAINAGE: Surface drainage shall be directed away from structures. The ponding of water or saturation of soils cannot be allowed adjacent to any of the foundations. Surface water WESTERN SOIL AND FOUNDATION ENGINEERING, INC. - I I I I I I I I I I I I I I I I I I I - Mill er June 17, 1991 Job No. 91-23 Page 12 must not be allowed to drain in an uncontrolled manner over the top or face of any slope. EARTHWORK: All earthwork and grading contemplated for site preparation must be accomplished in accordance with the attached Specifications for Construction of controlled Fills (Appendix 1). All special site preparation recommendations presented in the sections above will supersede those in the Standard Specifications for Construction of Controlled Fills. All embankments, structural fill, and fill shall be compacted to a minimum of 90%. All utility trench backfill must be compacted to a minimum of 90% of its maximum dry density. The maximum dry density of each soil type shall be determined in accordance with A.S.T.M. Test Method 01557-78. Prior to commencement of the brushing operation, a pregrading meeting shall be held at the site. The Developer, Surveyor, Grading Contractor, and Soil Engineer will attend. Our firm should be given at least 48 hours notice of the meeting time and date. CUT AND FILL SLOPES: We recommend that all cut and fill slopes be constructed with a slope ratio of 2.0:1.0 (horizontal: vertical) or flatter, to a maximum height of 30 feet. All cut slopes must be inspected for adverse geologic conditions during the grading operations by a representative of WESTERN SOIL AND FOUNDA nON ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I Miller June 17, 1991 Job No. 91-23 Page 13 our firm. Incompetent materials encountered in cut slopes shall be completely removed. Slope reconstruction shall be performed in accordance with the following recommendations for fill slopes. Fill slopes shall be keyed into dense natural ground. The key shall be a minimum of 2 feet deep at the toe of slope and fall with 5% grade toward the interior of the proposed fill areas (Plate No. 19). Existing incompetent earth materials shall be completely removed if feasible and if not, will be properly buttressed as presented in the diagram on Plate No. 20 of this report. The buttress slope shall be constructed with a slope ratio of 3.0:1.0 (horizontal:vertical) or flatter to a maximum height of 25 feet. The shear key for this fill must extend through all incompetent materials and then a minimum of 5 feet into competent formational material as measured at toe of slope. The bottom of the key shall have a width of at least 15 feet and fall with a 5% grade toward the interior of the proposed fill. All keys must be inspected by the Soil Engineer or his representative in the field. Slopes shall be planted as soon as feasible after grading. Slope erosion including sloughing, rilling, and slumping of surface soils may be anticipated if the slopes are left unplanted for a long period of time, especially during rainy seasons. Erosion control and drainage devices must be installed in compliance with the requirements of the controlling agencies. WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I Mi 11 er June 17, 1991 Job No. 91-23 Page 14 As the design of individual buildings and pads are formulated, recommendations concerning each proposed residence shall be determined. Care must be taken to insure that future pad designs do not detrimentally affect any buttress fills or other remedial procedures. RIPPABILITY: Soil materials encountered in our exploratory trenches are rippable by conventional means to the depths investigated. These depths range from 6 to 21 feet. FOUNDATIONS GENERAL: Structures shall be supported on continuous or pad spread footings bearing in firm natural undisturbed ground or non-expansive soil material recompacted in accordance with the recommendations contained in this report. Footings must be designed with the minimum dimensions and allowable dead plus live load bearing values given in the following table: FOOTING PARAMETERS Minimum Minimum Allowable Soil Number of Footing Depth width Bearing Value stories Type (inches) (inches) (P.s. f.) 1 Continuous 12 12 1700 2 Continuous 18 15 2000 1 Square Pad 12 30 2100 2 Square Pad 18 30 2400 WESTERN SOIL AND FOUNDATION ENGINEERING, INC. - I I I I I I I I I I I I I I I I I I I Miller June 17, 1991 Job No. 91-23 Page 15 The minimum depth given shall be below finish subgrade (bottom of sand cushion). All continuous footings shall contain at least one No. 5 reinforcing bar top and bottom to provide structural continuity and to permit spanning of local irregularities. The soil load bearing values presented above may be increased by one-third for short term loads, including wind or seismic. The allowable soil bearing value of import soil material shall be determined after its selection. Settlement under building loads are expected to be within tolerable limits for the proposed structures. Concrete slabs-on-grade may be supported on compacted on-site soil or dense natural ground. Three inches of clean sand (miniumu SE=30) shall be placed beneath the slab for curing. Slab reinforcing shall be provided in accordance with the anticipated use of and loadings on the slab. In areas where moisture sensitive floor coverings are to be utilized and in other areas where floor dampness would be undesirable, we recommend consideration be given to providing an impermeable membrane (6-mil visqueen or equal) beneath the slabs. The membrane shall be placed mid-height within the sand to protect it during construction. The sand shall be lightly moistened just prior to placing the concrete. Care shall be taken not to puncture the membrane. All joints (laps) in the WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I Miller June 17, 1991 Job No. 91-23 Page 16 membrane should be a minimum of 6 inches in width and sealed with an approved sealer. TRANSITION AREAS: Foundations supported partially on cut and partially on fill are not recommended. The tendency of cut and fill soils to compress differently can frequently result in unequal structural support and subsequent cracking to portions of the structure. Therefore, in transition areas, we recommend that the entire cut area be over excavated and replaced with soils compacted to a minimum of 90%. This over excavation or undercutting should be carried to a depth of 2 feet below the bottom of the deepest proposed footing. LATERAL RESISTANCE: Resistance to lateral loads may be provided by friction at the base of the footing and by passive pressure against the adjacent soil. For concrete footings in compacted or dense natural soil, an allowable coefficient of friction of 0.30 may be used. An allowable passive uniform pressure of 125 pounds per square foot per foot of depth acting against the foundations may be used in design. If footings are proposed adjacent to slope areas, we recommend that the footings be deepened to provide a minimum horizontal distance from the outer edge of footings to the WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I Mi 11 er June 17, 1991 Job No. 91-23 Page 17 adjacent slope face equal to one-half the height of the slope. This horizontal distance shall be no less than 7 feet and no more than 10 feet. RETAINING WALLS: Retaining walls must be designed to resist lateral earth pressures and any additional lateral loads caused by surcharge loads. We recommend unrestrained walls be designed for an equivalent fluid pressure of 50 pounds per cubic foot (pcf) where backfill is level. We recommend restrained walls be designed for an equivalent fluid pressure of 50 pcf plus an additional uniform lateral pressure of 7H pounds per square foot where H = the height in feet of backfill above the top of the wall footing. Wherever walls will be subjected to surcharge loads, they should be designed for an additional uniform lateral pressure equal to one-third the anticipated surcharge pressure in case of unrestrained walls, and one-half the anticipated surcharge in the case of restraining walls. The preceding design pressures assume there is sufficient drainage behind the walls to prevent the build-up of hydrostatic pressures from surface water infiltration. Adequate drainage may be provided by means of weep holes with permeable material installed behind the walls or by means of a system of subdrains. Expansive soils (greater than 3.0 percent swell or an expansive index of 30) shall not be used as retaining wall backfill material. WESTERN SOIL AND FOUNDATION ENGINEERING, INC. - I I I I I I I I I I I I I I I I I I I Mill er June 17, 1991 Job No. 91-23 Page 18 Backfill placed behind the walls shall be compacted to a minimum degree of compaction of 90% using light compaction equipment. If heavy equipment is used, the wall shall be appropriately temporarily braced during the compaction process. FOOTING OBSERVATIONS: All footing excavations shall be inspected by the Soil Engineer prior to placing reinforcing steel and concrete. FIELD EXPLORATIONS A total of eleven subsurface explorations were made on May 20 and 21, 1991 at the locations indicated on Plate No.1. These explorations included four long exploratory trenches excavated by a 220 excavator. These are numbered A through D. Seven short trenches were excavated using a rubber tired backhoe and are presented as T-l through T-7. The trenches were each logged using standard geological techniques. The field work was conducted by our geology and soil engineering personnel. The logs are presented on Plate Nos. 3 through 13. The soils are described in accordance with the Unified Soils Classification System as illustrated on the attached simplified chart (Plate No.2). In addition, a verbal textural description, the wet color, the apparent moisture and the density or consistency are presented. The density of granular material is WESTERN SOIL AND FOUNDATION ENGINEERING, INC. - I I I I I I I I I I I I I I I I I I I Miller June 17, 1991 Job No. 91-23 Page 19 given as either very loose, loose, medium dense, dense or very dense. The consistency of silts or clays is given as either very soft, soft, medium stiff, stiff, very stiff or hard. Samples of typical and representative soils were obtained and returned to our laboratory for testing. LABORATORY TESTING Laboratory tests were performed in accordance with the American Society for Testing and Materials (A.S.T.M.) test methods or suggested procedures. Test results are shown on Plate Numbers 14 through 18. PLAN REVIEW Western Soil and Foundation Engineering, Inc. shall review the grading plans prior to the start of grading and shall review the building plans before the foundations are excavated. It is highly recommended that a supplemental geotechnical investigation be performed on each individual lot to address the design needs of each homesite. WESTERN SOIL AND FOUNDATION ENGINEERING, INC. - I I I I I I I I I I I I I I I I I I I Hi 11 er June 17, 1991 Job No. 91-23 Page 20 LIMITATIONS The recommendations presented in this report are contingent upon our review of final plans and specifications. The soil engineer should review and verify the compliance of the final plans with this report and with Chapter 70 of the Uniform Bui! ding Code. It is recommended that Western Soil and Foundation Engineering, Inc. be retained to provide continuous soil engineering services during the earthwork operations. This is to observe compliance with the design concepts, specifications or recommendations and to allow design changes in the event that subsurface conditions differ from those anticipated prior to start of construction. Western Soil and Foundation Engineering, Inc. will not be held responsible for earthwork of any kind performed without our observation, inspection and testing. The recommendations and opinions expressed in this report reflect our best estimate of the project requirements based on an evaluation of the subsurface soil conditions encountered at the subsurface exploration locations and the assumption that the soil conditions do not deviate appreciably from those encountered. It should be recognized that the performance of the foundations and/or cut and fill slopes may be influenced by undisclosed or unforeseen variations in the soil conditions that may occur in the intermediate and unexplored areas. Any unusual conditions WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I - Miller June 17, 1991 Job No. 91-23 Page 21 not covered in this report that may be encountered during site development should be brought to the attention of the soil engineer so that he may make modifications, if necessary. This office should be advised of any changes in the project scope so that it may be determined if the recommendations contained herein are appropriate. This should be verified in writing or modified by a written addendum. The findings of this report are valid as of this date. Changes in the condition of a property can, however, occur with the passage of time, whether they be due to natural processes or the work of man on this or adjacent properties. In addition, changes in the state-of-the-Art and/or Government Codes may occur. Due to such changes, the findings of the report may be invalidated wholly or in part by changes beyond our control. Therefore, this report should not be relied upon after a period of one year without a review by us verifying the suitability of the conclusions and recommendations. We will be responsible for our data, interpretations, and recommendations, but shall not be responsible for the interpretations by others of the information developed. Our services consist of professional consultation and observation only, and no warranty of any kind whatsoever, expressed or implied, is made or intended in connection with the work performed or to be performed by us, or by our proposal for consulting or other services, or by our furnishing of oral or written reports or findings. WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I ------- Miller June 17, 1991 Job No. 91-23 Page 22 It is the responsibility of the Client or the Client's representative to ensure that the information and recommendations contained herein are brought to the attention of the engineer and architect for the project and incorporated into the project's plans and specifications. It is further his responsibility to take the necessary measures to ensure that the contractor and his subcontractors carry out such recommendations during construction. Respectfully submitted, WESTERN SOIL AND FOUNDATION ENGINEERING, INC. V' 1 } Vh~41t) Vince Gaby, Staff Geologist ()~ I:\fE S S/O;1/ '\) ~ <1'( 0~/~ t. ZIJfJ(;:;Z,<;' ~ ~i-_. ~ ~ \0'\\ ~ / i:!i ~ :2\ ": C::I l"" Rr""" r'1i LU No. Ct 2u070 "'; c;: E'X~ :3/.31'/7 ~~' lif.. . I r ~ J'I;; CIV~\. ~ -I( OF W-\\-~. ,~~~ Dennis E. Zimmerman CE 26676 GE 928 VG/DEZ:kw WESTERN SOIL AND FOUNDA nON ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I ATTACHMENTS WESTERN SOIL AND FOUNDATION ENGINEERING, INC. - I I I I I I I I I I I I I I I I I I I . SITE PLAN (Plate 1) (In Back Pocket) WESTERN SOIL AND FOUNDA nON ENGINEERING, INC. - I . I SUBSURFACE EXPLORATION LEGEND I SOIL DESCRIPTION UNIFIED SOIL CLASSIFICATION CHART GROUP SYMBOL TYPICAL NAMES I I. COARSE GRAINED, More than half of material is larger than No. 200 sieve size. GRAVELS CLEAN GRAVELS More than half of coarse fraction ~s larger than No. 4 sieve size but smaller than 3" GW Well graded gravels, gravel- sand mixtures, little or no fines. Poorly graded gravels, gravel- sand mixtures, little or no fines. Silty gravels, poorly graded gravel-sand-silt mixtures. Clayey gravels, poorly graded gravel-sand, clay mixtures. I I GP I GRAVELS WITH FINES (Appreciable amount of fines) GM GC I SANDS CLEAN SANDS - More than half of coarse fraction is smaller than No. 4 sieve size. SANDS WITH FINES (Appreciable amount of fines) SW Well graded sand, gravelly sands, little or no fines. Poorly graded sands, gravelly sands, little or no fines. Silty sands, poorly graded _and and silt mixtures. Clayey sands, poorly graded sand and clay mixtures. I SP SM I SC I II. FINE GRAINED, More than half of material is smaller than No. 200 sieve size. SILTS AND CLAYS ML I I Li'luid Limit less than 50 CL Inorganic silts and very fine sands, rock flour, sandy silt or clayey-silt-sand mixtures with slight plast- icity. Inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clays, lean clays. Organic silty and organic silty clays of low plasticity Inorganic siltys, micaceous or diatomaceous fine sandy or silty soils, elastic silts. Inorganic clays of high plasticity, fat Organic clays of medium to high plasticity. Peat and other highly organic soils I OL I SILTY AND CLAYS MH I Li'luid Limit greater than 50 CH I OH HIGHLY ORGANIC SOILS PT I I WESTERN SOIL AND FOUNDATION ENGINEERING, INC. PLATE NUMBER 2 - I I I I I I I I I I I I I I IJ?O I 110_ I I I - . PLATE NO. 3 Pale 0 gish-Yellow Silty Flne to Medium Sand, Loose Light Olive Green Sandy Silt, Very Fiable Colluvium: Dark Brown Clayey Silt 15 :,Pale Yellow Silty .... Fine to Medium Sand ....... , , . .-". '- - ., ,: ::.-: Dark Green Sandy Siltstone,' ," '::-:;:;:.<Stiff but Friable _ ,-J.:::-::'::::,-,:::::.==:-"--:- ,~'-~;,~ . ..... .......... .... .. .. . " , . ..;'. .......:..... :,~:::": White Slighti,y Silty Medium 'to Coarse "::':"::-'..'.':>' ,: J~'L ',.,J.;..,'...',. ;-:;2:-i,~:;:.'/..::';:';'C:': . , ,:,,~':":' -, "':~:"c'. "",,. ................:. 60~ f .' -.",' "':"::': :\~:)02:Z.;~'" Pale Greenish Gray Silty Fine to Medium Grained Sandstone, Dense, Fractured \.. " r DEL MAR/SANTIAGO FORMATIONS UNDIFFERENTIATED 13't .- .. . ". ." . :...... White Slightly Silty Medium Sand Vertically Jointed J ~ IIDD t 12 "Greenish Gray' ~Siltstone - ..' :,: ...... .".:'. ",: Yellow Concretionary Calcareous Shelly Medium to Coarse Grained Sandstone IIi Dark Green Siltstone 'Friable , Olive Green Extremely Crumbly :- Sandy Siltstone, Out of Slope " Grades Sandier . th De th ,~:;:::Yellow Silty Fine Sandstone '. ..... ......;.'::..;..:..... ~ Friable Jointing @ 150 Colluvium 400 \~'. ....\..:,'.. .............'.. '. ....... ,~.,. \. .., DEL MAR/SANTIAGO FORMATIONS UNDIFFERENTIATED " S:&il:d;s:t~D ..,.-,.... ." ," .." ....:....... "':" . ...:...:..... . ..... "" .J ~ 2"35 Colluvium (Ancient Alluvlum .. ". ~ Pale Yellowish Brown ~ C 'e Sand Dark Green Siltstone, Crumbly WESTERN BOIL AND FOUNDATION ENGINEERING INC. ..'-...:~.' MILLER PRoP. TRENtH R :roB NO. 'fl- Z3 "II\'I\h\~ ,:,[' \':' \~\'~" I,IIIII~ \ \ \ \ ~I, 1111\1 \I'l' I '" \ >,] \~(:I '11111)\ ]~~ \~ 'I II \\.. ~ ~ 21 \ I , " 'I \rJJ >""'; "" ?:\ \' 'III \;:; ~ ~ ~ ;:, t .o>>-"t:Ico\ I III\~ "-' Q) ......d II I co.,..;.... ;~t ' I \ Q) '" U) Q) "y , I', I' \ ~ ~: ~ ~\"'\ , , ..... 0 "-'H.... I I \ rJJ "'" II \ ] ~;:; '5 \ " , Ol Ol '''';'''; \ \ , , , : : I\\...:l 0. U) :>\ \ lilli,' , , I \ \ \ \ 11',',11' I, \ \ \ .::': I' ",', " 1\ \ \ \ \ 1::-1',',', , 'II \\ I \ \ \ <:'::,': 1,1' , ,.-... \\( 1;--,.:.'.:;.1, II e 'II I i,"":":-;: 'I I I - \ \ \ Ir'!' ........1 .;i 'JI,~ I ' . ,./.1 :::::;:; > II... 1.11 .": Ill. ~f::\'.:!::':::?;:/i:!;~ 11'1 :,1:,:,::.,:,;.. :":'1"" Q) ,'.' , , ,',:, I" S ro.: , ,'"" "-' '.: , '>,,,. Q) rJJ Q)." I,I;;::~ S] g . ,'r-! ~ ro .j.J '" 'CI) Cf.l Cf) ~"> II' "-' ,,-,:: . Q)"....."OJ ..... ',' II' : oo..! '''; Q) '''; ....:. ".!:: (lj Cf.l C C/.):: /1',1; ~ k >, '8 >, , I , .0 .] c3 ].. /11.;' Q) Ol Ol;: I, .,: ......,.; U) S U) .... 'I' )1' &; ".~ ,,::. II' - Q) "" Q)'" /1"'. 0 Q) Q) Q) :.'. III 1.1,.' "-' c3:;: c3 .,' I :J. Q). Q) 11.[.1.: "-' .>: "-' .>:. 1 ,.,.,. '''; .... ''''; ....:> , .,.,. ..r::,. l1l..r:: Ol,,' II',:I/~.: 0 ~...: 0,: \ ,II I """!il I:),:}:,'.,',' :.)::: 'i'j',' :':" 0- JII !,.,.I.<I::-':,>1-1I ..~..:'.r'Hr. I ~ I I I I I I I I I I I I I I I I I I I - \ ~ ~ - " Q) '" Q) " .... 0 c.:>"-' rJJ .>:"-' ......... l1l '''; OU) s '" '''; "" Q) Q) " ;.:: 0 "-' o rJJ "-''''' " Q) l1l <oU) '''; ~"" Q) Q) " "-' '''; '''; OJ ..r:: .... :;<c.:> ~ ... Eil !;;; H ,.. Z 0+1 ~ 0+1 ~ 0 ~ c.:> H < 0 H Z ,.. ::l Z < U) U) Z '- 0 ~ H ~ ,.. \ ~ ..sl ...1 0-- 0+1 0 ~I 0 ~ 1tl r1 WESTERN \ R_ .... PLATE NO.4 ,'I ,. Il'i 1'111'1 I ""'.i: 1/).1'11 ',:.lhll' ~ III.I/I'd , I "II " , ,.,' I ,I '::/ , '. , I ' III :" "-' ' :~II r: ~ >" 9'1 ;:, , '~{II ..::; I "'I.... u I ::1 ;: I 0'.:' ~ ' Si'l " , I' I, ~ 1 'I " I I,ll i'l ~ I I".:,., I: I III. I:, . i'." II, [ " '1'1 II: 'I II' I! ;Ig ~ '(,\ :;, , I':> U) ::-::. "1[' , 1::.$ ~~), II, 1'1 .'..... :;j ~.:, II, , .' ~ Q)R' I' . I I 0) 1: ;.:: s' 11'111, I I:: rJJ 0 ::lr':':,I"\I' . '''; "-"~.' ,. I I.... g> Q) -aLr I I'i 1:- l1l ,,;.::.... '1'[1 j';:.pi;:1:'}.rl,'I' I I ,.1",/, I" '1 111:r.Yj:C'rl'I,",I'1 I ::'-:'j :...... 'I ,1'111111' , : 11:(';' !;;-:.:I 1/1 11111 :'1 '~ ... , '" "', MILLE R PROP. TRENC.H B JDB No. 91-Z3 SOIL ANO FOUNDATION ENGINEERING INC. I I I ~ S \ ;:l 0 ..., I ~- > ;:l ,.., ,.., 0 U ~ I CO c:: ..., .... III "'d tl:) I III c:: c:: ..., ..., "-< ...., CO .... ,.., .... III 'M0.j.J CIl c:: I III ..., >,tIl ,..,.....c ...., CO...., ..c: 0 ,,-1 coU ;3: ..., I r-! 0 Q) Q.I U) .j.J C C o 0 ~ E: .j.J .j.J o ::i 00 cr.; 1""""I'M""O.j.J I 1""""I"l;:::~T"""'l Q) W r:o.r-! >< ;:;: CIl CIl I I I tIl '0 ...., III ,..,.0 .,-\ \wlJ-l CIl Ill,.., ....,..., I >'C::CIl Q)'M >, >, CO '0'0 ,.., III c:: U ""'co I ....CIl c:: 0 Q).j.JQ) IllC::CO J-l 0 c: L'lUCO .... I ~..c::C ........, ro.r-!4-I 0;' 0 I \ 0 ~ I I I - ." '" >, c:: -,.., ;.....,.0 O,..,S \...0; 'r-! ::I ""CIl.... U III >, > '0 >, 'r-! c: J-l ,.., CO '" OCll> '" c:: tIl CO Ill"" '00. ..., tIl .... c:: CO III III .'i.c UCIl ..., ,.., c:: CIl 0 '0 - III ...., .... ,.., ;:l "'d'r-! .j.J c:: CIl U ro cd >,.... '0 III I'>< III >- <>: CO 0 III ,.., ...., c:: 'OU 0 '" <fJ...., 1""""1 c: Q) Cf.l .j.JaJ"'l:;.j.J .j.J Q.) COr-! o J-l '"" .r-! ;:;: L'l COCll F- "'0 >.. .r-! t:: '0 '0 CO c: (lJ Q) (J) CO c:: ;:;: CIl 0 '0 .j.J ): Q) c:: rJJ 0 c: Q).j.J r-!.r-! QJ r-I r-I ro \-l'r-! Q) M ~Cf) >---0 I ~ M <fJ ..., .'i .... U.o o III ""0 I:Q '" "''0 F- ..., ;:l,.., ,.., <fJ CIl'O c:: '0 CO Ill-1 ...., co.c ....,...., 0,,,, <>: ;. \ C ~ WESTERN PLATE NO.4 (Cont.) \ C\/. <:1__ I') ~ F- ;:l ..., > ;:l ,.., ,.., o U ~ III '0 ..., ,.., <fJ '0 ,:; CO -1 "-< o III ,.., o CIl >, co III c:: >, ...., ..., co CO e- ,.., ,.., c::. U "-< ..... '0 . III >, c: ..... 0 ...., ...., c: tIl " ...., " ,.., ..., 0 en ...., <fJ ..... .... .0 III o III '0 ..., ,.., tIl '0 c:: CO -1 I \.(\ '.:/ M \ LLE.R PROP. TRENtH B (CON-r) SOIL ANO FOUNOATION ENGINEERING INC. J"b\3 ND. '11-23 I I I I I I I I I I I I 12' I I I I I I I - PLATE NO.5 I o IJ+lj i ~' i // --- ~~~ - - ----;::::-- ~.'~:..""~ ~ - Colluvium _ _ _ -- ,,~---: :':: ;:...;P:- --- ~::: --- ~ -:.;; ..- /.---......./.... -------:::;:::::;-: ,...._.....:.. -::-~- ."~'-<:...-- . /' --- --- .....---:-::..----"-. . . .---: ...- -- - - .- ~ ~ ..:;..> :::--- --- ~ ~..::. :.- :.". . .- - -- -- --- -- ~. -:-~ :,...//............/....------:-/->--:..-.;..;.'-~.- -- ------- --- .--;",-:-";-;:" ~ ---/:-.:-.. <:~. ----- ----- ==- - ~_. ~ ---- - ./ --- ,...--. . - . -- ---- --- --- ::::::::::: . :-:-- / ---- ~ ~.._..-~/~ ~~-~;.....:-..-/~ -------- ;; .65-~:-~ -------- ~--- ::.-:-.:<"~;-~~>;~ ~ ~> ___ ___ ___ r:::::--:'~ ~ ;--:.;:' ;:::.--_ -- - __ --..-. ,-,,'1.'~ -- -----' .--::::;::...--<....-:/- ./------.........----..---- ..;........ --- .-----:"'~-......~.':~. :::::,". .- ----. --- -- ....;;=..-; ::....-- --- - --- :::~.~_.~ ~ ::::::---:::::- --- -:::::...:::::: .~//'~ ,..- .............--- /--.--- ......-::.....-.?-...... 1?4- 1"2.'1- w Landslide Debris: Dark Green Clayey Silt with Contorted interbeds of Orange Sandy Silt 137 , 135 ~ 127 ~;?~~~ _ Colluvium 4/.~~~ -';::::::--....... ....... -- ~ -- ~ -"'0__~ --...:.-:. /~....::=-_-__:-: ~ __ -- ~-:::;::.- -----------~...-;:;;~---====-- - ----- ~ ~ ~/: Dark Brown . - ---:::.------- _ '<":.-;::---~ ;..-" _?..-'; - -- r ---:.--- ---=::: ....... ~ ,:;-- .--:::;.-- -- - -- WaXY CIa ~-- -~~'-~"-~0 ;;:K.::--.:::::- -=--::::~-:::- _:: ~~~~~-.::.;..-~~/A :;--.--:--__~- ~~-~-/ .- -.- -........- - _.-. :;.- - ~ - - --..-.::-"'"-..--: - --- --~- ~----- --- ~----;?>;;.:-;::-::: - ~~.---7 - --:::-:-- ~ _ --- --:::::::; - --- - --- --- :;;.- -:;.-- - - ~~ __-.--,-;. _- ._=-~~-- 0.-.._---__-::..-- =-----~~_;:::::::..::::., -/ -- .- - --- ~. - - - -- ~ - - - .-_--~----~~~ ------------~~......--_-~--;::.- -/ -- - - - - ~~,...:::;~~ -_.---: --.-::::;;--:::-:::::::-~~-=-~ --- =~---- --- --=----::.....:==- . -- - ~ -- - /-- ~ :-----_::-- -- - - -- Shear Zone with roots E/650 N / 135 t Mottled Green and Red Clayey Siltstone fractured and crumbly medium stiff -- Silty Mediu!;) ellow "t ined . Dark Green Clayey Siltstone / ZD5 ~ llC:; ,..... Sole of Landslide Slide Plane Colluvium '--- Yellow to lfuite Medium to Coarse Grained Sandstone, with thinly interbedded Green Siltstone ) Green Clayey Siltstone,Stiff to Hard ~ Rotated Slunp Block with Landslide Debris Lavender Siltstone) Hard MI LLER PRDP. WESTERN TRENCH C SOIL ANO FOUNOATION ENGINEERING INC. JOB ~O. 91-23 I I I I I I I I I I I I I I I I I I I - PLATE NO. 6 , o ~ "8- Green fractured Silt with White Silt Lense N50E/355 E 158_ 60" ~ Pale Green Silty Fine to Medium Grained Sandstone, Very Friable Ilt8_ becoming Dense @ 6 feet Clayey - - --==- -~-- =="'=::.==.=.=-~ - :.-::-;:;:::---. --.-:=.;;.;~ Green Siltstone fractured Slide Plane Landslide Debris: Dark Green Clayey Waxy Silt with contorted interbeds of Orange Very Silty Sand, Medium Stiff Very Moist to Wet /50 - bO' i litO - ~~_- Colluvium -:::----~ -:::==- _ ~~7-:(':"::::--:::~--::::-- ~ - ~>t::c"::" ~~...-------;:::;;:~/_______~:-::o--./Z~ -----~ - ----::.--c:::::::--;:::::::;-~~.;'.;.~ ---=:::~ - _:'-.-". -~:::;---~~:::::c::/ -.---: .-.~~:-.. -/ ~ WESTERN MIL LER. PROP. TRENC.H D JoB MD. ~1-23 SOIL AND FOUNDATION ENGINEERING INC. I I I I I I I I I I I I I I I I I I I - - z >- -, ~ w 0 TRENCH NUMBER >- . l- T-I I- ~ w lL I- w I-u - w . w >- I- ELEVATION 126 128 >E z 0:: zz Vl 0:: >2 w I- <t - - I- -0 "- U W ~ Ww Z "- ::J 1-- .J 0::1- Z - W 0:: I- w U I- <tl- .J 0 "- SAMPLING ~ Vl <t~ 0 lL Vl W .Ju r l- I- lL Vl Vl Backhoe 0 lLl/) - 0 w~ :; I/) METHOD lL lLZ Z lL >- 0:::; W <t <t <t :; <to 0:: ::;: 0 Cl (11 .J U 0 U 0 u DESC RIPTION U =::--= --- Groundsurface - =MH~ - 1- - - Very Dark Brown ~ - - --- -- Clayey Silt - -- - -- 2- --- --- Colluvium -- --- Very -- --- -- - --~ -,",,- Moist Soft -'-~ 3- .::::...~. - :.....-'--~ :.:..:.-...::.-==.. - ::~ Olive Green - 4- -- Sandy Silt - --- --, ~MIF- grades to - F-':'-~ Very Soft ~-- 5- ~ Dark Green Clayey Siltstone Moist to - --- - rnnt'act N20oE/7OSE -- '1edium 93.3 15.7 81.3- ef::: ::': 6- -::.:-.~.' Orangish Yellow poorly Stiff (@" " cemented Calcareous Shelly I - .:.:;:'''~ Medium to Coarse Grained '1edium - " ... 7- :.'SP.:,; Sandstone Moist Dense - ..... :(~(~: I - ..,...:."-; ......,............... 8- f'-~' " Dark Green Clayey Sandy Very Very ~MH~ - Cf".== Siltstone - Moist Stiff 9 .:..;_-......""7' - Bottom of Trench @ 9.0 Feet - 10- - - - 11- - - - 12 - - - - 13 - - - - 14 - - - - 15- - - - JOB NUMBER DATE LOGGED LOGGED BY 91-23 MILLER SUBDIVISION 5-20-91 V. G. SUBSURFACE EXPLORATION LOG PLATE NO,7 I . I - Z >- >!! W 0 TRENCH NUMBER >- - . t- ll. T-2 t-w t-u t- UJ~ W W t- - >- ELEVATION 107:1: za: ZZ Vl_ a:- >z w t- <t ::>t- -0 LL U w;:) ww ZLL f-- - W ...J - a:t- a:f- Wu f-z <tf- I ...J 0 LL SAMPLING cU~ <t~ Oll. VlW ...Ju J: - _ f- ll. Vl Vl Backhoe ll.Vl - we;: f- ::;; Vl METHOD ll.0 ll.z Oz ll. <t <t::;; <to >- ::;: 0 a:::;: <t a: w (f1 ...J U U 0 0 0 , I u DESC RIPTION U ~ - -MIl Dark Brown Sandy Silt Very Soft - I 1- fJ (Colluvium) Moist to - - Medium - 2- grades to Stiff ] I -'-'-'-'. 99.2 15.0 - '-'-'-'--'-- ~~. Very Dark Brown Slightly Sandy Medium I . . 84.9j 3- ,:MH Clayey Silt Stif f I :::;..=~. - (Alluvium) 4- to 102.7 15.6 =.c::~ ~ - Stif f I "c-= 5- ~=::= - - ~~_C;::o --1 I =0.7"- I 6 Bottom of Trench @ 6.0 Feet - - I 7- - - - I 8- - - - 9- - I - - 10- - I - - 11- - I - - 12 - - - - I 13- - - - I 14 - - - - I 15- - - - JOB NUMBER DATE LOGGED LOGGED BY I 91-23 MILLER SUBDIVISION 5-20-91 V. G. SUBSURFACE EXPLORATION LOG PLATE NO.8 I - - z >- ,!! uJ 0 TRENCH NUMBER T-3 >- - . l- ll. - I- I-U I- uJ ,!! uJ uJ I- uJ - . >- ELEVATION 104:1: z 0: ZZ Vl 0: >z uJ I- <l: - I- -0 u. U \.IJ;:, uJuJ Z u. => 1-- - uJ .J - 0:1- 0:1- uJ I- Z <l:1- !::: <l:~ U uJ :r .J 0 SAMPLING <l: Vl 0 Q. Vl I- .Ju Q. Vl Vl Backhoe ll. ll.Vl - - uJe;: I- ::E Vl METHOD Q. 0 Q. Z 0 Z ll. >- O:::E uJ <l: <l: <l: ::E <l:0 0: ::E 0 0 '" .J DESCRIPTION U 0 U 0 U U ". .',....,...'. Silt - ~ Dark Brown Sandy Very Soft - 1- grades to Moist to - - ~To = 1edium - .. Dark Brown Clayey Silt ~c.. Very Stiff 2- ~H~ 93.4 26.6 77.T - Moist ~ ~ 3- --- - -- - - --- -- 4- --- ~-= gradeE - ~~ - - - Stiff 112.6 17.7 93.0 5- -- - ~-= -- (Alluvium) - - -- --- - - I-C- 6 ~ Very Dark Yellowish-Brown Sandy - ~ - 7- Clay - ~ - ..' . Very Stiff - 8- " CHe - .~ Moist - - 9- ....". - - - 10- ~ ~ - ~ ~ - .. - 11_ ~. - - ..... - 12 - .. .... - - :c.c,~ ~, - 13 - '..:0:: (Older Alluvium) .. - *..... 14 - Bottom of Trench @ 13.5 Feet - - - 15 - - - - JOB NUMBER DATE LOGGED LOGGED BY 91-23 MILLER SUBDIVISION 5-20-91 V. G. I I I I I I I I I I I I I I I I I I I SUBSURFACE EXPLORATION LOG - PLATE NO.9 I I I I I I I I I I I I I I I I I I I - z >- :J! I- W 0 TRENCH NUMBER >- _. 0 w a. T-4 I- w I-U I- W :J! w >- I- - 0 W I- <( ELEVATION 126:t z 0: zz lfl_ 0: >z "- U w ;:) ww z ;:) I- -0 - ...J 0: 0:1- "- Z 1-- W I- Wu I- <(I- J: .J 0 "- SAMPLING ~ <(lfl W lfl 0 a. lfl .JU I- a. lfl lfl Backhoe a.u; - I- w~ a. ;:!; lfl METHOD a. 0 a.z >- 0 z <( <( <( ;:!; <(0 ;:!; 0 O:;:!; w a: lfl .J U u 0 p u DESCRIPTION 0 u ~~-.:.: - .~':~. Dark Brown Clayey Sandy Silt - . . .~. Very Soft 1- - MY~ - (Colluvium) Moist to - --:-.:.."':"- - ~--::...- 2- -:;',.z' (undulating contact) Medium - -'-' ~ Stiff - .;.....;-- . .-. 3- .......,-~. ~-:--.:.:-:..:.. .~......:... -,-:......:.:t-:.. Dark Green Sandy Silt with Moist Medium - "'-'--,-' - - - 4- :MH~ Mottled Red Sandy Silt Crumbly T~:~'- Extremely Dessicated with White to Stiff 105.2 16.3 91./ - i~~~ Sandy Silt Filled Partings - Very 5- - t~;~. Moist - - \-''':'''\ 6- :-i..:.....:~ (Landslide Debris) 102.2 20.5 89.1 .\' ," -......,...:....- - '..,' ~~Ct,-- - ~S-{ - .-.-\ 7 .-- - Bottom of Trench @ 7.0 Feet - 8- - - - 9- - - - 10- - - - 11- - - - 12- - - - 13- - - - 14- - - - 15- - - - JOB NUMBER DA TE LOGGED LOGGED BY MILLER SUBDIVISION 91-23 5-21-91 V. G. SUBSURFACE EXPLORATION LOG PLATE NO. 10 I I I I I I I I I I I I I I I I I I I - 2 >- ~ uJ 0 TRENCH NUMBER T-5 >- - . f- Il. - f- f-u f- ~ uJ f- uJ uJ 0 W >- ELEVATION 2 2Z - ex: >2 uJ f- <t llO:!: 0: (1)- }- -0 l1. U uJ ::> uJuJ 2 LL :l }-- - -1 - 0: f- o:f- uJ f- 2 <t}- uJ '= <t~ u w J: -1 0 SAMPLING a: (I) Cl Il. (I) -1U }- Il. (I) (I) Backhoe 1l.(I) - - }- we: ;> (I) METHOD Il. 0 Il.z 0 2 Il. <t <t ;> <to >- ;> 0 0:;> uJ <t 0: Cl CI' -1 DESCRIPTION U Cl U 0 U U ~. Dark Brown Sandy Silt Very Soft - - 1- Moist to f:!= - grades to ~edium - c=-~-.; to - 2- c:- -~ :MH~ Very Dark Brown Clayey Silt Wet Stiff - - := ~--=- ~ -- --- 3- :- --- --- - -- - -- -- --- 4- -- - grades - --- -- - --- - ~--:~ Stiff 5- -- - - -- - (Alluvium) - - -- - -- -- - -- 6 -- Bottom of Trench @ 6.0 Feet - - 7- - .- - 8- - - - 9- - - - 10- - - - 11- - - - 12- - - - 13_ - - - 14 _ - - - 15- - - - JOB NUMBER DATE LOGGED LOGGED BY 91-23 MILLER SUBDIVISION 5-20-91 V. G. SUBSURFACE EXPLORATION LOG PLATE NO. 11 I I I I I I I I I I I I I I I I I I I -------- - Z >- - >-! w 0 TRENCH NUMBER . f- T-6 >- f- >-! (l. - f-w f-U W . W W >- f- ELEVATION 108:!: za: zz - a: >z w f- cl: (f)_ ~f- -0 w=, ww l.l.. ...J U a:f- z l.l.. Z f-- - a:f- wu f- cl:f- W - l.l.. cl:<:? w :c ...J 0 SAMPLING it (f) 0 (l. (f) f- ...Ju f- (l. (f) (f) Backhoe 0 (l.(f) - 0 w~ ::; (f) METHOD (l. (l.z z (l. >- 0::::;: cl: cl: cl: ::;: cl:O 0:: ::;: 0 w (f) ...J U U 0 0 0 u DESCRIPTION u - --. Sandy Silt Very Soft - -'-'.- - Dark Brown - ~S; 1- Moist to - ~~~= - -- grades to - - - -. - to Medium j 2- - - MH:;: Dark Brown Clayey Silt '---- Wet Stiff - =~~ i --- -- j - -- 3- --- - -- -- --- - --- -- --- - -- - 4- - - - -- --- ~ -- - =-=-= ===_7 -- 5- - -- 84J -=- -- --'- - -- 101.6 - - -- 22.0 -- --- -- 6 - Bottom of Trench @ 6.0 Feet - 7- - - I - 8- - , - l 9- - - 10- - - - lL - - - 12- - - - 13 - - - - 14 _ - - - 15 - - - - JOB NUMBER DATE LOGGED LOGGED BY 91-23 MILLER SUBDIVISION 5-20-91 V. G. SUBSURFACE EXPLORATION LOG PLATE NO. 12 I I I I I I I I I I I I I I I I I I I - z T-7 ,... - ~ w 0 TRENCH NUMBER ,... . l- I- ~ a- - I- w I-u w . w W I- 116:t - >2 ,... ELEVATION 2 0:: 22 Cfl_ 0:: W I- <t W ww ::> I- -0 ,.. --' U => 0::1- 2 ,.. 2 1-- - 0:: I- W I- <tl- w ,.. <tCfl u W J: --' 0 SAMPLING ~ Cfl Cl a- Cfl I- --'u a- Cfl Cfl a-u; - wc: I- ::< Cfl METHOD Backhoe a- 0 a-z 0 2 a- <t ::< <to ,... ::< 0 0::::< <t <t 0:: W U U 0 Cl (11 --' Cl u DESCRIPTION u ~. ..:......:'....:.. "---~' . - - - Dark Brown Sandy Silt Soft - ",-,,- ."- - -. 1- :'-..:'-'-" - ~- to ~<-- Very I\edium - grades to - :...-:c:...c= 2- ,:-=_-:=:0 Moist - ::.=- ~ to Stiff - ~ ~ ,MH- Dark Brown Clayey Silt Wet 3- - =-=0= 4- =- -- - ~ -- - -- - - - - - - - ~= 5- -- - I - =----" -j - -- -- 6- - - - - -- -- - -- - - - ~ - 7- - - - -- -- - - ----:c=_ (Alluvium) I - - -- - 8 - - 9- - - - 10- - - - lL - - - 12- - - - 13 - - - - 14 - - - - 15 - - - - JOB NUMBER DATE LOGGED LOGGED BY 91-23 MILLER SUBDIVISION 5-20-91 V. G. SUBSURFACE EXPLORATION LOG PLATE NO. 13 I I I I I I I I I I I I I I I I I I I LABORATORY TEST RESULTS MAXIMlItoI DENSITJLOP!J~PM MQISTQRE Maximum Dry Optimum Sample Density Moisture Location Description ( pcf] (PeJ::~en t ) T-1 @ 6.0' Dark Green Sandy Clayey silt 107.4 20.0 T-3 @ 4.0' Dark Brown Sandy Clayey Silt 121. 0 13.9 T-4 @ 4.0' Dark Green Sandy Silt 114.7 16.3 D I ~ECT -..pHEAR Apparent Angle of Sample Cohesion Internal Friction Location (psf) ( deflLeeu * T-4 @ 4.0' 350 25 ** T-1 @ 6.0 875 16 * Sample remolded to 90% of maximum dry density at 3% over optimum moisture content. ** Sample remolded to in-place moisture and density - WESTERN SOIL AND FOUNDATION ENGINEERING, INC. PLATE NO. 14 I I I I I I I I I I I I I I I I I I I MECHANICAL SIEVE ANALYSIS Percent Passing U.S. standard Si eve Sample Location 2" 1-1/2" ~~_----L4 #10 1140 #100 #200 T-l @ 4.0' 100 86.0 58.3 36.6 31. 2 20.3 13.6 10.9 T-2 @ 2.0' 100 99.9 96.3 76.1 63.4 EXPANSION INDEX* T-l @ 6.0 Initial Final Moisture Moisture Expansion Content Content Expansion Index ~_~rceni.L ( Per_c~ntl_Pot_ential 185 15.0 35.5 Very High 99 15.5 28.7 High _Location T-7 @ 4.0 * Test performed in accordance with U.B.C. Standard No. 29-2. - WESTERN SOIL AND FOUNDATION ENGINEERING, INC. PLATE NO. 15 I I I I I I I I I I I I I I I I I I I PLASTICITY INDEX/LIQUID LIMIT T-2 @ 2'-4' T-4 @ 6' 37 30 14.7 21.7 22.3 8.3 Liquid Limit Plastic Limit Plastic Index 60 so >< T-2 @ 2'-4' '" Cl 40 l ;2: H ,., b 30 H U H b T-4 @ 6' tfJ <<: 20 CL or 0 ...:l 0.. MIl or OH 10 OL 0 0 10 20 30 40 SO 60 70 80 90 100 LIQUID LIMIT WESTERN SOIL AND FOUNDATION ENGINEERING INC. PLATE I,UMBER 16 - I I I I I I I I I I I I I I I I I I I 4 ~ ~ " c ~5 ..c e- w ~6 o U) (; c " ~ " "- I z o e- <t o ~ o U) z o u Date: By, - 0.2 o 1 2 3 6-17-91 V.G. CONSOLIDATION CURVES Load In KIPS Per Square Foot 0.4 0.6 0.8 1.0 2 1--0_ r-- -- 1< --------- I ~ I 1" I '\ \ I 1\ \ I -<p ! , , I , I o Indicates percent consolidation at field moisture . Indicates percent consolidation after saturation MILLER SUBDIVISION SAMPLE T-6 @ 60 WESTERN SOIL AND FOUNDATION ENGINEERING, INC. 4 6 8 10 16 Job No. 91- 2 3 Plate No. 17 I I I I I I I I I I I I I I I I I I I 0.2 o 1 2 3 4 ~ ~ ~ c ~ 5 -<: >- ~ E-6 o U) (; c w '=' w "'- z o >- <( o ~ o U) z o u Date, 6-17-91 By, V. G. - CONSOLIDATION CURVES Load In KIPS Per Square Foot 0.4 0.6 0.8].0 2 -0_ ---- ~--- -- r--- t- _( '.......... ~ I p,,--- .... ~, ! "'- , , ~ I cp '" ."- ! i o Indicates percent consolidation 01 field moisture . Indicates percent consolidation oher saturation MILLER SUBDIVISION T-7 @ 40 WESTERN SOIL AND FOUNDATION ENGINEERING, INC. 4 6 8 10 16 Job No. 91-23 Plate No. 18 I I I I I I I I I I I I I I I I I I I FILL SLOPE KEY NATURAL GROUND PROJECTED PLANE I TO I MAXIMUM FROM TOE OF SLOPE TO APPROVED GROUND FILL ----- - - - - - - - - - .- - - - - - - - - - - - 5% MINIMUM k..- MINIMUM BASE KEY 15' - - .- ....... - - ",p.."t~~:\........,-- ...... ", - E.p..~"t" _ ,. - - G,\,..E. _ ...- U\~"'" -' U~S _ -' ~<.lAO'll<' _ _ - - S' MINIMUM BENCH -' - TYPICAL BENCH (HEIGHT VARIES) MINIMUM DOWNSLOPE KEY DEPTH COMPETENT EARTH MATERIAL BACK DRAINS MAY BE REQUIRED PER RECOMMENDATIONS OF SOILS ENGINEER - MILLER SUBDIVISION JOB NO. 91-23 I DATE JUNE 17, 1991 WESTERN SOIL AND FOUNDATION ENGINEERING INC. PLATE NO. 19 1 1 1 1 BUTTRESS SLOPE KE'T FILL PROJECTED PLANE I TO I MAXIMUM FROM ToE OF ~UOPE TO APPROVED G RDUl-JD. I" '-'-,- '- '- '- - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - -- l-JA"TURAL- GI<OU!\.!D e>ACKDRAINS AS REQUIRED BY ':>OILS E!\.!GI!\.!EER. " - --- CONTACT 5ETwE.E1-.l LAND<SUDE DE.eR\S AND FoRMATIO!\.!AL.. MATERIAL-':>. ::::r 5' MI"-l. ~ J 1- , 15 MI!\.!. CONlPE-TEN"T FORMA"TIOI-JAL.. MATE.RIAL.. MILLER SUBDIVISION JOB NO. 91-23 1 JUNE 17 1991 WESTERN SOIL AND FOUNDATION ENGINEERING INC. PLATE NO. 20 I I I I I I I I I I I I I I I I I I I APPENDIX I WESTERN SOIL AND FOUNDATION ENGINEERING, INC. - I I I I I I I I I I I I I I I I I I I - WESTERN SOIL AND FOUNDA nON ENGINEERING, INC. PHONE 746-3553 AREA CODE 619 423 HALE AVENUE ESCONDIDO. CALIFORNIA 92029 SPECIFICATIONS FOR CONSTRUCTION OF CONTROLLED FILLS GENERAL DESCRIPTION: The construction of controlled fills shall consist of adequate preliminary soil investigations, and clearing, removal of existing structures and foundations, preparation of land to be filled, excavation of earth and rock from cut area, compaction and control of the fill, and all other work necessary to complete the grading of the filled area to conform with the lines, grades, and slopes as shown on the accepted plans. CLEARING AND PREPARATION OF AREAS TO BE FILLED: (a) All fill control projects shall have a preliminary soil investigation or a visual examination, depending upon the nature of the job, by a qualified soil engineer prior to grading. (b) All timber, trees, brush, vegetation, and other rubbish shall be removed, piled and burned, or otherwise disposed of to leave the prepared area with a finished appearance free from unsightly debris. (c) Any soft, swampy or otherwise unsuitable areas, shall be corrected by drainage of removal of compressible material, or both, to the depths indicated on the plans or as directed by the soil engineer. (d) The natural ground which is determined to be satisfactory for the support of the filled ground shall then be plowed or scarified to a depth of at least six inches (6") or deeper as specified by the soil engineer, and until the surface is free from ruts, hummocks, or other uneven features which would tend to prevent uniform compaction by the equipment to be used. (e) No fill shall be placed until the prepared native ground has been approved by the soil engineer. (f) Where fills are made on the hillsides with slopes greater than 5 (horizontal) to 1 (vertical), horizontal benches shall be cut into firm undisturbed natural ground to provide lateral and vertical stability. The initial bench at the toe of the fill shall be at least 10 feet in width on firm undisturbed natural ground at the elevation of the toe stake. The soil engineer shall determine the width and frequency of all succeeding benches which will vary with the soil conditions and the steepness of slope. I I I I I I I I I I I I I I I I I I I - . page 2 (g) After the natural ground has been prepared, it shall be brought to the proper moisture content and compacted to not less than 90% of maximum density, A.S.T.H. D1557-78. (h) Expansive soils may require special compaction specifications as directed in the preliminary soil investigation by the soil engineer. (i) The cut portions of building pads in which rock-like material exists may require excavation and recompaction for density compatibility with the fill as directed by the soil engineer. MATERIALS: The fill soils shall consist of select materials graded so that at least 40 percent of the material passes the No. 4 sieve. The material may be obtained from the excavation, a borrow pit, or by mixing soils from one or more sources. The material used shall be free from vegetable matter, and other deleterious substances, and shall not contain rocks or lumps greater than 6 inches in diameter. If excessive vegetation, rocks, or soils with unacceptable physical characteristics are encountered, these materials shall be disposed of in waste areas designated on the plans or as directed by the soil engineer. If soils are encountered during the grading operation which were not reported in the preliminary soil investigation, further testing will be required to ascertain their engineering properties. Any special treatment recommended in the preliminary or subsequent soil reports not covered herein shall become an addendum to these specifications. No material of a perishable, spongy, or otherwise unstable nature shall be used in the fills. PLACING, SPREADING AND COMPACTING FILL MATERIAL: (a) The selected fill material shall be placed in layers which shall not exceed six inches (6") when compacted. Each layer shall be spread evenly and shall be thoroughly blade-mixed during the spreading to insure uniformity of material and moisture in each layer. (b) When the moisture content of the fill material is below that specified by the soil engineer, water shall be added until the moisture content is near optimum as determined by the soil engineer to assure thorough bonding during the compacting process. (c) When the moisture content of the fill material is above that specified by the soil engineer, the fill material shall be aerated by blading and scarifying, or other satisfactory methods until the moisture content is near optimum as determined by the soils engineer. WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I - . . page 3 (d) After each layer has been placed, mixed and spread evenly, it shall be thoroughly compacted to not less than the specified maximum density in accordance with A.S.T.H. D1557-78. Compaction shall be by means of tamping or sheep~foot rollers, multiple-wheel pneumatic-tired rollers, or other types of rollers. Rollers shall be of such design that they will be able to compact the fill to the specified density. Rolling of each layer shall be continuous over its entire area and the roller shall make sufficient passes to obtain the desired density. The entire area to be filled shall be compacted to the specified density. (e) Fill slopes shall be compacted by means of sheepsfoot rollers or other suitable equipment. Compacting operations shall be continued until the slopes are stable but not too dense for planting and until there is no appreciable amount of loose soil on the slopes. Compacting of the slopes shall be accomplished by backrolling the slopes in increments of 3 to 5 feet in elevation gain or by other methods producing satisfactory results. (f) Field density tests shall be made by the soil engineer for approximately each foot in elevation gain after compaction, but not to exceed two feet in vertical height between tests. The location of the tests in plan shall be spaced to give the best possible coverage and shall be taken no farther than 100 feet apart. Tests shall be taken on corner and terrace lots for each two feet in elevation again. The soil engineer may take additional tests as considered necessary to check on the uniformity of compaction. Where sheepsfoot rollers are used, the tests shall be taken in the compacted material below the disturbed surface. No additional layers of fill shall be spread until the field density tests indicate that the specified density has been obtained. (g) The fill operation shall be continued in six inch (6") compacted layers, as specified above, until the fill has been brought to the finished slopes and grades as shown on the accepted plans. SUPERVISION: Supervision by the soil engineer shall be made during the filling and compacting operations so that he can certify that the fill was made in accordance with accepted specifications. The specifications and soil testing of subgrade, subbase, and base materials for roads, or other public property shall be done in accordance with specifications of the governing agency. WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I I I I I I I I I I I I I I I I I I I . - page 4 SEASONAL LIMITS: No fill material shall be placed, spread, or rolled during unfavorable weather conditions. when the work is interrupted by heavy rain, grading shall not be resumed until field tests by the soil engineer indicate that the moisture content and density of the ~ill are as previously specified. In the event that, in the opinion of the engineer, soils unsatisfactory as foundation material are encountered, they shall not be incorporated in the grading, and disposition will be made at the engineer's discretion. WESTERN SOIL AND FOUNDATION ENGINEERING, INC. I . '. I I I I I I I I I I I I I I I I I I APPENDIX II WESTERN SOIL AND FOUNDATION ENGINEERING, INC. - I I I I I I I I I I I I I I I I I I I - " . REFERENCES CITED Eisenberg, Leonard I., 1985, Pleistocene and Eocene Geology of the Encinitas and Rancho Santa Fe Quadrangle, in Abbot, Patrick L., editor, on the manner of deposition of the Eocene strata in northern San Diego County, San Diego Association of Geologists. Schnabel, P.B. and Seed, H.B., 1972, Accelerations in Rock for Earthquakes in the Western United States, EERC Report 72-2, University of California, Berkley. Singh, Awtar, November 1970, Shear Strength and Stability of Man- Made Slopes, Journal of the Soil Mechanics and Foundation Division, ASCE SM6, pp. 1879-1892. Tan, Siang S., 1986, Landslide Hazards in the Encinitas Quadrangle San Diego County California, CDMG Open File Report 86- 8 LA. WESTERN SOIL AND FOUNDATION ENGINEERING, INC. j ~~ . & . . . .. October 7, 1997 HYDROLOGY STUDY FOR . Civil Engineerin,] . Land Planning . Structural . Surveying CITY OF ENCINITAS T.M. 91-198 1 OF <; DESCRIPTION: 11 LOT SUBDIVISION DESERT ROSE WAY COLONY OF OLIVENHAIN CITY OF ENCINITAS T.M. 91-198 A.P.N. 264-151-48,50 & 51 OWNER/AGENT: MR. GREG BROWN 910 SUMMER HOLLY LANE OLIVENHAIN CA 92024 760-753- 477 DOUGLAS E. R.C.E. 397 EXPIRES 12-31-97 132 N. EI Camino Real, Suite N . Encinitas, CA 92024 Fax/ Phone 760-942-8474 2- l'f t? . 1=. Y8"5{bJ ~11~A Q 5. -Po d-vu~T -( 1'l)8.SlG;r.{ ~ ?j2.() te'j)J(lE MA,JU!\t..... .. 12A-ilo"'\M.- Nte:fHO'D ~Q::c.,IA " 'j2..01Z-M..- 1201 D G,4/n A1-. '; C- :: D. 4S 1f. +-t-llllZVL.bG-1 G\JAvJA-ild~ ,AI=-Lt7~. . 1t:: '1.0 MI.}. ( lJr2641 'Vf2M..tU,Eo) S ::::- 1.A-4(t.vJ(t:ly.&Ljq:: Z;.\''\/Hll- Qlba::' o.A-; (!i. V (IS)::: ~.A ~0 .6 ~ = 2.-=7<7 - l/j q:: 100 \ 7b ~ 0.11 L:: ,?9) I . At.:: ttD AC-. L:> t-l :: '?;1h - IlO:: 2-l c; \ L~ 4100 I . 1 t. -:: l0.o "",J, (NA-'TVruI1.- LJA-1tYL-SWG--D) j:'-:: 1.44 (1...'f.-) (1t7'f,tJv/f7::: ?,fo 1.J/t\R Q 100:: D,A'i (~, &) (2-1<;) -;; 771, (%5 ~ o{t3 . ~. t-!-l1Jfl-Aul..-\C- AJM.Hs\'3 -P::V,~1 - lITlA\JA6~ ~/'I\ 1Kls ACZ8l. \?HAt4DLfD -:f7-f 1IG?et.-'\ 12v% wA--( I ~-I \~ ~IO J . 7ttE. WAtJA6.'f:. 15 A-Vt62l1~ f-IM'DL8J1?~1 D~-~I1ts: '{2.OM).~ 1-t)'1l112-AI~A-4gc .e;5wM.-t."S/~. --V:f...tfl- - 17E:T8LM\---\~ too ~!\2-. L-JJg tlf l,JuJ-\'D4-~noJ 11J!Z. "Q,~ t( Q. ~'f 'fD01(O~ OF 11ZD3~. ?11\. 1+00 ;.<7~ t-lorz-.I~ 1''::2.01 \/ertr 1 "::::ID I . V\ =- 0, O~C; . 12.0 - o -____. v-l.t), -:: 1\1- /' _ - '\ \7 / .'''. / \ .. / . \".. 110 - Q 100:: I.Aq A 12- t.{? -S~'" V\ ''::;0:: zftl,~::: 0,0 I b .A=- 000'l.-- .12.:: 0%0:: Z f) 1.k1 (&0) (~)~/'>(().Ol ~'[z, ~ c7\3~7 ~4Cf? CXI00 - . O~'i ~V7f.~ v-L~. a..:: l\1.Q . 4 ()~ r; . ~ 1A-oo l'tu - 110 - \rI.4. -:: uti i! -.-~ . - ", - \l \ - - .".r- \ .r. ............/ --- .- ./" . -;70:::: Aj~'VJ:::: 19.014- .A-:;~o ~1-v .12.-= 0%7,-::' \,q QIOO -; I.AA (~O) (l.~J1-('>J( ~.OIA)'I~:: A~4~/ ,0"7<:; "Uhf; ---1 \.vL~. a. ~ \lA E qm =?-roo . l'kl - GL 00 ::. '70:: A('l/U)::'O,OI4- - _, vJ.7. -:: 111-..s /' '- \7 /' . k:: 0'0 0~ \\0- '" ,// .........--.--' fotd :\2.::. -(=?<7 -;; \ A l.,{tt (00)(1.~\~/?(O.OIA)dz.. :: r?~ur; 7 ~'76C!.-f7"""'-- . O~ t1 .lY1~-7 vJ.'7. a.. -:: !/-VL) . o o~ t? . ~Mro .-7m '7 +va 110 - _.___ w,tJ.;\o.z,~ ,,// '7o-::4k1.-c;-;{),OI4 1010 - "/" . . -- -- . k-;. t?!Jf(1.- ()lOU-; ~~~ (1?0)(\.i)t("(o.O(b)lf<-- -:: J,(O~7'?t;bi!.0 .12--: '7~AD:: I.~ · VI;(.-7 "J..-;. a ~ 1r><z-.9 ~ 10 -\--f>O 110 - .70;; 0~o -; 0,01"7 . A. -:; r?c? 0'" ( ;"\ ( \7/(, ( II .~. '7"/:?o ::1,0 ~" L \.~) ~ iO{.? ') 1--:; ~t?t '1CJPs > ~ 7b ~.....-- " \r.I.S.::' \Ofj.7 / _ \7 ./ '............// lOb - f() \. Act l>(IM - ,O~'1 . .. U0~ > \t4,~. fl.,:; \ 6~.s .,. -" . -'_.._._.'-~---' NOTES; (I) Soil'Croup lIa,?s are available at the offices of the Department of Public Works. (2)Wh~re actual conditions. deviate significantly from the tabulated impervious- ness values of 8~ or ~, the values given for coefficient C, may be revised by multiplying 8~ or ~ by the ratio of actual Imperviouspess to the tabulated imperviousness. However, In no case shall the final coefficient be less than 0.50. for clCaClj)le; . Consider commercial property on D soi I.rroup. Actual Imperviousness -5~ .Tabulated Imperviousness - So% , ' Revised C - ~.x 0.85 - 0.53 80 . '. lV-A-3 , APPEHDIX IX-B Re,v. SIll . ~;:1"J';";":;~ o:;~. --' ... .. ~;:~::".:._~ h~- .-- - -. . ." .# . - ''';' ... '0:- ~ .... .... ~ -I: ;: :.. i ~-.: :.t. ... :a ~ ..:; .'- "';. -' ;s: :: ." ~. . ~,.! ... .. ~ . : :! .. ~ i . ~ , '.' ... ~.:. -. ....- . -. .-.. .. .~.:.....,--:. .......::-.: ;.:.~~~. :.:.~ - - .-:_.:.......:: ":.: :.:::~'';~~'::. '~'';;''':: ....:.::~~~: . ~.~-;.;....:~ - ._.,-~-_.. .~_.......6~"""',,-.)o",:.' .""'~'.: .::."-..J'-. .......~.~ -~-~.':"-.-~-=---==':'=:"'~-- -' -:.. ... ..---....:......~~..:.~~.. :.--.~.,....::---=-...::"':_.~__ ._.;'" 1-'_. __.~~.:?~.:...~_. -.... _~~~ .....~ rfli~";~~ Iii. ~~~ Iq~ ~<---:--- ;'~ii "~P-:;l~ ~;}F.,........':'~"";:~ '.li'f:~~..:I".:;"3IIIC. IHiSitr;.~.~~~. ~t! :1~...:.!:..:._.. i1iJ;;" -. -:;. .-at.: I.~~.._._.- 1!ln~~~~~:~: ~~ r;;-~.,........,:.,_. .. ":?F -:...i.;;l_..: 11I!.'l~.'i"=:'--' '-.-. ~g ~~~._--. ~:,,". ~i:l ~-'. .:::~~,; I~t ~.7.;.:..':':"'= '.~_-=- ~~, .. ~ ~-=_.-r=- i~:! ~"-'-'-~:. :~.::. I ., ~~_..... .-""_ 11e~-.:...:-:....~ Il! ~"""'~+::::.:-.;?~'!.. '''I J~.____":"..'1 ~l~~ Ii ~~'! ..~-:.~ I'll'~' ~~-;=.r-;":~~'.~ r lir' ;;(:~''-'~-;:':' '1 -. i'.'-"'~.~-~' ]' .=~~~s:-~~ .' fJ'~ '-'.-'" : /. ,!!i; "'~.'.' .~r_4~::J::. f....r..t.~__..... :kJ' :::',"",,~"?"~;.."~"': ,'l' ~."......-.o::.;':""'"",=,-:; ';r. tP-';;;"7W"..~'" :::';.. · :..,' ~~~A~;' I i~: I ~~;.~ I ... -_.._~_.~~_ '1' ~ b~-<"~""- 'J ~:.l ." ~=.....:.:-;.: ..!J t.~ .::.~ry..:?..;.:. ;::H '~r:E:.~ ')'.:: --- .':'~-.-l.:"':.. ~. . . . .. : ::~lf ;.~~:~~~ ., ~ *~~-~. 'i f~ ~~~~ rm :;;.:~~&~ ;~j ~~~~~~ .i"l. :.-~"'. ~i:2":':>. ~"".'7 ~:...:<..,...,.- . 0: n..~.L.-~ _ -P.(1_ ~ ~---..-.. ~ ~~. ~.: s.~~~.~~ ~~~1i ~ e~.l~:;~:~ ljUI " _.~:{.1\'~ ~ ... - ~~~j. . .: ....: -..-. .. ~.~:a IJR.'BAJ bf2A,o.J A<..E.. 6J TIMEOFCONCENT1UTION - ~ . , . ICeo - . J. "Q.O :: s - :;... ..... "", .. Q. .!I '" .. .. - ,;. .. - 'i ~ ::'! 800 ~ , J:.. . ... i l: :, . 1100 80 .... - '., '" ... ~. .. .. II. oS ,; .. u c .. .. ~400 a CD-~ 'a. C -= .. > Q I -, .. a :; c 3 .5 u > .. t= 40'0 .. E ~ 'a C .:! :; .. Q . 200 o "gut.3-10 Overland u.n. alllowgragh. .' H 3000 EGtI/1TION (11..9L J~ .3{J~ Tc . . H lC. 7/m~ cI cO/1c=Inv'/o/7 L. L~n91h or wa/~rsh~d /I. f)1//~~/1C~ in ~/~val/;'n alan!? d'I'W/Y.. 510= Iln.. (S~.. /lpp.-ndJx y.8J J;. L C MI/~$ F~~" #O</rs Mlnul..... " .Nt) . Fe!~1 $"00/1 ~/J/1/J 2"/J/1 .3 IBd ~ I""" /tJ !JOO Boo 2 12/J roo GOo " 10/1 " .5 !ltJ $"/J(J , eo ~O" ~ 4 7tJ = ,,~ oJ .1 &0 300 '\.~~ '\. !J/J " 1..- " 2 ,. 4tJ , '\. .30 .. " lOa I So as 20 18 3000 , IG " I<< 1- " 2000 " 12 1800 , 1600 10 1<100 !J 12/J/J 8 ICJCJCJ 7 900 800 & 700 bot) 5 sot) 4- ~oo 300 .3 fo &J NOTE ~NATURALWATrnHEDS] Zt) R ADD TEN MINUTES TO , UCOMPUTEO TIME OF coj ~~TRATION_ ~=:::a..-=---_ 10 5 200 . H L 7C NOMOGRAPH FOR DETERMINATION OF TIME OF CONCENTRATION (Tel FOR NATURAL WATERSHEDS SAN 01 EGO COUNTY DEPARTMENT OF SPECIAL DISTRICT SERVICES DE 5 I GN MANUAL APPROVED ,3,;-/' /~4~. DATE /7./1/69 APPENDIX X-A V-A-10 Rev. 5/81 .' l- e: <: :;: u 2: ""' - V') :...J '. C-:l 'Z: .::> - I- ~ :::> a I >- l- V') :z "-' I- z: - . ----- - CJ >,.c "'.... OJ s- o 0.... .c 0 -u ~c VlO .... .... C .o~ '" '" -l< 10 >,1.- ~... ~ "0 13 '" ~ u-o-o >'''' .a .~ > ~ . C>,'" S- \0 10 ~1 S- S- "':1:-0 10 U ~ => C .c => => VI 0-..- <.> '" U '0 o:;">,~ VI....~ .<.: ~ ~ \0 OJ.... U OJ C- o ~ c C> I-Cc: u"" c:.. .~ 10 0 II . OJ OJ.....::J_ OJ "" r~ S- I- ~ .,. C 0:: C 0 C .,. 10 .... "'I N~ ~-O(J VI ... '" 0. 10 a.. a.. .... E1l.. Co ........ 0 .c s- -l< \ll '- 10 . -_ 0:::: ... .... => . OJ OJ u.c E~ ~ ~ C "0 . s.. ~ VI ..., OJ.... ~ OJ C ~ , -0 .~ ~ OJ OJ~ .10 e: 0:;". 0 0 >,OJ ~ C "OOJC s.. => 0 e: . 0. ... N Vl~ >,e: ~ 10 C c: ~>, ~ ~ 0 .. VI 10 ... S- o 0 OJ VI~ r---"0 .... e: ~<U"'Oo~ 10 .... .... .c e:IO 0 ro..c:cuo .... '" ... .... ... OJe: OJ .... c.~+)_ OJ ~.c 10 10 ....'" " ~ . S- :0 ... e: s.. c..... ... .... .c e: , """ e: .c 10 cs.._'"C => ~ .... .... C> .... C> >, N .... '- 10 U oos..c""O U ~ 0- Co => e: u a.. E c: u .~ -&t-'c..r.: CJ "'.... .... - 0 "'.~ e: .... ~ ~ .... u s...c u u s.. .c OJ '" - ~ 0- r.:J""GJe: 0 Co.... '" CJ .c . ....0 => . . 0. 0- ......., s.. L"') s.. _s.. s.. . ... VI .. cr c: . 0. <: ....C.. c.. . .,. a. a.... '" VIe: E. OJ .... \0 <C O-=> - s..- s.. OJe: _ 0 , s.. s.. 0.. s.. - 0",0-0 .c VI .~ . '" e:'~ ~ 0 IJ.. ~ it .... 0 u E 0..,..- e: - s...... s...c -~ "'.... IJ.. 0 .... QJ to 10_ co '" .s:: s.. .s:: u ~ e:IO "0 "0 ::z:: s.. E .... '" "0 _ U c: '" N '" it VI 0- ~ e: ..,-~'" '" OJ 10 OJ ~O 0 .... .... e: s.. GJ to 0'1 VI N '" .s:: ... ~ ~ u VI 0 E..c: '" ::Jo..- =>... CJ ... ... "'... '" .... OJ . => . ~ 0 .l1J C VI ....,10 OJ n 100 .... OJ 10 ~ ...., . ... s...v.t:ft;SQJ "'C..c:..c: 0 ~.... s..~ .c.s:: u OJ '" "0 U U lL.NI-=::'O <~..,..... a.. 0 CJ Co 1-'" .... V') 0- <C ... - OJ ~ s.. a. .... ~ ~ ~ ~ ~ a. ~ ~ ~ ~ ~ CJ ~ N .., .,. '" <C CJ ~ "" .., .,. co ..... 00 >< ..... 0-< >< ......". "tl 0....-4 ~ Z I .~ g: '"f ~ P-. > ~ <:..... '" ...-'~-~- ,: ~ L-:.::: C ..... t: ~ ~ c 0 ... .... :t: ... U1 ..... .., ~ ,..". ... '" c .... c ..... P- .... ~ .... :z u ~ C >, <> ... ... c '" .... c- o "- .. .... c, ... ..". () ... <:s' ..". ... :t: ... C ::J ..... ..... '" c n . . . -0 H ..... "- Cl .:,. . . -~' c .~-~ 0 ' . .... ... '" ::J 0'" 6-Hour Precipitation (inches) '. OU'1Ot.nOU'l CJ '" CJ '" C) . . . ~ \0 ..., .... ~ .., , , 'II, " , , l 1" , .; " ... 1!1 N " .,-; ~ CJ ..., C> '<T" C> .., C> N U'> , ~ , I , ~, -j ..' l-! , , ..... d'; '." 'l.,.1 ..:: I. '" .1;.' I,': I ",II I! !I i;1 "!0I II C> ~ IV-A-14 , , ',- ~.--r ; ;; I I;,. i I " . t-' " . . : ~ ;. ! " ,: ..... ,;Id;: " ~ ~ .d ..: .. .. ... ~ rI .... ~-- ~ ~ "'1 I ~~lIjU t) Al i Su~nu T r: N APPENDIX XI .... r ..JnOIl L . '" ~ - - I .... '^ [ . --::>,. c:: t:._ - b3 c .\ - 0 ~ - - -- 0 ~ . '"" CO L !- ~ - [:!.. ~ - LW c.J >- f r.t..l I 0 ~ 0 C!- ..- I ~ -c~ 0 :::> . en ..... 0 -I . ~~ d: - - - I > L._ (,0 ::l 0 <::> ~ .... .1. cz: 0- - 0 '^ ~ c.n I..l..J - >- \ " I c::::> u 0 c-... s: - 0 ~ 0: .. 0 l .. '"" "...- 1, 0: " ~ "';: O~ I. 1=" ~ ~ ... "'/ ~ w ..~ ;j 0" :r: :s. -0 '^ f~ % D:~- ... tu :.t'" .:r I 0) .. - 0 ~ ~<z % . o u> o. .. U ig .... l- ra. !!.J o~ .r 0 ;: 0 L '? L.. (; ~ - C> ... -. - ..- -- CO ....:z: . ... .. . ;c::, '- - ....< ~ 0 - '. w....- - Il\ : - <.. - OV> ..... . Il\ 'L ..... 00 0 %"--' ..:r I .... Z II ..... [. <00 . II: ~ u II> c< ..... I <,,- "-~!;;: ..... I 0.. i~ . w<o 01,110 . c" . , ~i=u . 'uj g G . ,",,0 :i .J :P: _<0 <:i ::>0..0 ~a 0....-' UQ"- 1=:: ; <- I ,,0 I t I -' < ;:; I " .. .. II-A-7 I' '0. I , . 1 , . I . rI':!. 0 c:: '0 ~ I - ::c l- I ~ ~ l- N I - c:: t:l. <: - '"' L.U >- I . L:.J . ~ CJ ~ CJ - I ,.",- - l..'~ .-J CJ 0 (/) I - -- -I I ~ . ~ > .1 N ~ -I c:: Co c::: Cl I !..l.J C,r') >- '\ I c::::J Cl c--.. c::J \ ~ , I '. . ob 2: 0, .... !;: Of- ..,.... w:z: .....< 0.... " Zl1...J <00 '" c=: 11.~!z 0"-'0 2:<.> >-f- f-C::o 2:<0 :>"'0 OLLl~. UOl4o' . <:: z:' ~ I.. ~ '^ .:r - o .... '^ . .., ..,. I 'I . ~, "-, . - - c ..... - !..-. . ..... ..- .. u 5= '" c .: r'"f.. '" .. 'I I ",to ~< ." ". ~.. t:l !- < U W'" .v z:! """'" =!- t:J ... < :;: ~ & ::=::u; 0.0 U ~-:.: .. c...::~ . 0;= ! :.. ~:a . Z i--= :- :a1 0( ~ .. ::c a 0 I. t- z.:III II: < U < \Ii': c.. ~,. t:J .( a Q" . . U.u. ",0 . .JJI: ::l o(~ "'.. o. 0:.. <- Kg to . .. < ii .. .. . '^ .:r .." ~ - o .., II-A-13 1/;. APPENDIX 175 OF CULVERTS r t I I '. '. ~ .. ~ ~, % U !t (10"1 ~L? !t e I ~ E ! ~ , ! .. ~ u II E ~ ~ ~ ~ . 0 Page I CHART l liar CotTug;it~ Meul Pipe Projttting ........................... ......... ..188 liar CotTug;ited Metal Pipe Projecting ...................... ........... .189 111;1! CotTugated Metal Pipe Headwall ................................... ....190 liar Corrugated MeuJ Pipe. Headwall . ................................ ..191 ul..r Corrugated Metal Pi~ Headwall ................ ..192 .ul\'er15 Flo.....ing Full. n =- 0.02............193 "0 ... .11 10,000 ',000 '.000 1.000 <,000 1,000 (I) (3) [U''''LI .. ...,_.........1 ........ ' I. 1<< ill .. I. ,," .. .. ... ... ... ,..-------- 4- ... I.' U 1'1 ., co .. 110 t,_ .. '01 ,. ........ ,hs for Circular' Corrugated Metal -Structural Plate .. ,. ',000 ... ----r:~ .. /' /' ././ ....v ..~ ./ tOO ........ ./ ./ -r::' Ie Circular Corrug.l.t~ Metal Pipe. , ................ .194 ll~ Circular Corrug.lled Metal Pipe. ... ...................................195 CIrcular Corrugated Met..al Pipe, ...............................1% :~ Circular Corrug:Hed Metal Pipe. " ................. ...197 14galed Metal Pipe Cuhert.!; Flowing full. ..... .198 ~ l. t. n '00 '.1 0.1 ~ E ~ ~ ~ ~ . o !t. 7- ,. . ~ U E ~ ~ c . o . ~ % o .., .. e ./~ .1 / : /' c . u ~ o 100 10 10 10 H. [NTRANCE .0 D.SCAU YYP'E '0 "1 ...-.......,. __" to '" .-,........ -..II IH --... ....,..'... ,. '.0 '.0 .. .1 .. .1 .1 .1 .T .T .T .< .1 t. ,phs for Corrugoted Metal Pipe- Culverts II )C-Arch Cul\'cr15 with Inlet CDntwl......I99 nugJ.ted MC'tal Pipe - Arch, Projecting . .................200 rTugated Met..al Pipe - Arch. Projecting - ......................... ..201 .rrugaled Metal Pipe - Arch. HCidwall . ................................202 .uugated Metal PiJX' - Arch. Hadwatl . ............................ ...203 _ Arch Culveru Flo\\'ing Full. n = 0.024. . .204 rugated Met41 PiJX - Arch Cull'ttU, ; Full,n = 0.0327 toO.0306..........,...,205 " '0 t1 .0 < I I < t< 1'..._.....ell"..... ..."......'.......111 t.. ..."........1_...:......... .-.........-...... .......... II , " t II .th for Various Discharges ~raphs wbeSl outlct is unsubmersai) ................................... .....206 I Horizontal. Critia] Depth. . . . . . . . . , .: . . .207 i Vertiol, Critical Depth........... ... ....208 ritiol I>cpth....,....,...................!09 h. Critiall Drpth........,., ..... .........210 .1 .1 .1 Ul It HEADWATER DEPTH FOR CONCRETE .PIPE CULVERTS WITH INLET CONTROL .........-."'l:......_.... .