1997-5246 G
? IG <;
---------------.
Category
521{~
Street J\ddress
--~-----------_._---_. ---.-----------
I
/67
) FS¿//f
Serial #
Name
.__.J~~~,.
Plan ck. #
Description
Year
'\
~
CONSTRUCTION 1ÈSTING & ENGINEERING, INC.
ENGINEERING, INc.
SAN DIEGO, CA .
2414 Vineyard Ave.
Suite G
FMondido, CA 92029
(760) 74M955
(760) 746-9806 FAX
RIVERSIDE, CA
490 Eo Prinœland Ct.
Suite 7
Corona, CA 91719
(909) 371.1890
(909) 371-2168 FAX
VENTURA, CA
1645 Pacific Ave.
Suite 105
Oxnard, CA 93033
(805) 486M75
(805) 486-9016 FAX
TRACY, CA
392 W. Larch Rd.
Suite 19
Tracy, CA 95376
(209) 839-2890
(209) 839-2895 FAX
LANCASTER, CA
42156 10th St W.
Unit K
Lancaster, CA 93534
(805) 726-9676
(805) 726-9676 FAX
October 28, 1997
CTE Job No.1 0-2515
Mr. Mark Copeland
Court Concepts
12260 Katydid Circle
San Diego, CA
Telephone: 619/538-3398
Subject:
Limited Soils Investigation
Proposed Tennis Court
3374 Rocking Horse Circle
Encinitas, California
IJJfI & fI 0 rv; fI
E:NC/fv IIOV 70 1997 [jJ
c £:ERIN
IJy OF E~7NL:RV'CE:S
IT AS
Mr. Copeland:
At your request we have completed our limited investigation of the referenced site to characterize the
surficial materials and develop recommendations for the proposed tennis court improvement. Our
investigation activities included surficial reconnaissance, excavation of exploratory test pits, soil
sampling, laboratory testing, and reference review.
#-
1.0 Site Description
The property of the improvement is at 3374 Rocking Horse Circle in Encinitas, California. Land use
in the surrounding areas consists generally of residential development. Figure I shows the
approximate location of the site.
The property ranges in elevation from 274 to 300 feet above mean sea level (msl) and consists of a
graded pad and a lower undeveloped yard connected by an approximate 2: I (horizontal:vertical)
slope. The graded pad is in the northeast and central portion of the property at approximately 300
feet above ms!. The upper pad supports a single family residence, swimming pool and associated
improvements (drive/parking areas, landscaping, etc.). The upper portion of the slope that descends
from the pad is covered with "ice-plant"or similar vegetation. The bottom portion of the slope is
scattered by natural vegetation and several small to medium size trees.
The lower yard is on the west portion of the property and ranges from 278 to 290 feet above msl
(south to north). The lower pad is undeveloped except for a wood fence. The proposed tennis court
GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION
'\
"\
Limited Soils Investigation
Proposed Tennis Court
3374 Rocking Horse Circle, California
October 28, 1997
Page 2
Job No. 10-2515
will be constructed in the south half of the lower yard. Figure 2 shows the approximate locations of
the existing and proposed improvements.
2.0 Exploratory Pits and Reconnaissance Observations
Four exploratory pits were excavated on October 20, 1997 to depths between approximately 2 and
3 feet below grade. Approximate exploratory locations are shown on Figure 2. Soils encountered
in the excavations are shown on the logs provided in Appendix A.
Based on information obtained from our test pits and reconnaissance, clayey surficial soils are
considered unsuitable for support of the proposed construction. We recommend that these materials
be removed and replaced with granular fill materials before construction improvements.
3.0 Laboratory Investillation
Laboratory tests for in-place moisture and density and expansion index determination was performed.
From expansion testing, surficial soils are considered to be highly expansive. Laboratory methods
and results are provided in Appendix B.
4.0 Gradinll. Earthwork. and Recommendations
4.1 Site Preparation
Upon commencement of construction, Construction Testing and Engineering, Inc. should
continuously observe the grading and earthwork operations for this project. Such observations are
essential to identify field conditions that differ from those predicted by this investigation, to adjust
designs to actual field conditions, and to ensure that the grading is in overall accordance with the
recommendations of this report. Our personnel should perform adequate observation and sufficient
testing of fills during grading to support the Geotechnical Consultant's professional opinion regarding
compliance with compaction requirements and specifications contained herein.
Before grading, the site should be cleared of any existing debris and other deleterious materials.
Expansive, surficial eroded, desiccated, burrowed, or otherwise disturbed soils should be removed
to the depth of competent soils. The estimated depth of removal is approximately 36 inches below
the proposed finish-grade. Expansive materials not suitable for backfill should be disposed of off-site
or in landscape areas away from improvements. All removed organic materials should be disposed
of at a legal disposal site. The geotechnical consultant should verify that the proper site preparation
has occurred before fill placement occurs.
~
Limited Soils Investigation
Proposed Tennis Court
3374 Rocking Horse Circle, California
October 28, 1997
Page 3
Job No. 10-2515
In addition to removals described above, areas to receive hardscape improvements should be
overexcavated two feet below the proposed finish sub grade elevation and replaced with properly
compacted fill.
4.2 Site Excavation
Excavations in site materials should generally be accomplished with heavy-duty construction
equipment under normal conditions, although localized dense zones may be encountered. Irreducible
materials greater than three inches should not be used in fills on the site.
4.3 Fill Placement and Compaction
As indicated above, the geotechnical consultant should verify that the proper site preparation has
occurred before fill placement occurs. Following removal of loose soils, areas to receive fills should
be scarified 9 inches, moisture conditioned to above optimum moisture content, and properly
compacted. Fill to be placed under the proposed tennis court should be compacted to a minimum
relative compaction of 95 percent as evaluated by ASTM D1557 at a moisture content between
optimum and 4 percent above optimum. General fill should be compacted to a minimum of 90
percent. The optimum lift thickness for backfill soil will be dependent on the type of compaction
equipment used. Generally, backfill should be placed in uniform lifts not exceeding eight inches in
loose thickness. Backfill placement and compaction should be done in overall conformance with
geotechnical recommendations and local ordinances.
4.4 Fill Materials
Clayey surficial soils are not considered suitable for use as fill in improvement areas. Non-expansive
to very low expansion soils derived from the on-site soils are considered suitable for reuse on the site
as compacted fill. If used, these materials must be screened of organic materials, debris, and
materials greater than three inches in a maximum dimension.
Imported fills should have an expansion index less than or equal to 30 (per UBC 18-I-B) with less
than 30 percent passing the no. 200 sieve. Imported fill soils for use in structural or slope areas
should be evaluated by the soils engineer to determine strength characteristics before placement on
the site.
4.5 Drainalle
Surface runoff should be collected and directed away from improvements by means of appropriate
erosion reducing devices and positive drainage should be established around the proposed
improvements. Positive drainage should be directed away from improvements at a gradient of at least
2 percent for a distance of at least five feet. The project civil engineer should evaluate the on-site
drainage and make necessary provisions to keep surface water from affecting the site.
~
.,
Limited Soils Investigation
Proposed Tennis Court
3374 Rocking Horse Circle, California
October 28, 1997
Page 4
Job No. 10-2515
4.6 Tennis Court
We understand the tennis court will consist of a 5 inch reinforced concrete slab. To mitigate
shrinkage cracking we recommend the concrete mix design utilize larger aggregate and a low
water/cement ratio. To aid in control of cracking we recommend placement of control joints at
regular intervals. We recognize that placement of joints other than beneath the net can interfere with
game play. In consideration of the court's function we understand that joints other than beneath the
net are not proposed. While this may improve court performance, uncontrolled cracking may
develop. Placement and curing of concrete should be performed according to American Concrete
Institute guidelines. The tennis court should be designed by the project structural engineer or tennis
court design specialist.
5.0 Limitations
The field evaluation, laboratory testing and geotechnical analysis presented in this report have been
conducted according to current engineering practice and the standard of care exercised by reputable
geotechnical consultants performing similar tasks in this area. No other warranty, expressed or
implied, is made regarding the conclusions, recommendations and opinions expressed in this report.
Variations may exist and conditions not observed or described in this report may be encountered
during construction.
Our conclusions and recommendations are based on an analysis of the observed conditions. If
conditions different from those described in this report are encountered, our office should be notified
and additional recommendations, if required, will be provided upon request. An evaluation of existing
slopes was beyond the scope of this investigation and was not performed.
We appreciate this opportunity to be of service on this project. If you have any questions regarding
this report, please do not hesitate to contact the undersigned.
Respectfully submitted,
ENGINEERING, INe.
dr'/ ~
Sean
Senior Project Engineer
Dan Math
Staff Engineer
~
.
\'
\
\
\
FOIm
E51
~;;- .
I
L-
YOlt
~
0
I
0
1/4
I
1320
1 MILES
~
5280 FEET
\/. CONSTRUCTION TESTING & ENGINEERING, INc.
Q.. GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION
~414 VINEY ARD AVENUE. STE G ESCONDIDOCA. 920~9 (760) 746-4955
1/2
I
2640
~OIIR(,F' THOMAS BROTHERS MAPS
1996 SAN DIEGO EDITION
SITE INDEX MAP
PROPOSED TENNIS COURT
3374 ROCKING HORSE CIRCLE
ENCINITAS. CALIFORNIA
CTE JOB NO:
10-2515
'GRAPHICS I' PROJECTS' I 0-~5 I 5INDEXMAP.CV5
DATE:
10/97
U E:
1
ø I .
~
~
n
~
~ .
0
~.
G
~
~
~,
~
R
n
~
ROCKING HORSE C1RCLE
-------------Ä\ -----------------
\
\
\
\
\
\ _l--
t-------
\
\
\
\
\
\
\
\
\
\
\
DRIVEWAY
WOOD FENCE
,,/
/"
"
/"
,,"
~~ /
~lS - ...'"
ÇA COúR1' ,; /'
'ýj /,.'"
TP-2 ,;,;
\ ------
----
...----
1y~3
@
STOCK PILE
TP-I APPROXIMATE
IZI TEST PIT LOCATION
CONSTRUCTION TESTING & ENGINEERING, INc.
GEOTECHNICAL AND CONSTRUCTION ENGINEERING TE:mNG AND INSPECnON
2414 VINEYARD AVENUE. STE Ci ESC'oNDIDO CA 92029 (760) 746-4955
EXPLORATION LOCATIONS
STUART RESIDENCE
3374 ROCKING HORSE CIRCLE
ENCITIT AS, CALIFORNIA
10-25] 5
NO SCALE
'ATE 10/97 I FIGURE 2
RET AINING WALL
3/4" GRAVEL SURROUNDED
BY FILTER FABRIC (MIRAFI
140 N, OR EQUN ALENT)
) -
l'MIN
FINISH GRADE
WALL FOOTING
MINIMUM 6" LAYER OF
FIL TER ROCK UNDERLYING
PIPE
f~'t ~\ CONSTRUCTION TESTING & ENGINEERING, INe.
# <>,. GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECllON
~ 2414 VINEYARD AVENUE, STE G ESCONDIDa CA. 92029 (760) 746-4955
RETAINING WALL DRAINAGE DETAIL
STUART RESIDENCE
3374 ROCKING HORSE CIRCLE
ENCINITAS, CALIFORNIA
\\GRAPHICS IIPROJECTS\10-22S8\RETAININGWALL,CV5
~
ofÞ
APPENDIX A
EXPLORA nON LOGS
PROJECT:
CTE JOB NO:
LOGGED BY:
ç
0
~
.È'
'"
c
"
Q
è
Q
112.4111.4
:¡
~
~
.e
...
.5
~
<¡¡",CONSTRUCTION TEST1NG & ENG1NEER1NG, lNC
'1-<>., GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION
2414 VINEYARD AVENUE, SUITE" ESCONIJIDO CA 92029 (7601 746.49\;
STUART RESIDENCE -- TENNIS COURT
10-2515
D, MATH
EXCAVATOR:
EXCA V A TION METHOD:
SAMPLING METHOD:
CTE
HAND
BULK & DRIVE SAMPLING
EXCAVATION DATE.
ELEVATION:
10120/97
õ
,l:J
e
;>-.
00
<Ii
U
<Ii
;j
Q/)
.3
0
:.a
¡;.
è5
CL
TEST PIT LOG: TP-l
DESCRIPTION
~2 inches of grass and root materials
DISTURBED SOILS/FILLS:
Dry to moist, dark reddish brown, moderately plastic, sandy CLAY, with roots
Moist, dark brown, sandy CLAY with gravel
Increasing sand with depth
Total Depth = 24 inches
.
.
Laboratory Tests
EI
MD
PROJECT:
CTE JOB NO:
LOGGED BY:
ç
t)
5
Þ
"¡¡;
,::
"
0
B
~
~
"
~
'õ
~
't",CONSTRUCTION TESTING & ENGINEERING, INC.
'1-", UEOTEClJNICAL AND CONSTRUCTIUN ENGINEERINU TESTING AND INSPECTION
..
2414 VINEYARD AVENUE, SUITE l; ESCONDIDO CA .202. (760) 746.4."
STUART RESIDENCE -- TENNIS COURT
10-2515
D, MATH
EXCAVATOR:
EXC A V A TI0N METHOD:
SAMPLING METHOD:
Õ
J:J
E
;>-.
C/)
<Ii
U
<Ii
;:j
OÐ
.3
t)
:.a
g
0
SC
CTE
HAND
BULK & DRIVE SAMPLING
TEST PIT LOG: TP-2
DESCRIPTION
~ 2 inches of grass and root materials
EXCAVATION DATE:
ELEVATION:
10120/97
Laboratory Tests
DISTURBED SOILS/FILLS:
Dry to moist, light brown, clayey SAND with gravel and cobbles
Total depth = 22 inches
FIG
::¡,^,CONSTRUCTION TESTING & ENGINEERING, INC.
'I
C~ GEOTECHNICAL AND CDNSTRUCTION ENGINEERING TESTING AND INSPECTION
1414 VINEYARD AVENUE SUITE G ESCONDIDO CA 'non 17(,0, 141,.4'1;;
CTE
HAND
BULK & DRIVE SAMPLING
STUART RESIDENCE -- TENNIS COURT
10-2515
D. MATH
EXCAVATOR:
EXCAVATION METHOD:
SAMPLING METHOD:
PROJECT:
CTE JOB NO:
LOGGED BY:
10/20/97
EXC A V A TION DATE:
ELEVATION:
ç
0
-=
.f'
~
...
~
ë
.c
E
;>,
v;
""
U
""
~
...
Q. ...
E Co
- I'" ;>,
... r/'. '-
... .
6
TEST PIT LOG: TP-3
~
~
!!
::>
t:
.ë
¿
Laboratory Tests
O/
q
"
:.ë
Co
'"
l-
e
"
~
DESCRIPTION
0
Dry, light brown, silty clayey fine SAND, with II2 to 1-II2 rocks
Soil Pile
9
PROJECT:
CTE JOB NO:
LOGGED BY:
Q
<.)
~
,g
'"
c
0)
Q
B
~
Z!
~
'õ
~
;tJ>-CONSTRUCTION TESTING & ENGINEERING, INC
><0 GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION
..
2414 VINEYARD AVENUE. SUITE G ESCONDJDO CA. 92029 (760) 746.49\5
STUART RESIDENCE -- TENNIS COURT
10-2515
D, MATH
õ
~
E
;..
"-'
vi
cj
vi
~
Ol)
j
0)
ri ¡ 0)
.<:: ¡;¡ Co,
~ "-' þ
;9 -'" ¡j
Co, "" :>
0) ::s '¡::
Q ~ Q
<.)
:E
~
ð
0
SC
...
EXCAVATOR:
EXCAVATION METHOD:
SAMPLING METHOD:
CTE
HAND
BULK & DRIVE SAMPLING
EXCA V ATION DATE:
ELEVATION:
10/20/97
TEST PIT LOG: TP-4
DESCRIPTION
Existing Grade
Grass and root material
DISTURBED SOILS/FILLS:
Dry to moist, light brown, clayey SAND,
with gravel and cobbles
Moist, dark brown, sandy CLAY, with gravel
Laboratory Tests
.
(:
. '
APPENDIX B
LAB ORA TORY METHODS AND RESULTS
. '
..
~
~
APPENDIX B
LABORATORY METHODS AND RESULTS
Laboratory Testinll Prollfam
Laboratory tests were performed on representative soil samples to detect their relative engineering
properties. Tests were performed following test methods of the American Society for Testing
Materials or other accepted standards. The following presents a brief description of the various test
methods used.
Classification
Soils were classified visually according to the Unified Soil Classification System. Visual classifications
were supplemented by laboratory testing of selected samples according to ASTM D2487. The soil
classifications are shown on the Exploration Logs in Appendix B.
Expansion Index
Expansion testing was performed on selected samples of the matrix of the onsite soils according to
Building Code Standard No. 18-2. Expansion Index results are reported in Appendix B.
In- Place MoisturelDensity
The in-place moisture content and dry unit weight of selected samples were determined using
relatively undisturbed chunk soil samples. The dry unit weight and moisture content are shown on
the attached exploration logs and are shown in Appendix B.
ff
'\
if:
l ~~CONSTRUCTION TESTING & ENGINEERING, INC,
l" ~" GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION
,-° 2414 VINEYARD AVENUE. SUITE G ESCONDIDO CA. 92029 (760) 746.4955
LOCATION
TP-l
LOCA nON
TP-l
CTE JOB NO: 10-2515
EXPANSION INDEX TEST
UBC 18-2
DEPTH
(feet)
EXPANSION INDEX
1-2
101.0
MOISTURE AND DENSITY TEST
DEPTH
(feet)
MOISTURE CONTENT
(%)
2-3
11.4
EXPANSION POTENTIAL
IDGH
DRY DENSITY
(pct)
112.4
FIGURE:
B-1
~
CONSTRUCTION 1ÈSTING & ENGINEERING, INC.
SAN DIEGO, CA .
2414 Vineyml. Ave.
Suite G
FMondido, CA 92029
(760) 74M955
(760) 746-9806 FAX
RIVERSIDE, CA
490 E. Prinœland Ct.
Suite 7
Corona, CA 91719
(909) 371.1890
(909) 371.2168 FAX
VENTURA, CA
1645 pacific Ave.
Suite 105
Oxnard, CA 93033
(805) 486M75
(805) 486-9016 FAX
TRACY, CA
392 W, Larch Rd,
Suite 19
Tracy, CA 95376
(209) 839-2890
(209) 839-2895 FAX
LANCASTER, CA
42156 10th St W.
UnitK
Lancaster, CA 93534
(805) 726-9676
(805) 726-0246 FAX
September 14, 1998
CTE Project No. 10-2515
Mr. Mark Copeland
Court Concepts
12260 Katydid Circle
San Diego, California
Subject:
Report of Testing of Compacted Fill
Proposed Tennis Court
3374 Rocking Horse Circle
Encinitas, California
Dear Mr. Copeland:
At your request, we have prepared this report documenting our observations and compaction testing
during grading operations at the referenced site. The attached report discusses the findings of our
investigation activities and provides geotechnical recommendations for future improvements and
construction.
If you have any questions regarding our findings or recommendations, please do not hesitate to
contact this office. The opportunity to be of service is appreciated.
Respectfully submitted,
CONSTRUCTION TESTING & ENGINEERING, INC.
~ßD
Thomas A. Gaeto, RCE #40182
--~-~{-(C~\.
_/'-~ \~.\". \~ \\\'\'.\
.... 1\, \,~,.-- "c' .\
;\.~/ 9 r\
'.---.---"
GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION
CONSTRUCTION 1ÈSTING & ENGINEERING, INC.
SAN OlIGO, CA . RIVERSIDE, CA . VEN'I1JRA, CA . TRACY, CA
2414 VIney2ni Ave. 490 E. Prinœland Ct. 1645 PxiIIc Ave. 392 W, Larch Rd.
SuIte G Suite 7 Suite 105 Suite 19
FMondido, CA 92029 Corona, CA 91719 Oxnard, CA 93033 Trxy, CA 95376
(760) 746-4955 (909) 371.1890 (805) 486-ó475 (209) 839-2890
(760) 746-9806 fAX (909) 371.2168 fAX (805) ~9016 FAX (209) 839-2895 fAX
REPORT OF TESTING OF COMPACTED FILL
PROPOSED TENNIS COURT
3374 ROCKING HORSE CIRCLE
ENCINITAS. CALIFORNIA
PREPARED FOR:
MR. MARK COPELAND
COURT CO\iCEPTS
12260 KA TYDI D CIRCLE
SAN DIEGO. CALIFORNIA
PREPARE) BY:
CONSTRUCTION TEST£NG & ENGINEERING, INC.
2414 VINEYARD A VENUE, SUITE G
ESCOND£DO. CA 92029
CTE Proj~ct No.1 0-2515
LANCASTER, CA
42156 10th St w.
UnilK
Lanaster, CA 93534
(805) 726-9676
(805) 726-9676 FAX
Septt:mber 14. 1998
GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION
Report of Testing of Compacted Fill
Proposed Tennis Court
3374 Rocking Horse Circle, California
September 14, 1998
CTE Project No. 10-2515
1.0 SITE DEVELOPMENT
The property of the improvement is at 3374 Rocking Horse Circle in Encinitas, California. Land
use in the surrounding areas consists generally of residential development. Figure 1 shows the
approximate location of the site.
The property ranges in elevation from 274 to 300 feet above mean sea level (msl) and consists of a
graded pad and a lower undeveloped yard connected by an approximate 2: 1 (horizontal:vertical)
slope. The graded pad is in the northeast and central portion of the property at approximately 300
feet above msl. The upper pad supports a single family residence, swimming pool and associated
, improvements (drive/parking areas, landscaping, etc.). The upper portion of the slope that descends
from the pad is covered with "ice-plant" similar vegetation. The bottom portion of the slope is
scattered by natural vegetation and several small to medium size trees.
The lower yard is on the west portion of the property and ranges from 278 to 290 feet above msl
(south to north). The lower pad is undeveloped except for a wood fence. The proposed tennis court
will be constructed in the south half of the lower yard.
2.0 TREATMENT OF ASSOCIATED IMPROVEMENTS
The tennis court pad was overexcavated approximately three feet below finished surface. At that
depth, the western portion of the pad was found to contain colluvial soils. This office recommended
that the clayey soil be removed and replaced with properly compacted fills. To contain costs at the
risk of increasing future distress, the owner elected not to remove the clayey materials.
3.0 FILL PLACEMENT
Compacted fills were placed at the site to prepare for the construction of the proposed tennis court.
Fill material was imported from offsite sources. Fills were generally placed in uniform compacted
lifts at or above optimum moisture content. Grading operations were performed using standard
heavy-duty construction equipment. Fill placement for the improvements occurred between June
18, 1997 and June 26, 1998.
4.0 TESTING
Testing was generally performed to supplement field observations in promoting compliance with
the applicable project requirements. Testing of compacted fills was conducted between June 22,
1997 and June 26, 1998. Field testing of the compacted fill material was conducted in accordance
with ASTM D2922 and D3017 (nuclear method). Results of the field testing suggest that fill
\\Cte _server\Projects\ I 0-2515\CRRPO2,doc
Final Report for Testing of Compacted Fill
Proposed T I:nnis Court
3374 Rocking Horse Circle, California
Jul" 13. Il)l)g
.
Page 2
CTE Project No. 10-2515
density (by test method ASTM 0-1557). Tabulated results of the field compaction testing
performed are provided in the attached Table I. Laboratory determination of the reference
compaction values for the fill materials are provided in Table n. Approximate test locations are
shown on Figure 2.
5.0 TENNIS COURT SLAB
5.1 Tennis Court Slab
We understand the tennis court will consist of a 5 inch reinforced concrete slab. To mitigate
shrinkage cracking we recommend the concrete mix design utilize larger aggregate and a low
water/cement ratio. To aid in control of cracking we recommend placement of control joints at
regular intervals. We recognize that placement of joints other than beneath the net can interfere with
game play. [n consideration of the court's function, we understand that joints other than beneath
the net are not proposed. While this may improve court performance, uncontrolled cracking may
develop. Placement and curing of concrete should be performed according to American Concrete
Institute guidelines. The tennis court should be designed by the project structural engineer or tennis
court design specialist.
6.0 AGGREGATE BASE
All aggregate base materials where hardscape impl"ùvements are to be placed should be compacted
to a minimum relative compaction of 95% of the laboratory standard at or above the optimum
moisture content.
7.0 ADDITIONAL CONSTRl:CTION OBSERVATION
All additional grading and backfilling should be observed and tested by CTE to assure conformance
with recommendations presented herein. All footing trenches should be examined before placement
of steel reinforcement.
8.0 SURFACE AND SUBGRADE DRAINAGE
Foundation and concrete-slab-on grade performam:\.: dl:p\.:IKis gn~atly on how well the runoff waters
drain from the site. This is true both during construction and over the entire life of the structure.
The ground surface around structures should be graded so that water tlows rapidly away from the
structures without ponding. The surtaœ gradient nL'\.:ded to do this depends on the landscaping type.
In gem:ral. the paVt:ments and tlowerbeds within live feet of buildings should slope away at
'ell' SF{ VFR''{( )JI'l'!S, 111-251 ~\CR{'1)2 J",
Final Report for Testing of Compacted Fill
Proposed Tennis Court
3374 Rocking Horse Circle, California
July 13, 1998
Page 3
CTE Project No.1 0-2515
In general, the pavements and flowerbeds within five feet of buildings should slope away at
gradients of at least two percent. Densely vegetated areas should have minimum gradients of five
percent away from buildings if doing so is practical.
Planters should be built so that water from them will not seep into the foundation areas or beneath
slabs and pavement. In any event, the site maintenance personnel should be instructed to limit
irrigation to the minimum actually necessary to sustain the landscaping plants properly. Saturated
zones may develop should excessive irrigation, waterline breaks, or unusually high rainfall occur.
Consequently, the site should be graded so that water drains away readily without saturating the
foundation or landscaped areas or cascading over slope faces. Potential water sources, such as water
pipes, drains, and the like should be frequently examined for signs of leakage or damage. Any such
leakage or damage should be repaired promptly.
9.0 LIMITATIONS
As limited by the scope of the services that we agreed to perform, our opinions presented herein are
based on our observations, test results, and understanding of the proposed site development. Our
service was performed according to the currently accepted standard of practice and in a way that
provides a reasonable measure of the compliance of the grading operations with the job
requirements. No warranty, express or implied, is given or intended with respect to the performance
of the project in any respect. Submittal of this report should not be construed as relieving the
grading contractor of his responsibility to comply with the project requirements.
The opportunity to be of service is appreciated. If you have any questions regarding testing
conducted, observations made during construction or recommendations presented herein, please do
not hesitate to contact this office.
Respectfully submitted,
C~~ST VCT!. 0. ~../.,:~.: ~.¡.:N...?~.~...y",.,E...N~.. INEERING, INc.
3~ . ~~.F,~~:;o ~~~.:~
: ¡ r::~"
i \ ,~c.-'!"J (1"'1'" ;.;J Ji
,\:.~:\~t;f~-{'~JD¿G ù l
\ J' '" (J"",., .,~I/
"<~~:,:.~~~~:~~~~~;/
rdb:jcg:bhs
\\Ctc_scrver\Projects\IO-25 I 5\CRRPO2,doc
REFERENCES
1.
Construction Testing & Engineering, Inc,. 1997. "Limited Soils Investigation, Proposed
Tennis Court. 3374 Rocking Horse Circle. Encinitas. California" [Consultant Report].
Icn - 'III{ VI'IU'RI )jl-:l"T'I' III.!~ I,.('RRI'II! lI..,
TABLE I
COMPACTION TEST SUMMARY
Job Name: PROPOSED TENNIS COURT Job No. 10-2515
Job Address: ENCINIT AS CALIFORNIA Date: 7/6/98
Date Test Location Elevation Density Moisture Relative Soil
No. (See map) Feet pcf Content Compaction Type
% Dry %
Weight
6/22/98 1 KEYWAY" 268.0 109.7 16.1 89% 4
6/22/98 2 KEYWAY 267.0 113.7 17.9 92% 4
6/22/98 3 TENNIS COURT 275.0 114.8 18.5 96% 2
6/22/98 4 TENNIS COURT" 275.0 105.4 24.3 94% I
6/25/98 5 RETEST OF I 268.0 112.8 15.8 92% 4
6/25/98 6 RETEST OF 4 275.0 108.0 15.2 96% 1
6/25/98 7 KEYWAY 270.0 116.5 13.1 92% 3
6/25/98 8 KEYWAY 272.0 118.4 11.8 93% 3
6/25/98 9 KEYWAY 274.0 117.3 12.3 92% 3
6/25/98 10 TENNIS COURT 274.0 122.0 11.2 96% 3
6/25/98 II TENNIS COURT 275.0 122.6 10.7 97% 3
6/25/98 12 TENNIS COURT 274.5 121.7 11.5 96% 3
6/25/98 13 TENNIS COURT 274.5 122.9 10.4 97% 3
6/26/98 14 TENNIS COURT 275.5 121.9 11.4 96% 3
6/26/98 15 TENNIS COURT 276.0 121.3 12.1 96% 3
6/26/98 16 TENNIS COURT 277.0 122.7 10.9 97% 3
6/26/98 17 TENNIS COURT 277.0 123.1 10.6 97% 3
"
.. TEST FAILED. SEE RETEST
T AIJLE II
LABORATORY TEST DATA
Job Name: PROPOSED TENNIS COURT Job No. 10-2515
Job Address: ENCINITAS CALIFORNIA Date 7/6/98
Maximum Optimum
Sample No. Dry Density Moisture Soil
pcf Content Description
%wt
112.4
ll.~
Brown sandy CLA Y
2
119.0
13,0
Brown silty SAND
3
127.0
10.0
Brown silty fine to medium SAND with
gravel
Tan clayey SAND
4
123.0
12.5
4 -_.~~
I -It/I
Ji //
11:-1 11>.'-'1
I II-, G7 \ Ol_.
I \¡ I J! '-- \
'--" -' \
\ \ (
L'
...
it:
~
0
I
0
1/2
I
2640
I \IlLES
I
52110 FEET
~\ CONSTRUCTION TESTING & ENGINEERING, INc.
~;. GEO rECHNIC AI. AND CONSTRUCTION ENGINF.ERING rESTING AND INSPECTION
Z414 VINEYARD AVENUE, STE G F.SCONDIDO CA. ~=O291760) 746-49SS
1/4
I
1320
SOIJRCE THOMAS BROTHERS MAPS
IINfI SAN DIEGO EDITION
SITE INDEX MAP
PROPOSED TENNIS COURT
3374 ROCKING HORSE CIRCLE
ENCINIT,\S, CALIFORNIA
(;RAPltlC~ 1 rRocr~ III'~'I' INI>IX\lAI'(\<
~.
"-
" -
./ -
" ,
"
" ,
./
./ @ '
./
PL I ,
I ,
I @J ø '
, ,
, @ '
, ,
, ,
CO' ~ '
5 , ,
, PROPOSED ,
0 , TENNIS ,
, COURT ,
, e '
' e '
, ,
, ,
, ,
cD ' ,
, e )
, I
ø, e I
, ...
./
, ./
ø "
, ./
"
- "
- "
-"
LEGEND
0
APPROXIMATE COMPACTION
TEST LOCATION
PROPERTY LINE
PL
~ -: LIMITS OF PROPOSED
I I TENNIS COURT
'---'
CONSTRUCTION TESTING & ENGINEERING, INc.
GEOTECHNIC AL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION
~414 VINEY ARD A VENUE. STE G ESCONDIDO CA. nO~9 (760) 746-4955
SITE MAP
PROPOSED TENNIS COURT
3374 ROCKING HORSE CIRCLE
ENCINITAS. CALIFORNIA
GRAPIIICS I PR()JF.C1'S1(}'231~' MAPCV5
PL
~
[g
@
iF--
~~\.~.~ ~/Z4--\1l
LANDMARK ENGINEERING CORPORATION
CIVIL ENGINEERING. SURVEYING
September 9, 1997
City of Encinitas
Engineering Department
505 S. Vulcan Avenue
Encinitas, CA 92024
RE:
2605 CAMINO DEL RIO SOUTH, SUITE 321
SAN DIEGO, CA 92108-3706
TELEPHONE (619) 260-0420
FAX (619) 260-0456
Site Drainage for 3374 Rocking Horse Circle
Dear Sir:
The existing drainage in the area where the n~w tennis court is
proposed is sheet drainage flowing southwesterly to a low point at the
southwest corner of the lot.
No diversion of flowage is proposed. The court drains westerly to a
french drain and then flows therein southerly to a discharge point which
has a small, but adequate, rip-rap energy dissipator.
The combined sheet flows and tennis court discharge is carried to
existing pattern at the southwest corner of the site.
If
call.
the
you
have further questions or concerns, please do not hesitate to
Sincerely,
~- ;:-&
/ Lawrence E. Cole
RCE 36292, expo 6/30/00
SEP 1 () 1991
,-,.
, ,
. ,