Loading...
1995-4508 G Street Address ~(&Ç Category I L¡ ?-Lf I 7- Serial # '1$62 ~ Name I Description Year Plan ck. # ~. recdescv ... SCENIC COAST BUILDING SCIENCES 974 Bremen Way w, M, Hubbard, ACE 7193 Alpine, California 91901 Dennis j, Sloan, ACE 29704 (619) 445-4700 Owen C. "Carl" Lemons, 8-586215 Soil Sampling Testing Compaction Control Foundation/Slab Inspections Mr. Ken Eaton Eaton Development 3710 Hilltop Drive, Suite 9 Lemon Grove, California 91945 Subject: Report of site preparation, grading and compaction of fills. Copper Crest Drive @ Dusty Trail Encinitas, California Dear Mr. Eaton: Pursuant to your request, we have completed tests, inspections and surveillance required to assure proper site preparation, grading and compaction of fills on the subject project. All trash and debris have been removed from the areas to be graded and the site prepared and graded in accordance with our recommendations and in compliance with the approved grading plan and specifications. Keys were properly cut and topsoils recompacted under our surveillance. About 100 C.Y. of granular soils which had been stockpiled were spread and compacted over the building site. Laboratory tests performed in accordance with ASTM test method 0-1557 indicate a maximum dry density of 112.0 pcf and optimum moisture of 13.0 % for the native soils and 129.0 at 9.8% for the stockpiled materials. As the grading progressed, compaction procedures were observed and tests were made in accordance with ASTM test method 0-1556. Results of these tests are presented on Page "A" and their approximate locations are shown on Figure No.1. Based on the results of tests and observations, we hereby certify that all fills placed on the property have been compacted to within 90 percent of maximum dry density. The site has been properly prepared and graded and is suitable for its intended use. Fri, Mar 22, 1996 2617 1 -"" Copper Crest Road Compaction/Inspection Report Continued: RECOMMENDATIONS 1. The foundation system as delineated on the approved plans and defined in appurtenant specifications will provide adequate response to the site soil conditions. 2. Finish grade the site after structures and other improvements are installed such that surface waters are directed away from building foundations and fill slopes for a distance of at least five feet. Thence, via surface swales and/or underground drains, toward and into approved drainage ways. If you should have any questions after reviewing this report, please do not hesitate to call. We appreciate this opportunity to provide our professional services. Sincerely Scenic Coast Building Sciences ~~~~~~------- W. M. Hubbard, ACE 7193 Attach me nts Fri, Mar 22, 1996 2617 2 -"'" Copper Crest Road Compaction/Inspection Report Continued: [F)~@}~ oo~oo T ABLE OF FIELD DENSITY TEST RESULTS Test Depth Field Field Laboratory Relative No of Moisture Density Density Compaction Fill (& dry wt) (p c f) (p c f) (% Lab Den) ---- ----- -------- ------ --------- --------- 1. Key 13.3 101.6 112.0 90.71 2. Key 13.6 103.3 112.0 92.23 3. 2' 12.8 100.9 112.0 90.09 4. 2' 13.2 103.3 112.0 92.23 5. 4' 13.2 103.8 112.0 92.68 6. 6' 13.0 102.6 112.0 91.61 7. 8' 12.7 102.8 112.0 91.79 8. 4' 13.3 104.6 112.0 93.39 9. 6' 12.9 103.6 112.0 92.50 - --- --- -- _._---- -- - ---- --- -- -- - - -- --- - -- - - --- -- --- -- -- --- -- Stockpiled Material 10. l' 9.8 117.8 129.0 91.32 11. 2' 9.6 116.8 129.0 90.54 12 2' 9.5 116.9 129.0 90.62 13. F.G. 9.7 118.2 129.0 91.63 14. F.G. 9.8 118.6 129.0 91.94 Fri, Mar 22, 1996 2617 3 ,4 . Figure No. -- Field Technician Report iì ¡:?f? K OX / /w # rE C (PC ......- \I \" \/ f I -- ~ ~ \ 1 ,{ ( ~ '?' ~T olD 0) tÞ 14- - - - - .--'? }- I ,07 . (, I , - " , ¡ I ,... ¡.. \' t... ~j' - I . ~ CI -rr ¡ Þl L - - - - - ffÞ il tfJ/3 ~/:l- ~~ It / -~ - - _. - ... --- OVS ì Y TR,I:)IC- ,..--- 4- Scenic Coast Laboratory 974 Bremen Way, Alpine, CA. 91901 (619) & ~ r}j !j ~ " V) ~ \J ~ lJJ { ì ~ ( ~A~þpl?? 445.4700 Figure t'Jo. .. ",. :??¿:i'::\';:):¡(~~2:;~! , \' , "ì '\' ). I" ¡'" I') ¡: ,:1! \\ ,~i~~ ~ ~ u '-~\JD dU ~OV 1 4 1995 ""':.F.').::',;',' SOIL TESTERS ~.~~,~_:~, " - ~- c: ~ "- CITY OF ENCINITAv SOILS INVESTIGATION FOR COPPER CREST ROAD RESIDENTIAL BUILDING SITE CITY OF ENCINITAS, COUNTY OF SAN DIEGO SECTION CONTENTS SECTION 1. PROJECT DESCRIPTION AND SCOPE. . . . . . SECTION 2. FINQINGQ . . . . . . . . . . . . . . . . . 2.1 SITE CONDITIONS. . . . . . . . . . . . . . . 2.2 SOIL CONDITIONS. . . . . . . . . . . . . . . SECTION 3. RECOMMENDATIONS. . . . . . . . . . . . . 3.1 FOUNDATIONS. . . . . . . . . . . . . . . . . 3.2 EXPANSIVE SOILS. . . . . . . . . . . . . . . 3.3 SLABS ON GRADE. . . . . . . . . . . . . . . . 3.4 EARTHWORK. . . . . . . . . . . . . . . . . . SECTION 4. lIMITATIONS. . . . . . . . . . . . . . . BORING LOGS.................... . . r.:" 0 ./ I ,.' v P.O. Box 1195 993 I Channel Road lakeside, CA 92040 (619) 443-0060 PAGE 2 3 3 3 4 .... 4 5 7 7 10 12 ...' i I .. .. - }.':\"'~.:~f:\~/;f:' :,':;:'.."','.;:':.:.:::':':1 SOIL TESTERS 2~;',,~2.:;~ P.O. Box 1195 9931 Channel Road lakeside, CA 92040 1619) 443.0060 November 20, 1989 Harjeet Singh 13215 Bavarian Drive San Diego, California 92129 Attention: Harjeet Singh SUBJECT: Project No. 25E2A-89 Fi le No. 8086 REPORT OF PRELIMINARY SOILS INVESTIGATION FOR Proposed Residential Building Site Copper Crest Road City of Encinitas Dear Mr. Singh: The attached report has been prepared to present the results of an investigation of the soil conditions at the subject site. It was undertaken to provide the information to design foundations and grading for the proposed single family residence. In general, we found extremely expansive soils which should be removed from the propose building area prior to construction. .... If you have any quest ions, please do not hes itate to contact us. opportunity to be of service is sincerely appreciated. This Respectfully submitted, ~(~~ c~ 1 n9 RCE 10778, GTE 903 CHW/tem cc: (3) submitted Engineer, . .'..' 4 c Singh Project No. 25E2A-89I 11-20-89 REPORT OF SOIL INVESTIGATION for Proposed Residential Building Site Copper Crest Road City of Encinitas SECTION 1. PROJECT DESCRIPTION AND SCOPE This report presents the results of our soils investigation for Residential Site to be located on Copper Crest Road, in the city of Encinitas. It is our understanding that a two story single family residence is planned. Anticipated loads are in the order of 2000 plf for continuous footings. This investigation was undertaken to: A. Determine the physical properties of the prevailing soils, including strength, supporting capacity, expansion, and settlement characteristics. B. Provide design information preparation, and foundations. regarding grading, site The investigation included the following elements: A. Review of available plans and maps to delineate the geometry of the property. B. Inspection of the property. .... C. Subsurface exploration to inspect and sample the soils and strata. D. Soil tests to determine the pertinent physical properties. E. Analysis to integrate the data to apply the information to the property and conditions as we understand them at this time. ,. 2 ""j, ,.. ~ Singh Project No. 25E2A-891 11-20-89 SECTION 2. FINDINGS 2.1 SITE CONDITIONS The property consists of an undeveloped rectangular parcel located on the west side of Copper Crest Road. The parcel slopes moderately to the south. Pertinent geometry of the property is shown on attached Plate #1 entitled "Test Location Sketch". There are no exi st i ng improvements. Searches for underground ut 11 it i es are beyond the scope of this investigation. Man-made fill was encountered to a depth of approximately one foot. This fill was loose clayey sand. Adjacent development includes single family residences. 2.2 SOIL CONDITIONS 2.21 GENERAL DESCRIPTION The soils encountered in our explorations and on the observable surface were loose to medium dense clayey sands. Fill materials to a depth of approximately one foot were encountered on the westerly side of the site. The fill soils were underlain by extremely expansive, compressable clays with and Expansion Index on the order of 250. We recommend that no structures capable of differential movement be supported on these clays. They should ~ removed from the support prism. The resulting void should be filled with the less expansive site soils or with select imported soil. Differentiation between the extremely expansive, compressab1e soils that are to be removed and the less expansive sandy clays must be done in the field at the time of grading. ' All loose soils must be recompacted to provide competent support. Field density tests during the excavation process will be required to define the extent of removal and recompaction. Natural soils having a field density corresponding to relative compaction of less than 85% or f111 soils with less than 90:\; compaction should be removed and recompacted to 90%. We estimate the average dept,h of removal for recompaction to be about one foot. Only one soil type will be considered hereinafter for specific recommendations. This soil is the moderately expansive, recompacted blend of soils resulting from mixing and recompaction subsequent to the removal of the extremely expansive clays. We emphasize that we present the so11 conditions as we found them in our explorations. The location and extent of our subsurface explorations are based on maps, drawings, experience, field inspections, and any reasonably available previous subsurface work and reports. Although it is probable that the so11 conditions will be similar elsewhere on the site, we cannot guarantee the similarity. Data that we have gathered while following or exceeding current standards of care and using or exceeding state of the art methods, imply that ". 3 .. .. Singh Project No. 25E2A-891 11-20-89 the conditions are as we describe. Verification of soil conditions including extent of any remedial measures can only be done, and must be done in the field at the time of construction. Procedures and quality control for construction involving compaction and recompaction are covered under a following section entitled 'Earthwork'. 2.22 FIELD EXPLORATION Field Exploration included three subsurface explorations made at the locations indicated on attached Plate #1 on October 6, 1989. These explorations consisted of trenches advanced with a backhoe. We logged and sampled the explorations at the time they were made. The logs are presented on attached Plate No.2 and Plate No.3 and contain sample location, unified soil classification, lithology, textural description, wet color, apparent moisture and apparent soil density or consistency. 2.23 SOIL TESTS Soil tests were performed in both the field and laboratory on representative samples. Testing was performed in accordance with generally accepted American Society for Testing and Materials (ASTM) test methods and/or suggested procedures. Any estimated parameters are shown in parenthesis. SECTION 3. RECOMMENDATIONS 3.1 FOUNDATIONS Footing widths should be determined by the allowable soil bearing value. Practical considerations dictate that the widths should exceed 12 and 24 inches for continuous and square footings respectively. Reinforcing for concentrated or uneven loads is dictated by the structural requirements and should be furnished by your structural engineer. THE EXPANSIVE SOIL CONDITIONS dictate the foundation and footing design. For any foundat ion or support system. the expansive soil s must be pre-saturated and moisture equilibrium must be maintained in the future. Alternatives methods of dealing with the expansive conditions in ascending order of cost are: 1) Special foundations and slabs; 2) capping with non-expansive soils; 3) ribbed, reinforced, monolithic slabs; 4) Prestressed slabs; or 5) deep (20' to 60') specially designed piles with a system of grade beams and structural slabs. Details for the first two follow. Details for the other systems will be presented upon request and upon a revision of scope. 1. Spread footings with expansive soils within 2.5 feet of the surface may be designed as a continuous grade beam. The footing/beam must have dimensions and reinforcing that will provide stiffness, strength and moisture conditions that are commensurate with the expansive potential of the soils. The following foundations are recommended for shallow depths to expansive soils: 4 " ,. .. to Singh Project No. 25E2A-891 11-20-89 . It is imperative that the extremely expansive soils, Soil Type No 2, be removed from the proposed building area and that no structures or fill soils be placed upon them. I Use continuous exterior perimeter foundations (including door openings). They should be founded a minimum of 24 inches below lowest adjacent grade, I Interior footing depth should exceed 18 inches below top of slab or 18 inches below lowest adjacent grade for raised floor construction, I Reinforce continuous concrete foundations as a beam with one "5 bar positioned 3 inches above the bottom of footing and one "5 bar positioned 1 inch below top of foundation or top of finish floor. I Slabs-on-grade and subgrade saturation are covered elsewhere in this report. 2. Capping the building pad with 2.5 feet of non-expansive soil as an alternative will allow the use of conventional footings. Non-expansive soil is defined in the Recommended Earthwork Specifications. The underlying expansive soils must be pre-saturated and moisture equilibrium must be maintained in the future. These conventional footings should be founded 12 inches below lowest adjacent grade. ALLOWABLE FOUNDATION BEARING pressures as determi ned by so; 1 'shear strength for full live and dead loads may be safely assumed to be 2000 psf for the native clayey sands. This value may be increased 1/3 for wind and/or seismic loading~ If the highly expansive soils are capped with non-expansi~e soils, the bearing value will be determined by the import soils used. 3.2 EXPANSIVE SOILS In addition to the special foundations recommended hereinbefore, the following deta il s should be incorporated to reduce the probabi li ty of damage from the expansive soils. If the expansive soils are capped with 2.5 feet or more of select fill soils as defined in the recommended grading specifications, all special requirements (including special foundation dimensions and reinforcing) may be ignored. Capping if used, should be carried five feet beyond the exterior perimeter of the structure. Presaturation of expansive soils prior to placing concrete is imperative if the probability and/or amount of damage from the expansive soils is to be reduced. The subgrade soil s are saturated and expanded either before or after the concrete is placed and they are impossible to keep dry. Therefore, the clayey subgrade soils, especially below concrete f1atwork should not be allowed to dry 5 . '>," .. . Singh Project No. 25E2A-89I 11-20-89 and should be sprinkled if necessary to insure they are kept in a very moist condition. Soils underlying slabs should have a moisture content exceeding 4 percent above optimum moisture. They should be tested for proper moisture from a depth of 2 feet not more than 24 hours before placing concrete. Allowance for 5011 expansion should be made when setting subgrade elevations prior to presaturating the soils. Expansive soils should be compacted at a high water content; preferably 3% above optimum moisture. This w111 result in less energy required for compaction, considerably less time required for presaturation below the structure, and greater dependable strength and stability. Close moisture control is essential to prevent saturation. In order to reduce the potential for future expansive soil related damages, it i s imperat ive that the subsurface moi sture 1eve 1 s beneath the structure and concrete f1atwork be maintained at or very near the level obtained initially in preparation to the construction. Future cyclic heave and subsidence of the subsurface soils caused by seasonal changes in moisture levels, subsidence resulting from drying of the soils from plant use, and heave and subsidence from unequal irrigation or drainage accidents can only be prevented by holding the soil moisture at a relatively high value. This can be accomplished by exceptionally careful maintenance of landscape watering patterns around the perimeter of the structure on a daily basis. The landscape watering should be adjusted in order to provide daily replacement of soil moisture losses due to plant use and evapo-transpiration. In order to accomplish the moisture stab11ization by landscape watering, we recommend installation of an automatic irrigation system. The irrigation syst~m should i nc 1 ude several moi sture sensors. The i rri gat ion system should be designed, installed and .9uaranteed to have a capability of stabilizing the subgrade soil moisture to within :t 5% 1. Greater tolerances will produce intolerable heave and subsidence of the structure. Alternatively, the stable subsurface moisture levels can be maintained with a self-adjusting, automatic, relatively maintenance free subsurface irrigation system utilizing 2" diameter, 3' deep sand wells, located 2' on center around the exterior perimeter of the structure. Subsurface drippers in an inverted plastic protector over each sand well and a standard drip irrigation system will be ample to hold the soil moisture in equilibrium. The timer should be initially set for 15 minutes at weekly intervals and adjusted as necessary. 1Normal plant use encompasses up to 65% change in soil moisture. 6 ",' .. Singh Project No. 25E2A-891 11-20-89 3.3 SLABS ON GRADE Should be specially constructed for the expansive conditions. The slabs should. be reinforced both ways with either welded wire mesh or reinforcing bars and underlain with a sand subbase. Reinforcing steel should be spaced not more than 4 times the slab thickness and should provide an area of steel of 0.11% of gross cross section of the slab in each in each direction. Number 3 bars at 20" on center for 5" slabs, #2 bars at 12" on center or S"xS"-1t6/tt6 welded wire mesh for 4" slabs will meet this criteria. Horizontal movement of foundations and consequential slab cracking may be prevented by extending the slab steel through any joints and into the foundation a minimum of 30 diameters. Subbase material should be non-expansive, sandy soil or sand having a sand equivalent exceeding 30 when tested in accordance with the ~~erican Society of Testing and Materials test method 'ASTM 01555'. Slabs should be 5 inches thick unless provided with thickened edges around the slab perimeter. If thickened edges are used, slab thickness may be reduced to 4 inches. Thickened edges should be 8 inches thick at the perimeter with the thickness decreasing uniformly to 4 inches thick at 2 feet from the perimeter. Slabs may be considered to have thickened edges by way of monolithic, continuous footings. Any slab joint (construction, expansion, weakened plane, etc.) should be considered slab edges and should be provided with thickened edges if this option is chosen. If wheel loads exceeding 1500 pounds or abnormal tire pressures are anticipated, we should be contacted to provide a heavier slab section. Spacing of weakened plane joints and expansion joints should not exceed 20 feet and 60 feet, respectively for interior slabs and 20 feet and 40 feet~ respectively for exterior slabs. 3.4 EARTHWORK Any grading contemplated or required should be accomplished in accordance with the recommendations and !recommended grading specifications' presented here.i nafter. RECOMMENDED GRADING SPECIFICATIONS for Proposed Residential Building Site Copper Crest Road City of Encinitas GENERAL: C.H.Wood, Soil Testers and 'Soil Engineer' are synonymous hereinafter and shall be employed to inspect and test earthwork in accordance with these specifications, the accepted plans, and the requirements of any jurisdictive governmenta 1 agenci es. They are to be allowed adequate access so that the inspections and tests may be performed. The Soil Engineer shall be appraised of schedules and any unforeseen soil conditions. 7 .. . Singh Project No. 25E2A-89I 11-20-89 Substandard conditions or workmanship, inadequate compaction, adverse weather, or deviation from the lines and grades shown on the plans, etc., shall be cause for the Soil Engineer to either stop construction until the conditions are corrected or recommend rejection of the work. Refusa 1 to comply with these specifications or the recommendations and/or interpretations of the Soil Engineer will be cause for the Soil Engineer and/or his representative to immediately terminate his services. Acceptance of these specifications in their entirety and without modification and without construed meanings is acknowledge by the signatures hereon. Deviations from the recommendations of the Soil Report, from the plans, or from these Specifications must be approved in writing by the owner and the contractor and endorsed by the Soil Engineer. SOIL TEST METHODS: Maximum Density & opt Moisture Density of Soil In-Place Soil Expans i on Shear Strength Gradation & Grain Size Capillary Moisture Tension Organic Content -- ASTM 01557-70 -- ASTM 01556 or ASTM 02922 and 03017 -- UBC STANDARD 29-2 -- ASTM 03080-72 -- ASTM 01140-71 -- ASn-t 02325-68 -- ~ Weight loss after heating for 24 hours at 300. F and after dedu6ting soil moisture. Expans i ve So il s Insufficient Fines Oversized Particles LIMITING SOIL CONDITIONS: Minimum Compaction -- 90% for 'disturbed' soils. (Existing fill, newly placed fill, plowed ground, etc.) -- 84% for natural, undisturbed soils. -- 95% for pavement subgrade within 2' of finish grade and pavement base course. -- Expansion index exceeding 20 -- Less than 40% passing the #4 sieve. -- Rocks over 10" in diameter. .... PREPARATION OF AREAS TO RECEIVE FILL: Brush, trash, debris and detrimental soils shall be cleared from the areas to receive fill. Detrimental soils shall be removed to firm competent soil. Slopes exceeding 20% should be stepped uphill with benches 10' or greater in width. Scarify area to receive fill to 6" depth and compact. FILL MATERIAL shall not contain insufficient fines, oversized particles, or excessive organics. On-site disposition of oversized rock or expansive soils are to be at the written direction of the Soil Engineer. Select fill shall be as specified by the Soil Engineer. All fill shall be compacted and tested. SUBDRAINS shall be installed if required by and as directed by and detailed by the Soil Engineer and shall be left operable and unobstructed. They shall consist of 3" plastic perforated pipe set in a minimum cover of 4" of filter I'" 8 .. Singh Project No. 25E2A-891 11-20-89 rock in a 'vee' ditch to intercept and drain free ground from the mass fills. Perforated pipe shall be schedule 40, Po1y-Viny1-Ch10ride or Acrylonitrile Butad1enne Styrene plastic. Rock filter material shall conform to the following gradation: Sieve size: X Passing: 3/4" #4 90-100 25-50 #30 5-20 #200 0-7 . . Subdrains shall be set at a minimum gradient of 0.2% to drain by gravity and shall be tested by dye flushing before acceptance. Drains found inoperable shall be excavated and replaced. CAPPING EXPANSIVE SOILS: If capping expansive soils with non-expansive soil to mi t i gate the expans i ve potent i a lis used, the cap shou 1 d be compacted, non- expansive, select soil placed for a minimum thickness 2.5' over the expansive soil and for a minimum distance of 8' beyond the exterior perimeter of the structure. Special precautions should be taken to ensure that the non expansive soil remains uncontaminated and the minimum thickness and dimensions around the structure are maintained. The expansive soils underlying the cap of non- expansive cap should be pre-saturated to a depth of 2.5' to obtain a degree saturation exceeding 90% before any construction supported by the compacted cap. The non-expansive soil comprising the cap should conform to the following: Minimum Compaction Maximum Expansion Index Minimum Angle of Internal Friction Cohesion Intercept 90 X 30 33 Deg 100 psf ' UNFORESEEN CONDITIONS: C. H. Wood and Soil Testers assume no responsibility for conditions which differ from those described in the applicable current reports and documents for this property. Upon termination of the Soil Engineer's services for any reason, his fees up to the time of termination become due and payable. If it is necessary for the Soil Engineer to issue an unfavorable report concerning the work that he has been hi red to test and inspect, the Soi 1 Engineer shall not be held liable for any damages that might result from his 'unfavorable report'. Acknowledged by: Contractor: Date: Owner: Date: Soil Engineer: Date: ,'; " ~ 9 I Singh Project No. 25E2A-89I 11-20-89 SECTION 4. LIMITATIONS 4.1 UNIFORMITY OF SOIL CONOITIOHS The values presented in this report are based on our evaluation of the soil conditions exposed at each of our subsurface exploration locations as well as the assumption that the soil conditiohs in the remaining portions of the site can be interpolated without significant deviation in physical properties. Although the location of the subsurface excavations were selected in order to explore a representative portion of the site soils and, according to equipment accessibility to each exploration site, the values may be substantially different in unexplored areas due to unforeseeable variations in the so11s occurring in the areas not investigated. Should any soil or geological condition not described within this report be encountered, the soils engineer should be contacted immedi ate1 y so that he may re-evaluate the concl us ions presented herein. 4.2 TIHE LIMITS The conclusions and findings presented in this report are valid as of the report date. Changes in the site conditions and soil conditions of the property may occur in the near future due to artificial works or natural occurrences. This may include changes which occur on adjacent property which may direct1y affect the property investigated. Therefore, the recommendat ions and desi gn values presented in this report may become inaccurate due to alteration of the site or adjacent properties subsequent to this investigation. It is, therefore, our intent that the values in this report remain applicable fo'r a period of not longer than one year provided the site conditions remain unaltered. After a period of one year, we should be contacted to inspect the site and review thi? report in order to verify the validity of the recommendations and design values presented herein. 4.3 WARRANTY Certain risks are involved with soil stability, foundations,and Soil engineering which should be recognized by those involved. During the course of our engineering services, we have performed in accordance with the current standard practices and procedures presently utilized by members of our profession in this region. No warranty or guarantee is either expressed or implied by the professional services we have performed including the written reports of our findings. 4.4 OUTSIDE RESPONSIBILITY It is the responsibility of the firm or person requesting our services or their representative to insure that the recommendations and design criteria presented herein are made available to the project engineer and architect so that they may be included in the job plans and specifications. In addition, it is the responsibility of the client and/or architect to provide whatever measures are ,'i ,. 10 " . ,. Singh Project No. 25E2A-89I 11-20-89 required in order to make certain that the contractor and contractor employees are made aware of and comply with the applicable recommendations set forth in this report during construction. 4.5 PROJECT CONCEPT This office should be notified of any changes in the proposed structures or site grading concept so that an addendum or modifications to this report may be provided as necessary. ..... ... "" , ,. 11 . ~ , Singh Project No. 25E2A-89I 11-20-89 BOOI LOGS Oept , , , , , I :_X- _L_O_R_^_T_I_O_U_N_U_H_B_E_R_T1 )ate : Logged.. 6-Oct-89 Equipment u.ed: Backhoe Reported: 20-Nov-89 Groundwater: Free groundwater not encountered. Re'usal: Not ~et. 5.5 'depth. :SOIL TEST RESULTS ON UNDISTURBED SAHPLES I Sampler penetration r8si.tanoe ('k/') "Soil type" : : Density (pc') Pan noo screen : ample Locations :: : COlipaction : Friction (~SI) :: : Unified Claeelficatione :::: Moisture: : Cohesion (psr) I : Soil Description ::::: Saturation: : Potential v :: : v v v v v v v v Expanalon 0 v-:-v--:----v------------------------------:---En----Yd----Rc----Wc----Da---P200---Fr----c-----Ex-:--v-: --' " , I , I, , I -1 --: : Red brown, damp, Had.dense: : : V-: SC: CLAYEY SAND (Native): -- 120.1 95" 7.3" 51" : 1: -2 --: :: : : --' " I , , " , , -3 --I :: : : --' " I I , " I , -4 --:----:-----------------------------------: : : --' " , , I "' , , -5 V-: CH: Ylw/green, ~i.t, veryatiff: -- 105.8 98" 15.4" 70" 90X 14.0 62 : 2: --I : CLAY (tlative) : : : -6 --:_:: : : )ept :_X- _L_O_R_^- T _I_O_tl_N_U_"CB_E_R- T2 )ate : logged.. 6-Oct-B9 Equipment used: Backhoe Reported: 20-tlov-89 Groundwater: Free groundwater not encountered. Refusal: Not met. 8 'depth. : SOIL TEST RESULTS ON UtmISTURBED SAHPLES : Sampler penetration resistance ('k/') "Boil ty~" : : Density (pc') Pa.. 1200 ecr-.en : ample Locations :: : COIIIpaction : Friction (deg) :: : Unified Classifications :::: HolBtur-e : : Coheaion (psr)-.: : : Soil Description :::: Satur-.tion: Potential v :: : : v v v v v v v v Expansion 0 v-:-v--:----v------------------------------:---En----Yd----Rc----Wc----De---P200---Fr----c-----Ex-:--v-1 --: BC: Red br-own, dr-y, very loose: : : -1 U-:----:--ClAYEY SAND ------------(Fill): 96.4 76S 1.0S 4X : 1: U-:-SC-I- damp, 10098,: -- 107.8 8SS 10.1X 50X : 1: -2 --I : (Uative) : : : --: :: : : -3 --: :: : : U-: CH: Ylw/green, lIoiBt, v.ry 100.8: -- 102.4 95X 1I.1S 80X : 2: -4 --I : CLAY (Native) : : : --:----:-----------------------------------: : : -5 --I :: : : V-: : Ylw/gr-een, damp, Med.denu: 0.0 ass 30x : 3: -6 --I : CHTD CLAYSTONE (Uative) : : : , , , ,-, , "" . ,. 12 4t .. Singh Project No. 25E2A-891 11-20-89 E- _P_L_0_R_A_T_I_0_"_tI_U_H_B_E_R_T3 Da 89: Logged.. 6-Oct-89 Equipment used: Backhoe Reported: 20-Nov-89 OroundHater: Fr.. groundwater not encount.r.d. R.fueal: Not met. 5 'depth. : SOIL TEST RESULTS Ofl UNDISTURBED SAHPLE8 : Sampler penetrat 'on r..iatanc. (' k/') "son type" De th : : Den.,ty (pcI') Pa.. J200 acr..n : : Sample LocatIons :: : COI1pactlon : Friction (deg) : :: : : Untried Clulllflcat,ons :::: loIohtur. : : CoMalon (pa') : : : : 50'1 Description :::: SaturatIon :Pohnthl :: : : v v v v v v v v Expana'on -v-:-v--:----v------------------------------:---En----Yd----Rc----Wc----Ds---P200---Fr----c-----Ex-:--v-: ---: : Red brown, /IIoht, dens.,: : : -V-: SC: CLAYEY SAND (Fnl) : -- 122.2 96" 8.9" 67% : 1: ---'----'-----------------------------------' I I I " I , ---' " , I , " , I ---: : Red brown, wet, dense,: : : -U- SC -:--CLAYEY SAtiD ------------(Native): -- 122.2 96" 11.0" 83" : 1: ---' I I , , I , , , ---I : Ylw/brown, damp, 10098,: : : ---: : GRVLY CLYY SAlID (Ilative) : : : -U-- SC-:-----------------------------------: -- 105.8 88% 10.7% 50% : ~: I , , I_' , 50 L TEST RESULTS ON REHOLDED SAHPLES 5C descriptions v Texture CLAYEY SAIID CLAY CHTO CLAY5TOtIE GRVLY CLYV SAND : (-----------REHOLDED SPECIHEIIS-----------): Haxlmum dentllty (pcI') : Den81ty (per). : : Optimum Holsture : Compaction Friction (deg) : : Specific Oravity: : Hotaturn : CohesIon : : : :Expanston Index: Saturation (paf) v v v:v v v v v v v: Ymx OHc 011: EI Yd Rc Wc Da Fr c: 126.8 9.2" 2.65 90 115.3 91.0" 12.2" 75.0X 29.0 200 107.8 18.7" 2.70 252 98.09 91.0X 19.9" 75.0X 15.0 80 -- " 50tl "type" : Classification : Sample teeted : : General v : v v Color T182 Red brown T185 Vlw/green T285+ Vlw/green T385 Vlw/brown 120.0 1'.~" 2.65 60 109.2 91.0" 14.5" 7 5.0" 31. 3 368 ¡ ,,' 13 .t -t: ¡:;¡¡jI ". EXP,LOÆ?A lION ("Æ£Nc.~r" .~Œ' ,. r c;¡tí1. Dr/5 rV 9931 Channel Ad, Lakeside. CA 92040 (619) 443-0060 -.. v ] 7;e.4/L- (pppER CRésr ~oAb .. BY W JOB NO. ~5'f .2,q- pt] ,...L ë ~I ~- \f' ~/ Q¿ \l U. I.J./ Q.. c- o u I .... DATE 11- ;;1./- g'1 PLf)TE ilo. I