1996-4778 G I
Street Address
S7 s a
Category Serial #
( S7
Name Description
Plan ck. # Year
recdescv
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
February 12, 1997
Project No. CE -5307
Al Mayo
1772 Kettering
Irvine, CA 92714
Subject: Partial Report of Certification of Compacted Fill Ground
Proposed Single Family Dwelling
Lot #1 of Wildflower Estates
Encinitas, California
Dear Mr. Mayo:
In response to your request, the following report has been prepared
to indicate results of soil testing, observations and inspection of
earthwork construction at the subject site.
Testing and inspection services were performed from October 1, 1996
through February 10, 1997.
Briefly, our findings reveal filled ground has been compacted to a
minimum of ninety percent (90 %). Therefore, we recommend
construction continue as scheduled.
SCnPE
Our firm was retained to observe grading operations with regard to
current standard practices and to determine the degree of
compaction of placed fill.
Grading plans were prepared by K & S Engineering of San Diego,
California.
Grading operations were performed by Greg Whillock of Vista,
California.
Reference is made to our previously submitted report entitled,
''Preliminary Soils Investigation ", dated July 17, 1996.
Approximate locations and depth of filled ground and extent of
earthwork construction covered in this report are indicated on the
attached Plate No. One entitled, "Test Location Sketch ".
Grading operations were performed in order to create a level
building pad to accommodate the proposed single family dwelling.
Should the finished pad be altered in any way, we should be
contacted to provide additional recommendations.
P.O. BOX 302002 • ESCONDIDO, CA 92030
(619) 480 -1116
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
February 12, 1997
Project No. CE -5307
Page 2
The site was graded in accordance with recommendations set forth in
our previously submitted report.
The site was graded to approximately conform to project plans.
Actual pad size and elevation may differ. Finish grade operations
are to be completed at a later date.
LABORATORY TESTING
Representative soil samples were collected and returned to the
laboratory for testing. The following tests were performed and are
tabulated on the attached Plate No. Three.
1. Optimum Moisture /Maximum Density (ASTM D -1557)
2. Expansion Potential Test
3. Direct Shear (ASTM D -3080)
S OIL CONDITIONS
Native soils encountered were gravelly- clays, silty- clays, and
clayey- sands. Fill soils were imported and generated from the on-
site excavation.
The building site contained a transition from cut to fill.
However, cut areas located within the building area were over
excavated a minimum of 3 feet and brought to grade with compacted
soil. Over excavation was carried a minimum of 5 feet beyond
exterior building perimeter. Hence, no consideration need be given
this characteristic.
Expansive soils were observed during grading and exist at finish
grade. Therefore, special recommendations will be necessary to
reduce the probability of structure damage.
The key was approximately 25 feet wide, a minimum of 3 feet in
depth and inclined into the slope. During earthwork construction,
native areas to receive fill were scarafied, watered and compacted
to a minimum of ninety percent (90 %) of maximum density. Subsequent
fill soils were placed, watered and compacted in 6 inch lifts.
Benches were constructed in natural ground at intermediate levels
to properly support the fill. To determine the degree of
compaction, field density tests were performed in accordance with
ASTM D -1556 or D -2922 at the approximate horizontal locations
designated on the attached Plate No. One entitled, ''Test Location
Sketch". A tabulation of test results and their vertical locations
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
February 12, 1997
Project No. CE -5307
Page 3
are presented on the attached Plate No. Two entitled, "Tabulation
of Test Results". Fill soils found to have a relative compaction of
less than ninety percent (90 %) were reworked until proper
compaction was achieved.
RECOMME AND CONCLUSIO
Continuous inspection was not requested to verify fill soils were
placed in accordance with current standard practices regarding
grading operations and earthwork construction. Therefore, as eco-
nomically feasible as possible, part -time inspection was provided.
Hence, the following recommendations are based on the assumption
that all areas tested are representative of the entire project.
1) Compacted fill and natural ground within the defined
building areas have adequate strength to safely support
the proposed loads..
2) Slopes may be considered stable with relation to deep
seated failure, provided they are properly maintained.
Slopes should be planted within 30 days of this report
with light groundcover (no gorilla iceplant) indigenous
to the area. Drainage should be diverted away from the
slopes to prevent water flowing on the face of slope.
This will reduce the probability of failure as a result
of erosion.
3) Continuous footings having a minimum width of 12
inches and founded a minimum of 24 inches below lowest
adjacent grade for one and two story, respectively, will
have an estimated allowable bearing value of 1300 lbs.
per square foot.
4) Footings located on or adjacent to slopes should be
founded at a depth such that the horizontal distance from
the bottom outside face of footing to the face of the
slope is a minimum of 8 feet.
5) Plumbing trenches should be backfilled with non -
expansive soil having a swell of less the 2% and a
minimum sand equivalent of 30. Backfill soils should be
inspected and compacted to a minimum of ninety percent
(90 %) .
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
February 12, 1997
Project No. CE -5307
Page 4
6) Unless requested, recommendations for future
improvements (additions, pools, recreational slabs,
additional grading, etc.) were not included in this
report. Prior to construction, we should be contacted to
update conditions and provide additional recommendations.
7) Expansive soils were observed during grading and exist
within 48 inches of finish grade. Therefore, foundations
should be constructed in accordance with Recommendation
6B2 or 6B3 of our "Preliminary Soils Investigation ",
dated July 17, 1996.
8) Clayey soils should not be allowed to dry prior to
placing concrete. They should be watered to insure they
are kept in a very moist condition or at a moisture
content exceeding optimum moisture content by a minimum
of five percent (5%) .
Prior to pouring of concrete, North County COMPACTION ENGINEERING,
INC. should be contacted to inspect foundation recommendations for
compliance to those set forth.
During placement of concrete, North County COMPACTION ENGINEERING,
INC. and /or a qualified concrete inspector should be present to
document construction of foundations.
Q�CERTAIN�Y ANP LIMITATIONS
In the event foundati excavation and steel placement inspection
is required and /or requested, an additional cost of $170. 00 will be
invoiced to perform the field inspection and prepare a Final
Conformance Letter. If foundations are constructed in more than one
phase, $120.00 for each additional inspection will be invoiced.
It is the responsibility of the owner and /or his representative to
carry out recommendations set forth in this report.
San Diego County is located in a high risk area with regard to
earthquake. Earthquake resistant projects are economically un-
feasible. Therefore, damage as a result of earthquake is probable
and we assume no liability.
We assume the on site safety of our personnel only. We cannot
assume liability of personnel other than our own. It is the
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
February 12, 1997
Project No. CE -5307
Page 5
responsibility of the owner and contractor to insure construction
operations are conducted in a safe manner and in conformance with
regulations governed by CAL -OSHA and /or local agencies.
If you have any questions, please do not hesitate to contact us.
This opportunity to be of service is sincerely appreciated.
Respectfully submitted,
North County
COMPACTION ENGINEERING, INC_ ®Q �QEESStOjy q
G E)? F�
N . GE713
xp
. 9 _, 30 - 9 7
y
Ronald K. Adams Dale R. R
President Registere C' Qr 19393
Geotechnica ��Q 000713
RKA: kla
cc: (3) Submitted
(2) Filed
NORTH
Approx. Scale
COUNTY COMPACTION ENGINEERING, INC. & —�-
SOIL T
1 = 40'
2:1 Fill Slo e
13 133 134
8
146 /45 140 /C 9
7 /4
153 149 /35 130
154 157 /55 44 14114214,3 136
158 159 164 138
360 /5Z 15 0
/65 361 /56 /60 151
166 163 /6/
173 174 Test 171
167
(LOT #1) /72
w
H
(LOT #2)
A
H 358 359
U
d
a
H
a
2:1 Cut Slope
TEST LOCATION SKETCH
PROJECT No. CE05307
PLATE No. ONE
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATIO OF TEST RESULTS
TEST# DATE R ORZ. VERT, F-LEU DRY DENSITY SOIL PERCENT
LOC. LOC, MOIST LB- /C0. FT. E C�1O (ACTION
1 10/08/96 See 226 17.3 108.8 I 92.2
2 Plate 227 17.0 107.2 I 90.8
3 10/09/96 One 229 16.2 111.1 I 94.2
4 231 18.3 109.1 I 92.5
5 229 18.8 108.0 I 91.5
6 204 17.3 108.9 I 92.2
7 206 16.7 110.9 I 93.9
8 206 19.3 112.1 I 95.0
9 208 18.1 110.1 I 93.3
10 210 16.1 114.2 I 96.8
11 212 19.3 106.4 I 90.2
12 214 16.5 112.8 I 95.6
13 10/10/96 216 17.3 109.7 I 93.0
14 217 18.2 107.8 I 91.4
15 218 17.7 109.2 I 92.5
16 220 19.6 107.0 I 90.7
17 221 17.1 110.0 I 93.2
18 10/11/96 215 19.2 108.5 I 92.0
19 217 15.9 112.2 I 95.1
20 222 17.2 109.2 I 92.5
21 10/14/96 233 14.3 117.2 II 96.4
22 235 15.9 111.8 II 92.0
23 230 18.0 112.2 II 92.3
24 232 17.1 112.6 II 92.7
25 221 15.4 114.4 II 94.2
26 223 16.2 113.7 II 93.6
27 212 14.3 112.3 I 95.2
28 214 13.8 111.2 I 94.3
29 10/15/96 234 16.3 111.5 II 91.8
30 236 16.6 112.7 II 92.8
31 237 17.2 113.4 II 93.4
32 225 15.8 117.6 II 96.8
33 226 18.1 113.1 II 93.1
34 228 17.3 111.6 II 91.8
35 10/16/96 238 17.8 111.7 11 91.9
36 240 18.0 113.3 II 93.3
37 241 15.4 109.1 I 92.4
38 243 18.3 106.9 I 90.6
39 266 18.1 109.2 I 92.5
40 268 18.5 107.0 I 90.7
PROJECT NO. CE -5307
PLATE NO. TWO (Page 1)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABU LAT10, OX TEST RESOL
TESTIt DATE HORZ, VERT. E�I2 DRY DENSITY SOIL PERCENT
� LOC. MOIST LB-/CU-FT, TYPE COMPACTION
41 10/17/96 See 270 16.2 115.4 III 97.8
42 Plate 272 19.1 110.0 III 93.2
43 One 245 20.2 109.0 III 92.4
44 247 18.0 110.8 III 93.9
45 242 18.7 108.1 III 91.7
46 244 20.4 107.1 III 90.8
47 10/18/96 245 17.0 115.8 11 95.3
48 246 16.5 113.7 II 93.6
49 249 17.3 112.8 II 92.9
50 250 15.7 112.6 II 92.7
51 247 18. 1 114.3 II 94.1
52 274 18.2 109.1 III 92.4
53 276 17.0 109.5 III 92.8
54 10/21 /96 246 18.1 111.6 II 91.9
55 247 17.0 111.1 II 91.4
56 249 16.2 112.5 III 95.3
57 251 15.7 113.6 III 96.3
58 252 15.3 116.4 II 95.8
59 10/23/96 253 18.3 112.4 IV 91.5
60 255 17.1 111.0 IV 90.4
61 255 15.4 113.9 IV 92.8
62 256 16.2 113.1 IV 92.1
63 10/24/96 255 18.2 116.3 IV 94.7
64 256 16.5 110.9 IV 90.3
65 254 17.4 112.7 IV 91.8
66 255 15.7 112.1 IV 91.3
67 10/25/96 255 17.3 110.9 IV 90.3
68 256 16.6 111.9 IV 91.1
69 233 19.5 112.0 IV 91.2
70 235 16.1 112.4 IV 91.5
71 238 15.0 114.2 IV 93.0
72 240 20.1 111.4 IV 90.7
73 10/28/96 240 17.8 112.1 I 95.0
74 242 19.3 109.4 I 92.7
75 243 19.6 110.7 I 93.8
76 242 18.0 109.6 I 92.9
77 244 20.1 108.8 I 92.2
78 245 19.6 108.6 I 92.0
79 10/29/96 268 18.6 110.5 I 93.6
80 270 19.4 109.0 I 92.4
PROJECT NO. CE -5307
PLATE NO_ TWO (page 2)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST# DATE MRZ,- VERT. FIELD DRY DENSITY SOIL PERCENT
LQc._ LOS MQ IST LB. /CU. FT. TYPE COMPACTIO
81 10/29/96 See 272 18.5 109.8 III 93.1
82 Plate 244 19.2 111.4 III 94.4
83 One 245 18.6 109.9 III 93.1
84 246 17.8 112.2 III 95.1
85 10/30/96 274 19.3 108.0 I 91.5
86 276 18.3 110.0 I 93.2
87 245 16.2 112.1 III 95.0
88 247 17.6 109.7 III 93.0
89 10/31/96 247 16.4 111.7 IV 91.0
90 247 19.6 113.2 IV 92.2
91 247 17.0 113.4 IV 92.3
92 11/01/96 278 18.8 110.7 IV 90.1
93 246 15.7 113.6 IV 92.5
94 247 16.3 112.4 IV 91.5
95 254 15.0 111.7 IV 91.0
96 255 18.6 112.8 IV 91.9
97 11/04/96 282 18.3 109.2 III 92.6
98 284 18.8 111.8 III 94.7
99 288 16.4 113.2 III 95.9
100 11/05/96 293 15.3 115.3 IV 93.9
101 295 16.4 114.6 IV 93.3
102 11/06/96 292 16.7 112.7 IV 91.7
103 294 17.6 114.9 IV 93.5
104 297 16.6 113.4 IV 92.3
105 299 .18.8 112.2 IV 91.4
106 11/08/96 218 19.7 112.5 IV 91.6
107 220 17.3 114.0 IV 92.8
108 11/07/96 215 19.6 112.2 IV 91.4
109 217 16.8 114.6 IV 93.3
110 222 19.7 110.9 IV 90.3
111 11/11/96 219 14.6 115.4 IV 94.0
112 224 15.7 116.6 IV 95.0
113 11/12/96 201 18.6 106.0 V 91.6
114 203 16.5 110.8 V 95.8
115 204 14.6 111.7 V 96.5
116 206 17.7 107.3 V 92.7
117 208 18.6 110.7 III 93.8
118 210 17.6 109.4 III 92.7
119 211 18.0 108.0 III 91.5
120 11/12/96 205 15.1 112.6 III 95.4
PROJECT NO. CE -5307
PLATE NO. TWO (page 3)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
ATIO OF TEST RESULTS
TEST# DA-TK HORZ. yERT• M-LD DRY DENSITY SOIL PERCENT
LOC. LOC. d o= LB-/CU-FT, TM COMPACTION
121 11/12/96 See 207 19.6 108.0 III 91.5
122 Plate 208 18.3 110.7 III 93.8
123 One 209 19.8 107.5 III 90.9
124 218 16.8 115.7 IV 94.2
125 220 18.2 113.3 IV 92.3
126 221 15.0 116.2 IV 94.6
127 11/15/96 203 17.2 114.7 VI 93.9
128 205 15.8 114.3 VI 93.6
130 206 14.7 116.1 VI 95.1
131 213 16.6 114.7 IV 93.4
132 214 15.0 113.3 IV 92.3
133 11/18/96 208 17.8 110.1 VI 90.2
134 210 16.6 111.9 VI 91.7
135 211 16.8 110.5 VI 90.5
136 207 17.7 112.6 VI 92.3
137 209 15.4 111.4 VI 91.2
138 210 16.6 111.7 VI 91.5
139 11/19/96 213 16.8 112.3. 'VI 92.0
140 215 17.4 113.5 VI 93.0
141 214 15.1 111.6 VI 91.4
142 216 14.7 114.5 VI 93.8
143 11/20/96 215 17.7 110.5 VI 90.5
144 216 17.3 112.7 VI 92.3
145 217 15.6 112.9 VI 92.5
146 219 17.8 110.8 VI 90.8
147 11/26/96 220 14.9 118.4 VI 97.0
148 222 17.6 115.7 VI 94.8
149 221 18.9 111.1 VI 91.0
150 223 17.5 113.4 VI 92.9
151 11/27/96 225 17.5 113.2 VI 92.7
152 227 15.3 115.6 IV 94.7
153 226 17.8 110.2 VI 90.3
154 228 19.1 110.1 VI 90.2
155 12/02/96 223 17.3 112.7 VI 92.3
156 225 15.2 114.4 VI 93.7
157 227 18.1 111.7 VI 91.5
158 12/03/96 228 15.9 113.4 VI 92.9
159 229 16.4 112.2 VI 91.9
160 225 14.7 116.1 VI 95.1
161 227 18.3 112.8 VI 92.4
PROJECT NO. CE -5307
PLATE NO. TWO (page 4)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST DATY VERT, F IELD DRY DENSITY SOIL PERCENT
LOC. LOC. MOIST _ /CQ. FT. TYPE COMPACTIO
162 12/04/96 See 229 16.3 110.4 VI 90.4
163 Plate 231 17.8 111.7 VI 91.5
164 One 233 14.5 113.7 VI 93.1
165 12/05/96 231 17.4 112.2 VI 91.9
166 230 18.0 113.4 VI 92.9
167 232 16.6 115.4 VI 94.5
168 12/09/96 257RFG 11.3 114.3 VII 97.9
169 257RFG 11.4 110.4 VII 94.5
170 257RFG 13.6 112.7 VII 96.5
171 12/13/96 233 17.7 116.1 VIII 91.7
172 234 18.2 118.0 VIII 92.2
173 232 17.4 117.8 VIII 92.0
174 233 16.2 123.7 VIII 96.6
175 199 18.2 112.3 VI 92.0
176 201 16.2 113.6 VI 93.0
177 12/16/96 202 18.3 109.0 VI 90.8
178 204 17.6 111.3 VI 91.5
179 206 16.5 114.6 VI 93.8
180 208 17.0 112.1 VI 91.8
181 204 16.8 116.0 VI 95.0
182 12/17/96 208 15. 1 113. 1 VI 92.6
183 210 18.0 114.7 VI 93.9
184 212 18. 1 112.3 VI 91.9
185 207 16.9 115.6 VI 94.6
186 214 16.7 113.5 VI 92.9
187 209 15.0 114.0 VI 93.3
188 12/18/96 216 15.1 116.3 VI 95.2
189 218 16.7 112.1 VI 91.8
190 220 15.1 113.1 VI 92.6
191 12/19/96 222 14.9 113.0 VI 92.5
192 12/23/96 207 17.3 110.7 III 93.8
193 209 15.9 111.4 III 94.4
194 211 16.1 112.7 III 95.5
195 213 18.6 115.0 IV 93.6
196 215 19.2 114.1 IV 92.8
197 273 16.3 115.7 IX 95.2
198 275 17.4 114.0 IX 93.8
199 270 15.7 113.5 IX 93.4
200 12/26/96 216 18.2 111.6 IV 90.9
201 218 17.2 113.6 IV 92.5
PROJECT NO. CE -5307
PLATE NO. TWO (page 5)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
�r ATTON OF TEST RESULTS
'ES_# DATE Ij Dn VEST - FJ ELD DRY DENSITY SOIL MCM
LOC. Loc. MOIST j, B /C0. T. Tm COMPA TI
202 12/"6/96 See 215 16.3 115.4 IV 94.0
203 Plate 217 19.3 107.7 III 91.3
204 One 277 17.2 113.3 IX 93.3
205 279 16.1 115.0 IX 94.7
206 280 15.4 114.4 IX 94.2
207 271 15.0 116.3 IX 95.7
208 273 17.7 112.7 IX 92.8
209 12/27/96 230 15.7 114.9 IV 93.6
210 232 15.3 113.6 IV 92.5
211 218 17.0 109.4 III 92.7
212 220 18.3 110.2 III 93.3
213 210 16.2 109.0 III 92.3
214 212 17.7 108.7 III 92.1
215 12/30/96 281 17.7 111.4 IX 91.7
216 283 16.6 112.9 IX 92.9
217 282 15.7 112.7 IX 92.8
218 284 16.9 113.4 IX 93.3
219 285 15.3 114.0 IX 93.8
220 217 16.2 114.8 VI 94.0
221 219 16.7 112.9 VI 92.4
222 213 17.2 113.4 VI 92.6
223 215 16.3 115.6 VI 94.6
224 12/31/96 217 16.7 115.6 VI 94.7
225 219 17.7 113.1 VI 92.6
226 222 17.5 113.4 VI 92.9
227 224 14.7 118.4 VI 97.0
228 318 15.7 113.0 IX 93.0
229 320 15.4 111.4 IX 91.7
230 322 16.3 112.6 IX 92.7
231 288 19.3 112.6 IX 92.7
232 291 19.7 110.9 IX 91.3
233 01/02/97 217 18.6 111.2 III 94.2
234 219 19.2 113.3 III 96.0
235 221 17.5 111.0 III 94.1
236 227 16.2 110.7 III 93.8
237 229 16.6 112.4 VI 92.1
238
230 15.3 113.6 VI 93.0
239 223
15.0 112.2 2 VI 91.9
240 225 14.9 115.2 VI 94.3
241 293 15.2 113.7 IX 93.6
PROJECT NO. CE -5307
PLATE NO. TWO (page 6 )
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF T1ST RESULTS
TES DATE HORZ, yXgRT. E IKU DRY DENSITY SOIL
LOC. LOC. d.OIST LB 1cjL_IT� TYPE COMPACTION
ION
242 01/02/97 See 295 14.3 115.4 IX 95.0
243 Plate 297 14.7 114.7 IX 94.4
244 01/06/97 One 223 16.7 112.3 VI 92.0
245 225 15.8 113.0 VI 92.5
246 227 17.7 111.4 VI 91.2
247 294 16.8 114.1 X 90.
2 48 296 14.1 116.3 X 91.7
249 287 15.7 114.5 X 90.2
250 289 14.6 115.7 X 91.2
251 01/07/97 226 15.3 118.2 VI 96.8
252 228 16.8 115.7 VI 94.7
253 229 15.4 111.0 VI 90.9
254 230 17.3 112.6 VI 92.3
255 " 232 18.6 111.4 VI 91.2
256 290 17.0 114.7 X 90.4
257 292 15.2 114.5 X 90.2
258 298 16.4 116.0 X 91.4
259 299 13.2 117.3 X 92
260 01/08/97 234 14.7 112.3 VI 92.0
261 236 17.4 110.7 VI 90.7
262 238 14.5 114.4 VI 93.7
263 240 18.3 111.4 VI 91.2
264 242 17.0 113.7 VI 93.1
265 01/09/97 233 12.8 117.7 VIII 92.0
266 234 13.6 118.5 VIII 92.8
267 278 18.3 110.4 III 93.6
268 280 16.2 112.7 III 95.5
269 288 15.3 113.1 III 95.8
270 290 15.9 110.7 III 93.8
271 302 17.8 114.7 X 90.4
272 303 17.4 115.0 X 90.6
273 324 15.4 109.3 III 92.6
274 01/10/97 304 13.7 114.5 X 90.3
275 301 14.6 116.3 X 91.7
276 302 15.2 115.3 X 90.9
277 292 16.7 112.6 III 95.4
278 294 17.3 111.4 III 94.4
7 VI 93.1
01/15/97 270 16.2 113.
279
280 272 14.3 114.5 VI 9 3.8
281 273 14.4 115.9 VI 94.9
PROJECT NO. CE -5307
PLATE NO. TWO (page 7)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TES DATE HORZ, VERT, FIELD DRY DENSITY SOIL PERCENT
LOC_ LOC. NOIST LB./CU-FT. TYPE COMPACTIO
282 01/16/97 See 275 16.3 111.7 VI 91.5
283 Plate 277 15.9 113.0 VI 92.5
284 One 252 17.3 114.0 IX 93.8
285 254 18.2 110.7 IX 91.1
286 01/17/97 244 16.4 113.7 IX 93.6
287 246 17.3 115.4 IX 95.0
288 245 18.1 111.7 IX 91.9
289 247 18.4 110.4 IX 90.9
290 01/21/97 246 16.1 112.5 IX 92.6
291 01/22/97 230 18.4 116.5 IX 95.8
292 238 15.9 109.7 IX 90.2
293 235 18.1 114.6 IX 94.3
294 248 18.7 110.2 IX 90.6
295 232 18.1 112.5 IX 92.5
296 01/24/97 220 19.5 110.2 IX 90.6
297 234 18.1 111.1 IX 91.4
298 224 17.6 113.7 IX 93.6
299 226 15.4 112.4 IX 92.5
300 01/29/97 250 17.6 113.8 IX 93.7
301 337 15.4 115.0 IX 94.7
302 336 17.7 112.4 IX 92.5
303 01/30/97 338 14.7 117.1 VI 95.9
304 336 16.2 115.3 VI 94.9
305 338 13.6 120.1 IX 98.8
306 336 16.5 114.0 IX 93.8
307 02/01/97 228 14.7 113.7 VI 93.1
308 229 16.2 112.0 VI 91.7
309 234 17.3 111.4 VI 91.2
310 236 13.4 115.3 VI 94.4
311 340 13.3 116.2 VI 95.2
312 342 13.8 115.7 VI 94.8
313 02/04/97 229 15.9 118.2 XI 95.7
314 228 16. 1 117.0 XI 94.7
315 229 16.6 115.0 XI 93.1
316 228 17.4 114.6 XI 92.8
317 228 13.7 119.5 XI 96.8
318 223 18.6 112.3 XI 90.9
319 225 17.9 113.7 XI 92.1
320 227 15.6 115.2 XI 93.3
321 244 16.0 116.4 XI 94.3
PROJECT NO. CE -5307
PLATE NO. TWO (page 8 )
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF EST RESULTS
SST# DATE HORZ. VERT. FIELD DRY DENSITY SOIL EERCENT
L4C, LOC. N IST L, _ / U_ FT TM A ION
322 02/04/97 See 242 16.7 113.9 XI 92.2
323 Plate 244 17.6 113.0 XI 91.5
324 One 252 16.2 110.7 VI 90.7
325 254 17.3 112.0 VI 91.7
326 02/05/97 302 20.9 108.2 XIII 94.4
327 304 18.8 110.4 XIII 96.3
328 306 17.3 105.6 XIII 92.1
329 294 15.9 118.0 XII 90.1
330 296 17.3 119.2 XII 91.1
331 305 12.1 119.4 XII 91.2
332 306 13.8 120.3 XII 91.9
333 308 14.9 119.6 XII 91.6
334 02/06/97 329 14.3 110.2 XIII 96.2
335 331 19.6 105.7 XIII 92.2
336 333 20.4 104.9 XIII 91.5
337 308 13.8 119.7 XII 91.4
338 310 12.7 122.3 XII 93.4
339 312 11.9 124.3 -XII 95.0
340 302 15.6' 121.7 XII 93.0
341 296 14.4 120.8 XII 92.3
342 298 16.6 119.9 XII 91.6
343 02/07/97 332 19.7 111.3 XIII 97.1
344 334 15.6 112.4 XIII 98.1
345 336 17.6 106.7 XIII 93.1
346 335 20.7 103.3 XIII 90.1
347 336 15.6 108.2 XIII 94.4
348 333 20.4 104.6 XIII 91.3
349 335 19.7 107.4 XIII 93.7
350 02/10/97 335 16.8 118.7 XII 90.7
351 336 17.3 119.6 XII 91.4
352 335 19.4 106.5 XIII 93.0
353 336 15.3 119.0 XII 90.9
354 334 15.7 122.6 XII 93.7
355 294 16.7 116.7 XIV 96.0
356 296 13.7 118.2 XIV 97.3
357 304 14.9 117.8 XIV 97.0
358 233 14.2 117.9 VIII 92.1
359 235RFG 12.9 107.7 VII 92.2
360 233 13.2 118.6 VIII 92.7
361 235RFG 13.8 106.0 VII 90.8
PROJECT NO. CE -5307
PLATE NO TWO (page 9)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
� U AL TTON OF TEST RESULTS
REMARKS:
Test tabulated and not shown on Plate No. One were
taken on other lots in the subdivision. This is a
partial report for Lot #1 only for the purpose of
obtaining a building permit.
RFG = Rough Finish Grade
PROJECT NO. CE -5307
PLATE NO. TWO (page 10)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TA ULAT ION of TEST RESULT
OPTIMUM MOISTURE /MAXIMUM DENSITY
SOIL DESCRIPTION TYPE MAX. DRY DENSITY OPTIMUM MOISTURE
(lb /cu. ft. ) (% dry wt)
Red Brown Clay I 118.0 14.7
Red Brown Gravelly -
Clay II 121.5 14.5
Orange -Brown Clayey -
Gravel III 118.0 15.0
Orange- Red -Brown
Silty- Gravelly -Clay IV 122.8 13.5
Yellow -Tan Fine
Clayey -Sand V 115.7 14.6
Yellow Brown Clayey -
Gravel VI 122.1 13.6
Light White -Beige
Silty Sand VII 116.8 13.2
Light Orange Brown
Silty Gravelly Clayey
Sand VIII 128.0 11.2
Brown Red Silty
Gravelly Clay IX 121.5 13.7
Orange Brown Silty
Gravelly Clay X 126.8 11.5
Brown Orange Silty
Gravelly Clay XI 123.5 13.3
Gray Brown Gravelly
Clay XII 130.9 10.6
Brown Sandy Clay XIII 114.6 15.1
Yellow Beige Clayey
Gravel XIV 121.5 13.8
PROJECT NO. CE -5307
PLATE NO_ THREE (Page 1)
r /
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
Q I,ATION�_TEST RESl7r,TS
EXPANSION POTENTIAL
SAMPLE CND VIII
CONDITION Remold 90%
INITIAL MOISTURE M 10.7
AIR DRY MOISTURE M 8.3
FINAL MOISTURE ( %) 21.8
FINAL DRY DENSITY (pcf) 115.3
LOAD (psf) 150
SWELL ( %) 6.3
EXPANSION INDEX 63
DIRECT SHEAR
SAMPLE N O. VIII
CONDITION Remold 90%
ANGLE INTERNAL FRICTION 23
COHESION INTERCEPT (PCF) 280
PROJECT NO. CE -5307
PLATE NO. THREE (page 2)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
L~ '( March 27, 1997
Project No. CE -5307
Al Mayo �'�' Q►Q : EP�
1772 Kettering
Irvine, CA 92714 Lei G�� 0 "
Subject: Partial Report of Certification of Compacted Fill Ground
Proposed Single Family Dwellings
Lot #'s 2, 3, 4, 10 & 12 of Wildflower Estates
Encinitas, a i ornia
Dear Mr. Mayo.
In response to your request, the following report has been prepared
to indicate results of soil testing, observations and inspection of
earthwork construction at the subject site.
Testing and inspection services were performed from October 1, 1996
through March 27, 1997.
Briefly, our findings reveal filled ground has been compacted to a
minimum of ninety percent (90%). Therefore, we recommend
construction continue as scheduled.
SCOPE
Our firm was retained to observe grading operations with regard to
current standard practices and to determine the degree of
compaction of placed fill.
Grading plans were prepared by K & S Engineering of San Diego,
California.
Grading operations were performed by Greg Whillock of Vista,
California.
Reference is made to the following previously submitted soils
reports prepared by our firm.
1). "Preliminary Soils Investigation ", Lot #2, dated July
24, 1996 (CE- 5246).
2). Preliminary Soils Investigation ", Lot #3, dated July
18, 1996 (CE- 5247).
3). "Preliminary Soils Investigation ", Lot #4, dated July
12, 1996 (CE- 5248).
P.O. BOX 302002 • ESCONDIDO, CA 92030
(619) 480 -1116
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
March 27, 1997
Project No. CE -5307
Page 2
4). "Preliminary Soils Investigation ", Lot #10, dated
June 26, 1996(CE- 5254).
5). "Preliminary Soils Investigation ", Lot 12, dated
March 5, 1996 (CE- 5230).
Approximate locations and depth of filled ground and extent of
earthwork construction covered in this report are indicated on the
attached Plate No. One entitled, "Test Location Sketch ".
Grading operations were performed in order to create level building
pads to accommodate the proposed single family dwellings. Should
the finished pads be altered in any way, we should be contacted to
provide additional recommendations.
The sites were graded in accordance with recommendations set forth
in our previously submitted reports.
The site was graded to approximately conform to project plans.
Actual pad size and elevation may differ. Finish grade operations
are to be completed at a later date.
LABORATORY TESTING
Representative soil samples were collected and returned to the
laboratory for testing. The following tests were performed and are
tabulated on the attached Plate No. Three.
1. Optimum Moisture /Maximum Density (ASTM D -1557)
2. Expansion Potential Test
3. Direct Shear (ASTM D -3080)
SOIL CONDITIONS
Native soils encountered were gravelly- clays, silty - clays, and
clayey- sands. Fill soils were imported and generated from the on-
site excavation.
The building sites contained a transition from cut to fill.
However, cut areas located within the building areas were over
excavated a minimum of 3 feet and brought to grade with compacted
soil. Over excavation was carried a minimum of 5 feet beyond
exterior building perimeter. Hence, no consideration need be given
this characteristic.
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
March 27, 1997
Project No. CE -5307
Page 3
Expansive soils were observed during grading and exist at finish
grade. Therefore, special recommendations will be necessary to
reduce the probability of structure damage.
The keys were approximately 25 feet wide, a minimum of 3 feet in
depth and inclined into the slope. During earthwork construction,
native areas to receive fill were scarafied, watered and compacted
to a minimum of ninety percent (90 %) of maximum density. Subsequent
fill soils were placed, watered and compacted in 6 inch lifts.
Benches were constructed in natural ground at intermediate levels
to properly support the fill. To determine the degree of
compaction, field density tests were performed in accordance with
ASTM D -1556 or D -2922 at the approximate horizontal locations
designated on the attached Plate No. One entitled, "Test Location
Sketch ". A tabulation of test results and their vertical locations
are presented on the attached Plate No. Two entitled, "Tabulation
of Test Results ". Fill soils found to have a relative compaction of
less than ninety percent (90 %) were reworked until proper
compaction achieved.
RECOMMENDATIONS AND CONCLUSIONS
Continuous inspection was not requested to verify fill soils were
placed in accordance with current standard practices regarding
grading operations and earthwork construction. Therefore, as eco-
nomically feasible as possible, part -time inspection was provided.
Hence, the following recommendations are based on the assumption
that all areas tested are representative of the entire project.
1) Compacted fill and natural ground within the defined
building areas have adequate strength to safely support
the proposed loads.
2) Slopes may be considered stable with relation to deep
seated failure, provided they are properly maintained.
Slopes should be planted within 30 days of this report
with light groundcover (no gorilla iceplant) indigenous
to the area. Drainage should be diverted away from the
slopes to
prevent water flowing on the face of slope.
This will reduce the probability of failure as a result
of erosion.
NORTH COUNTY
COMPACTION
ENGINEERING, INC. s
March 27, 1997
Project No. CE -5307
Page 4
3) Continuous footings having a minimum width of 12
inches and founded a minimum of 24 inches below lowest
adjacent grade for one and two story, respectively, will
have an estimated allowable bearing value of 1500 lbs.
per square foot.
4) Footings located on or adjacent to slopes should be
founded at a depth such that the horizontal distance from
the bottom outside face of footing to the face of the
slope is a minimum of 8 feet.
5) Plumbing trenches should be backfilled with non -
expansive soil having a swell of less the 2% and a
minimum sand equivalent of 30. Backf ill soils should be
inspected and compacted to a minimum of ninety percent
(90 %) .
6) Unless requested, recommendations for future
improvements (additions, pools, recreational slabs,
additional grading, etc.) were not included in this
report. Prior to construction, we should be contacted to
update conditions and provide additional recommendations.
7) Expansive soils were observed during grading and exist
within 48 inches of finish grade. Therefore, foundations
should be constructed in accordance with Recommendation
6B2 or 6B3 of our "Preliminary Soils Investigation
reports.
8) Clayey soils should not be allowed to dry prior to
placing concrete. They should be watered to insure they
are kept in a very moist condition or at a moisture
content exceeding optimum moisture content by a minimum
of five percent (5 %) .
Prior to pouring of concrete, North County COMPACTION ENGINEERING,
INC. should be contacted to inspect foundation recommendations for
compliance to those set forth.
During placement of concrete, North County COMPACTION ENGINEERING,
INC. and /or a qualified concrete inspector should be present to
document construction of foundations.
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
March 27, 1997
Project No. CE -5307
Page 5
UNCERTAINTY AND LIMITATIONS
In the event foundation excavation and steel placement inspection
is required and /or requested, an additional cost of $170.00 will be
invoiced to perform the field inspection and prepare a Final
Conformance Letter. If foundations are constructed in more than one
phase, $120.00 for each additional inspection will be invoiced.
It is the responsibility of the owner and /or his representative to
carry out recommendations set forth in this report.
San Diego County is located in a high risk area with regard to
earthquake. Earthquake resistant projects are economically un-
feasible. Therefore, damage as a result of earthquake is probable
and we assume no liability.
We assume the on site safety of our personnel only. We cannot
assume liability of personnel other than our own. It is the
responsibility of the owner and contractor to insure construction
operations are conducted in a safe manner and in conformance with
regulations governed by CAL -OSHA and /or local agencies.
If you have any questions, please do not hesitate to contact us.
This opportunity to be of service is sincerely appreciated.
Respectfully submitted, FESS1
Q A
.,
North County ��� �tj,0 V EQ l e,,
COMPACTION ENGINEERING, INC.
CID GE71 N
x� 9 ....:.... 30 - 97
' v
onald K. Adams Dale R �G
President Registe r 19393
Geotechn 000713
RKA: kla
cc: (3) Submitted
(2) Filed
NORTH COUNTY COMPACTION ENGINEERING, INC.
SOIL TEST114G
-. Approx. Scale
ti 1 = 50'
DRW
5% 1 , 8, PVC / .E
{� p j pST
4, VC , j G3 gr
I-
Boa
T"_
PAQ8 518
VC
3-15 TEST
2 ^ }^
Z
1E 254
TEST LOCATION SKETCH
PROJECT No . CE -5307
PLATE No ONE
NORTH COUNTY COMPACTION ENGINEERING, INC. 40
SOIL TESTING
- = :_ - - ►. _ =*- - Approx. Scal
NI11QfZ0 . R - O lC!L` 1 11 = 501
OLrpvc --�
J 0. ` :1
Awl rpm.
PVC
- 252_ -
i 233 6
�.• ,- -291 .29'f
- G
i 50a T_
06`� _
a 510 -
a�Y"'
.309 -
- /o/ IE 2 -
o_ 0— -42L -TE_ ST-
IE 264. .
TEST LOCATION SKETCH
PROJECT No . CE -5307
PLATE No . ONE —A
NORTH COUNTY COMPACTION ENGINEERING, INC.
SOIL TESTING
Approx. Scale
1" = 40'
116 �
L 2
_b� _ 2 . 8: 4TH
2 T 24 240
42-
JE ??47.
_ 1T� 47.0 305 292 ` o
`31i.. 302'. 304 321
4 03 3l,2 404 260 25 ,
� 32? F
248.o 3
• �93 r
f 4054 301`
455 TEST 261 `DP
7 ?47 p 456 �
S�
?s • . mo tip,•
- N
1
TEST LOCATION SKETCH
PROJECT No . CE -5307
PLATE No . ONE -B
NORTH COUMN COMPACTION ENGINEERING, INC.
SOIL TESTING Approx. Scale
® 1 = 40'
,t35 »t VC
TG
/ _-
s 365
zW -
/;36
1 / / 3 j P0 340.01- -- -
3
/ 373 X391. -4EST
361/ �,� j
1 /
38 6 i� ;' / ;•�
TEST LOCATION SKETCH
PROJECT No . CE -5307
PLATE No . ONE —C
NORTH COUNTY COMPACTION ENGINEERING, INC.
SOIL TESTING Approx . Scal
® 1 = 40'
V
Y
,�. /, :'i� � � • ! /r r � % i �
399 Oa , r
310. OV
j' goo; ,•'°s�,
406
414
.. o .
TEST ,
3(�6 ► ,� `, 413
415
' ` 4.. Z
ID
o � WP's •', �. • , �� �. _ __ 2�
TEST LOCATION SKETCH
PROJECT No . CE -5307
PLATE No . ONE —D
N ORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESOLES
TEST# DOTE HORZ. VERT, FIELD DRY DENSITY SOIL PERCENT
LOC- j�OC. HOIST LB. /CU. FT. TYPE COMPACTION
1 10/08/96 See 226 17.3 108.8 I 92.2
2 Plate 227 17.0 107.2 I 90.8
3 10/09/96 One 229 16.2 111.1 I 94.2
.4 231 18.3 109.1 I 92.5
5 229 18.8 108.0 I 91.5
6 204 17.3 108.9 I 92.2
7 206 16.7 110.9 I 93.9
8 206 19.3 112.1 I 95.0
9 208 18.1 110.1 I 93.3
10 210 16.1 114.2 I 96.8
11 212 19.3 106.4 I 90.2
12 214 16.5 112.8 I 95.6
13 10/10/96 216 17.3 109.7 I 93.0
14 217 18.2 107.8 I 91.4
15 218 17.7 109.2 I 92.5
16 220 19.6 107.0 I 90.7
17 221 17.1 110.0 I 93.2
18 10/11/96 215 19.2 108.5 I 92.0
19 217 15.9 112.2 I. 95.1
20 222 17.2 109.2 I 92.5
21 10/14/96 233 14.3 117.2 11 96.4
22 235 15.9 111.8 II 92.0
23 230 18.0 112.2 II 92.3
24 232 17.1 112.6 II 92.7
25 221 15.4 114.4 II 94.2
26 223 16.2 113.7 II 93.6
27 212 14.3 112.3 I 95.2
28 214 13.8 111.2 I 94.3
29 10/15/96 234 16.3 111.5 II 91.8
30 236 16.6 112.7 II 92.8
31 237 17.2 113.4 II 93.4
32 225 15.8 117.6 II 96.8
33 226 18.1 113.1 II 93.1
34 228 17.3 111.6 II 91.8
35 10/16/96 238 17.8 111.7 II 91.9
36 240 18.0 113.3 II 93.3
37 241 15.4 109.1 I 92.4
38 243 18.3 106.9 I 90.6
39 266 18.1 109.2 I 92.5
40 268 18.5 107.0 I 90.7
PROJECT NO. CE -5307
PLATE NO. TWO (page 1)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST# D= HORZ. y$$T FTELD DRY DENSITY SOIL F ERCENT
LOC. r oC. MUST i.R. /CU. FT. TYPE_ COMPACTION
41 10/17/96 See 270 16.2 115.4 III 97.8
42 Plate 272 19.1 110.0 III 93.2
43 One 245 20.2 109.0 III 92.4
44 247 18.0 110.8 III 93.9
45 242 18.7 108.1 III 91.7
46 244 20.4 107.1 III 90.8
47 10/18/96 245 17.0 115.8 II 95.3
48 246 16.5 113.7 II 93.6
49 249 17.3 112.8 II 92.9
50 250 15.7 112.6 II 92.7
51 247 18.1 114.3 II 94.1
52 274 18.2 109.1 III 92.4
53 276 17.0 109.5 III 92.8
54 10/21/96 246 18.1 111.6 II 91.9
55 247 17.0 111.1 II 91.4
56 249 16.2 112.5 III 95.3
57 251 15.7 113.6 III 96.3
58 252 15.3 116.4 II 95.8
59 10/23/96 253 18.3 112.4 IV 91.5
60 255 17.1 111.0 IV 90.4
61 255 15.4 113.9 IV 92.8
62 256 16.2 113.1 IV 92.1
63 10/24/96 255 18.2 116.3 IV 94.7
64 256 16.5 110.9 IV 90.3
65 254 17.4 112.7 IV 91.8
66 255 15.7 112.1 IV 91.3
67 10/25/96 255 17.3 110.9 IV 90.3
68 256 16.6 111.9 IV 91.1
69 233 19.5 112.0 IV 91.2
70 235 16.1 112.4 IV 91.5
71 238 15.0 114.2 IV 93.0
72 240 20.1 111.4 IV 90.7
73 10/28/96 240 17.8 112.1 I 95.0
74 242 19.3 109.4 I 92.7
?5 243 19.6 110.7 I 93.8
76 242 18.0 109.6 I 92.9
77 244 20.1 108.8 I 92.2
78 245 19.6 108.6 I 92.0
79 10/29/96 268 18.6 110.5 I 93.6
80 270 19.4 109.0 I 92.4
PROJECT NO. CE -5307
PLATE NO. TWO (page 2 )
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST# DATE HORZ_ VERT_ FTRL) DRY DENSITY SOIL PERCENT
j s}� LOC _ NOIST LB-/CU-FT- T.y.PE, CONFACT ION
81 10/29/96 See 272 18.5 109.8 III 93.1
82 Plate 244 19.2 111.4 III 94.4
83 One 245 18.6 109.9 III 93.1
84 246 17.8 112.2 III 95.1
85 10/30/96 274 19.3 108.0 I 91.5
86 276 18.3 110.0 I 93.2
87 245 16.2 112.1 III 95.0
88 247 17.6 109.7 III 93.0
89 10/31/96 247 16.4 111.7 IV 91.0
90 247 19.6 113.2 IV 92.2
91 247 17.0 113.4 IV 92.3
92 11/01/96 278 18.8 110.7 IV 90.1
93 246 15.7 113.6 IV 92.5
94 247 16.3 112.4 IV 91.5
95 254 15.0 111.7 IV 91.0
96 255 18.6 112.8 IV 91.9
97 11/04/96 282 18.3 109.2 III 92.6
98 284 18.8 111.8. III 94.7
99 288 16.4 113.2 III 95.9
100 11/05/96 293 15.3 115.3 IV 93.9
101 295 16.4 114.6 IV 93.3
102 11/06/96 292 16.7 112.7 IV 91.7
103 294 17.6 114.9 IV 93.5
104 297 16.6 113.4 IV 92.3
105 299 18.8 112.2 IV 91.4
106 11/08/96 218 19.7 112.5 IV 91.6
107 220 17.3 114.0 IV 92.8
108 11/07/96 215 19.6 112.2 IV 91.4
109 217 16.8 114.6 IV 93.3
110 222 19.7 110.9 IV 90.3
111 11/11/96 219 14.6 115.4 IV 94.0
112 1. 224 15.7 116.6 IV 95.0
113 11/12/96 201 18.6 106.0 V 91.6
114 203 16.5 110.8 V 95.8
115 204 14.6 111.7 V 96.5
116 206 17.7 107.3 V 92.7
117 208 18.6 110.7 III 93.8
118 210 17.6 109.4 III 92.7
119 211 18.0 108.0 III 91.5
120 11/12/96 205 15.1 112.6 III 95.4
PROJECT NO. CE -5307
PLATE NO. TWO (page 3)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST# DM HORZ_ VERT. FIELD DRY DENSITY SQ L. PERCENT
LOC_ Of,, MOIST LB-/CU-FT. Tom& COMPACTION
121 11/12/96 See 207 19.6 108.0 III 91.5
122 Plate 208 18.3 110.7 III 93.8
123 One 209 19.8 107.5 III 90.9
124 218 16.8 115.7 IV 94.2
125 220 18.2 113.3 IV 92.3
126 221 15.0 116.2 IV 94.6
127 11/15/96 203 17.2 114.7 VI 93.9
128 205 15.8 114.3 VI 93.6
129 204 15.3 115.5 VI 94.6
130 206 14.7 116.1 VI 95.1
131 213 16.6 114.7 IV 93.4
132 214 15.0 113.3 IV 92.3
133 11/18/96 208 17.8 110.1 VI 90.2
134 210 16.6 111.9 VI 91.7
135 211 16.8 110.5 VI 90.5
136 207 17.7 112.6 VI 92.3
137 209 15.4 111.4 VI 91.2
138 210 16.6 111.7 VI 91.5
139 11/19/96 213 16.8 112.3 VI 92.0
140 215 17.4 113.5 VI 93.0
141 214 15. 1 111.6 VI 91.4
142 216 14.7 114.5 VI 93.8
143 11/20/96 215 17.7 110.5 VI 90.5
144 216 17.3 112.7 VI 92.3
145 217 15.6 112.9 VI 92.5
146 219 17.8 110.8 VI 90.8
147 11/26/96 220 14.9 118.4 VI 97.0
148 222 17.6 115.7 VI 94.8
149 221 18.9 111.1 VI 91.0
150 223 17.5 113.4 VI 92.9
151 11/27/96 225 17.5 113.2 VI 92.7
152 227 15.3 115.6 IV 94.7
153 226 17.8 110.2 VI 90.3
154 228 19.1 110.1 VI 90.2
155 12/02/96 223 17.3 112.7 VI 92.3
156 225 15.2 114.4 VI 93.7
157 227 18.1 111.7 VI 91.5
158 12/03/96 228 15.9 113.4 VI 92.9
159 229 16.4 112.2 VI 91.9
160 225 14.7 116.1 VI 95.1
161 227 18.3 112.8 VI 92.4
PROJECT NO. CE -5307
PLATE NO. TWO (page 4)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST# ]2ATB. HORZ. VERT. F.TELD DRY DENSITY SOIL PERCENT
LOG_ LOC_ MOIST LB-/CU-FT, TM COMPACTION
162 12/04/96 See 229 16.3 110.4 VI 90.4
163 Plate 231 17.8 111.7 VI 91.5
164 One 233 14.5 113.7 VI 93.1
165 12/05/96 231 17.4 112.2 VI 91.9
166 230 18.0 113.4 VI 92.9
167 232 16.6 115.4 VI 94.5
168 12/09/96 257RFG 11.3 114.3 VII 97.9
169 257RFG 11.4 110.4 VII 94.5
170 257RFG 13.6 112.7 VII 96.5
171 12/13/96 233 17.7 116.1 VIII 91.7
172 234 18.2 118.0 VIII 92.2
173 232 17.4 117.8 VIII 92.0
174 233 16.2 123.7 VIII 96.6
175 199 18.2 112.3 VI 92.0
176 201 16.2 113.6 VI 93.0
177 12/16/96 202 18.3 109.0 VI 90.8
178 204 17.6 111.3 VI 91.5
179 206 16.5 114.6 VI 93.8
180 208 17.0 112.1 VI 91.8
181 204 16.8 116.0 VI 95.0
182 12/17/96 208 15.1 113.1 VI 92.6
183 210 18.0 114.7 VI 93.9
184 212 18.1 112.3 VI 91.9
185 207 16.9 115.6 VI 94.6
186 214 16.7 113.5 VI 92.9
187 209 15.0 114.0 VI 93.3
188 12/18/96 216 15.1 116.3 VI 95.2
189 218 16.7 112.1 VI 91.8
190 220 15.1 113.1 VI 92.6
191 12/19/96 222 14.9 113.0 VI 92.5
192 12/23/96 207 17.3 110.7 III 93.8
193 209 15.9 111.4 III 94.4
194 211 16.1 112.7 III 95.5
195 213 18.6 115.0 IV 93.6
196 215 19.2 114.1 IV 92.8
197 273 16.3 115.7 IX 95.2
198 275 17.4 114.0 IX 93.8
199 270 15.7 113.5 IX 93.4
200 12/26/96 216 18.2 111.6 IV 90.9
201 218 17.2 113.6 IV 92.5
PROJECT NO. CE -5307
PLATE NO. TWO (page 5)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST# DATE HORZ_ VERT. FTEjD DRY DENSITY SOIL PERCENT
Lx- Lx- MOIST LB-/CU-FT, Tye$. COMPACTION
202 12/26/96 See 215 16.3 115.4 IV 94.0
203 Plate 217 19.3 107.7 III 91.3
204 One 277 17.2 113.3 IX 93.3
205 279 16.1 115.0 IX 94.7
206 280 15.4 114.4 IX 94.2
207 271 15.0 116.3 IX 95.7
208 273 17.7 112.7 IX 92.8
209 12/27/96 230 15.7 114.9 IV 93.6
210 232 15.3 113.6 IV 92.5
211 218 17.0 109.4 III 92.7
212 220 18.3 110.2 III 93.3
213 210 16.2 109.0 III 92.3
214 212 17.7 108.7 III 92.1
215 12/30/96 281 17.7 111.4 IX 91.7
216 283 16.6 112.9 IX 92.9
217 282 15.7 112.7 IX 92.8
218 284 16.9 113.4 IX 93.3
219 285 15.3 114.0 IX 93.8
220 217 16.2 114.8 VT 94.0
221 219 16.7 112.9 VI 92.4
222 213 17.2 113.4 VI 92.6
223 215 16.3 115.6 VI 94.6
224 12/31/96 217 16.7 115.6 VI 94.7
225 219 17.7 113.1 VI 92.6
226 222 17.5 113.4 VI 92.9
227 224 14.7 118.4 VI 97.0
228 318 15.7 113.0 IX 93.0
229 320 15.4 111.4 IX 91.7
230 322 16.3 112.6 IX 92.7
231 288 19.3 112.6 IX 92.7
232 291 19.7 110.9 IX 91.3
233 01/02/97 217 18.6 111.2 III 94.2
234 219 19.2 113.3 III 96.0
235 221 17.5 111.0 III 94.1
236 227 16.2 110.7 III 93.8
237 229 16.6 112.4 VI 92.1
238 230 15.3 113.6 VI 93.0
239 223 15.0 112.2 VI 91.9
240 225 14.9 115.2 VI 94.3
241 293 15.2 113.7 IX 93.6
PROJECT NO. CE -5307
PLATE NO. TWO (page 6 )
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST# DM BORZ, VERT, FTEyjZ DRY DENSITY SOIL PERCENT
LW,- LOC. MOIST LB. /C0.FT, TYPE COMPACTION
242 01/02/97 See 295 14.3 115.4 IX 95.0
243 Plate 297 14.7 114.7 IX 94.4
244 01/06/97 One 223 16.7 112.3 VI 92.0
245 225 15.8 113.0 VI 92.5
246 227 17.7 111.4 VI 91.2
247 294 16.8 114.1 X 90.0
248 296 14.1 116.3 X 91.7
249 287 15.7 114.5 X 90.2
250 289 14.6 115.7 X 91.2
251 01/07/97 226 15.3 118.2 VI 96.8
252 228 16.8 115.7 VI 94.7
253 229 15.4 111.0 VI 90.9
254 230 17.3 112.6 VI 92.3
255 232 18.6 111.4 VI 91.2
256 290 17.0 114.7 X 90.4
257 292 15.2 114.5 X 90.2
258 298 16.4 116.0 X 91.4
259 299 13.2 117.3 X 92.5
260 01/08/97 234 14.7 112.3 VI 92.0
261 236 17.4 110.7 VI 90.7
262 238 14.5 114.4 VI 93.7
263 240 18.3 111.4 VI 91.2
264 242 17.0 113.7 VI 93.1
265 01/09/97 233 12.8 117.7 VIII 92.0
266 234 13.6 118.5 VIII 92.8
267 278 18.3 110.4 III 93.6
268 280 16.2 112.7 III 95.5
269 288 15.3 113.1 III 95.8
270 290 15.9 110.7 III' 93.8
271 302 17.8 114.7 X 90.4
272 303 17.4 115.0 X 90.6
273 324 15.4 109.3 III 92.6
274 01/10/97 304 13.7 114.5 X 90.3
275 301 14.6 116.3 X 91.7
276 302 15.2 115.3 X 90.9
277 292 16.7 112.6 III 95.4
278 294 17.3 111.4 III 94.4
279 01/15/97 270 16.2 113.7 VI 93.1
280 272 14.3 114.5 VI 93.8
281 273 14.4 115.9 VI 94.9
PROJECT NO. CE -5307
PLATE NO. TWO (Page 7)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST# DATE $ORZ. VERT. FIELD DRY DENSITY SOIL PERCENT
LOC_ LOC_ MOIST I,f3_ /CO_ FT. TYPg COMPACTION
282 01/16/97 See 275 16.3 111.7 VI 91.5
283 Plate 277 15.9 113.0 VI 92.5
284 One 252 17.3 114.0 IX 93.8
285 " 254 18.2 110.7 IX 91.1
286 01/17/97 244 16.4 113.7 IX 93.6
287 246 17.3 115.4 IX 95.0
288 245 18.1 111.7 IX 91.9
289 " 247 18.4 110.4 IX 90.9
290 01/21/97 246 16.1 112.5 IX 92.6
291 01/22/97 230 18.4 116.5 IX 95.8
292 238 15.9 109.7 IX 90.2
293 " 235 18.1 114.6 IX 94.3
294 248 18.7 110.2 IX 90.6
295 232 18.1 112.5 IX 92.5
296 01/24/97 220 19.5 110.2 IX 90.6
297 234 18.1 111.1 IX 91.4
298 224 17.6 113.7 IX 93.6
299 226 15.4 112.4 IX 92.5
300 01/29 /97 250 17.6' 113.8 IX 93.7
301 337 15.4 115.0 IX 94.7
302 336 17.7 112.4 IX 92.5
303 01/30/97 338 14.7 117.1 VI 95.9
304 336 16.2 115.3 VI 94.9
305 338 13.6 120.1 IX 98.8
306 336 16.5 114.0 IX 93.8
307 02/01/97 228 14.7 113.7 VI 93.1
308 229 16.2 112.0 VI 91.7
309 234 17.3 111.4 VI 91.2
310 236 13.4 115.3 VI 94.4
311 340 13.3 116.2 VI 95.2
312 342 13.8 115.7 VI 94.8
313 02/04/97 229 15.9 118.2 XI 95.7
314 228 16.1 117.0 XI 94.7
315 229 16.6 115.0 XI 93.1
316 228 17.4 114.6 XI 92.8
317 228 13.7 119.5 XI 96.8
318 223 18.6 112.3 XI 90.9
319 225 17.9 113.7 XI 92.1
320 227 15.6 115.2 XI 93.3
321 244 16.0 116.4 XI 94.3
PROJECT NO. CE -5307
PLATE NO. TWO (Page 8)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TESTA DAM $ORZ. VERT. gyp DRY DENSITY SOIL PERCENT
LS2- LOC. MOIST LB. /CU. FT. TYPE COMPACTION
322 02/04/97 See 242 16.7 113.9 XI 92.2
323 Plate 244 17.6 113.0 XI 91.5
324 One 252 16.2 110.7 VI 90.7
325 254 17.3 112.0 VI 91.7
326 02/05/97 302 20.9 108.2 XIII 94.4
327 304 18.8 110.4 XIII 96.3
328 306 17.3 105.6 XIII 92.1
329 294 15.9 118.0 XII 90.1
330 296 17.3 119.2 XII 91.1
331 - 305 12.1 119.4 XII 91.2
332 306 13.8 120.3 XII 91.9
333 308 14.9 119.6 XII 91.6
334 02/06/97 329 14.3 110.2 XIII 96.2
335 331 19.6 105.7 XIII 92.2
336 333 20.4 104.9 XIII 91.5
337 308 13.8 119.7 XII 91.4
338 310 12.7 122.3 XII 93.4
339 312 11.9 124.3 .XII 95.0
340 302 15.6* 121.7 XII 93.0
341 296 14.4 120.8 XII 92.3
342 298 16.6 119.9 XII 91.6
343 02/07/97 332 19.7 111.3 XIII 97.1
344 334 15.6 112.4 XIII 98.1
345 336 17.6 106.7 XIII 93.1
346 335 20.7 103.3 XIII 90.1
347 336 15.6 108.2 XIII 94.4
348 333 20.4 104.6 XIII 91.3
349 335 19.7 107.4 XIII 93.7
350 02/10/97 335 16.8 118.7 XII 90.7
351 336 17.3 119.6 XII 91.4
352 335 19.4 106.5 XIII 93.0
353 336 15.3 119.0 XII 90.9
354 334 15.7 122.6 XII 93.7
355 294 16.7 116.7 XIV 96.0
356 296 13.7 118.2 XIV 97.3
357 304 14.9 117.8 XIV 97.0
358 233 14.2 117.9 VIII 92.1
359 235RFG 12.9 107.7 VII 92.2
360 233 13.2 118.6 VIII 92.7
361 235RFG 13.8 106.0 VII 90.8
PROJECT NO. CE -5307
PLATE NO TWO (page 9)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TAT# DATK $ORZ_ VERT. FTRLD DRY DENSITY SOIL PERCENT
LOG, Loc_ MOIST LB-/CU-FT, TUK COMPACTION
362 02/11/97 See 337 15.6 117.9 XII 90.1
363 Plate 338 14.7 118.3 XII 90.4
364 One 337 15.3 118.7 XII 90.7
365 337 14.4 119.7 XII 91.4
366 307 16.9 114.9 X 90.6
367 308 17.4 114.5 X 90.3
368 310 18.2 114.4 X 90.2
369 290 17.3 112.2 XIV 92.3
370 292 16.6 113.6 XIV 93.5
371 02/12/97 335 12.2 118.4 X 93.4
372 336 13.8 114.7 X 90.5
373 `' 338 14.6 118.9 X 93.8
374 280 14.0 118.8 X 93.7
37 02/13/97 299 11.9 126.5 XII 96.7
376 298 12.6 124.0 XII 94.7
377 302 11.4 123.2 XII 94.1
378 301 11.9 121.1 XII 95.2
379 308 13.4 122.6 XII 93.7
380 310 15.0 121.7 XII 93.0
381 311 12.0 124.9 XII 95.4
383 288 15.3 116.5 X 91.1
384 290 14.0 123.1 XII 94.0
385 292 13.7 122.6 XII 93.7
386 338 14.7 127.8 XII 97.6
387 338 13.8 120.0 XII 91.7
388 335 12.2 123.7 XII 94.5
389 337 15.8 115.7 X 91.2
390 02/14/97 338 12.6 123.7 XII 94.5
391 338 13.4 112.2 XI 90.8
392 282 13.2 120.7 X 95.2
393 282 14.8 124.0 XII 96.0
394 02/18/97 294 20.5 110.3 XIV 90.8
395 1. 276 16.6 116.3 XI 94.2
396 02/19/97 296 17.7 110.7 XIV 91.1
397 264 18.1 113.8 XI 92.1
398 247 17.3 114.2 XI 92.5
399 02/20/97 298 18.6 110.6 IX 91.0
400 301 17.4 112.5 IX 92.4
401 302 19.0 112.9 IX 92.9
402 242 18.3 111.7 VI 91.5
PROJECT NO. CE -5307
PLATE NO. TWO (page 10)
• NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESOLIS
TEST# RATE HORZ. y$$T F TRT,p DRY DENSITY SOIL PERCENT
LOC, Loc� MOIST LB_ /CQ. FT_ TYPE COMPACTION
403 02/20/97 See 243 17.6 112.2 VI 91.9
404 Plate 242 16.3 118.7 VI 97.2
405 02/21/97 One 304 17.3 118.6 IX 97.6
406 306 16.6 115.4 IX 95.0
407 307 18.5 112.7 IX 92.8
408 268 17.7 108.3 II 91.8
409 270 16.9 109.6 II 92.9
410 02/24/97 258 18.9 112.0 XV 93.3
411 308 17.9 115.2 XI 93.3
412 260 17.6 110.8 XV 92.3
413 309 18.0 115.2 XI 93.3
414 310 17.2 116.1 XI 94.0
415 310 15.1 115.4 XI 93.4
416 02/25/97 308 14.4 116.1 XI 94.0
417 309 14.7 119.7 XI 97.0
418 307 16.3 114.6 XI 92.8
419 262 17.7 109.6 XV 91.3
420 263 17.3 108.2 XV 90.2
421 239 14.4 112.7 XI 91.3
422 239 13.7 114.4 XI 92.6
423 02/26/97 251 11.8 123. 3 XI I 94.2
424 256 13.4 122.2 XII 93.4
425 253 11.1 129.0 XII 98.6
426 264 15.4 111.6 XV 93.0
427 262 16.2 112.0 XV 93.3
428 264 14.3 109.6 XV 91.3
429 02/28/97 268 17.2 113.4 XV 94.5
430 270 17.4 112.2 XV 93.5
431 272 18.2 110.7 XV 92.3
432 266 17.7 112.3 XV 93.6
433 268 18.6 110.1 XV 91.8
434 267 19.3 109.6 XV 91.3
435 274 19.5 117.2 XV 97.6
436 275 14.1 109.2 XV 91.0
437 272 16.1 117.0 XV 97.5
438 03/03/97 273 15.7 114.2 XV 95.2
439 272 17.2 113.6 XV 94.7
440 272 12.6 114.9 XV 95.8
441 274 15.7 113.0 XV 94.2
442 270 17.2 114.0 XV 95.0
PROJECT NO. CE -5307
PLATE NO TWO (page 11)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST# DATR HORZ. VERT_ FTRLD DRY DENSITY SOIL PERCENT
LOC. LOC_ MOIST LB. /C0. FT. TM COMPACTION
443 03/03/97 See 272 18.2 112.4 XV 93.7
444 Plate 276 20.0 109.3 XV 91.1
445 One 274 18.8 110.1 XV 91.8
446 276 18.5 111.0 XV 92.5
447 03/04/97 281 18.2 110.2 XV 91.8
448 275 19.6 109.3 XV 91.1
449 277 18.4 110.7 XV 92.3
450 282 17.1 111.1 XV 92.6
451 284 19.4 109.0 XV 90.8
452 277 14.4 115.2 XV 96.0
453 279 15.5 113.9 XV 94.9
454 03/05/97 245 13.7 120.9 XI 97.9
455 245 14.4 121.7 XI 98.5
456 246 15.6 119.2 XI 96.5
457 251 16.7 108.0 III 91.5
458 253 17.7 109.3 III 92.6
459 254 16.2 110.7 III 93.6
460 244 17.0 115.9 XI 93.8
461 03/06/97 221 18.2 109.4 XV 91.2
462 224 16.4 106.6 III 90.4
463 222 15.9 113.5 XV 94.5
464 03/07/97 220 19.0 112.9 XVI 90.0
465 222 20.2 113.8 XVI 90.7
466 222 13.8 120.4 XVI 95.9
467 220 18.0 114.5 XVI 91.2
468 221 20.1 113.3 XVI 90.3
469 03/10/97 226 16.9 118.5 XVI 94.7
470 226 17.9 113.8 XVI 90.7
471 223 17.6 120.2 XVI 95.8
472 223 17.5 114.6 XVI 91.3
473 03/11/97 293 18.1 110.7 XVII 92.6
474 295 16.4 112.6 XVII 94.2
475 295 15.5 113.4 XVII 94.9
476 297 15.0 115.4 XVII 96.6
477 216 20.7 111.0 I 94.1
478 216 17.7 112.2 I 95.1
479 217 21.6 110.7 XV 92.3
480 03/12/97 217 15.1 112.7 XV 93.9
481 219 15.4 114.9 XV 95.8
482 214 14.0 113.0 XV 94.1
PROJECT NO. CE -5307
PLATE NO. TWO (page 12)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST# RATE HORZ. VERT- Fj$yp DRY DENSITY SOIL PERCENT
LOC_ LOC. MOIST LB. /CU.FT_ TYPg COMPACTION
483 03/12/97 See 222 15.3 113.1 XV 94.3
484 11 Plate 223 17.1 106.2 III 90.0
485 03/13/97 One 250 16.5 113.9 XI 92.2
486 252 18.2 111.7 XI 90.4
487 253 17.3 115.4 XI 93.4
488 254 14.4 116.2 XI 94.1
489 220 16.7 109.2 XV 91.0
490 222 19.4 106.2 III 90.1
491 221 21.8 108.6 XV 90.5
492 03/14/97 232 15.7 115.4 XV 96.2
493 225 16.9 111.6 XV 93.0
494 232 14.5 114.0 XV 95.1
495 03/17/97 293 18.4 108.7 XVII 91.7
496 299 20.3 110.6 XVII 92.6
497 03/18/97 282 16.9 123.7 XVI 98.6
498 281 14.8 121.5 XVI 96.8
499 282 16.6 122,2 XVI 97.4
500 274 15.1 119.6 XVI 95.3
501 274 15.4 115.4 XVI 92.0
502 260 17.5 110.9 XVII 92.7
503 258 19.9 111.4 XVII 93.2
504 03/19/97 303 15.1 112.3 XVII 93.9
505 03/20/97 306 17.6 111.7 XVII 93.5
506 305 14.3 114.1 XVII 95.4
507 302 16.0 108.5 XVII 90.8
508 03/21/97 241 RFG 16.1 110.6 VII 94.6
509 241 RFG 12.1 108.6 VII 92.9
510 241 RFG 11.3 110.1 VII 94.3
511 03/24/97 305 16.4 112.7 XVII 94.3
512 303 17.9 108.8 XVII 91.0
513 303 15.3 110.4 XVII 92.3
514 03/26/97 306 15.0 117.4 XVII 98.7
515 308 14.7 116.3 XVII 97.1
516 308 15.3 115.1 XVII 96.3
517 306 14.1 116.5 XVII 97.5
518 03/27/97 230 RFG 12.2 118.7 XVIII 97.5
519 248 RFG 09.6 111.4 XVIII 91.6
520 340 RFG 10.2 110.5 XVIII 90.9
521 308 23.6 109.3 XVII 91.5
522 312 RFG 12.2 109.4 XVIII 90.0
PROJECT NO. CE -5307
PLATE NO TWO (page 13)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TARUL.ATTON OF TEST RESULTS
REMARKS:
Tests tabulated and not shown on Plate No. One
were taken on other lots in the subdivision. This
is a partial report for Lot Vs 2, 3, 4, 10, & 12
only for the purpose of obtaining a building
permit.
Test No. 382 not available due to a field report numbering
error.
RFG = Rough Finish Grade
PROJECT NO. CE -5307
PLATE NO. TWO (page 14)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
OPTIMUM MOISTURE/MAXIMUM DENSITY
SOIL DESCRIPTION TYPE MAX. DRY DENSITY OPTIMUM MOISTURE
(lb /cu. ft. ) (% dry wt)
Red Brown Clay I 118.0 14.7
Red Brown Gravelly -
Clay II 121.5 14.5
Orange -Brown Clayey -
Gravel III 118.0 15.0
Orange- Red -Brown
Silty- Gravelly -Clay IV 122.8 13.5
Yellow -Tan Fine
Clayey -Sand V 115.7 14.6
Yellow Brown Clayey-
Gravel VI 122.1 13.6
Light White -Beige
Silty Sand (Import) VII 116.8 13.2
Light Orange Brown
Silty Gravelly Clayey
Sand VIII 128.0 11.2
Brown Red Silty
Gravelly Clay IX 121.5 13.7
Orange Brown Silty
Gravelly Clay X 126.8 11.5
Brown Orange Silty
Gravelly Clay XI 123.5 13.3
Gray Brown Gravelly
Clay XII 130.9 10.6
Brown Sandy Clay XIII 114.6 15.1
Yellow Beige Clayey
Gravel XIV 121.5 13.8
PROJECT NO. CE -5307
PLATE NO. THREE (page 1)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESDL.TS
OPTIMUM MOISTURE/MAXIMUM DENSITY
SOIL DESCRIPTION TYPE MAX. DRY DENSITY OPTIMUM MOISTURE
(lb /cu. ft. ) (% dry wt)
.Orange Brown Silty -
Clay XV 120.0 15.5
Orange Brown Silty -
Clayey Gravel XVI 125.5 12.0
Yellow Red Gravelly -
Clay XVII 119.5 14.0
Yellow Tan Silty -
Sand ( Import) XVIII 121.5 11.7
EXPANSION POTENTIAL
SAMPLE NO, XI XVI XVII
CONDITION Remold 90% Remold 90% Remold 90%
INITIAL MOISTURE ( %) 13.8 11.5 13.5
AIR DRY MOISTURE ( %) 10.5 7.7 6.8
FINAL MOISTURE ( %) 24.3 23.1 25.0
FINAL DRY DENSITY (pcf) 111.2 113.0 107.6
LOAD (psf ) 150 150 150
SWELL ( %) 7.7 7.2 7.5
EXPANSION INDEX 77 72 75
DIRECT SHEAR
SAMPLE N0, XI XVI XVII
CONDITION Remold 90% Remold 90% Remold 90%
ANGLE INTERNAL FRICTION 15 22 17
COHESION INTERCEPT (PCF) 320 200 290
PROJECT NO. CE -5307
PLATE NO. THREE (page 2)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
May 6 1997
Project No. CE-5307
Al Mayo
1772 Kettering MAY 121997
Irvine, CA 92714 ""GI
SERVICES
Subject: Partial Report of Certification of Compacted Fill Ground
Proposed Single Family Dwellings
Lot #'s 7, 8, 9, 20, & 21 of Wildflower Estates
Encinitas, California
Dear Mr. 1 , 1 1 3yo:
In response to Your request, the following report has been prepared
to indicate results of soil testing, observations and inspection of
earthwork construction at the subject site.
Testing and inspection services were performed from October 1, 1996
through April 22, 1997.
Briefly, our f indings reveal filled ground has been compacted to a
L
minimum Of ninety inety Percent (90%). Therefore, we recommend
construction continue as scheduled.
S-C-QEX
Our firm was retained to observe grading operations with regard to
current standard practices and to determine the degree of
compaction of placed fill.
Grading Plans were prepared by K & S Engineering of San Diego,
California.
Grading operations were Performed by Greg Whillock of Vista,
California.
Reference is made to the following Previously submitted soils
reports Prepared by our firm.
1). "Preliminary Soils Investigation ", Lot #7, dated July
8, 1996 (CE-5251).
2). Preliminary Soils Investigation", Lot #8, dated July
8, 1996 (CE-5252).
3) . "Preliminary Soils Investigation", Lot A9, dated July
12, 1996 (CE-5253).
P.O. BOX 302002 * ESCONDIDO, CA 92030
(619) 480-1116
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
May 6, 1997
Project No. CE -5307
Page 2
4). "Preliminary Soils Investigation ", Lot #13, dated
February 22, 1996 (CE- 5221).
5). "Preliminary Soils Investigation ", Lot #20, dated May
3, 1996 (CE- 5260).
6). "Preliminary Soils Investigation" Lot #21, dated May
14, 1996. (CE- 5261).
Approximate locations and depth of fi11_ed ground and extent of
earthwork construction covered in this report are indicated on the
attached Plate No. One entitled, "Test Location Sketch ".
Grading operations were performed in order to create level building
pads to accommodate the proposed single family dwellings. Should
the finished pads be altered in any way, we should be contacted to
.provide additional recommendations.
The sites were graded in accordance with recommendations set forth
in our previously submitted reports.
The site was graded to approximately conform to project plans.
Actual pad sine and elevation may differ. Finish grade operations
are to be completed at a later date.
LABORATORY TESTING
Representative soil samples were collected and returned to the
laboratory for testing. The following tests were performed and are
tabulated on the attached Plate No. Three.
1. Optimum Moisture /Maximum Density (ASTM D -1557)
2. Expansion Potential Test
3. Direct Shear (ASTM D -3080)
$OIL CONDITIONS
Native soils encountered were gravelly- clays, silty - clays, and
clayey- sands. Fill soils were imported and generated from the on-
site excavation.
The building sites contained a transition from cut to fill.
However, cut areas located within the building areas were over
excavated a minimum of 3 feet and brought to grade with compacted
soil. Over excavation was carried a minimum of 5 feet beyond
,NORTH COUNTY
COMPACTION
ENGINEERING, INC.
May 6, 1997
Project No. CE -5307
Page 3
exterior building perimeter. Hence, no consideration need be given
this characteristic.
Expansive soils were observed during grading and exist within 4
feet of finish grade. Therefore, special recommendations will be
necessary to reduce the probability of structure damage.
The keys were approximately 25 feet wide, a minimum of 3 feet in
depth and inclined into the slope. During earthwork construction,
native areas to receive fill were scarafied, watered and compacted
to a minimum of ninety percent (90 %) of maximum density. Subsequent
fill soils were placed, watered and compacted in 6 inch lifts.
Benches were constructed in natural ground at intermediate levels
to properly support the fill. To determine the degree of
compaction, field density tests were performed in accordance with
ASTM D -1556 or D -2922 at the approximate horizontal locations
designated on the attached Plate No. One entitled, "Test Location
Sketch ". -A tabulation of test results and their vertical locations
are Fresented.on the attached Plate No. Two entitled, "Tabulation
of Test Results ". Fill soils found to have a relative compaction of
less than ninety percent (90 %) were reworked until proper
compaction was achieved.
R£COMIONS AND CONCLDSIONS
Continuous inspection was not requested to verify fill soils were
placed in accordance with current standard practices regarding
grading operations and earthwork construction. Therefore, as eco-
nomically feasible as possible, part -time inspection. was provided.
Hence, the following recommendations are based on the assumption
that all areas tested are representative of the entire project.
1) Compacted fill and natural ground within the defined
building areas have adequate strength to safely support
the proposed loads.
2) Slopes may be considered stable with relation to deep
seated failure, provided they are properly maintained.
Slopes should be planted within 30 days of this report
with light groundcover (no gorilla iceplant) indigenous
to the area. Drainage should be diverted away from the
slopes to prevent water flowing on the face of slope.
This will reduce the probability of failure as a result
of erosion.
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
May 6, 1997
Project No. CE -5307
Page 4
3) Continuous footings having a minimum width of 12
inches and founded a minimum of 24 inches below lowest
adjacent grade for one and two story, respectively, will
have an estimated allowable bearing value of 1500 lbs.
per square foot.
4) Footings located on or adjacent to slopes should be
founded at a depth such that the horizontal distance from
the bottom outside face of footing to the face of the
slope is a minimum of 8 feet.
5) Plumbing trenches should be backfilled with non -
expansive soil having a swell of less the 2% and a
minimum sand equivalent of 30. Backfill soils should be
inspected and compacted to a minimum of ninety percent
(90 %).
6) Unless requested, recommendations •for future
improvements (additions, 'pools, recreational slabs,
additional grading, etc.) were not included in this
report. Prior to construction, we should be contacted to
update conditions and provide additional recommendations.
7) Expansive soils were observed during grading and exist
within 48 inches of finish grade. Therefore, foundations
should be constructed in accordance with Recommendation
6B2 or 6B3 of our "Preliminary Soils Investigation"
reports.
8) Clayey soils should not be allowed to dry prior to
placing concrete. They should be watered to insure they
are kept in a very moist condition or at a moisture
content exceeding optimum moisture content by a minimum
of five percent (5%) .
Prior to of concrete, North County COMPACTION ENGINEERING,
INC_ should be contacted to inspect foundation recommendations for
compliance to those set forth.
During placement of concrete, North County COMPACTION ENGINEERING,
INC. and /or a qualified concrete inspector should be present to
document construction of foundations.
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
May 6, 1997
Project Mo. CE -5307
Page 5
UN CERTAINTY AND LIMITATIONS
In the event foundation excavation and steel placement inspection
is required and /or requested, an additional cost of $170. 00 will be
invoiced to perform the field inspection and prepare a Final
Conformance Letter. If foundations are constructed in more than one
phase, $120.00 for each additional inspection will be invoiced.
It is the responsibility of the owner and /or his representative to
carry out recommendations set forth in this report.
San Diego County is located in a high risk area with regard to
earthquake. Earthquake resistant projects are economically un-
feasible. Therefore, damage as a result of earthquake is probable
and we assume no liability.
We assume the on site safety of our personnel only. We cannot
assume liability of personnel other than our own. It is the
responsibility of the owner* and contractor to insure construction
operations are conducted in a safe manner and in conformance with
regulations.governed by CAL- OSHA.and /or local agencies.-
If you have any questions, please do not hesitate to contact us.
This opportunity to be of service is sincerely appreciated.
Respectfully submitted, OQ[ SJ �;y
G FIQ
North County
COMPACTION ENGINEERING, INC. r
No, GE713
CC x 9 -30.97
onald K. Adams Dale R. FO
P nt istered reside TE N�
Registered 19393
Geotechnical n 000713
RKA: kla
cc: (3) Submitted
(2 ) Filed
NORTH COUNTY COMPACTION ENGINEERING, INC. '
soy. TESTING
PROPOSED SINGLE FAMILY DWELLING
LOT V , WILDFLOWER ESTATES
ENCINITAS , CALIFORNIA
No Scale
35 .�
3 6 0
' rte: -- " ,% �•- �,-
TEST LOCATION SKETCH
PROJECT No . CE -5307
PLATE No ONE
NORTH COUNTY COMPACTION ENGINEERING, INC.
SOIL TESTING
PROPOSED SINGLE FAMILY DWELLING
LOT #8, WILDFLOWER ESTATES
ENCINITAS, CALIFORNIA
_ f j No Scale
!= u .
/ 9 / ��-6 '' � 300 �
�= 27 ,
29
" g+
= 30-99 -
5
ST
- - - 575 - 5,
Rio
310 i �1/ T •- ' /f -t�" ?Z
32
rte - - 2
'x
TEST LOCATION SKETCH
'PROJECT No CE -5307
PLATE No . ONE —A
t
NORTH COUNTY COMPACTION ENGINEERING, INC.
SOIL TESTING
PROPOSED SINGLE FAMILY DWELLING
LOT #9, WILDFLOWER ESTATES
ENCINITAS, CALIFORNIA
No Scale
VC
7 ,
�• 9 %3 g / $� TE T
r o
jz
313.0/' /
389
TEST LOCATION SKETCH
PROJECT No . CE -5307
PLATE No . ONE —B
NORTH COUNTY COMPACTION ENGINEERING, INC.
SOIL TESTING
PROPOSED SINGLE FAMILY DWELLING
LOT #13, WILDFLOWER ESTATES
ENCINITAS, CALIFORNIA
No Scale
i lk 'A
539 -
OT
f� AE 271. 5
35 -
\w\ �......_
e 21 • ° \o � AD 2770 5 BEST
C `
zz
1E .4,7 7 � 0
21
-''E •
�� �• .74 ...-
• `\* • :moo .. ; .. \ _ ``
TEST LOCATION SKETCH
PROJECT No . CE -5307
PLATE No . ONE —C
a
NORTH COUNTY COMPACTION ENGINEERING, INC.
SOIL TESTING
PROPOSED SINGLE FAMILY DWELLING
LOT #20, WILDFLOWER ESTATES
ENCINITAS, CALIFORNIA
No Scale
wr .57
�, / 469 ••-- �.._.� °��,�.
wo
4
r �~e• � Ito --�
TEST LOCATION SKETCH
PROJECT No . CE -5307
PLATE No . ONE -D
NORTH COUNTY COMPACTION ENGINEERING, INC.
SOIL TESTING
PROPOSED SINGLE FAMILY DWELLING
LOT #21, WILDFLOWER ESTATES
ENCINITAS, CALIFORNIA
No Scale
i 71
°-- �489,j - - - -
-r - - F ---- -- 1' 226
No 490 ~T BST .¢
_48,3 _ 84
�UCr sRO - 477
TYPr EX�•tP� o— w arcx� L - 491
-
- �s O
-: T 2
21 1� 1
PAp
-ft 478 113 I /3
IE 215 Q 156'4 PVC 9y
288.16'
RECREATI p RAP Fe,•....
CaNNfCT tC PU8tJC SER �' ER
—
TypF A , n T0 EX �,.. • --
TEST LOCATION SKETCH
PROJECT No . CE -5307
PLATE No . ONE —E
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
VEST# DATE HORZ, VERT,_ FIELD DRY DENSITY SOIL PERCENT
LOC. LOC. MOIST LB. /CU. FT. TYPE COMPAC TION
1 10/08/96 See 226 17.3 108.8 I 92.2
2 11 Plate 227 17.0 107.2 I 90.8
3 10/09/96 Orie 229 16.2 111.1 I 94.2
4 231 18.3 109.1 I 92.5
5 229 18.8 108.0 I 91.5
6 204 17.3 108.9 I 92.2
7 206 16.7 110.9 I 93.9
8 " 206 19.3 112.1 I 95. 0
9 208 18.1 110.1 I 93.3
10 210 16.1 114.2 I 96.8
li 212 19.3 106.4 I 90.2
12 214 16.5 112.8 I 95.6
13 10/10/96 216 17.3 109.7 I 93.0
14 217 18.2 107.8 I 91.4
15 218 17.7 109.2 I 92.5
16 220 19.6 107.0 I 90.7
17 221 17. 1 110.0 I 93.2
18 10/11/96 215 19.2 108.5 I 92.0
19 1. 217 15.9 112. 2 I. 95. 1
20 222 17.2 109.2 I 92.5
21 10/14/96 233 14.3 117.2 II 96.4
22 235 15.9 111.8 II 92.0
23 230 18.0 112.2 II 92.3
24 232 17.1 112.6 II 92.7
25 221 15.4 114.4 II 94.2
26 223 16.2 113.7 II 93.6
27 212 14.3 112.3 I 95.2
28 214 13.8 111.2 I 94.3
29 10/15/96 234 16.3 111.5 II 91.8
30 " 236 16.6 112.7 I1 92.8
31 237 17.2 113.4 II 93.4
32 225 15.8 117.6 IT 96.8
33 226 18.1 113.1 II 93.1
34 228 17.3 111.6 II 91.8
35 10/16/96 238 17.8 111.7 11 91.9
36 240 18.0 113.3 II 93.3
37 241 15.4 109.1 I 92.4
38 243 18.3 106.9 I 90.6
39 266 18.1 109.2 I 92.5
40 " " 268 18.5 107.0 i 90.7
PROJECT NO. CE -5307
PLATE NO. TWO (Page 1)
. NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
T EST# DATE HORZ, VERT. FIELD DRY DENSITY SOIL PERCENT
LOC. LOC, FOIST LB. /CU. FT. TYPE COMPACTION_
41 10/17/96 See 270 16.2 115.4 III 97.8
42 Plate 272 19.1 110.0 III 93.2
43 One 245 20.2 109.0 III 92.4
44 247 18.0 110.8 III 93.9
45 242 18.7 108.1 III 91.7
46 244 20.4 107.1 III 90.8
47 10/18/96 245 17.0 115.8 II 95.3
48 246 16.5 113.7 II 93.6
49 249 17.3 112.8 II 92.9
50 250 15.7 112.6 II 92.7
51 247 18.1 114.3 II 94.1
52 274 18.2 109.1 III 92.4
53 276 17.0 109.5 III 92.8
54 10/21/96 246 18.1 111.6 II 91.9
55 247 17.0 111.1 II 91.4
56 " 249 16.2 112.5 III 95.3
57 251 15.7 113.6 III 96.3
58 252 15.3 116.4 II 95.8
59 10/23/96 253 18.3 112.4 IV 91.5
60 255 17.1 111.0 IV 90.4
61 255 15.4 113.9 IV 92.8
62 256 16.2 113.1 IV 92.1
63 10/24/96 255 18.2 116.3 IV 94.7
64 256 16.5 110.9 IV 90.3
65 254 17.4 112.7 IV 91.8
66 255 15.7 112.1 IV 91.3
67 10/25/96 255 17.3 110.9 IV 90.3
68 256 16.6 111.9 IV 91.1
69 233 19.5 112.0 IV 91.2
70 235 16.1 112.4 IV 91.5
71 238 15.0 114.2 IV 93.0
72 240 20.1 111.4 IV 90.7
73 10/28/96 240 17.8 112.1 I 95.0
74 242 19.3 109.4 I 92.7
75 243 19.6 110.7 I 93.8
76 242 18.0 109.6 I 92.9
77 244 20.1 108.8 I 92.2
78 245 19.6 108.6 I 92.0
79 10/29/96 268 18.6 110.5 I 93.6
80 270 19.4 109.0 I 92.4
PROJECT NO. CE -5307
PLATE NO. TWO (Page 2)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TES DATE HORZ. VERT. FIELD DRY DENSITY SOIL PERCENT
LOC. LOC. MOIST T.B -/CU-FT, TYPE COMPACTION
81 10/29/96 See 272 18.5 109.8 III 93.1
82 Plate 244 19.2 111.4 III 94.4
83 One 245 18.6 109.9 III 93.1
84 246 17.8 112.2 III 95.1
85 10/30/96 274 19.3 108.0 I 91.5
86 276 18.3 110.0 I 93.2
87 245 16.2 112.1 III 95.0
88 247 17.6 109.7 III 93.0
89 10/31/96 247 16.4 111.7 IV 91.0
90 247 19.6 113.2 IV 92.2
91 247 17.0 113.4 IV 92.3
92 11/01/96 278 18.8 110.7 IV 90.1
93 246 15.7 113.6 IV 92.5
94 247 16.3 112.4 IV 91.5
95 254 15.0 111.7 IV 91.0
96 255 18.6 112.8 IV 91.9
97 11/04/96 282 18.3 109.2 III 92.6
98 284 18.8 111.8. III 94.7
99 288 ' 16. 4 113.2 III 95.9
100 11/05/96 293 15.3 115.3 IV 93.9
101 295 16.4 114.6 IV 93.3
102 11/06/96 292 16.7 112.7 IV 91.7
103 294 17.6 114.9 IV 93.5
104 297 16.6 113.4 IV 92.3
105 299 18.8 112.2 IV 91.4
106 11/08/96 218 19.7 112.5 IV 91.6
107 1. 220 17.3 114.0 IV 92.8
108 11/07/96 215 19.6 112.2 IV 91.4
109 217 16.8 114.6 IV 93.3
110 222 19.7 110.9 IV 90.3
ill 11/11/96 219 14.6 115.4 IV 94.0
112 1. 224 15.7 116.6 IV 95.0
113 11/12/96 201 18.6 106.0 V 91.6
114 203 16.5 110.8 V 95.8
115 204 14.6 111.7 V 96.5
116 206 17.7 107.3 V 92.7
117 208 18.6 110.7 III 93.8
118 210 17.6 109.4 III 92.7
119 211 18.0 108.0 III 91. 5
120 11/1-2/96 205 15.1 112.6 III 95.4
PROJECT NO. CE -5307
PLATE NO. TWO (page 3)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
,
TEST# RATE HORZ. VERT _ FIELD DRY DENSITY SOIL PERCENT
LOC. LOC- MOIST LB. /CU. FT. TYPE COMPACTION
121 11/12/96 See 207 19.6 108.0 III 91.5
122 Plate 208 18.3 110.7 III 93.8
123 One 209 19.8 107.5 III 90.9
124 218 16.8 115.7 IV 94.2
125 220 18.2 113.3 IV 92.3
126 221 15.0 116.2 IV 94.6
127 11/15/96 203 17.2 114.7 VI 93.9
128 205 15.8 114.3 VI 93.6
129 204 15.3 115.5 VI 94.6
130 206 14.7 116.1 VI 95.1
131 213 16.6 114.7 IV 93.4
132 214 15.0 113.3 IV 92.3
133 11/18/96 208 17.8 110.1 VI 90.2
134 210 16.6 111.9 VI 91.7
135 211 16.8 110.5 VI 90.5
136 207 17.7 112.6 VI 92.3
137 209 15.4 111.4 VI 91.2
138 - 210 16.6 111.7 VI 91.5
139 11/19/96 213 16.8 112.3 VI 92.0
140 215 17.4 113.5 VI 93.0
141 214 15. 1 111.6 VI 91.4
142 216 14.7 114.5 VI 93.8
143 11/20/96 215 17.7 110.5 VI 90.5
144 216 17.3 112.7 VI 92.3
145 217 15.6 112.9 VI 92.5
146 219 17.8 110.8 Vi 90.8
147 11/26/96 220 14.9 118.4 VI 97.0
148 222 17.6 115.7 VI 94.8
149 221 18.9 111.1 VI 91.0
150 223 17.5 113.4 VI 92.9
151 11/27/96 225 17.5 113.2 VI 92.7
152 227 15.3 115.6 IV 94.7
153 226 17.8 110.2 VI 90.3
154 228 19.1 110.1 VI 90.2
155 12/02/96 223 17.3 112. 7 VI 92.3
156 225 15.2 114.4 VI 93.7
157 227 18. i 111.7 VI 91.5
158 12/03/96 228 15.9 113.4 VI 92.9
159 229 16.4 112.2 VI 91.9
160 225 14.7 116.1 VI 95.1
161 227 18.3 112.8 VI 92.4
PROJECT NO_ CE -5307
PLATE NO. TWO (page 4 )
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST# DATA E ORZ_ VERT. FIELD DRY DENSITY SOIL PERCENT
LOC. LOC, MOIST LB. /CQ. Tom. TYPE COACTIO
162 12/04/96 See 229 16.3 110.4 VI 90.4
163 Plate 231 17.8 111.7 VI 91.5
164 One 233 14.5 113.7 VI 93.1
165 12/05/96 231 17.4 112.2 VI 91.9
166 230 18.0 113.4 VI 92.9
167 232 16.6 115.4 VI 94.5
168 12/09/96 257RFG 11.3 114.3 VII 97.9
169 257RFG 11.4 110.4 VII 94.5
170 257RFG 13.6 112.7 VII 96.5
171 12/13/96 233 17.7 116.1 VIII 91.7
172 234 18.2 118.0 VIII 92.2
173 232 17.4 117.8 VIII 92.0
174 233 16.2 123.7 VIII 96.6
175 199 18.2 112.3 VI 92.0
176 201 16.2 113.6 VI 93.0
177 12/16/96 202 18.3 109.0 III 92.3
178 204 17.6 111.3 VI 91.5
179 206 16.5 114.6 VI 93.8
180 208 17.0 112.1 VI 9 1. 8
181 204 16.8 116.0 VI 95.0
182 12/17 /96 208 15.1 113.1 VI 92.6
183 210 18.0 114.7 VI 93.9
184 212 18. 1 112.3 VI 91.9
185 207 16.9 115.6 VI 94.6
186 214 16.7 113.5 VI 92.9
187 209 15.0 114.0 VI 93.3
188 12/18/96 216 15.1 116.3 VI 95.2
189 218 16.7 112.1 VI 91.8
190 220 15.1 113.1 VI 92.6
191 12/19/96 222 14.9 113.0 VI 92.5
192 12/23/96 207 17.3 110.7 III 93.8
193 209 15.9 111.4 III 94.4
194 211 16.1 112.7 III 95.5
195 213 18.6 115.0 IV 93.6
196 215 19.2 114.1 IV 92.8
197 273 16.3 115.7 IX 95.2
198 275 17.4 114.0 IX 93.8
199 270 15.7 113.5 IX 93.4
200 12/26/96 216 18.2 111.6 IV 90.9
201 218 17.2 113.6 IV 92.5
PROJECT NO. CE -5307
PLATE NO. TWO (page 5)
-NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESUL IS
TEST DATE HORZ. VERT. FIELD DRY DENSITY SOIL PERCENT
LD-Q- LOG, MOIST LB./CU-,ET- TYPE COMPACTIO
202 12/26/96 See 215 16.3 115.4 IV 94.0
203 Plate 217 19.3 107.7 III 91.3
204 One 277 17.2 113.3 IX 93.3
.205 279 16.1 115.0 IX 94.7
206 280 15.4 114.4 IX 94.2
207 271 15.0 116.3 IX 95.7
208 273 17.7 112.7 IX 92.8
209 12/27/96 230 15.7 114.9 IV 93.6
210 232 15.3 113.6 IV 92.5
211 218 17.0 109.4 III 92.7
212 220 18.3 110.2 III 93.3
213 210 16.2 109.0 III 92.3
214 212 17.7 108.7 III 92.1
215 12/30/96 281 17.7 111.4 IX 91:7
216 283 16.6 112.9 IX 92.9
217 282 15.7 112.7 IX 92.8
218 284 16.9 113.4 IX 93.3
219 285 15.3 114.0 IX 93.8
220 217 16.2 114.8 VI 94.0
221 219 16.7 112.9 VI 92.4
222 213 17.2 113.4 VI 92.6
223 215 16.3 115.6 VI 94.6
224 12/31/96 217 16.7 115.6 VI 94.7
225 219 17.7 113.1 VI 92.6
226 222 17.5 113.4 VI 92.9
227 224 14.7 118.4 VI 97.0
228 318 15.7 113.0 IX 93.0
229 320 15.4 111.4 IX 91.7
230 322 16.3 112.6 IX 92.7
231 288 19.3 112.6 IX 92.7
232 291 19.7 110.9 IX 91.3
233 01/02/97 217 18.6 111.2 III 94.2
234 219 19.2 113.3 III 96.0
235 221 17.5 111.0 III 94.1
236 227 16.2 110.7 III 93.8
237 229 16.6 112.4 VI 92.1
238 230 15.3 113.6 VI 93.0
239 223 15.0 112.2 VI 91.9
240 225 14.9 115.2 VI 94.3
241 293 15.2 113.7 IX 93.6
PROJECT N0. CE -5307
PLATE NO. TWO (page 6 )
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST# DATE BORZ, VERT. FIELD DRY DENSITY SOIL PfiRCTNT
LOC. LOG. MOIST LB. /CQ. FT. TYPE COMPACTIO
242 01/02/97 See 295 14.3 115.4 IX 95.0
243 Plate 297 14.7 114.7 IX 94.4
244 01/06/97 One 223 16.7 112.3 VI 92.0
245 225 15.8 113.0 VI 92.5
246 227 17.7 111.4 VI 91.2
247 294 16.8 114.1 X 90.0
248 296 14. 1 116.3 X 91.7
249 287 15.7 114.5 X 90.2
250 289 14.6 115.7 X 91.2
251 01/07/97 226 15.3 118.2 VI 96.8
252 228 16.8 115.7 VI 94.7
253 229 15.4 111.0 VI 90.9
254 230 17.3 112.6 VI 92.3
255 232 18.6 111.4 VI 91.2
256 290 17.0 114.7 X 90.4
257 292 15.2 114.5 X 90.2
258 298 16.4 116.0 X 91.4
259 299 13.2 117.3 X 92.5
260 01/08/97 234 14.7 112.3 VI 92.0
261 236 17.4 110.7 Vi 90.7
262 238 14.5 114.4 VI 93.7
263 240 18.3 111.4 VI 91.2
264 242 17.0 113.7 VI 93.1
265 01/09/97 233 12.8 117.7 VIII 92.0
266 234 13.6 118.5 VIII 92.8
267 278 18.3 110.4 III 93.6
268 280 16.2 112.7 III 95.5
269 288 15.3 113.1 III 95.8
270 290 15.9 110.7 III' 93.8
271 302 17.8 114.7 X 90.4
272 303 17.4 115.0 X 90.6
273 324 15.4 109.3 III 92.6
274 01/10/97 304 13.7 114.5 X 90.3
275 301 14.6 116.3 X 91.7
276 302 15..2 115.3 X 90.9
277 292 16.7 112.6 III 95.4
278 294 17.3 111.4 III 94.4
279 01/15/97 270 16.2 113.7 VI 93.1
280 272 14.3 114.5 VI 93.8
281 273 14.4 115.9 Vi 94.9
PROJECT NO. CE -5307
PLATE NO. TWO (Page 7)
.NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TES DM H( RZ. VERT. FIELD DRY DENSITY $DM PERCENT
LOC. LQ-C- MOIST LB. /CU. FT. = COMPACTION
282 01/16/97 See 275 16.3 111.7 VI 91.5
283 Plate 277 15.9 113.0 VI 92.5
284 One 252 17.3 114.0 IX 93.8
285 254 18.2 110.7 IX 91.1
286 01/17/97 244 16.4 113.7 IX 93.6
287 246 17.3 115.4 IX 95.0
288 245 18.1 111.7 IX 91.9
289 247 18.4 110.4 IX 90.9
290 01/21/97 246 16.1 112.5 IX 92.6
291 01/22/97 230 18.4 116.5 IX 95.8
292 238 15.9 109.7 IX 90.2
293 235 18.1 114.6 IX 94.3
294 248 18.7 110.2 IX 90.6
295 232 18.1 112.5 IX 92.5
296 01/24/97 220 19.5 110.2 IX 90.6
297 234 18.1 111.1 IX 91.4
298 224 17.6 113.7 IX 93.6
299 226 15.4 112.4 IX 92.5
300 01/29/97 250 17.6 113.8 IX 93.7
301 337 15.4 115.0 IX 94.7
302 336 17.7 112.4 IX 92.5
303 01/30/97 338 14.7 117.1 VI 95.9
304 336 16.2 115.3 VI 94.9
305 338 13.6 120.1 IK 98.8
306 336 16.5 114.0 IX 93.8
307 02/01/97 228 14.7 113.7 VI 93.1
308 229 16.2 112.0 VI 91.7
309 234 17.3 111.4 VI 91.2
310 236 13.4 115.3 VI 94.4
311 340 13.3 116.2 VI 95.2
312 342 13.8 115.7 VI 94.8
313 02/04/97 229 15.9 118.2 XI 95.7
314 228 16.1 117.0 XI 94.7
315 229 16.6 115.0 XI 93.1
316 228 17.4 114.6 XI 92.8
317 228 13.7 119.5 XI 96.8
318 223 18.6 112.3 XI 90.9
319 225 17.9 113.7 XI 92.1
320 227 15.6 115.2 XI 93.3
321. 244 16.0 116.4 xi 94.3
PROJECT NO. CE -5307
PLATE NO_ TWO (page 8 )
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TAABULAT I0 ST RESULTS
TEST# DATE HORZ._ VERT, FIELD DRY DENSITY SOIL ERA CENT
LOC, LOC. HOIST LB. /CU. FT TYPE COMPACTIO
322 02/04/97 See 242 16.7 113.9 XI 92.2
323 " Plate 244 17.6 113.0 XI 91.5
324 One 252 16.2 110.7 VI 90.7
325 254 17.3 112.0 VI 91.7
326 02/05/97 302 20.9 108.2 XIII 94.4
327 304 18.8 110.4 XIII 96.3
328 306 17.3 105.6 XIII 92.1
329 294 15.9 118.0 XII 90.1
330 296 17.3 119.2 XII 91.1
331 305 12.1 119.4 XII 91.2
332 306 13.8 120.3 XII 91.9
333 308 14.9 119.6 Xii 91.6
334 02/06/97 329 14.3 110.2 XIII 96.2
335 331 19.6 105.7 XIII 92.2
336 333 20.4 104.9 XIII 91.5
337 308 13.8 119.7 Xii 91.4
338 310 12.7 122.3 XIi 93.4
339 312 11.9 124.3 •XIi 95.0
340 302 15.6' 121.7 XIi 93.0
341 296 14.4 120.8 XII 92.3
342 298 16.6 119.9 XII 91.6
343 02/07/97 332 19.7 111.3 XIII 97.1
344 334 15.6 112.4 XIII 98.1
345 336 17.6 106.7 XIII 93.1
346 335 20.7 103.3 XIII 90.1
347 336 15.6 108.2 XIII 94.4
348 333 20.4 104.6 XIII 91.3
349 335 19.7 107.4 XIII 93.7
350 02/10/97 335 16.8 118.7 Xii 90.7
351 336 17.3 119.6 Xii 91.4
352 335 19.4 106.5 XIII 93.0
353 336 15.3 119.0 XIi 90.9
354 334 15.7 122.6 Xii 93.7
355 294 16.7 116.7 XIV 96.0
356 296 13.7 118.2 XIV 97.3
357 304 14.9 117.8 XIV 97.0
358 233 14.2 117.9 VIII 92.1
359 235RFG 12.9 107.7 VII 92.2
360 233 13.2 118.6 VIII 92.7
361 235RFG 13.8 106.0 VII 90.8
PROJECT NO. CE -5307
PLATE NO TWO (page 9)
.NORTH C0UNTY
COMPACTION
ENGINEERING, INC.
TBULATION OF TEST RESULTS
TES`P# DATE HORZ- VERT. FIELD DRY DENSITY SOIL PERCENT
LOC- LOC. MOIST LB./CU-FT. TYPE COPACTIO
362 02/11/97 See 337 15.6 117.9 XII 90.1
363 Plate 338 14.7 118.3 XII 90.4
364 One 337 15.3 118.7 XII 90.7
365 337 14.4 119.7 XII 91.4
366 307 16.9 114.9 X 90.6
367 308 17.4 114.5 X 90.3
368 310 18.2 114.4 X 90.2
369 290 17.3 112.2 XIV 92.3
370 292 16.6 113.6 XIV 93.5
371 02/1 /97 335 12.2 118.4 X 93.4
372 336 13.8 114.7 X 90.5
373 338 14.6 118.9 X 93.8
374 280 14.0 118.8 X 93.7
375 02/13/97 299 11.9 126.5 XII 96.7
376 298 12.6 124.0 XII 94.7
377 302 11.4 123.2 XII 94.1
378 301 11.9 121.1 XII 95.2
379 308 13.4 122.6 XII 93.7
380 310 15.0 121.7 XII 93.0
381 311 12.0 124.9 XII 95.4
383 288 15.3 116.5 X 91.1
384 290 14.0 123.1 XII 94.0
385 292 13.7 122.6 XII 93.7
386 338 14.7 127.8 XII 97.6
387 338 13.8 120.0 XII 91.7
388 335 12.2 123.7 XII 94.5
389 337 15.8 115.7 X 91.2
390 02/14/97 338 12.6 123.7 XII 94.5
391 338 13.4 112.2 XI 90.8
892 282 13.2 120.7 X 95.2
393 282 14.8 124.0 XII 96.0
394 02/18/97 294 20.5 110.3 XIV 90.8
395 1. .' 276 16.6 116.3 XI 94.2
396 02/19/97 296 17.7 110.7 XIV 91. 1
397 264 18.1 113.8 XI 92.1
398 247 17.3 114.2 XI 92.5
399 02/20/97 298 18.6 110.6 IX 91.0
400 301 17.4 112.5 IX 92.4
401 302 19.0 112.9 IX 92.9
402 242 18.3 111.7 VI 91.5
PROJECT NO. CE -5307
PLATE NO. TWO (page 10)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
T UL.ATION OF TEST RESULTS
TES DATE HORZ. VERT,_ FIELD DRY DENSITY SOIL PERCENT
LOG. LOC. MOIST LB. /CD. FT. T= COMPACTION
403 02/20/97 See 243 17.6 112.2 VI 91.9
404 Plate 242 16.3 118.7 VI 97.2
405 02/21/97 One 304 17.3 118.6 IX 97.6
406 306 16.6 115.4 IX 95.0
407 307 18.5 112.7 IX 92.8
408 268 17.7 108.3 III 91.8
409 270 16.9 109.6 III 92.9
410 02/24/97 258 18.9 112.0 XV 93.3
411 308 17.9 115.2 XI 93.3
412 260 17.6 110.8 XV 92.3
413 309 18.0 115.2 XI 93.3
414 310 17.2 116.1 XI 94.0
415 310 15.1 115.4 XI 93.4
416 02/25 /97 308 14.4 116.1 XI 94.0
417 309 14.7 119.7 XI 97.0
418 307 16.3 114.6 XI 92.8
419 262 17.7 109.6 XV 91.3
420 263 17.3 108.2 XV 90.2
421 " 239 14.4 112.7 Xi 91.3
422 239 13.7 114.4 XI 92.6
423 02/26/97 251 11.8 123.3 XII 94.2
424 256 13.4 122.2 XII 93.4
425 253 11.1 129.0 XII 98.6
426 264 15.4 111.6 XV 93.0
427 262 16.2 112.0 XV 93.3
428 264 14.3 109.6 XV 91.3
429 02/28/97 268 17.2 113.4 XV 94.5
430 270 17.4 112.2 XV 93.5
431 272 18.2 110.7 XV 92.3
432 266 17.7 112.3 XV 93.6
433 268 18.6 110.1 XV 91.8
434 267 19.3 109.6 XV 91.3
435 274 19.5 117.2 XV 97.6
436 275 14.1 109.2 XV 91.0
437 272 16.1 117.0 XV 97.5
438 03/03/97 273 15.7 114.2 XV 95.2
439 272 17.2 113.6 XV 94.7
440 272 12.6 114.9 XV 95.8
441 274 15.7 113.0 XV 94.2
442 270 17.2 114.0 XV 95.0
PROJECT NO. CE -5307
PLATE NO TWO (page 11)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST# DATE HI QRZ. VERT, FIELD DRY DENSITY SOIL PERCENT
LOC. LOC. FOIST jB./S0. FT. TYPE COLPACTION
443 03/03/97 See 272 18.2 112.4 XV 93.7
444 Plate 276 20.0 109.3 XV 91.1
445 One 274 18.8 110.1 XV 91.8
446 276 18.5 111.0 XV 92.5
447 03/04/97 281 18.2 110.2 XV 91.8
448 275 19.6 109.3 XV 9i.1
449 277 18.4 110.7 XV 92.3
450 282 17.1 111.1 XV 92.6
451 284 19.4 109.0 XV 90.8
452 277 14.4 115.2 XV 96.0
453 279 15.5 113.9 XV 94.9
454 03/05/97 245 13.7 120.9 XI 97.9
455 245 14.4 121.7 XI 98.5
456 246 15.6 119.2 XI 96.5
457 251 16.7 108.0 III 91.5
458 253 17.7 109.3 III 92.6
459 254 16.2 110.7 III 93.6
460 244 17.0 115.9 XI 93.8
461 03/06/97 221 18.2 109.4 XV. 91.2
462 224 16.4 106.6 III 90.4
463 222 15.9 113.5 XV 94.5
464 03/07/97 220 19.0 112.9 XVI 90.0
465 222 20.2 113.8 XVI 90.7
466 222 13.8 120.4 XVI 95.9
467 220 18.0 114.5 XVI 91.2
468 221 20.1 113.3 XVI 90.3
469 03/10/97 226 16.9 118.5 XVI 94.7
470 226 17.9 113.8 XVI 90.7
471 223 17.6 120.2 XVI 95.8
472 223 17.5 114.6 XVI 91.3
473 03/11/97 293 18.1 110.7 XVII 92.6
474 295 16.4 112.6 XVII 94.2
475 295 15.5 113.4 XVII 94.9
476 297 15.0 115.4 XVII 96.6
477 216 20.7 111.0 I 94.1
478 216 17.7 112.2 I 95.1
479 217 21.6 110.7 XV 92.3
480 03/12/97 217 15.1 112.7 XV 93.9
481 219 15.4 114.9 XV 95.8
482 214 14.0 113.0 XV 94.1
PROJECT NO. CE -5307
PLATE NO. TWO (page 12 )
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
T EST# DATE HORZ. VERT. FIELD DRY DENSITY SOIL PERCENT
LOG- LOC. (I� )IST LB./CU-FT, TYPE COMPACTION
483 03/12/97 See 222 15.3 113. 1 XV 94.3
484 1. Plate 223 17.1 106.2 III 90.0
485 03/13/97 One 250 16.5 113.9 XI 92.2
486 252 18.2 111.7 XI 90.4
487 253 17.3 115.4 XI 93.4
488 254 14.4 116.2 XI 94.1
489 -220 16.7 109.2 XV 91.0
490 222 19.4 106.2 III 90.1
491 221 21.8 108.6 XV 90.5
492 03/14/97 232 15.7 115.4 XV 96.2
493 225 16.9 111.6 XV 93.0
494 232 14.5 114.0 XV 95.1
495 03/17/97 293 18.4 108.7 XVII 91.7
496 299 20.3 110.6 XVII 92.6
497 03/18/97 282 16.9 123.7 XVI 98.6
498 281 14.8 121.5 XVI 96.8
499 282 16.6 122,2 XVI 97.4
500 274 15.1 119.6 XVI 95.3
501 " 274 15.4 115.4 XVI 92.0
502 260 17.5 110.9 XVII 92.7
503 258 19.9 111.4 XVII 93.2
504 03/19/97 303 15.1 112.3 XVII 93.9
505 03/20/97 306 17.6 111.7 XVII 93.5
506 305 14.3 114.1 XVII 95.4
507 302 16.0 108.5 XVII 90.8
508 03/21/97 241 RFG 16.1 110.6 VII 94.6
509 241 RFG 12.1 108.6 VII 92.9
510 241 RFG 11.3 110.1 VII 94.3
511 03/24/97 305 16.4 112.7 XVII 94.3
512 303 17.9 108.8 XVII 91.0
513 303 15.3 110.4 XVII 92.3
514 03/26/97 306 15.0 117.4 XVII 98.7
515 308 14.7 116.3 XVII 97.1
516 308 15.3 115.1 XVII 96.3
517 306 14.1 116.5 XVII 97.5
518 03/27/97 230 RFG 12.2 118.7 XVIII 97.5
519 248 RFG 09.6 111.4 XVIII 91.6
520 340 RFG 10.2 110.5 XVIII 90.9
521 308 23.6 109.3 XVII 91.5
522 312 RFG 12.2 109.4 XVIII 90.0
PROJECT NO. CE -5307
PLATE NO TWO (Page 13)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST# DATE HORZ, VERT. FIELD DRY DENSIT 5011, PERCEN
L OC. LOC. MozS LB. /C0. F TYPE COMPACTION
523 03/28/97 See 310 13.5 121.5 XVI 96.8
524 Plate 312 17.1 114.2 XVI 91.0
525 One 310 13.0 119.0 XVI 94.8
526 312 17.7 113.1 XVI 90.2
527 03/31/97 284 14.2 120.8 XII 92.3
528 286 13.7 121.4 XII 92.7
529 283 14.7 119.6 XII 91.4
530 282 13.0 121.7 XII 93.0
531 04/01/97 256 17.1 112.7 XV 93.9
532 256 15.4 113.6 XV 94.7
533 257 13.7 111.4 XV 92.8
534 276 13.5 112.6 XVII 94.2
535 275 13.1 111.1 XVII 92.9
536 283 16.2 110.7 XVII 92.6
537 308 17.0 109.4 XVII 91.5
538 310 15.4 113.0 XVII 94.6
539 04/03/97 277 RFG 10.6 117:1 XVI I I 96.4
540 " 277 11. -3 114.3 XVII 94.1
541 04/07/97 312 10.2 115.3 XVII 96.4
542 312 13.6 121.2 XVII 9
543 " " 312 17.4 114.4 XVII 95.7
544 04/08/97 306 RFG 13.0 109.8 VII 94.0
545 306 12.7 113.7 VII 97.3
546 224 16.1 113.5 XVII 95.0
547 225 13.4 112.1 XVII 93.8
548 236 17.8 111.3 XVII 93.1
549 237 16.3 109.4 XVII 91.5
550 04/09/97 238 16.5 108.3 XVII 90.6
551 " 238 18.1 110.1 XVII 92.1
552 04/10/97 265 15.0 111.7 IV 91.0
553 267 17.7 109.4 III 92.7
554 268 14.1 112.6 IV 91.7
555 270 16.2 111.4 IV 90.7
556 271 13.6 110.7 IV 90.1
557 04/11/97 273 16.7 108.6 III 97.0
558 275 17.4 109.4 III 92.7
559 " 274 15.4 112.6 IV 91.7
560 276 14.3 112.9 IV 92.0
561 275 17.3 113.7 IV 92.6
562 277 14.9 115.0 IV 93.6
PROJECT NO. CE -5307
PLATE NO. TWO ( page 14 )
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST# DATE HORZ, VERT. FIELD DRY DENSITY 2OIL EX R=-
LOC. LOC. MOIST LB. /CU.FT. TYPE COMPACTIO
563 04/11/97 See 279 17.2 111.6 IV 90.9
564 Plate 280 18.1 109.6 III 92.9
565 04/14/97 One 280 16.0 112.7 IV 91.8
566 282 14.7 113.7 IV 92.6
567 04/15/97 283 13.5 117.2 IV 95.4
568 282 14.4 113.6 IV 92.5
569 04/16/97 303 14.9 111.6 IV 90.9
570 305 15.8 112.4 IV 91.5
571 04/18/97 306 15.6 113.7 III 96.4
572 313 RFG 09.8 113.3 XIX 94.0
573 313 09.9 109.6 XIX 91.0
574 237 15.3 114.4 XVII 95.7
575 04/22/97 309 PFG 08.0 108.8 XIX 90.2
576 226 '' 15.3 113.0 XIX 93.7
577 224 15.5 110.4 XIX 91.7
578 308 13.7 112.3 IV 0 -1.4
REMARKS:
Tests tabulated and not shown on Plate No. One
were taken on other lots in the subdivision. This
is a partial report for Lot #'s 7, 8, 9, 13, 20 &
21 only for the purpose of obtaining a building
permit.
Test No. 382 not available due to a field report numbering
error.
RFG = Rough Finish Grade
PROJECT NO_ CE -5307
PLATE NO_ TWO (Page 15)
P NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
OPTIMUM MOISTURE/MAXIMUM DENSITY
SOIL DESCRIPTION TYPE MAX. DRY DENSITY OPTIMUM MOISTURE
(lb /cu. ft. ) (% dry wt)
Red Brown Clay I 118.0 14.7
Red Brown Gravelly -
Clay II 121.5 14.5
Orange - Brown Clayey -
Gravel III 118.0 15.0
Orange- Red -Brown
Silty- Gravelly -Clay IV 122.8 13.5
Yellow -Tan Fine
Clayey -Sand V 115.7 14.6
Yellow Brown Clayey -
Gravel Vi 122.1 13.6
Light White -Beige
Silty Sand (Import) VII 116.8 13.2
Light Orange Brown
Silty Gravelly Clayey
Sand VIII 128.0 11.2
Brown Red Silty
Gravelly Clay IX 121.5 13.7
Orange Brown Silty
Gravelly Clay X 126.8 11.5
Brown Orange Silty
Gravelly Clay XI 123.5 13.3
Gray Brown Gravelly
Clay XII 130.9 10.6
Brown Sandy Clay XIII 114.6 15.1
Yellow Beige Clayey
Gravel XIV 121.5 13.8
PROJECT NO. CE -5307
PLATE NO. THREE (page 1)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
OPTIMUM MOISTURE /MAXIMUM DENSITY
SOIL DESCRIPTION =F. MAX. DRY DENSITY OPTIMUM MOISTURE
(lb /cu. ft. ) (% dry wt)
Orange Brown Silty -
Clay XV 120.0 15.5
Orange Brown Silty -
Clayey Gravel XVI 125.5 12.0
Yellow Red Gravelly -
Clay XVII 119.5 14.0
Yellow Tan Silty -
Sand ( Import) XVIII 121.5 11.7
Beige Tan Silty -
Sand XIX 120.5 12.2
Gray Brown Gravelly -
Clayey -Sand XX 132.0 09.7
EXPANSION POTENTIAL -
SAMPLE NO. XVI XVII XX
CONDITION Remold 90% Remold 90% Remold 90%
INITIAL MOISTURE (%) 11.5 13.5 09.2
AIR DRY MOISTURE ( %) 07.7 06.8 6.4
FINAL MOISTURE ( %) 23.1 25.0 19.6
FINAL DRY DENSITY (pcf) 113.0 107.6 118.8
LOAD (psf ) 150 150 150
SWELL ( %) 7.2 7.5 6.8
EXPANSION INDEX 72 75 68
DIRECT SHEAR
SAMPLE NO. XVI XVII
CONDITION Remold 90% Remold 90%
ANGLE INTERNAL FRICTION 22 17
COHESION INTERCEPT (PCF) 200 290
PROJECT NO. CE -5307
PLATE NO. THREE (page 2)
- 6-
NORTH COUNTY q - 7 Sq
COMPACTION copy
ENGINEERING, INC.
JUL 30 1997 June 30, 1997
VIC;-" Project No. CE-5307
Al Mayo - ;--- \. -- L-
, . 1:3
I ry 1 7 ff L
1772 Kettering C "' C
Irvine, CA 92714
Subject: Partial Report of Certification of Compacted Fill Ground
Proposed Single Family Dwellings
Lot No.'s 5, 6, 14, & 17 of Wildflower Estates
Encinitas, California
Dear Mr. Mayo:
In response to your request, the following report has been prepared
to indicate results of soil testing, observations and inspection of
earthwork construction at the subject site.
Testing and inspection services were performed from October 1, `1996
through June 26, 1997.
Briefly, our findings reveal filled ground has been compacted to a
minimum of ninety percent (90%). Therefore, we recommend
construction continue as scheduled.
SCOPE
Our firm was retained to observe grading operations with regard to
current standard Practices and to determine the degree of
compaction of placed fill.
Grading plans were prepared by K & S Engineering of San Diego,
California.
Grading operations were performed by Greg Whillock of Vista,
California.
Reference is made to the following Previously submitted soils
reports prepared by our firm.
1). "Preliminary Soils Investigation", Lot #5, dated July
11, 1996 (CE-5249)-
2). Preliminary Soils Investigation", Lot #6, dated July
10, 1996 (CE-5250).
3). "Preliminary Soils Investigation", Lot #14, dated May
29, 1996 (CE-5257).
P.O. BOX 302002 • ESCONDIDO, CA 92030
(760) 480-1116
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
June 30, 1997
Project No. CE -5307
Page 2
4). "Preliminary Soils Investigation ", Lot #17, dated
March 4, 1996 (CE -5222) .
Approximate locations and depth of filled ground and extent of
earthwork construction covered in this report are indicated on the
attached Plate No. One entitled, "Test Location Sketch ".
Grading operations were performed in order to create level building
pads to accommodate the proposed single family dwellings. Should
the finished pads be altered in any way, we should be contacted to
provide additional recommendations.
The sites were graded in accordance with recommendations set forth
in our previously submitted reports.
The site was graded to approximately conform to project plans.
Actual pad size and elevation may differ. Finish grade operations
are to be completed at a later date.
LABORATORY TESTING
Representative soil samples were collected and returned to the
laboratory for testing. The following tests were performed and are
tabulated on the attached Plate No. Three.
1. Optimum Moisture /Maximum Density (ASTM D -1557)
2. Expansion Potential Test
3. Direct Shear (ASTM D -3080)
SOIL CONDITIONS
Native soils encountered were gravelly- clays, silty- clays, and
clayey- sands. Fill soils were imported and generated from the on-
site excavation.
The building sites contained a transition from cut to fill.
However, cut areas located within the building areas were over
excavated a minimum of 3 feet and brought to grade with compacted
soil. Over excavation was carried a minimum of 5 feet beyond
exterior building perimeter. Hence, no consideration need be given
this characteristic.
NORTH COUNTY
COMPACTION
ENGINEERING, INC. '
June 30, 1997
Project No. CE -5307
Page 3
Expansive soils were observed during grading and exist within 4
feet of finish grade. Therefore, special recommendations will be
necessary to reduce the probability of structure damage.
The keys were approximately 25 feet wide, a minimum of 3 feet in
depth and inclined into the slope. During earthwork construction,
native areas to receive fill were scarafied, watered and compacted
to a minimum of ninety percent (90 %) of maximum density. Subsequent
fill soils were placed, watered and compacted in 6 inch lifts.
Benches were constructed in natural ground at intermediate levels
to properly support the fill. To determine the degree of
compaction, field density tests were performed in accordance with
ASTM D -1556 or D -2922 at the approximate horizontal locations
designated on the attached Plate No. One entitled, "Test Location
Sketch ". A tabulation of test results and their vertical locations
are presented on the attached Plate No. Two entitled, "Tabulation
of Test Results ". Fill soils found to have'a relative compaction of
less_ than. ninety percent (90%) were reworked un�il proper
compaction was achieved.
RECOMMENDATIONS AND CONCLUSIONS
Continuous inspection was not requested to verify fill soils were
placed in accordance with current standard practices regarding
grading operations and earthwork construction. Therefore, as eco-
nomically feasible as possible, part -time inspection was provided.
Hence, the following recommendations are based on the assumption
that all areas tested are representative of the entire project.
1) Compacted fill and natural ground within the defined
building areas have adequate strength to safely support
the proposed loads.
2) Slopes may be considered stable with relation to deep
seated failure, provided they are properly maintained.
Slopes should be planted within 30 days of this report
with light groundcover (no gorilla iceplant) indigenous
to the area. Drainage should be diverted away from the
slopes to prevent water flowing on the face of slope.
This will reduce the probability of failure as a result
of erosion.
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
June 30, 1997
Project No. CE -5307
Page 4
3) Continuous footings having a minimum width of 12
inches and founded a minimum of 24 inches below lowest
adjacent grade for one and two story, respectively, will
have an estimated allowable bearing value of 1500 lbs.
per square foot.
4) Footings located on or adjacent to slopes should be
founded at a depth such that the horizontal distance from
the bottom outside face of footing to the face of the
slope is a minimum of 8 feet.
5) Plumbing trenches should be backfilled with non -
expansive soil having a swell of less the 2% and a
minimum sand equivalent of 30. Backfill soils should be
inspected and compacted to a minimum of ninety percent
(90 %).
6) Unless requested, recommendations for future
improvements (additions, pools, recreational labs,
additional grading, etc.) were not included in this
report. Prior to construction, we should be contacted to
update conditions and provide additional recommendations.
7) Expansive soils were observed during grading and exist
within 48 inches of finish grade. Therefore, foundations
should be constructed in accordance with Recommendation
6B2 or 6B3 of our "Preliminary Soils Investigation"
reports.
8) Clayey soils should not be allowed to dry prior to
placing concrete. They should be watered to insure they
are kept in a very moist condition or at a moisture
content exceeding optimum moisture content by a minimum
of five percent (5%).
Prior to pouring of concrete, North County COMPACTION ENGINEERING,
INC. should be contacted to inspect foundation recommendations for
compliance to those set forth.
During placement of concrete, North County COMPACTION ENGINEERING,
INC. and /or a qualified concrete inspector should be present to
document construction of foundations.
WORTH COUNTY
COMPACTION
ENGINEERING, INC.
June 30, 1997
Project No. CE -5307
Page 5
UNCERTAINTY AND LIMITATIONS
In the event foundation excavation and steel placement inspection
is required and /or requested, an additional cost of $170. 00 will be
invoiced to perform the field inspection and prepare a Final
Conformance Letter. If foundations are constructed in more than one
phase, $120.00 for each additional inspection will be invoiced.
It is the responsibility of the owner and /or his representative to
carry out recommendations set forth in this report.
San Diego County is located in a high risk area with regard to
earthquake. Earthquake resistant projects are economically, un-
feasible. Therefore, damage as a result of earthquake is probable
and we assume no liability.
We assume' the on site safety of our personnel only. We cannot
assume liability of personnel other than our own. It As the
responsibility of the owner and contractor to insure construction
operations are conducted in a safe manne and in conformance with
regulations governed by CAL -OSHA and /or local agencies.
if you have any questions, please do not hesitate to contact us.
This opportunity to be of service is sincerely appreciated.
Respectfully submitted,
North County YESS1o�,q
COMPACTION ENGINEERING, INC_
4 � 0 G ERF �2c�
CD o. GE713
xp. 9 -30.97
Ronald K. Adams Dale R. Re i
President Registered 9393
Geotechnical OR,K 000713
RKA: kla
cc: (3 ) Submitted
(2 ) Filed
NORTH COUNTY COMPACTION ENGINEERING, INC.
SO TESTING
PROPOSED SINGLE FAMILY DWELLING No Scale
LOT #5 OF WILDFLOWER ESTATES
OLIVENHAIN, CALIFORNIA
i 306.p0'
I
Z 606.
87 ;
69 294 ° 5�r_
' 1#22.90 s . . 84 � - N
3 ..- 532
o' r3 TEST 589 2_
— f
20'
641 - .607/ 268
•'172
'270. - :• � ,��
/'rte pp N
280 - Y` n
TEST LOCATION SKETCH
PROJECT No . CE -5307
PLATE No ONE
NORTH COUNTY COMPACTION ENGINEERING, INC.
SOIL TESTING
PROPOSED SINGLE FAMILY DWELLING
No Scale
LOT #6 OF WILDFLOWER ESTATES
OLIVENHAIN, CALIFORNIA
r � -- - -- -_ -- - -
2125
280
2:1 �•
i 527
79 IL
2g2U 530 � cv
T M
Cp
6391
`
- 288.0 84
l - o
640
3 2820
.648.. , 1
i -
i = 137.74
TEST LOCATION SKETCH
PROJECT No . CE -5307
PLATE No . ONE -A
NORTH COUNTY COMPACTION ENGINEERING, INC.
SOIL TESTING
PROPOSED SINGLE FAMILY DWELLING
LOT #14 OF WILDFLOWER ESTATES No Scale
OLIVENHAIN, CALIFORNIA
7 +r04•w
27e + 7 -
.
- --� -8' PVC
HYDROSEED SLOPES (T1P 4 -- -
4E.229.0 - - -
- , -SOT" •� 4 -_
2.1 _ _ o
4g ?e� Avs. ,
4 9 8 PV 284.0 ..
a � . " 645 �s_T4_ gg 64
�.`-.. F a,� .- ; 2Q
1 G .
T -
'1 !E "276.0
.451 TG 283.0 g
z'm
-e• PVC` 44t-
Z • - 44�' - `'• 44 Ln
2.� 2 44 .2:1 272
42 - -
pv
"OOjTw -M 9E REMOVE& _-
.¢ - JA�1____ E_CRFST —
TEST LOCATION SKETCH
PROJECT No .. CE -5307
PLATE No . ONE —B
NORTH COUNTY COMPACTION ENGINEERING, INC.
SOUL TESTING
PROPOSED SINGLE FAMILY DWELLING No Scale
LOT #17 OF WILDFLOWER ESTATES
OLIVENHAIN, CALIFORNIA
ti
_
_sue
W l
1
-6 .Y
U f•- O -
.
J'N'f N_
6 9
V r '
....
� 9�
624 ,�
64? TEST 0 a 621
J 649
O
258 83 of
- - a u
W
N 6� P ... 94 627 -84 _ _.. 7B _... _ - W CL
_
73 W
69 "
p .7
•
..T� +• - _ ...... _ .. _ ...i 437, '" A
- i
TEST LOCATION SKETCH
PROJECT No . CE -5307
PLATE No . ONE -C
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST# DATE HORZ. yERT, EIFU DRY DENSITY SOIL PERCENT
LOS LOC. MOIST LB. /CU. FT. TYPE C014PACTION
1 10/08/96 See 226 17.3 108.8 I 92.2
2 " Plate 227 17.0 107.2 I 90.8
3 10/09/96 One 229 16.2 111. 1 I 94.2
4 231 18.3 109.1 I 92.5
5 229 18.8 108.0 I 91.5
6 204 17.3 108.9 I 92.2
7 206 16.7 110.9 I 93.9
8 206 19.3 112.1 I 95.0
9 208 18.1 110.1 I 93.3
10 210 16.1 114.2 I 96.8
11 212 19.3 106.4 I 90.2
12 214 16.5 112.8 I 95.6
13 10/10/96 216 17.3 109.7 I 93.0
14 217 18.2 107.8 I 91.4
15 218 17.7 109.2 I 92.5
16 220 19.6 107.0 I 90.7
17 221 17.1 110.0 I 93.2
18 10/11/96 215 19.2 108.5 I 92.0
19 217 15.9 112.2 I. 95. 1
20 222 17.2 109.2 I 92.5
21 10/14/96 233 14.3 117.2 II 96.4
22 235 15.9 111.8 II 92.0
23 230 18.0 112.2 II 92.3
24 232 17.1 112.6 II 92.7
25 221 15.4 114.4 II 94.2
26 223 16.2 113.7 II 93.6
27 212 14.3 112.3 I 95.2
28 214 13.8 111.2 I 94.3
29 10/15/96 234 16.3 111.5 II 91.8
30 236 16.6 112.7 II 92.8
31 237 17.2 113.4 II 93.4
32 225 15.8 117.6 II 96.8
33 226 18.1 113.1 II 93.1
34 228 17.3 111.6 II 91.8
35 10/16/96 238. 17.8 111.7 I I 91.9
36 240 18.0 113.3 II 93.3
37 241 15.4 109.1 I 92.4
38 243 18.3 106.9 I 90.6
39 266 18.1 109.2 I 92.5
40 268 18.5 107.0 I 90.7
PROJECT NO. CE -5307
PLATE NO. TWO (page 1)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESOLTS
TEST# DATE HORZ. VERT. FIELD DRY DENSITY SOIL PERCENT
LOC. LOC, MOIST LB. /CU. FT. TME CO UPACTION
41 10/17/96 See 270 16.2 115.4 III 97.8
42 Plate 272 19.1 110.0 III 93.2
43 One 245 20.2 109.0 III 92.4
44 247 18.0 110.8 III 93.9
45 242 1.8.7 108.1 III 91.7
46 244 20.4 107.1 III 90.8
47 10/18/96 245 17.0 115.8 II 95.3
48 246 16.5 113.7 II 93.6
49 249 17.3 112.8 II 92.9
50 250 15.7 112.6 II 92.7
51 247 18.1 114.3 II 94.1
52 274 18.2 109.1 III 92.4
53 276 17.0 109.5 III 92.8
54 10/21/96 246 18.1 111.6 11 91.9
55 247 17.0 111.1 II 91.4
56 .249 16.2 112.5 III 95.3
57 " 251 15.7 113.6 III 96.3
58 252 15.3 116.4 II 95.8
59 10/23/96 253 18. 3* 112.4 IV 91. 5
60 255 17.1 111.0 IV 90.4
61 255 15.4 113.9 IV 92.8
62 256 16.2 113.1 IV 92.1
63 10/24/96 255 18.2 116.3 IV 94.7
64 256 16.5 110.9 IV 90.3
65 254 17.4 112.7 IV 91.8
66 255 15.7 112.1 IV 91.3
67 10/25/96 255 17.3 110.9 IV 90.3
68 256 16.6 111.9 IV 91.1
69 233 19.5 112.0 IV 91.2
70 235 16.1 112.4 IV 91.5
71 238 15.0 114.2 IV 93.0
72 240 20.1 111.4 IV 90.7
73 10/28/96 240 17.8 112.1 I 95.0
74 242 19.3 109.4 I 92.7
75 243. 19.6 110.7 I 93.8
76 242 18.0 109.6 I 92.9
77 244 20.1 108.8 I 92.2
78 245 19.6 108.6 I 92.0
79 10/29/96 268 18.6 110.5 I 93.6
80 270 19.4 109.0 I 92.4
PROJECT NO_ CE -5307
PLATE NO_ TWO (page 2)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST# DATE HORZ. VERT. FIELD DRY NSITY SOIL PERCENT
LOC. LOC. MOIST LB /CD. FT. TYPE COMPACTION
81 10/29/96 See 272 18.5 109.8 III 93.1
82 Plate 244 19.2 111.4 III 94.4
83 One 245 18.6 109.9 III 93.1
$4 246 17.8 112.2 III 95.1
85 10/30/96 274 19.3 108.0 I 91.5
86 276 18.3 110.0 I 93.2
87 245 16.2 112.1 III 95.0
88 247 17.6 109.7 III 93.0
89 10/31/96 247 16.4 111.7 IV 91.0
90 247 19.6 113.2 IV 92.2
91 247 17.0 113.4 IV 92.3
92 11/01/96 278 18.8 110.7 IV 90.1
93 246 15.7 113.6 IV 92.5
94 247 16.3 112.4 IV 91.5
95 254 15.0 111.7 IV 91.0
96 255 18.6 112.8 IV 91.9
97 11/04/96 282 18.3 109.2 iI1 92.6
98 284 18.8 111.8. III 94.7
99 288 16.4 113.2 III / 95.9
100 11/05/96 293 15.3 115.3 IV 93.9
101 295 16.4 114.6 IV 93.3
102 11/06/96 292 16.7 112.7 IV 91.7
103 294 17.6 114.9 IV 93.5
104 297 16.6 113.4 IV 92.3
105 299 18.8 112.2 IV 91.4
106 11/08/96 218 19.7 112.5 IV 91.6
107 1 . 220 17.3 114.0 IV 92.8
108 11/07/96 215 19.6 112.2 IV 91.4
109 217 16.8 114.6 IV 93.3
110 222 19.7 110.9 IV 90.3
111 11/11/96 219 14.6 115.4 IV 94.0
112 224 15.7 116.6 IV 95.0
113 11/12/96 201 18.6 106.0 V 91.6
114 203 16.5 110.8 V 95.8
115 204. 14.6 111.7 V 96.5
116 206 17.7 107.3 V 92.7
117 208 18.6 110.7 III 93.8
118 210 17.6 109.4 III 92.7
119 211 18.0 108.0 III 91.5
120 11/12/96 205 15.1 112.6 III 95.4
PROJECT NO. CE -5307
PLATE NO. TWO (Page 3)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
'EST# DATE EIORZ. VERT_ EIZU DRY DENSITY SOIL PERCENT
L9c- LD-Q- MOIST LB./CU-FT. T YPE COMPACTION
121 11/12/96 See 207 19.6 108.0 I1I 91.5
122 Plate 208 18.3 110.7 III 93.8
123 One 209 19.8 107.5 III 90.9
124 218 16.8 115.7 IV 94.2
125 220 18.2 113.3 IV 92.3
126 221 15.0 116.2 IV 94.6
127 11/15/96 203 17.2 114.7 VI 93.9
128 205 15.8 114.3 VI 93.6
129 204 15.3 115.5 VI 94.6
130 206 14.7 116.1 VI 95.1
131 213 16.6 114.7 IV 93.4
132 214 15.0 113.3 IV 92.3
133 11/18/96 208 17.8 110.1 VI 90.2
134 210 16.6 111.9 VI 91.7
135 211 16.8 110.5 VI 90.5
136 207 17.7 112.6 VI 92.3
137 " 209 15.4 111.4 VI 91.2
138 210 16.6 111.7 VI 91.5
139 11/19/96 213 16.8 112.3 VI /92.0
140 215 17.4 113.5 VI 93.0
141 214 15.1 111.6 VI 91.4
142 216 14.7 114.5 VI 93.8
143 11/20/96 215 17.7 110.5 VI 90.5
144 216 17.3 112.7 VI 92.3
145 217 15.6 112.9 VI 92.5
146 219 17.8 110.8 VI 90.8
147 11/26/96 220 14.9 118.4 VI 97.0
148 222 17.6 115.7 VI 94.8
149 221 18.9 111.1 VI 91.0
150 223 17.5 113.4 VI 92.9
151 11/27/96 225 17.5 113.2 VI 92.7
152 227 15.3 115.6 IV 94.7
153 226 17.8 110.2 VI 90.3
154 228 19.1 110.1 VI 90.2
155 12/02/96 223 17.3 112.7 VI 92.3
156 225 15.2 114.4 VI 93.7
157 227 18.1 111.7 VI 91.5
158 12/03/96 228 15.9 113.4 VI 92.9
159 229 16.4 112.2 VI 91.9
160 225 14.7 116.1 VI 95.1
161 227 18.3 112.8 VI 92.4
PROJECT NO. CE -5307
PLATE N0. TWO (page 4)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TESTA DAM HORZ, VERT, FIELD DRY DENSITY SOIL PERCENT
LOC. LOC. MOIST LB_ /CU.FT. TYPE COMPACTIO
162 12/04/96 See 229 16.3 110.4 VI 90.4
163 Plate 231 17.8 111.7 VI 91.5
164 One 233 14.5 113.7 VI 93.1
165 12/05/96 231 17.4 112.2 VI 91.9
166 230 18.0 113.4 VI 92.9
167 232 16.6 115.4 VI 94.5
168 12/09/96 257RFG 11.3 114.3 VII 97.9
169 257RFG 11.4 110.4 VII 94.5
170 257RFG 13.6 112.7 VII 96.5
171 12/13/96 233 17.7 116.1 VIII 91.7
172 234 18.2 118.0 VIII 92.2
173 232 17.4 117.8 VIII 92.0
174 233 16.2 123.7 VIII 96.6
175 199 18.2 112.3 VI 92.0
176 201 16.2 113.6 VI 93.0
177 12/16/96 202 18.3 109.0 III 92.3
178 204 17.6 111.3 VI 91.5
179 206 16.5 114.6 VI 93.8
180 208 17.0 112.1 VI 91.8
181 204. 16.8 116.0 VI 95.0
182 12/17/96 208 15.1 113.1 VI 92.6
183 210 18.0 114.7 VI 93.9
184 212 18.1 112.3 VI 91.9
185 207 16.9 115.6 VI 94.6
186 214 16.7 113.5 VI 92.9
187 209 15.0 114.0 VI 93.3
188 12/18/96 216 15.1 116.3 VI 95.2
189 218 16.7 112.1 VI 91.8
190 220 15.1 113.1 VI 92.6
191 12/19/96 222 14.9 113.0 VI 92.5
192 12/23/96 207 17.3 110.7 III 93.8
193 209 15.9 111.4 III 94.4
194 211 16.1 112.7 III 95.5
195 213 18.6 115.0 IV 93.6
196 215 19.2 114.1 IV 92.8
197 273 16.3 115.7 IX 95.2
198 275 17.4 114.0 IX 93.8
199 270 15.7 113.5 IX 93.4
200 12/26/96 216 18.2 111.6 IV 90.9
201 218 17.2 113.6 IV 92.5
PROJECT NO. CE -5307
PLATE NO. TWO (page 5)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST# D ATE HORZ. V ERT. FIELD DRY DENSITY SOIL PERCENT
L oc. L9c- MOIST LB-/CU-FT. TYPE COMPACTION
202 12/26/96 See 215 16.3 115.4 IV 94.0
203 Plate 217 19.3 107.7 III 91.3
204 One 277 17.2 113.3 IX 93.3
205 279 16.1 115.0 IX 94.7
206 280 15.4 114.4 IX 94.2
207 271 15.0 116.3 IX 95.7
208 273 17.7 112.7 IX 92.8
209 12/27/96 230 15.7 114.9 IV 93.6
210 232 15.3 113.6 IV 92.5
211 218 17.0 109.4 III 92.7
212 220 18.3 110.2 III 93.3
213 210 16.2 109.0 III 92.3
214 212 17.7 108.7 III 92.1
215 12/30/96 281 17.7 111.4 IX 91.7
216 283 16.6 112.9 IX 92.9
217 282 15.7 112.7 IX 92.8
218 284 16.9 113.4 IX 93.3
219 285 15.3 114.0 IX 93.8
220 217 16.2 114.8 VI /94.0
221 " 219 16.7 112.9 VI 92.4
222 213 17.2 113.4 VI 92.6
223 215 16.3 115.6 VI 94.6
224 12/31/96 217 16.7 115.6 VI 94.7
225 219 17.7 113.1 VI 92.6
226 222 17.5 113.4 VI 92.9
227 224 14.7 118.4 VI 97.0
228 318 15.7 113.0 IX 93.0
229 320 15.4 111.4 IX 91.7
230 322 16.3 112.6 IX 92.7
231 288 19.3 112.6 IX 92.7
232 291 19.7 110.9 IX 91.3
233 01/02/97 217 18.6 111.2 III 94.2
234 219 19.2 113.3 III 96.0
235 221 17.5 111.0 III 94.1
236 227 16.2 110.7 III 93.8
237 229 16.6 112.4 VI 92.1
238 230 15.3 113.6 VI 93.0
239 223 15.0 112.2 VI 91.9
240 225 14.9 115.2 VI 94.3
241 293 15.2 113.7 IX 93.6
PROJECT N0. CE -5307
PLATE NO. TWO (page 6)
NORTH COUNTY
COMPACTION
ENGINEERING, INC. .
TABULATION OF TEST RESULTS
TEST #. DM AORZ, VERT• FIELD DRY DENSITY SOIL PERCENT
LOC, LOC. MOIST LB. /CQ.FT, TYPE COMPACTION
242 01/02/97 See 295 14.3 115.4 IX 95.0
243 Plate 297 14.7 114.7 IX 94.4
244 01/06/97 One 223 16.7 112.3 VI 92.0
245 225 15.8 113.0 VI 92.5
246 227 17.7 111.4 VI 91.2
247 294 16.8 114.1 X 90.0
248 296 14.1 116.3 X 91.7
249 287 15.7 114.5 X 90.2
250 289 14.6 115.7 X 91.2
251 01/07/97 226 15.3 118.2 VI 96.8
252 228 16.8 115.7 VI 94.7
253 229 15.4 111.0 VI 90.9
254 230 17.3 112.6 VI 92.3
255 232 18.6 111.4 VI 91.2 ;
256 290 17.0 114.7 X 90.4
257 292 15.2 114.5 X 90.2
258 298 16.4 116.0 X 91.4
259 299 13-2 117.3 X 92.5
260 01/08/97 234 14.7 112.3 VI j'92.0
261 236 17.4 110.7 VI 90.7
262 238 14.5 114.4 VI 93.7
263 240 18.3 111.4 VI 91.2
264 242 17.0 113.7 VI 93.1
265 01/09/97 233 12.8 117.7 VIII 92.0
266 234 13.6 118.5 VIII 92.8
267 278 18.3 110.4 III 93.6
268 280 16.2 112.7 III 95.5
269 288 15.3 113.1 III 95.8
270 290 15.9 110.7 III' 93.8
271 302 17.8 114.7 X 90.4
272 303 17.4 115.0 X 90.6
273 324 15.4 109.3 III 92.6
274 01/10/97 304 13.7 114.5 X 90.3
275 301 14.6 116.3 X 91.7
276 302. 15.2 115.3 X 90.9
277 292 16.7 112.6 III 95.4
278 294 17.3 111.4 III 94.4
279 01/15/97 270 16.2 113.7 VI 93.1
280 272 14.3 114.5 VI 93.8
281 273 14.4 115.9 VI 94.9
PROJECT NO. CE -5307
PLATE NO. TWO (page 7)
NORTH COUNTY
"COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TESTA DATE H ORZ. VERT_ FIELD DRY DENSITY SQL PERCENT
LOC_ IOC. MOIST LB_ /CU. FT. TYPE COMPACTION
282 01/16/97 See 275 16.3 111.7 VI 91.5
283 Plate 277 15.9 113.0 VI 92.5
284 One 252 17.3 114.0 IX 93.8
285 254 18.2 110.7 IX 91.1
286 01/17/97 244 16.4 113.7 IX 93.6
287 246 17.3 115.4 IX 95.0
288 245 18.1 111.7 IX 91.9
289 247 18.4 110.4 IX 90.9
290 01/21/97 246 16.1 112.5 IX 92.6
291 01/22/97 230 18.4 116.5 IX 95.8
292 238 15.9 109.7 IX 90.2
293 235 18.1 114.6 IX 94.3
294 248 18.7 110.2 IX 90.6
295 232 18.1 112.5 IX 92.5
296 01/24/97 220 19.5 110.2 IY 90.6 '
297 234 18.1 111.1 IX 91.4
298 224 17.6 113.7 IX 93.6
299 226 15.4 112.4 IX 92.5
300 01/29/97 250 17.6* 113.8 IX 93.7
301 337 15.4 115.0 IX 94.7
302 336 17.7 112.4 IX 92.5
303 01/30/97 338 14.7 117.1 VI 95.9
304 336 16.2 115.3 VI 94.9
305 338 13.6 120.1 IX 98.8
306 336 16.5 114.0 IX 93.8
307 02/01/97 228 14.7 113.7 VI 93.1
308 229 16.2 112.0 VI 91.7
309 234 17.3 111.4 VI 91.2
310 236 13.4 115.3 VI 94.4
311 340 13.3 116.2 VI 95.2
312 342 13.8 115.7 VI 94.8
313 02/04/97 229 15.9 118.2 XI 95.7
314 228 16.1 117.0 XI 94.7
315 229 16.6 115.0 XI 93.1
316 228 17.4 114.6 XI 92.8
317 228 13.7 119.5 XI 96.8
318 223 18.6 112.3 XI 90.9
319 225 17.9 113.7 XI 92.1
320 227 15.6 115.2 XI 93.3
321 244 16.0 116.4 XI 94.3
PROJECT NO_ CE -5307
PLATE NO_ TWO (page 8)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF 'EST RESULTS
TEST# DATE HORZ. VERT. FIELD DRY DENSITY SOIL PERCE
LOC. LOC, MOIST LB. /CU. FT. TUB. COMPACTIO
322 02/04/97 See 242 16.7 113.9 XI 92.2
323 Plate 244 17.6 113.0 XI 91.5
324 One 252 16.2 110.7 VI 90.7
325 254 17.3 112.0 VI 91.7
326 02/05/97 302 20.9 108.2 XIII 94.4
327 304 18.8 110.4 XIII 96.3
328 306 17.3 105.6 XIII 92.1
329 294 15.9 118.0 XII 90.1
330 296 17.3 119.2 XII 91.1
331 305 12.1 119.4 XII 91.2
332 306 13.8 120.3 XII 91.9
333 308 14.9 119.6 XII 91.6
334 02/06/97 329 14.3 110.2 XIII 96.2
335 331 19.6 105.7 XIII 92.2
336 333 20.4 104.9 XIII 91.5
337 308 13.8 119.7 XII 91.4
338 310 12.7 122.3 XII 93.4
339 " 312 11.9 124.3 -XII 95.0
340 302 15.6' 121.7 XII j93.0
341 296 14.4 120.8 XII 92.3
342 298 16.6 119.9 XII 91.6
343 02/07/97 332 19.7 111.3 XIII 97.1
344 334 15.6 112.4 XIII 98.1
345 336 17.6 106.7 XIII 93.1
346 335 20.7 103.3 XIII 90.1
347 336 15.6 108.2 XIII 94.4
348 333 20.4 104.6 XIII 91.3
349 335 19.7 107.4 XIII 93.7
350 02/10/97 335 16.8 118.7 XII 90.7
351 336 17.3 119.6 XII 91.4
352 335 19.4 106.5 XIII 93.0
353 336 15.3 119.0 XII 90.9
354 334 15.7 122.6 XII 93.7
355 294 16.7 116.7 XIV 96.0
356 296 13.7 118.2 XIV 97.3
357 304 14.9 117.8 XIV 97.0
358 233 14.2 117.9 VIII 92.1
359 235RFG 12.9 107.7 VII 92.2
360 233 13.2 118.6 VIII 92.7
361 235RFG 13.8 106.0 VII 90.8
PROJECT NO. CE -5307
PLATE NO TWO (page 9)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
EST# DATE HORZ_ VERT. FIELD DRY DENSITY SOIL PERCENT
LOC. LOC- MOIST LB-/CU-FT, TYPE COMPACTIO
362 02/11/97 See 337 15.6 117.9 XII 90.1
363 Plate 338 14.7 118.3 XII 90.4
364 One 337 15.3 118.7 XII 90.7
365 337 14.4 119.7 XII 91.4
366 307 16.9 114.9 X 90.6
367 308 17.4 114.5 X 90.3
368 310 18.2 114.4 X 90.2
369 290 17.3 112.2 XIV 92.3
370 292 16.6 113.6 XIV 93.5
371 02/12/97 335 12.2 118.4 X 93.4
372 336 13.8 114.7 X 90.5
373 338 14.6 118.9 X 93.8
374 280 14.0 118.8 X 93.7
375 02/13/97 299 11.9 126.5 XII 96.7
376 298 12.6 124.0 XII 94.7
377 302 11.4 123.2 XII 94.1
378 " 301 11.9 121.1 XII 95.2
379 308 13.4 122.6 XII 93.7
380 310 15.0 121.7 XII /93.0
381 311 12.0 124.9 XII 95.4
383 288 15.3 116.5 X 91.1
384 290 14.0 123.1 XII 94.0
385 292 13.7 122.6 XII 93.7
386 338 14.7 127.8 XII 97.6
387 338 13.8 120.0 XII 91.7
388 335 12.2 123.7 XII 94.5
389 337 15.8 115.7 X 91.2
390 02/14/97 338 12.6 123.7 XII 94.5
391 338 13.4 112.2 XI 90.8
392 282 13.2 120.7 X 95.2
393 282 14.8 124.0 XII 96.0
394 02/18/97 294 20.5 110.3 XIV 90.8
395 276 16.6 116.3 XI 94.2
396 02/19/97 296 17.7 110.7 XIV 91.1
397 264. 18.1 113.8 XI 92.1
398 247 17.3 114.2 XI 92.5
399 02/20/97 298 18.6 110.6 IX 91.0
400 301 17.4 112.5 IX 92.4
401 302 19.0 112.9 IX 92.9
402 242 18.3 111.7 VI 91.5
PROJECT NO. CE -5307
PLATE NO. TWO (page 10)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST# DATE HORZ. VEjjT. MI DRY DENSITY SOIL PERCENT
LOC. LOC_ MOIST LB_ /CU. FT. TYPE CO'EACTI N
403 02/20/97 See 243 17.6 112.2 VI 91.9
404 11 Plate 242 16.3 118.7 VI 97.2
405 02/21/97 One 304 17.3 118.6 IX 97.6
406 306 16.6 115.4 IX 95.0
407 307 18.5 112.7 IX 92.8
408 268 17.7 108.3 III 91.8
409 270 16.9 109.6 III 92.9
410 02/24/97 258 18.9 112.0 XV 93.3
411 308 17.9 115.2 XI 93.3
412 260 17.6 110.8 XV 92.3
413 309 18.0 115.2 XI 93.3
414 310 17.2 116.1 XI 94.0
415 310 15.1 115.4 XI 93.4
416 02/25/97 308 14.4 116.1 XI 94.0 .:
417 309 14.7 119.7 XI 97.0
418 307 16.3 114.6 XI 92.8
419 262 17.7 109.6 XV 91.3
420 263 17.3 108.2 XV 90.2
421 239 14.4 112.7 XI 91.3
422 239 13.7 114.4 XI 92.6
423 02/26/97 251 11.8 123.3 XII 94.2
424 256 13.4 122.2 XII 93.4
425 253 11.1 129.0 XII 98.6
426 264 15.4 111.6 XV 93.0
427 262 16.2 112.0 XV 93.3
428 264 14.3 109.6 XV 91.3
429 02/28/97 268 17.2 113.4 XV 94.5
430 270 17.4 112.2 XV 93.5
431 272 18.2 110.7 XV 92.3
432 266 17.7 112.3 XV 93.6
433 268 18.6 110.1 XV 91.8
434 267 19.3 109.6 XV 91.3
435 274 19.5 117.2 XV 97.6
436 275 14.1 109.2 XV 91.0
437 272 16.1 117.0 XV 97.5
438 03/03/97 273 15.7 114.2 XV 95.2
439 272 17.2 113.6 XV 94.7
440 272 12.6 114.9 XV 95.8
441 274 15.7 113.0 XV 94.2
442 270 17.2 114.0 XV 95.0
PROJECT NO. CE -5307
PLATE NO TWO (page 11)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATIOS OF TEST RESULTS
TEST# DATE HORZ. VERT. FIELD DRY DENSITY SOIL PERCENT
LOC. LOS MOIST LB./Cu-FT, TYPE COMPACTION
443 03/03/97 See 272 18.2 112.4 XV 93.7
444 Plate 276 20.0 109.3 XV 91.1
445 One 274 18.8 110.1 XV 91.8
446 276 18.5 111.0 XV 92.5
447 03/04/97 281 18.2 110.2 XV 91.8
448 275 19.6 109.3 XV 91.1
449 277 18.4 110.7 XV 92.3
450 282 17.1 111.1 XV 92.6
451 284 19.4 109.0 XV 90.8
452 277 14.4 115.2 XV 96.0
453 279 15.5 113.9 XV 94.9
454 03/05/97 245 13.7 120.9 XI 97.9
455 245 14.4 121.7 XI 98.5
456 246 15.6 119.2 XI 96.5
457 251 16.7 108.0 III 91.5
458 253 17.7 109.3 III 92.6
459 254 16.2 110.7 III 93.6
460 244 17.0 115.9 XI 93.8
461 03/06/97 221 18.2 109.4 XV. / 91.2
462 224 16.4 106.6 III 90.4
463 222 15.9 115.5 XV 94.5
464 03/07/97 220 19.0 112.9 XVI 90.0
465 222 20.2 113.8 XVI 90.7
466 222 13.8 120.4 XVI 95.9
467 220 18.0 114.5 XVI 91.2
468 221 20.1 113.3 XVI 90.3
469 03/10/97 226 16.9 118.5 XVI 94.7
470 226 17.9 113.8 XVI 90.7
471 223 17.6 120.2 XVI 95.8
472 223 17.5 114.6 XVI 91.3
473 03/11/97 293 18.1 110.7 XVII 92.6
474 295 16.4 112.6 XVII 94.2
475 295 15.5 113.4 XVII 94.9
476 297 15.0 115.4 XVII 96.6
477 216 20.7 111.0 I 94.1
478 216 17.7 112.2 I 95.1
479 217 21.6 110.7 XV 92.3
480 03/12/97 217 15.1 112.7 XV 93.9
481 219 15.4 114.9 XV 95.8
482 214 14.0 113.0 XV 94.1
PROJECT NO. CE -5307
PLATE NO. TWO (page 12 )
N ORTH COUNTY
COMPACTION
ENGINEERING, INC. t
TABU LATION OF TEST RESULTS
TESTA DATE. HORZ, VERT. FIELD DRY DENSITY SOIL PERCENT
LOC_ LOC. MOIST LB./CU-FT. TE �OMPACTIQN
YP
483 03/12/97 See 222 15.3 113.1 XV 94.3
484 1. Plate 223 17.1 106.2 I1I 90.0
485 03/13/97 One 250 16.5 113.9 XI 92. 2
486 252 18.2 111.7 XI 90.4
487 253 17.3 115.4 XI 93.4
488 254 14.4 116.2 XI 94.1
489 220 16.7 109.2 XV 91.0
490 222 19.4 106.2 III 90.1
491 221 21.8 108.6 XV 90.5
492 03/14/97 232 15.7 115.4 XV 96.2
493 225 16.9 111.6 XV 93.0
494 232 14.5 114.0 XV 95.1
495 03/17/97 293 18.4 108.7 XVII 91.7
496 1 299 20.3 110.6 XVII 92.6
497 03/18/97 282 16.9 123.7 XVI 98.6
498 281 14.8 121.5 XVI 96.8
499 282 16.6 122,2 XVI 97.4
500 274 15.1 119.6 XVI 55.3
501 274 15.4 115.4 XVI / 492.0
502 260 17.5 110.9 XVII 92.7
503 258 19.9 11'1.4 XVII 93.2
504 03/19/97 303 15.1 112.3 XVII 93.9
505 03/20/97 306 17.6 111.7 XVII 93.5
506 305 14.3 114.1 XVII 95.4
507 302 16.0 108.5 XVII 90.8
508 03/21/97 241 RFG 16.1 110.6 VII 94.6
509 241 RFG 12.1 108.6 VII 92.9
510 241 RFG 11.3 110.1 VII 94.3
511 03/24/97 305 16.4 112.7 XVII 94.3
512 303 17.9 108.8 XVII 91.0
513 303 15.3 110.4 XVII 92.3
514 03/26/97 306 15.0 117.4 XVII 98.7
515 308 14.7 116.3 XVII 97.1
516 308 15.3 115.1 XVII 96.3
517 306 14.1 116.5 XVII 97.5
518 03/27/97 230 RFG 12.2 118.7 XVIII 97.5
519 248 RFG 09.6 111.4 XVIII 91.6
520 340 RFG 10.2 110.5 XVIII 90.9
521 308 23.6 109.3 XVII 91.5
522 312 RFG 12.2 109.4 XVIII 90.0
PROJECT NO. CE -5307
PLATE NO TWO (page 13)
NORTH COUNTY
'COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
IESTR DATE HORZ. VV RT, FJEILD DRY DENSITY SOIL PERCENT
LOC. LO_C, MOIST LB./CU-Fl. TYPE COMPACTION
523 03/28/97 See 310 13.5 121.5 XVI 96.8
524 Plate 312 17.1 114.2 XVI 91.0
525 One 310 13.0 =19.0 XVI 94.8
526 312 17.7 113.1 XVI 90.2
527 03/31/97 284 14.2 120.8 XII 92.3
528 286 13.7 121.4 XII 92.7
529 283 14.7 119.6 XII 91.4
530 282 13.0 121.7 XII 93.0
531 04/01/97 256 17.1 112.7 XV 93.9
532 256 15.4 113.6 XV 94.7
533 257 13.7 111.4 XV 92.8
534 276 13.5 112.6 XVII 94.2
535 275 13.1 111.1 XVII 92.9
536 283 16.2 110.7 XVII 92.6
537 308 17.0 109.4 XVII 91.5
538 310 15.4 113.0 XVII 94.6
539 04/03/97 " 277 RFG 10.6 117.1 XVIII 96.4
540 11, 277 11. "3 114.3 XVII 94.1
541 04/07/97 312 10.2 115.3 XVII 96.4
542 312 13.6 121.2 XVII 96.8
543 312 17.4 124.4 XVII 95.7
544 04/08/97 306 RFG 13.0 109.8 VII 94.0
545 306 12.7 113.7 VII 97.3
546 224 16.1 113.5 XVII 95.0
547 225 13.4 :112.1 XVII 93.8
548 236 17.8 111.3 XVII 93.1
549 237 16.3 109.4 XVII 91.5
550 04/09/97 238 16.5 108.3 XVII 90.6
551 11 238 18.1 110.1 XVI'I 92.1
552 04/10/97 265 15.0 111.7 IV 91.0
553 267 17.7 109.4 III 92.7
554 268 14.1 112.6 IV 91.7
555 270 16.2 111.4 IV 90.7
556 271 13.6 110.7 IV 90.1
557 04/11/97 273. 16.7 108.6 III 97.0
558 275 17.4 109.4 III 92.7
559 274 15.4 112.6 IV 91.7
560 276 14.3 112.9 IV 92.0
561 275 17.3 113.7 IV 92.6
562 277 14.9 115.0 IV 93.6
PROJECT NO. CE -5307
PLATE NO. TWO ( page 14)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST# DATE HORZ. VERT, FIELD DRY DENSITY SOIL PE RCENT
LOC. LOC. MOIST LB. /CU. FT. TYP QOkPACTIO
563 04/11/97 See 279 17.2 111.6 IV 90.9
564 Plate 280 18.1 109.6 III 92.9
565 04/14/97 One 280 16.0 112.7 IV 91.8
566 282 14.7 113.7 IV 92.6
567 04/15/97 283 13.5 117.2 IV 95.4
568 282 14.4 113.6 IV 92.5
569 04/16/97 303 14.9 111.6 IV 90.9
570 305 15.8 112.4 IV 91.5
571 04/18/97 306 15.6 113.7 III 96.4
572 313RFG 09.8 113.3 XIX 94.0
573 313RFG 09.9 109.6 XIX 91.0
574 237 15.3 114.4 XVII 95.7
575 04/22/97 309RFG 08.0 108.8 XIX 90.2
576 226RFG 15.3 113.0 XIX 93.7
577 224RFG 15.5 110.4 XIX 91.7
578 308RFG 13.7 112.3 IV 91.4
579 04/24/97 253 15.6 119.7 XX 90.7
580 254 14:3 121.2 XX 91.8
581 257 16.2 119.0 XX 90.2
582 255 13.9 111.8 IX 92.0
583 258 14.8 120.3 IX 90.8
584 257 15.6 112.4 IX 92.5
585 04/29/97 285 15.9 117.6 IX 96.8
586 286 16.3 115.4 IX 95.0
587 285 13.6 119.7 XX 90.7
588 257 12.7 121.2 XII 92.6
589 257 12.9 118.6 XII 90.6
590 05/08/97 256 16.8 115.4 XVII 96.6
591 258 17.3 112.0 XVII 93.7
592 259 17.4 113.4 XVII 94.9
593 258 16.6 114.4 XVI 91.2
594 260 13.7 115.3 XVI 91.9
595 05/09/97 261 18.2 109.9 XVII 92.0
596 263 17.3 111.7 XVII 93.5
597 262 18.6 110.4 XVII 92.4
598 264 15.9 114.7 XVI 91.4
599 265 16.8 112.9 XVI 90.0
600 05/12/97 267 18.6 114.4 XVII 95.7
601 268 18.8 113.7 XVI 90.6
602 269 19.5 110.2 XVII 92.2
603 271 16.8 113.5 XVII 95.0
PROJECT NO_ CE -5307
PLATE NO. TWO (page 15)
NORTH COUNTY
'COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TEST #_ DBE HORZ VERT FIELD DRY DENSITY SOIL PERCENT
LOG. LOG. MOIST LB./CU-FT. TYPE COMPACTION
604 05/13/97 See 273 16.8 115.4 XVI 92.0
605 Plate 275 13.4 117.7 XVI 93.8
606 One 256 11.2 121.6 XII 92.9
607 257 11.0 124.0 XII 94.7
608 286 13.2 122.8 XX 93.0
609 286 13.7 121.4 XX 92.0
610 05/14/97 277 16.8 116.7 XVI 93.0
611 11 279 17.4 112.9 XVI 90.0
612 05/15/97 280 15.0 114.3 XV 95.3
613 281 18.2 111.1 XV 93.4
614 282 16.3 112.4 XV 93.7
615 05/16/97 281 15.6 113.0 XVI 90.0
616 283 13.0 115.4 XVI 92.0
617 282 13.7 116.8 XVI 93.1
.618 282 17.3 114.2 XVI 91.0
619 05/20/97 247 15.2 112.8 IV 91.9
620 248 17.3 111.0 IV 90.4
621 247 14.2 113.4 IV 93.2
622 05/21/97 281 17.7 110.6, XV 92.2
623 282 16.1 112.2 XV j93.5
624 247 14.6 114.6 IV 93.3
625 05/27/97 244 15.3 112.7 IV 91.8
626 246 14.2 115.4 IV 94.0
627 247 13.8 113.6 IV 92.5
628 247 12.2 114.4 IV 93.2
629 281 15.8 117.7 XVI 93:8
630 283 17.8 114.1 XVI 90.9
631 283 18.2 112.6 XV 93.8
632 05/30/97 286 10.6 121.7 XX 92.2
633 286 11.3 123.0 XX 93.2
634 286 11.8 121.2 XX 91.8
635 315RFG 12.8 109.6 XIX 91.0
636 315RFG 13.7 110.2 XIX 91.5
637 315RFG 13.1 112.0 XIX 92.9
638 06/26/97 288RFG 09.7 109.0 XIX 90.4
639 288RFG 08.6 109.9 XIX 91.2
640 288RFG 07.4 111.7 XIX 92.7
641 259RFG 06.4 109.4 XIX 90.8
642 " 259RFG 07.4 112.2 XIX 93.1
643 259RFG 06.9 113.6 XIX 94.3
644 284RFG 07.9 111.1 XIX 92.2
PROJECT N0. CE -5307
PLATE NO. TWO (page 16 )
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
TESTA DATE HORZ_ VERT_ FIELD DRY DENSITY SOIL PERCENT
LOC_ LOC. MOIST LB. /CU. FT_ TYPE COKFACTION
645 06/26/97 See 284RFG 08.6 112.0 XIX 92.9
646 Plate 284RFG 07.3 109.7 XIX 91.0
647 One 249RFG 08.0 112.7 XIX 93.5
648 249RFG 09.6 111.6 XIX 92.6
649 249RFG 08.2 109.6 XIX 91.0
REMARKS: Tests tabulated and not shown on Plate No. One were
taken on other lots in the subdivision. This is a
partial report for Lot Vs 5, 6, 14, & 17 only for the
purpose of obtaining a building permit.
Test No. 382 not available due to a field report numbering
error.
RFG = Rough Finish Grade
PROJECT NO. CE -5307
PLATE NO. TWO (page 17)
NORTH COUNTY
'COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESULTS
OPTIMUM MOISTURE /MAXIMUM DENSITY
SOIL DESCRIPTION TYPE MAX. DRY DENSITY OPTIMUM MOISTURE
(lb /cu.ft.) (% dry wt)
Red Brown Clay I 118.0 14.7
Red Brown Gravelly -
Clay II 121. 5 14.5
Orange -Brown Clayey -
Gravel III 118.0 15.0
Orange- Red -Brown
Silty - Gravelly -Clay IV 122.8 13.5
Yellow -Tan Fine
Clayey -Sand V 115.7 14.6
Yellow Brown Clayey-
Gravel VI 122.1 13.6
Light White -Beige
Silty Sand. (Import) VII 116.8 13.2
Light Orange Brown
Silty Gravelly Clayey
Sand VIII 128.0 11.2
Brown Red Silty
Gravelly Clay IX 121.5 13.7
Orange Brown Silty
Gravelly Clay X 126.8 11.5
Brown Orange Silty
Gravelly Clay XI 123.5 13.3
Gray Brown Gravelly
Clay XII 130.9 10.6
Brown Sandy Clay XIII 114.6 15.1
Yellow Beige Clayey
Gravel XIV 121.5 13.8
PROJECT N0. CE -5307
PLATE NO. THREE (page 1)
NORTH COUNTY
COMPACTION
ENGINEERING, INC.
TABULATION OF TEST RESU
OPTIMUM MOISTURE /MAXIMUM DENSITY
SOIL DESCRIPTION TYPE MAX. DRY DENSITY OPTIMUM MOISTURE
(lb /cu. ft. ) (% dry wt)
Orange Brown Silty -
Clay XV 120.0 15.5
Orange Brown Silty -
Clayey Gravel XVI 125.5 12.0
Yellow Red Gravelly -
Clay XVII 119.5 14.0
Yellow Tan Silty -
Sand (Import) XV I I I 121.5 11.7
Beige Tan Silty -
Sand (Import) XIX 120.5 12.2
Gray Brown Gravelly -
Clayey -Sand XX 132.0 09.7
'EXPANSION POTENTIAL
SAMPLE N0, IV XII XVII
CONDITION Remold 90% Remold 90% Remold 90%
INITIAL MOISTURE ( %) 12.7 10.7 13.5
AIR DRY MOISTURE ( %) 08.9 07.0 06.8
FINAL MOISTURE ( %) 23.3 21.7 25.0
FINAL DRY DENSITY (pcf) 110.5 117.8 107.6
LOAD (psf) 150 150 150
SWELL M 8.0 5.9 7.5
EXPANSION INDEX 80 59 75
DIRECT SHEAR
SAMPLE N0, IV XVII
CONDITION Remold 90% Remold 90%
ANGLE INTERNAL FRICTION 17 17
COHESION INTERCEPT (PCF) 300 290
PROJECT NO. CE -5307
PLATE NO. THREE (page 2)
K &S ENGINEERING
Planning Engineering Surveying
HYDROLOGICAL ANALYSIS
FOR
WILDFLOWER ESTATES LOTS i - 10
IN
CITY OF ENCINITAS
JN 9637 `
September 25, 1996
°4 r
a
Q RpfESS/0,y�
S. ` Fy n
CD CD No. 48592 N
Exp. 630.00 z 6
S. E S R. E. 48592 s cryn
� CAW
7801 Mission Center Court, Suite 200-San Diego, California 92108• (619)296 -5565 • Fax (619)296 -5564
TABLE OF CONTENTS
l.HYDROLOGY DESIGN MODELS
2.HYDROLOGIC CALCULATIONS .......................... APPENDIX A
3.TABLES AND CHARTS . ............................... APPENDIX B
4.HYDROLOGY MAPS .... ............................... APPENDIX C
1. HYDROLOGY DESIGN MODELS
A. DESIGN METHODS
THE RATIONAL METHOD IS USED IN THIS HYDROLOGY STUDY; THE RATIONAL
FORMULA IS AS FOLLOWS:
Q = CIA, WHERE : Q= PEAK DISCHARGE IN CUBIC FEET /SECOND
C = RUNOFF COEFFICIENT (DIMENSIONLESS)
I = RAINFALL INTENSITY IN INCHES /HOUR
A = TRIBUTARY DRAINAGE AREA IN ACRES
*1 ACRE INCHES /HOUR = 1.008 CUBIC FEET /SEC
THE OVERLAND FLOW METHOD IS ALSO USED IN THIS HYDROLOGY STUDY; THE
OVERLAND FLOW FORMULA IS AS FOLLOWS:
T [1.8(1.1 —C) (L)'s] /(So)1 /3
C = RUNOFF COEFFICIENT
L = OVERLAND TRAVEL DISTANCE IN FEET
S = SLOPE IN PERCENT
T TIME IN MINUTES
B. DESIGN CRITERIA
— FREQUENCY, 100 YEAR STORM.
— LAND USE PER SPECIFIC PLAN AND TENTATIVE MAP.
— RAIN FALL INTENSITY PER COUNTY OF SAN DIEGO 1993 HYDROLOGY
DESIGN MANUAL.
C. REFERENCES
— COUNTY OF SAN DIEGO 1993, HYDROLOGY MANUAL.
— COUNTY OF SAN DIEGO 1992 REGIONAL STANDARD DRAWING.
— HAND BOOK OF HYDRAULICS BY BRATER & KING, SIXTH EDITION.
APPENDIX A
(2. HYDROLOGIC CALCULATIONS)
SAN DIEGO COUNTY
RATIONAL - HYDROLOGY
PROGRAM PACKAGE
Rational Hydrology Study Date: 9 -25 -1996
--------------------------------------------------------------------------
*USER SPECIFIED HYDROLOGY INFORMATION*
---------------------------------------------------------------------------
Rational method hydrology program based on
San Diego County Flood Control Division
1985 Hydrology Manual
Storm Event(Year) = 100.00
Map data precipitation entered:
6 HOUR, Precipitation(Inches) = 2.700
24 Hour Precipitation(Inches) = 4.500
Adjusted 6 Hour Precipitation (Inches) = 2.700
P6/P24 = 60.0 %
San Diego Hydrology Manual "C" Values Used
Runoff Coefficients by RATIONAL METHOD
++++++++++++++++++++++++++++++++++++++++++++ + ++ ++++ ++++++ + + + ++++ ++++++++ +++
Process from Point/Station 1.000 to Point/Station 2.000
* ** INITIAL AREA EVALUATION * **
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Initial Subarea Flow Dist. = 70.00
Highest Elevation = 266.00
Lowest Elevation = 235.00
Elevation Difference = 31.00
Time of concentration calculated by the Urban
Areas overland flow method (APP X -C) = 10.022 Min.
TC = [1.8 *(1.1 -C) *DISTANCE ^.5) /(% SLOPE-(1/3)]
TC = [1.8 *(1.1- .4500) *( 328.00 ^.5) /( 9.45 ^(1 /3)1)= 10.022
100.00 Year Rainfall Intensity(In./Hr.) = 4.543
Subarea(Acres) = .14 Subarea Runoff(CFS) = .29
Total Area(Acres) = .14 Total Runoff(CFS) = .29
TC(MIN) = 10.02
++++++++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + +++++++ + + +++ +++++ + ++
Process from Point/Station 2.000 to Point/Station 3.000
* ** TRAPEZOIDAL/RECT. CHANNEL TRAVEL TIME * **
Upstream point elevation = 235.00
Downstream point elevation = 234.00
Channel length thru subarea(Feet) = 225.00
Channel base(Feet) = .00
Slope or "Z" of left channel bank = 2.000
Slope or "Z" of right channel bank = 100.000
Mannings "N" = .330 Maximum depth of channel (Ft.) _ .50
Flow(Q) thru subarea(CFS) _ .29
Upstream point elevation = 235.00
Downstream point elevation = 234.00
Flow length(FL) = 225.00
Travel time (Min.) = 47.85 TC(min.) = 57.87
Depth of flow = .27 (FL)
Average Velocity = .08 (FL/Sec.)
Channel flow top width = 27.29 (FL)
Process from Point/Station 2.000 to Point/Station 3.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 1.466
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .41 Subarea Runoff(CFS) _ .27
Total Area(Acres) _ .55 Total Runoff(CFS) _ .56
TC(MIN) = 57.87
+ + + ++++++++++++++ + H H 1 11 +++ +++++++ + + + ++++ ++++ + ++t++++ ++++i
Process from Point/Station 3.000 to Point/Station 4.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 234.00
Downstream point elevation = 220.00
Flow length(Ft.) = 42.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) _ .56
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) _ .56
Normal flow depth in pipe = 1.47 (In.)
Flow top width inside pipe = 6.20 (In.)
Velocity = 12.657 (Ft/S)
Travel time (Min.) _ .06 TC(min.) = 57.92
+ +++ + + + + + + H r ++++ ++++ + + +++++++++++ + ++++++ + T,, r + + + +++ + + ++++ ++++ + +++
Process from Point/Station 4.000 to Point/Station 5.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 220.00
Downstream point elevation = 200.00
Flow length(FL) = 185.00 Mannings N = .015
No. of pipes = I Required pipe flow (CFS) _ .56
Given pipe size (In.) = 24.00
Calculated Individual Pipe flow (CFS) _ .56
Normal flow depth in pipe = 1.58 (In.)
Flow top width inside pipe = 11.91 (In.)
Velocity = 6.302 (Ft/S)
Travel time (Min.) _ .49 TC(min.) = 58.41
++++++++++++++++++++++++++++++++++++++++++++ + ++ + + + + + +++ + + ++ + +++ ++ + + + ++++ + ++
Process from Point/Station 4.000 to Point/Station 5.000
*** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 1.457
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) = .26 Subarea Runoff(CFS) = .17
Total Area(Acres) = .81 Total RunofT(CFS) = .73
TC(MIN) = 58.41
+++++ +++ ++
Process from Point/Station 4.000 to Point/Station 5.000
* ** CONFLUENCE OF MINOR STREAMS * **
100.00 Year Rainfall Intensity(In./Hr.) = 1.457
ALONG THE MAIN STREAM NUMBER: 1
The flow values used for the stream: 1 are:
Time of concentration(min.) = 58.41
Rainfall intensity (in./hro = 1.46
Total flow area (Acres) = .81
Total runoff (CFS) at confluence point = .73
+ +++ + +++i H H H H H H H! H11 !HHHHHHHHHHHHHH + +;rr + ++++ + ++
Process from Point/Station 6.000 to Point/Station 7.000
* ** INITIAL AREA EVALUATION * **
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Initial Subarea Flow Dist. = 120.00
Highest Elevation = 279.00
Lowest Elevation = 235.00
Elevation Difference = 44.00
Time of concentration calculated by the Urban
Areas overland flow method (APP X -C) = 10.015 Min.
TC = [1.8 *(1.1 -C) *DISTANCE ^.5 )/(% SLOPE-(1/3)]
TC = [1.8 *(1.1- .4500) *( 377.00 ^.5 )/( 11.67 ^(I /3)])= 10.015
100.00 Year Rainfall Intensity(In./Hr.) = 4.545
Subarea(Acres) = .24 Subarea Runoff(CFS) = .49
Total Area(Acres) = .24 Total Runofl(CFS) = .49
TC(MIN) = 10.02
+ + + + + +++ + +++ + + + + ++ + + TTT r +++++++++++++++++++ + + + +++ +++++ ++++ +++ +++++++ + + + + ++
Process from Point/Station 7.000 to Point/Station 8.000
* ** TRAPEZOIDAL/RECT. CHANNEL TRAVEL TIME * **
Upstream point elevation = 235.00
Downstream point elevation = 234.00
Channel length thru subarea(Feet) = 190.00
Channel base(Feet) = .00
Slope or "Z" of left channel bank = 100.000
Slope or "Z" of right channel bank = 2.000
Mannings "N" = .330 Maximum depth of channel (Ft.) _ .50
Flow(Q) thru subarea(CFS) _ .49
Upstream point elevation = 235.00
Downstream point elevation = 234.00
Flow length(Ft) = 190.00
Travel time (Min.) = 33.14 TC(min.) = 43.16
Depth of flow = .32 (Ft)
Average Velocity = .10 (Ft /Sec.)
Channel flow top width = 32.37 (Ft)
+ + + ++ HHHHHHHHHHHHHH1
Process from Point/Station 7.000 to Point/Station 8.000
* ** SUBAREA FLOW ADDITION ►ss
100.00 Year Rainfall Intensity(In./Hr.) = 1.771
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) = .44 Subarea Runoff(CFS) = .35
Total Area(Acres) = .68 Total RunoMCFS) = .84
TC(MIN) = 43.16
+++++++++++++++++++ F++++ 1++++++ TT+++ ++++++++ ++++++++ ++++++ + + + + + + + +++++ +++ ++
Process from Point/Station 8.000 to Point/Station 5.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 234.00
Downstream point elevation = 200.00
Flow length(Ft) = 70.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) = .84
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) _ .84
Normal flow depth in pipe = 1.64 (In.)
Flow top width inside pipe = 6.46 (In.)
Velocity = 16.327 (Ft/S)
Travel time (Min.) = .07 TC(min.) = 43.23
++++++++++++++++++++++ Hill ++++++++++++++++++ + +++ + + + + + + + + +++++++++ + Hill + ++++
Process from Point/Station 8.000 to Point/Station 5.000
* ** CONFLUENCE OF MINOR STREAMS * **
* ** Compute Various Confluenced Flow Values * **
----------------------------------------------------------------------------
100.00 Year Rainfall Intensity(In./Hr.) = 1.770
ALONG THE MAIN STREAM NUMBER: I
The flow values used for the stream: 2 are:
Time of concentration(min.) = 43.23
Rainfall intensity (in./lir/) = 1.77
Total flow area (Acres) = .68
Total runoff (CFS) at confluence point = .84
Confluence information:
Stream runoff Time Intensity
Number (C. 3) (min.) (inch/hour)
----------------------------------------------------------------------------
1 .73 58.41 1.457
2 .84 43.23 1.770
QSMX(I) =
+1.000* 1.000* .7)
+ .824* 1.000* .8)
= 1.420
QSMX(2) _
+1.000* .740* .7)
+1.000* 1.000* .8)
= 1.380
Rainfall intensity and time of concentration
used for 2 streams.
Individual stream flow values are:
.73 .84
Possible confluenced flow values are:
1.42 1.38
Individual Stream Area values are:
.81 .68
Computed confluence estimates are:
Runofff(CFS) = 1.42 Time(min.) = 58.413
Total main stream study area (Acres) = 1.49
+++++++++++++++++++++++++++++++++++ ++++ +++++++++++ + + + + + ++ ++ + ++ ++++
Process from Point/Station 5.000 to Point/Station 9.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 200.00
Downstream point elevation = 197.00
Flow length(Ft-) = 50.00 Mannings N = .015
No. of pipes = 1 Required pipe flow (CFS) = 1.42
Given pipe size (In.) = 24.00
Calculated Individual Pipe flow (CFS) = 1.42
Normal flow depth in pipe = 2.83 (In.)
Flow top width inside pipe = 15.49 (In.)
Velocity = 6.811 (Ft/S)
Travel time (Min.) _ .12 TC(min.) = 58.53
+++++++++++ i+++++++++ � ++++++ +++++++ + + +++++++ + +++++ +++
Process from Point/Station 5.000 to Point/Station 9.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 1.455
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .09 Subarea Runoff(CFS) _ .06
Total Area(Acres) = 1.58 Total Runoff(CFS) = 1.48
TC(MIN) = 58.53
+ + + + ++ i ii i i r ++++++++++++++++++++++++++++ + + +++++++ + ++++++ + + + + + + + + + + +++ ++
Process from Point/Station 5.000 to Point/Station 9.000
* ** CONFLUENCE OF MINOR STREAMS * **
100.00 Year Rainfall Intensity(In./Hr.) = 1.455
ALONG THE MAIN STREAM NUMBER: 1
The flow values used for the stream: 1 are:
Time of concentration(min.) = 58.53
M
Rainfall intensity (in./hr/) = 1.46
Total flow area (Acres) = 1.58
Total runoff (CFS) at confluence point = 1.48
+ ++++ +++ + + + + + + + ++ + + + +m, r+
Process from Point/Station 10.000 to Point/Station 11.000
* ** INITIAL AREA EVALUATION *"
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Initial Subarea Flow Dist. = 80.00
Highest Elevation = 268.00
Lowest Elevation = 230.00
Elevation Difference = 38.00
Time of concentration calculated by the Urban
Areas overland flow method (APP X -C) = 10.003 Min.
TC = [1.8 *(1.1 -C) *DISTANCE ^.5) /(% SLOPE
TC = [1.8 *(1.1- .4500) *( 355.00 ^.5) /( 10.70 ^(1/3)1)= 10.003
100.00 Year Rainfall Intensity(In./Hr.) = 4.548
Subarea(Acres) _ .10 Subarea Runoff(CFS) _ .20
Total Area(Acres) _ .10 Total Runoff(CFS) _ .20
TC(MIN) = 10.00
++++++++++++++++++++++++++++++++++++++++++++ +
Process from Point/Station 11.000 to Point/Station 12.000
* ** TRAPEZOIDAL/RECT. CHANNEL TRAVEL TIME
Upstream point elevation = 230.00
Downstream point elevation = 229.00
Channel length thnr subarea(Feet) = 160.00
Channel base(Feet) _ .00
Slope or "Z" of left channel bank = 2.000
Slope or "Z" of right channel bank = 100.000
Mannings "N" _ .033 Maximum depth of channel (FL) _ .50
Flow(Q) thru subarea(CFS) _ .20
Upstream point elevation = 230.00
Downstream point elevation = 229.00
Flow length(Ft) = 160.00
Travel time (Min.) = 5.79 TC(min.) = 15.79
Depth of flow = .09 (Ft.)
Average Velocity = .46 (Ft. /Sec.)
Channel flow top width = 9.52 (FL)
++++++++++++++++++++++++++++++++++++++++++++ + + +++ ++++++++ ++ + + + + + +++ + + + + + + ++
Process from Point/Station 11.000 to Point/Station 12.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 3.388
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .26 Subarea Runoff(CFS) _ .40
Total Area(Acres) _ .36 Total Runoff(CFS) _ .60
TC(M IN) = 15.79
Process from Point/Station 12.000 to Point/Station 9.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 229.00
Downstream point elevation = 197.00
Flow length(Ft.) = 64.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) _ .60
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) _ .60
Normal flow depth in pipe = 1.38 (In.)
Flow top width inside pipe = 6.05 (In.)
Velocity = 14.936 (Ft/S)
Travel time (Min.) _ .07 TC(min.) = 15.86
+ + + +++ ++,-, H H +; ++ + r, r +++ + +++ + + + + + + +++ + ++ + 7777 TTT + + + + + + +++ ++++ + + + ++
Process from Point/Station 12.000 to Point/Station 9.000
* ** CONFLUENCE OF MINOR STREAMS * **
* ** Compute Various Confluenced Flow Values * *'
--------------------------------------------------------------------------
100.00 Year Rainfall Intensity(InJHr.) = 3.379
ALONG THE MAIN STREAM NUMBER: 1
The flow values used for the stream: 2 are:
Time of concentration(min.) = 15.86
Rainfall intensity (in./hr/) = 3.38
Total flow area (Acres) _ .36
Total runoff (CFS) at confluence point = .60
Confluence information:
Stream runoff Time Intensity
Number (CFS) (min.) (inch/hour)
----------------------------------------------------------------------------
1 1.48 58.53 1.455
2 .60 15.86 3.379
QSMX(1) _
+1.000* 1.000* 1.5)
+ .431 * 1.000* .6)
= 1.738
QSMX(2) _
+1.000* .271* 1.5)
+1.000 *1.000* .6)
= 1.002
Rainfall intensity and time of concentration
used for 2 streams.
Individual stream flow values are:
1.48 .60
Possible confluenced flow values are:
1.74 1.00
Individual Stream Area values are:
1.58 .36
Computed confluence estimates are:
RunoTCFS) = 1.74 Time(min.) = 58.535
Total main stream study area (Acres) = 1.94
+ + +++++ +++ +++++ +++++++++++ + +++ + +++++++ T+-#-TTTT ++++ +++++++
Process from Point/Station 9.000 to Point/Station 13.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 197.00
Downstream point elevation = 196.00
Flow length(FL) = 50.00 Mannings N = .015
No. of pipes = 1 Required pipe flow (CFS) = 1.74
Given pipe size (In.) = 24.00
Calculated Individual Pipe flow (CFS) = 1.74
Normal flow depth in pipe = 4.07 (In.)
Flow top width inside pipe = 18.02 (In.)
Velocity = 4.918 (Ft/S)
Travel time (Min.) = .17 TC(min.) = 58.70
+ + ++++++ + ++++ + + ++TT+ + +++ : �++;+ + + + ++++ + + + + + ++++ + +++ + +++ +T;H +H H11 ++++
Process from Point/Station 9.000 to Point/Station 13.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(InJHr.) = 1.453
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) = .12 Subarea Runoff(CFS) _ .08
Total Area(Acres) = 2.06 Total Runoff(CFS) = 1.82
TC(MIN) = 58.70
++++++ + + + + + + + +++++ + Hill ++++ + + ++++ + + + +1,1111+
Process from Point/Station 9.000 to Point/Station 13.000
* ** CONFLUENCE OF MAIN STREAMS * **
FOLLOWING DATA INSIDE MAIN STREAM ARE CALCULATED
100.00 Year Rainfall Intensity(In./I - Ir.) = 1.453
The flow values used for the stream: 1 are:
Time of concentration(min.) = 58.70
Rainfall intensity (in./hr/) = 1.45
Total flow area (Acres) = 2.06
Total runoff (CFS) at confluence point = 1.82
Program is now starting with MAIN STREAM NO. 2
Process from Point/Station 14.000 to Point/Station 16.000
* ** INITIAL AREA EVALUATION * **
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Initial Subarea Flow Dist. = 90.00
Highest Elevation = 278.00
Lowest Elevation = 240.00
Elevation Difference = 38.00
Time of concentration calculated by the Urban
Areas overland flow method (APP X -C) = 10.003 Min.
TC = [1.8 *(I.1 -C) *DISTANCE ^ .5) /(% SLOPE^(1/3)]
TC = [1.8 *(1.1- .4500) *( 355.00 ^.5 )/( 10.70^(1/3)))= 10.003
100.00 Year Rainfall Intensity(In./Hr.) = 4.548
Subarea(Acres) _ .13 Subarea Runoff(CFS) _ .27
Total Area(Acres) _ .13 Total Runoff(CFS) _ .27
TC(MIN) = 10.00
+++ +++ + + + + + +++ + + + + + +++ + + + +++ ++++ ++
Process from Point/Station 15.000 to Point/Station 16.000
* ** TRAPEZOIDAL/RECT. CHANNEL TRAVEL TIME * **
Upstream point elevation = 241.00
Downstream point elevation = 240.00
Channel length thru subarea(Feet) = 70.00
Channel base(Feet) _ .00
Slope or "Z" of left channel bank = 100.000
Slope or "Z" of right channel bank = 2.000
Mannings "N" _ .033 Maximum depth of channel (Ft.) _ .50
Flow(t) thru subarea(CFS) _ .27
Upstream point elevation = 241.00
Downstream point elevation = 240.00
Flow length(Ft.) = 70.00
Travel time (Min.) = 1.74 TC(min.) = 11.74
Depth of flow = .09 (Ft.)
Average Velocity = .67 (Ft. /Sec.)
Channel flow top width = 9.00 (Ft.)
+++++ HTTT,, + +++++++++++++ + + Hill + +++ +7777,-+ + + + + + +TT+ + + + + + + + + ++
Process from Point/Station 15.000 to Point/Station 16.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 4.102
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .29 Subarea Runoff(CFS) _ .54
Total Area(Acres) _ .42 Total Runoff(CFS) _ .80
TC(MIN) = 11.74
++++++++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + +++ + +++ + + ++ + + + ++ + ++
Process from Point(Station 16.000 to Point/Station 17.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 235.00
Downstream point elevation = 232.60
Flow length(FL) = 117.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) _ .80
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) _ .80
Normal flow depth in pipe = 3.65 (In.)
Flow top width inside pipe = 7.97 (In.)
Velocity = 5.161 (Ft/S)
Travel time (Min.) _ .38 TC(min.) = 12.12
+ + +++ + + + + + ++ ++++++++++ + + + + ;'+�T +++++++r +++++++++ + ++++
Process from Point/Station 16.000 to Point/Station 17.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 4.019
Decimal Friction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .20 Subarea Runoff(CFS) _ .36
Total Area(Acres) _ .62 Total Runoff(CFS) = 1.16
TC(MIN) = 12.12
++++++++ + +++ ++++++ + + +++ + + + +,+;r++ + + + + ++
Process from Point/Station 17.000 to Point/Station 18.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 232.60
Downstream point elevation = 210.00
Flow length(Ft.) = 76.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) = 1.16
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) = 1.16
Normal flow depth in pipe = 2.18 (In.)
Flow top width inside pipe = 7.13 (In.)
Velocity = 15.064 (Ft/S)
Travel time (Min.) _ .08 TC(min.) = 12.20
++++++++++++++++++++++++++++++++++++++++++++ ++ +++++++++ ++ + ++ ++ + + + + + + + + + ++++
Process from Point/Station 18.000 to Point/Station 19.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation= 210.00
Downstream point elevation = 208.00
Flow length(Ft.) = 35.00 Mannings N = .015
No. of pipes = 1 Required pipe flow (CFS) = 1.16
Given pipe size (In.) = 24.00
Calculated Individual Pipe flow (CFS) = 1.16
Normal flow depth in pipe = 2.61 (In.)
Flow top width inside pipe = 14.93 (In.)
Velocity = 6.305 (Ft/S)
Travel time (Min.) _ .09 TC(min.) = 12.30
++++++++++++++++++++++++++++++++++++++++++++ + + ++++++ + + +++++ ++++++ + +++++ + + ++
Process from Point/Station 18.000 to Point/Station 19.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 3.981
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .06 Subarea Runoff(CFS) _ .11
Total Area(Acres) _ .68 Total Runoff CFS) = 1.27
TC(MIN) = 12.30
"r
Process from Point/Station 18.000 to Point/Station 19.000
* ** CONFLUENCE OF MINOR STREAMS sss
100.00 Year Rainfall Intensity(In./Hr.) = 3.981
ALONG THE MAIN STREAM NUMBER: 2
The flow values used for the stream: 1 are:
Time of concentration(min.) = 12.30
Rainfall intensity (in./hr/) = 3.98
Total flow area (Acres) = .68
Total runoff (CFS) at confluence point = 1.27
+++++++++++++++++ ��TT, r++++ +++++++++++++++++++ + +++ + + +++++ + TTT + + + + ++++++ + + + + ++
Process from Point/Station 6.000 to Point/Station 20.000
* ** INITIAL AREA EVALUATION * **
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Initial Subarea Flow Dist = 140.00
Highest Elevation = 279.00
Lowest Elevation = 259.00
Elevation Difference = 20.00
Time of concentration calculated by the Urban
Areas overland flow method (APP X -C) = 10.014 Min.
TC = [1.8 *(1.1 -C) *DISTANCE ^.5Y(% SLOPE
TC = [1.8'(1.1- .4500) *( 275.00 ^.5 )1( 7.27 ^(1 /3)])= 10.014
100.00 Year Rainfall Intensity(In.4k.) = 4.545
Subarea(Acres) = .22 Subarea Runoff(CFS) = .45
Total Area(Acres) = .22 Total Runoff(CFS) = .45
TC(MIN) = 10.01
++ + + + ++++++++ + + + + +++ + + + + +TT,, r!
Process from Point/Station 20.000 to Point/Station 21.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 254.00
Downstream point elevation = 224.00
Flow length(Ft.) = 150.00 Mannings N = .012
No. of pipes = I Required pipe flow (CFS) = .45
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) _ .45
Normal flow depth in pipe = 1.50 (In.)
Flow top width inside pipe = 6.25 (In.)
Velocity = 9.927 (Ft/S)
Travel time (Min.) = .25 TC(min.) = 10.27
++++++++++++++++++++++++++++++++++++++++++++ + + ++ +++++ + + + + + + + + + + + + + + + + +++ + ++
Process from Point/Station 20.000 to P oint/Station 21.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 4.473
Decimal Fraction Soil Group A = .000
'e
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) = .35 Subarea Runoff(CFS) = .70
Total Area(Acres) = .57 Total Runoff(CFS) = 1.15
TC(MIN) = 10.27
Process from Point/Station 21.000 to Point/Station 22.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) ***
Upstream point elevation = 224.00
Downstream point elevation = 222.70
Flow length(FL) = 61.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) = 1.15
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) = 1.15
Normal flow depth in pipe = 4.48 (In.)
Flow top width inside pipe = 7.94 (In.)
Velocity = 5.730 (Ft/S)
Travel time (Min.) = .18 TC(min.) = 10.44
+ + +++ T, T+ ++++++ + + + + + +++++ +++ +++++++++++ + + + ++++
Process from Point/Station 21.000 to Point/Station 22.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 4.424
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) = .17 Subarea Runoff(CFS) = .34
Total Area(Acres) = .74 Total Runoff(CFS) = 1.49
TC(MIN) = 10.44
++ H,,++ + ++ ++++ ++++++++++++++++++++++++ ++++++++++ + +++ +++ + + + ++++ + + + + + ++
Process from Point/Station 22.000 to Point/Station 19.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 222.70
Downstream point elevation = 208.00
Flow lengdot) = 55.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) = 1.49
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) = 1.49
Normal flow depth in pipe = 2.55 (In.)
Flow top width inside pipe = 7.46 (In.)
Velocity = 15.564 (Ft/S)
Travel time (Min.) = .06 TC(min.) = 10.50
++++++++++++++++++++ Hill +++++++++++++++++ + + + + + +++ + + ++++++ + + + +++++ + + + +++
Process from Point/Station 22.000 to Point/Station 19.000
* ** CONFLUENCE OF MINOR STREAMS * **
* ** Compute Various Confluenced Flow Values * **
100.00 Year Rainfall Intensity(In./Hr.) = 4.408
ALONG THE MAIN STREAM NUMBER: 2
The flow values used for the stream: 2 are:
Time of concentration(min.) = 10.50
Rainfall intensity (inJhr/) = 4.41
Total flow area (Acresl _ .74
Total runoff (CFS) at confluence point = 1.49
Confluence information:
Stream runoff Time Intensity
Number (CFS) (min.) (inch/hour)
-------------------------------------------------------------------------
1 1.27 12.30 3.981
2 1.49 10.50 4.408
QSMX(1) _
+1.000* 1.000* 1.3)
+ .903* 1.000* 1.5)
= 2.619
QSMX(2) _
+1.000* .854* 1.3)
+1.000* 1.000* 1.5)
= 2.578
Rainfall intensity and time of concentration
used for 2 streams.
Individual stream flow values are:
1.27 1.49
Possible confluenced flow values are:
2.62 2.58
Individual Stream Area values are:
.68 .74
Computed confluence estimates are:
Runoff(CFS) = 2.62 Time(min.) = 12.296
Total main stream study area (Acres) = 1.42
+++++++++ ++ + + ++ rTrTTr- rT- r ++- I- ++H - + i++
Process from Point/Station 19.000 to Point/Station 13.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 208.00
Downstream point elevation = 196.00
Flow length(Ft) = 145.00 Mannings N = .015
No. of pipes = 1 Required pipe flow (CFS) = 2.62
Given pipe size (In.) = 24.00
Calculated Individual Pipe flow (CFS) = 2.62
Normal flow depth in pipe = 3.52 (In.)
Flow top width inside pipe = 16.98 (In.)
Velocity = 9.153 (Ft/S)
Travel time (Min.) _ .26 TC(min.) = 12.56
+ + + + Tr; + +++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + +++ + + + + + + + + ++
Process from Point/Station 19.000 to Point/Station 13.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 3.927
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .20 Subarea Runoff(CFS) _ .35
Total Area(Acres) = 1.62 Total Runoff(CFS) = 2.97
TC(MIN) = 12.56
+ + +++ + + + + + + + + + ++++ +,+Tr,-, , ++++++ + +++++
Process from Point/Station 19.000 to Point/Station 13.000
* ** CONFLUENCE OF MAIN STREAMS * **
* ** Compute Various Confluenced Flow Values * **
FOLLOWING DATA INSIDE MAIN STREAM ARE CALCULATED
100.00 Year Rainfall Intensity(In./Hr.) = 3.927
The flow values used for the stream: 2 are:
Time of concentration(min.) = 12.56
Rainfall intensity (indho = 3.93
Total flow area (Acres) = 1.62
Total runoff (CFS) at confluence point = 2.97
Confluence information:
Stream runoff Time Intensity
Number (CFS) (min.) (inch/hour)
--------------------------------------------------------------------------
1 1.82 58.70 1.453
2 2.97 12.56 3.927
QSMX(1) _
+1.000* 1.000* 1.8)
+ .370* 1.000* 3.0)
= 2.916
QSMX(2) _
+1.000* .214* 1.8)
+1.000* 1.000* 3.0)
= 3.361
Rainfall intensity and time of concentration
used for 2 MAIN streams.
Individual stream flow values are:
1.82 2.97
Possible confluenced flow values are:
2.92 3.36
Individual Stream Area values are:
2.06 1.62
--------------------------------------------- -- --- ------- --- ---- ----- - - - - ---
Computed confluence estimates are:
Runoff(CFS) = 3.36 Time(min.) = 12.561
Total main stream study area (Acres) = 3.68
++++++ TT++++ TTT,-, r ++++++++++++++++++++++++ + + + + + + + + + +++++++ + + + +++ + + + + + + + ++
Process from Point/Station 83.000 to Point/Station 23.000
* ** INITIAL AREA EVALUATION * **
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Initial Subarea Flow Dist = 160.00
Highest Elevation = 287.00
Lowest Elevation = 269.00
Elevation Difference = 18.00
Time of concentration calculated by the Urban
Areas overland flow method (APP X -C) = 10.057 Min.
TC = [1.8 *(1.1 -C) *DISTANCE ^.5y( * /o SLOPE ^(1 /3)]
TC = [1.8 *(1.1- .4500) *( 265.00 ^.5y( 6.79 ^(1 /3)])= 10.057
100.00 Year Rainfall Intensity(In./Hr.) = 4.533
Subarea(Acres) _ .28 Subarea Runoff(CFS) _ .57
Total Area(Acres) _ .28 Total Runoff(CFS) _ .57
TC(MIN) = 10.06
++ ++++++++++ + + + +++;r ++++ + + + + ++++++++ + ++++++
Process from Point/Station 23.000 to Point/Station 24.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 264.00
Downstream point elevation = 235.00
Flow length(FL) = 120.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) _ .57
Given pipe size (a) = 8.00
Calculated Individual Pipe flow (CFS) _ .57
Normal flow depth in pipe = 1.61 (In.)
Flow top width inside pipe = 6.42 (In.)
Velocity = 11.382 (Ft/S)
Travel time (Min.) _ .18 TC(min.) = 10.23
+ ++ +++++++++++++++++++++++ +
Process from Point/Station 23.000 to Point/Station 24.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 4.482
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .42 Subarea Runoff(CFS) _ .85
Total Area(Acres) _ .70 Total Runoff(CFS) = 1.42
TC(MIN) = 10.23
++++++++ i;:+ ++++++++++++++++++++++++++ + + ++ + + + + +++++++ + + + + + +++++++ ++++
Process from Point/Station 24.000 to Point/Stition 25.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 235.00
Downstream point elevation = 233.60
Flow length(FL) = 66.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) = 1.42
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) = 1.42
Normal flow depth in pipe = 5.14 (In.)
Flow top width inside pipe = 7.67 (In.)
Velocity = 5.984 (Ft/S)
Travel time (Min.) _ .18 TC(min.) = 10.42
++++++++++++++++++++++++++++++++++++++++++++ + + + + + + + + ++++ +++ + + + + + + + + + + + + + + ++
r )
Process from Point/Station 24.000 to Point/Station 25.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 4.431
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) = .22 Subarea Runoff(CFS) = .44
Total Area(Acres) = .92 Total Runoff(CFS) = 1.86
TC(MIN) = 10.42
Process from Point/Station 25.000 to Point/Station 26.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 233.60
Downstream point elevation = 223.00
Flow length(Ft) = 46.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) = 1.86
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) = 1.86
Normal flow depth in pipe = 2.98 (In.)
Flow top width inside pipe = 7.74 (In.)
Velocity = 15.675 (Ft/S)
Travel time (Min.) = .05 TC(min.) = 10.47
+++6iiiiiiiiifiiiiiiiiiiiiiiiiiiiiiiii + + ++++ + + + +++ + +++ ++++++ + + + ++
Process from Point/Station 27.000 to Point/Station 29.000
* * * INITIAL AREA EVALUATION
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient =.4500
Initial Subarea Flow Dist = 90.00
Highest Elevation = 283.00
Lowest Elevation = 247.00
Elevation Difference = 36.00
Time of concentration calculated by the Urban
Areas overland flow method (APP X -C) = 10.017 Min.
TC = [1.8 *(1.1 -C) *DISTANCE ^.5) /(% SLOPE^(1 /3)]
TC = [1.8 *(1.1- .4500) *( 348.00 ^.5y( 10.34 ^(1 /3)j)= 10.017
100.00 Year Rainfall Intensity(In./Hr.) = 4.544
Subarea(Acres) = .16 Subarea Runoff(CFS) = .33
Total Area(Acres) = .16 Total Runoff(CFS) = .33
TC(MIN) = 10.02
+ +++ +++ +++++ ++ r; i ++++++++++++ +
Process from Point/Station 28.000 to Point/Station 29.000
* ** TRAPEZOIDAL/RECT. CHANNEL TRAVEL TIME * **
Upstream point elevation = 248.00
Downstream point elevation = 247.00
Channel length thru subarea(Feet) = 70.00
Channel base(Feet) = .00
Slope or "Z" of left channel bank = 100.000
Slope or "Z" of right channel bank = 2.000
Mannings "N" _ .033 Maximum depth of channel (Ft.) _ .50
Flow(Q) thru subarea(CFS) _ .33
Upstream point elevation = 248.00
Downstream point elevation = 247.00
Flow length(Ft) = 70.00
Travel time (Min.) = 1.65 TC(min.) = 11.67
Depth of flow = .10 (Ft)
Average Velocity = .71 (Ft /Sec.)
Channel flow top width = 9.72 (Ft)
+ + + + + + + ++ ++++ ++ + + ++
Process from Point/Station 28.000 to Point/Station 29.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 4.118
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .21 Subarea Runoff (CFS) _ .39
Total Area(Acres) _ .37 Total Runoff(CFS) _ .72
TC(MIN) = 11.67
+ + + + ++++ + ++ +++++++++++++++ + ++ ++++ + ++++ + ++++++++++++++++++
Process from Point/Station 29.000 to Point/Station 30.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 242.00
Downstream point elevation = 239.60
Flow length(Ft.) = 116.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) _ .72
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) _ .72
Normal flow depth in pipe = 3.42 (In.)
Flow top width inside pipe = 7.92 (In.)
Velocity = 5.027 (Ft/S)
Travel time (Min.) _ .38 TC(min.) = 12.05
+ + + + + + +++ + ++t + + ++ ++++++++++ + +++ + + + + + ++++ + + + + + + ++++ ++++ + + ++
Process from Point/Station 29.000 to Point/Station 30.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 4.033
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .21 Subarea Runoff(CFS) _ .38
Total Area(Acres) _ .58 Total RunoMCFS) = 1.10
TC(MIN) = 12.05
++++++++++++++ Hill +++++++++++ ��rrT+++;-; + + + +++ + + + + + + +++ + +++ + + ++++ + + + + ++
Process from Point/Station 30.000 to Point/Station 31.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 239.60
Downstream point elevation = 218.00
Flow length(FL) = 56.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) = 1.10
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) = 1.10
Normal flow depth in pipe = 1.99 (In.)
Flow top width inside pipe = 6.91 (In.)
Velocity = 16.250 (FVS)
Travel time (Min.) _ .06 TC(min.) = 12.11
++ +++ + + + + + + + + ++++ + + + ++++++ +++
Process from Point/Station 32.000 to Point/Station 33.000
* ** INITIAL AREA EVALUATION * **
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Initial Subarea Flow Dist. = 30.00
Highest Elevation = 354.00
Lowest Elevation = 340.00
Elevation Difference = 14.00
Time of concentration calculated by the Urban
Areas overland flow method (APP X -C) = 10.034 Min.
TC = [1.8 *(1.1 -C) *DISTANCE ^.5 )1(° /* SLOPE^(1 /3)]
TC = [1.8 *(1.1- .4500) *( 239.00 ^.5y( 5.86 ^(1 /3)])= 10.034
100.00 Year Rainfall Intensity(In./Hr.) = 4.539
Subarea(Acres) _ .09 Subarea Runoff(CFS) _ .18
Total Area(Acres) _ .09 Total Runoff(CFS) _ .18
TC(MIN) = 10.03
+iiii iiii;;++++++ TTTTTi ii iiiii + ++++ +++ + + + + + + +++ + + + + +++ + r TTY -7777 T +++++++
Process from Point/Station 33.000 to Point/Station 34.000
* ** TRAPEZOIDALJRECT. CHANNEL TRAVEL TIME * **
Upstream point elevation = 340.00
Downstream point elevation = 339.00
Channel length thru subarea(Feet) = 220.00
Channel base(Feet) _ .00
Slope or "Z" of left channel bank = 2.000
Slope or "Z" of right channel bank = 100.000
Mannings "N" _ .033 Maximum depth of channel (Ft.) _ .50
Flow(Q) thru subarea(CFS) _ .18
Upstream point elevation = 340.00
Downstream point elevation = 339.00
Flow length(FL) = 220.00
Travel time (Min.) = 9.21 TC(min.) = 19.24
Depth of flow = .10 (FL)
Average Velocity = .40 (Ft. /Sec.)
Channel flow top width = 9.71 (FL)
++++++++++ HT+ �+ T +++++++++ +++ + + + + + + + + + + + + + + + + + + + + + + + + ++
Process from Point/Station 33.000 to Point/Station 34.000
* ** SUBAREA FLOW ADDITION * **
s
100.00 Year Rainfall Intensity(InAir.) = 2.982
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) = .40 Subarea Runoff(CFS) = .54
Total Area(Acres) = .49 Total Runoff(CFS) = .72
TC(MIN) = 19.24
+ + + + + + + + +++
Process from Point/Station 34.000 to Point/Station 35.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 335.00
Downstream point elevation = 332.00
Flow length(Ft.) = 293.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) = .72
Given pipe size (In.) = 10.00
Calculated Individual Pipe flow (CFS) _ .72
Normal flow depth in pipe = 3.76 (In.)
Flow top width inside pipe = 9.69 (In.)
Velocity = 3.849 (Ft/S)
Travel time (Min.) = 1.27 TC(min.) = 20.51
+ + + ++ ++++++++++ + ++ +++ +++++ + +++ + + + + + +++++ + + + + ++
Process from Point/Station 34.000 to Point/Station 35.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 2.862
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) = .66 Subarea Runoff(CFS) _ .85
Total Area(Acres) = 1.15 Total Runoff(CFS) = 1.57
TC(MIN) = 20.51
++++++++++++++ Tr++++ ++++++++++++++++++++++++ + + + + + +++ + + + + + + ++++ +++ +++ +++ + + ++
Process from Point/Station 35.000 to Point/Station 36.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 332.00
Downstream point elevation = 331.00
Flow length(FL) = 24.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) = 1.57
Given pipe size (In.) = 10.00
Calculated Individual Pipe flow (CFS) = 1.57
Normal flow depth in pipe = 3.92 (In.)
Flow top width inside pipe = 9.76 (In.)
Velocity = 7.931 (Ft/S)
Travel time (Min.) = .05 TC(min.) = 20.56
++++++++++++++++ T+ TT;-+ ++++++++++++++++++++++ + + + + + + + + + + +++ ++++++ + + +++ + + + + + ++
Process from Point/Station 36.000 to Point/Station 37.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 331.00
Downstream point elevation = 298.00
Flow lengdot.) = 400.00 Mannings N = .015
No. of pipes = 1 Required pipe flow (CFS) = 1.57
Given pipe size (In.) = 24.00
Calculated Individual Pipe flow (CFS) = 1.57
Normal flow depth in pipe = 2.76 (In.)
Flow top width inside pipe = 15.30 (In.)
Velocity = 7.846 (Ft/S)
Travel time (Min.) _ .85 TC(min.) = 21.41
+ ++ + + + + + + + + +
Process from Point/Station 36.000 to Point/Station 37.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 2.784
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .80 Subarea RunoMCFS) = 1.00
Total Area(Acres) = 1.95 Total Runoff(CFS) = 2.57
TC(MIN) = 21.41
++++++ + + ++++ + + + + + + + ++++ +, r ++++ + + + + TTTrr + + + + ++
Process from Point/Station 36.000 to Point/Station 37.000
* ** CONFLUENCE OF MINOR STREAMS * **
----------------------- -------- ----------- -- ----------------------------
100.00 Year Rainfall Intensity(In./Hr.) = 2.784
ALONG THE MAIN STREAM NUMBER: 1
The flow values used for the stream: 1 are:
Time of concentration(min.) = 21.41
Rainfall intensity (in./hr/) = 2.78
Total flow area (Acres) = 1.95
Total runoff (CFS) at confluence point = 2.57
++++ + + +, HH + + + + ++ + + TTT rTT + +.++++ + + + + + + + + + + + + + ++++ + ++++ rTT +++ +++ + + + + + ++
Process from Point/Station 38.000 to Point/Sutlion 39.000
* * * INITIAL AREA EVALUATION
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Initial Subarea Flow Dist. = 180.00
Highest Elevation = 334.00
Lowest Elevation = 325.00
Elevation Difference = 9.00
Time of concentration calculated by the Urban
Areas overland flow method (APP X -C) = 10.022 Min.
TC = [1.8 *(1.1 -C) *DISTANCE ^.5) /(% SLOPE-(1/3))
TC = [1.8 *(1.1- .4500) *( 200.00 ^.5y( 4.50 ^(1 /3)))= 10.022
100.00 Year Rainfall Intensity(In./Hr.) = 4.543
Subarea(Acres) _ .18 Subarea Runoff(CFS) _ .37
Total Area(Acres) _ .18 Total Runoff(CFS) = .37
TC(MIN) = 10.02
Process from Point/Station 39.000 to Point/Station 37.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 325.00
Downstream point elevation = 298.00
Flow length(FL) = 250.00 Mannings N = .015
No. of pipes = 1 Required pipe flow (CFS) = .37
Given pipe size (In.) = 24.00
Calculated Individual Pipe flow (CFS) _ .37
Normal flow depth in pipe = 1.30 (In.)
Flow top width inside pipe = 10.87 (In.)
Velocity = 5.553 (Ft/S)
Travel time (Min.) = .75 TC(min.) = 10.77
++++ T,;+++ ++++++++++++++++++++++++++++++++++ + + + +++ + + + + + + +++++ +++ + + Hill + + + ++
Process from Point/Station 39.000 to Point/Station 37.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 4.336
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) = .91 Subarea Runoff(CFS) = 1.78
Total Area(Acres) = 1.09 Total Runofl(CFS) = 2.14
TC(MIN) = 10.77
+++++++++++++++++++++++++ + + + + + + + + + +++ + + + + + + ++ + +++ +++++ H H 1 H + + + + +++ + + ++
Process from Point/Station 39.000 to Point/Station 37.000
* ** CONFLUENCE OF MINOR STREAMS * **
--------------------------------------------------------------------------
100.00 Year Rainfall Intensity(In./Hr.) = 4.336
ALONG THE MAIN STREAM NUMBER: 1
The flow values used for the stream: 2 are:
Time of concentration(min.) = 10.77
Rainfall intensity (in./hr/) = 4.34
Total flow area (Acres) = 1.09
Total runoff (CFS) at confluence point = 2.14
+++++++++++++ Hill ++++++++++++++++++++ +++ + +++++ + +++ ++++++++++++ + +++ ++
Process from Point/Station 38.000 to Point/SLltion 40.000
* ** INITIAL AREA EVALUATION * **
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Area Type is: RURAL(Greater than 1/2 Acre)
Time of concentration computed by the Natural
Watersheds nomograph, (App. X -A)
TC = [11.9 *Length(Mi) ^3y(Elevation Change)] ^.385 *60(MIN/HR)
Initial Subarea Flow Dist = 210.00
Highest Elevation = 334.00
Lowest Elevation = 306.00
Elevation Difference = 28.00
TC = [(11.9* .2822 * *3) /( 28.00)]* *..385 = 10.011
100.00 Year Rainfall Intensity(In./Hr.) = 4.546
Subarea(Acres) _ .20 Subarea Runoff(CFS) _ .41
Total Area(Acres) _ .20 Total Runoff(CFS) _ .41
TC(MIN) = 10.01
++++++++++++ z+++++ +++++++++ + + +++++ + + + + + + + + + + +TTTT-r,- +H+ ++ ++++� ++++++
Process from Point/Station 40.000 to Point/Station 41.000
* ** TRAPEZOIDAL/RECT. CHANNEL TRAVEL TIME * **
Upstream point elevation = 306.00
Downstream point elevation = 305.00
Channel length thru subarea(Feet) = 160.00
Channel base(Feet) _ .00
Slope or "Z" of left channel bank = 100.000
Slope or "Z" of right channel bank = 2.000
Mannings "N" _ .033 Maximum depth of channel (Ft.) _ .50
Flow(t) thru subarea(CFS) _ .41
Upstream point elevation = 306.00
Downstream point elevation = 305.00
Flow length(Ft) = 160.00
Travel time (Min.) = 4.86 TC(min.) = 14.88
Depth of flow = .12 (Ft)
Average Velocity = .55 (Ft /Sec.)
Channel flow top width = 12.34 (Ft)
iiiTTTTT,r + + +++++ +iiiiii iii ..+++++++++ + + + +++ + + + +++++++++ Hill + + ++�+++ ++
Process from Point/Station 40.000 to Point/Station 41.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 3.521
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .37 Subarea Runoff(CFS) _ .59
Total Area(Acres) _ .57 Total Runoff(CFS) = 1.00
TC(MIN) = 14.88
+ ++++ + + + +TTT + + + + +++ +++ +++ + " i ..+++++++++ + + + ++ +++ + +++ + + + + +++ + + + ++++ ++ + ++
Process from Point/Station 41.000 to Point/S4ation 37.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 300.00
Downstream point elevation = 298.00
Flow length(Ft.) = 34.00 Mannings N = .012
No. of pipes = I Required pipe flow (CFS) = 1.00
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) = 1.00
Normal flow depth in pipe = 3.08 (In.)
Flow top width inside pipe = 7.78 (In.)
l
1 1
Velocity = 8.046 (Ft/S)
Travel time (Min.) _ .07 TC(min.) = 14.95
Process from Point/Station 41.000 to Point/Station 37.000
* ** CONFLUENCE OF MINOR STREAMS * **
* ** Compute Various Confluenced Flow Values * **
-------- -- ---------------------- -- ------ ---- --------------------------
100.00 Year Rainfall Intensity(InAir.) = 3.511
ALONG THE MAIN STREAM NUMBER: 1
The flow values used for the stream: 3 are:
Time of concentration(min.) = 14.95
Rainfall intensity (in./hr/) = 3.51
Total flow area (Acres) _ .57
Total runoff (CFS) at confluence point = 1.00
Confluence information:
Stream runoff Time Intensity
Number (CFS) (min.) (inch/hour)
1 2.57 21.41 2.784
2 2.14 10.77 4.336
3 1.00 14.95 3.511
QSMX(1) _
+1.000 *1.000* 2.6)
+ .642* 1.000* 2.1)
+ .793* 1.000* 1.0)
= 4.739
QSMX(2) _
+1.000* .503* 2.6)
+1.000 *1.000* 2.1)
+1.000* .721* 1.0)
= 4.155
QSMX(3) _
+1.000* .698* 2.6)
+ .810* 1.000* 2.1)
+1.000 *1.000* 1.0)
= 4.527
Rainfall intensity and time of concentration
used for 3 streams.
Individual stream flow values are:
2.57 2.14 1.00
Possible confluenced flow values are:
4.74 4.16 4.53
Individual Stream Area values are:
1.95 1.09 .57
Computed confluence estimates are:
Runoff(CFS) = 4.74 Time(min.) = 21.413
Total main stream study area (Acres) = 3.61
++++++++++++++++++++++ H+ hF+++++++++++++++++ + + +++ ++++++++ + + ++++++++ ++++++++
Process from Point/Station 37.000 to Point/Station 42.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 298.00
Downstream point elevation = 276.00
f
r I
Flow length(Ft.) = 205.00 Mannings N = .015
No. of pipes = 1 Required pipe flow (CFS) = 4.74
Given pipe size (In.) = 24.00
Calculated Individual Pipe flow (CFS) = 4.74
Normal flow depth in pipe = 4.41 (In.)
Flow top width inside pipe = 18.59 (In.)
Velocity = 11.957 (Ft/S)
Travel time (Min.) _ .29 TC(min.) = 21.70
++ + + + + + + + + + + ++++++++ + + + + + + + + r T +
Process from Point/Station 37.000 to Point/Suition 42.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In.4k.) = 2.760
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL ( lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .21 Subarea Runoff(CFS) _ .26
Total Area(Acres) = 3.82 Total Runoff(CFS) = 5.00
TC(MIN) = 21.70
T + ++ +++ + + + + + + + + + + ,+ T,1 +++ ++
Process from Point/Station 37.000 to Point/Station 42.000
* ** CONFLUENCE OF MINOR STREAMS * **
100.00 Year Rainfall Intensity(In./Hr.) = 2.760
ALONG THE MAIN STREAM NUMBER: 1
The flow values used for the stream: 1 are:
Time of concentration(min.) = 21.70
Rainfall intensity (in./hr/) = 2.76
Total flow area (Acres) = 3.82
Total runoff (CFS) at confluence point = 5.00
+++++++++++++++++++++
Process from Point/Station 43.000 to Point/Station 45.000
* ** INITIAL AREA EVALUATION * **
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Initial Subarea Flow Dist. = 60.00
Highest Elevation = 326.00
Lowest Elevation = 305.00
Elevation Difference = 21.00
Time of concentration calculated by the Urban
Areas overland flow method (APP X -C) = 10.002 Min.
TC = [1.8 *(1.1 -C) *DISTANCE ^.5) /(% SLOPE ^(1 /3)]
TC = [1.8 *(1.1- .4500) *( 280.00 ^.5) /( 7.50 ^(1 /3)])= 10.002
100.00 Year Rainfall Intensity(In./Hr.) = 4.549
Subarea(Acres) _ .07 Subarea Runoff(CFS) _ .14
Total Area(Acres) _ .07 Total Runoff(CFS) _ .14
TC(MIN) = 10.00
Process from Point/Station 44.000 to Point/Station 456000
* ** TRAPEZOIDAL/RECT. CHANNEL TRAVEL TIME * **
Upstream point elevation = 306.00
Downstream point elevation = 305.00
Channel length thnt subarea(Feet) = 70.00
Channel base(Feet) _ .00
Slope or "Z" of left channel bank = 100.000
Slope or "Z" of right channel bank = 2.000
Mmmings "N" _ .033 Maximum depth of channel (Ft.) _ .50
Flow(Q) thou subarea(CFS) _ .14
Upstream point elevation = 306.00
Downstream point elevation = 305.00
Flow length(Ft) = 70.00
Travel time (Min.) = 2.03 TC(min.) = 12.03
Depth of flow = .07 (Ft)
Average Velocity = .57 (Ft /Sec.)
Channel flow top width = 7.13 (Ft)
i iiiiiiiiiiiiiiiiitllilllii jllslt ++++
Process from Point/Station 44.000 to Point/Station 45.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 4.037
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .21 Subarea Runoff(CFS) _ .38
Total Area(Acres) _ .28 Total Runoff(CFS) = 52
TC(MIN) = 12.03
+ + + + + ++++++ +++++++++++++++++ + + + + ++++ +++ +H�++ + ++++ +++ + + + ++++
Process from Point/Station 45.000 to Point/Station 46.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 300.00
Downstream point elevation = 295.70
Flow length(Ft) = 140.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) _ .52
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) _ .52
Normal flow depth in pipe = 2.60 (In.)
Flow top width inside pipe = 7.50 (In.)
Velocity = 5.330 (FVS)
Travel time (Min.) _ .44 TC(min.) = 12.47
++++++++++++++++++++++++++++++++++++++++++++++++ +++ + + 1111T,rTT + +++++ + +++ + + +++ ++
Process from Point/Station 45.000 to Point/Station 46.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 3.945
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
i • l
Decimal Fraction Soil Group D = 1.000
RURAL. (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .17 Subarea Runoff(CFS) _ .30
Total Area(Acres) _ .45 Total Runofl(CFS) _ .83
TC(MIN) = 12.47
+ + + + + + + + + ;;,T „T
Process from Point/Station 46.000 to Point/Station 42.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 295.70
Downstream point elevation = 276.00
Flow length(Ft.) = 89.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) _ .83
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) _ .83
Normal flow depth in pipe = 1.98 (In.)
Flow top width inside pipe = 6.90 (In.)
Velocity = 12.289 (Ft/S)
Travel time (Min.) _ .12 TC(min.) = 12.59
Process from Point/Station 46.000 to Point/Station 42.000
* ** CONFLUENCE OF MINOR STREAMS * **
* ** Compute Various Confluenced Flow Values * **
100.00 Year Rainfall Intensity(InJHr.) = 3.921
ALONG THE MAIN STREAM NUMBER: I
The flow values used for the stream: 2 are:
Time of concentration(min.) = 12.59
Rainfall intensity (in./hr/) = 3.92
Total flow area (Acres) _ .45
Total runoff (CFS) at confluence point = .83
Confluence information:
Stream runoff Time Intensity
Number (CFS) (min.) (inch/hour)
------------------------------------------------------------------------
1 5.00 21.70 2.760
2 .83 12.59 3.921
QSMX(1) _
+1.000* 1.000* 5.0)
+ .704* 1.000* .8)
= 5.581
QSMX(2) _
+1.000* .580* 5.0)
+1.000* 1.000* .8)
= 3.728
Rainfall intensity and time of concentration
used for 2 streams.
Individual stream flow values are:
5.00 .83
Possible confluenced flow values are:
5.58 3.73
Individual Stream Area values are:
3.82 .45
Computed confluence estimates are:
Runoft(CFS) = 5.58 Time(min.) = 21.698
Total main stream study area (Acres) = 4.27
TTTT + + + + + + + + + + +++ +
Process from Point/Station 42.000 to Point/Station 47.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 276.00
Downstream point elevation = 272.00
Flow length(Ft.) = 40.00 Mannings N = .015
No. of pipes = 1 Required pipe flow (CFS) = 5.58
Given pipe size (In.) = 24.00
Calculated Individual Pipe flow (CFS) = 5.58
Normal flow depth in pipe = 4.87 (In.)
Flow top width inside pipe = 19.30 (In.)
Velocity = 12.237 (FVS)
Travel time (Min.) _ .05 TC(min.) = 21.75
++++ + + + + + +++
Process from Point/Station 42.000 to Point/Station 47.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./fIr.) = 2.756
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .05 Subarea Runoff(CFS) _ .06
Total Area(Acres) = 4.32 Total Runoff(CFS) = 5.64
TC(MIN) = 21.75
+ +++++++++ +++++ ++ +++ ++ +++++ HHHHHHHHHHHH1 +++++
Process from Point/Station 42.000 to Point/Station 47.000
* ** CONFLUENCE OF MINOR STREAMS * **
100.00 Year Rainfall Intensity(In.ft.) = 2.756
ALONG THE MAIN STREAM NUMBER: I
The flow values used for the stream: 1 are:
Time of concentration(min.) = 21.75
Rainfall intensity (in./hr/) = 2.76
Total flow area (Acres) = 4.32
Total runoff (CFS) at confluence point = 5.64
+iiiiiiiiiiiiiiiiiiiiiiiiiiiiiii + + + + + + + + + + + + + + + +++ ++ " T, , + +++ +++ + + + +++ + + + + + ++
Process from Point/Station 48.000 to Point/Station 49.000
* ** INITIAL AREA EVALUATION * **
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Initial Subarea Flow Dist. = 170.00
Highest Elevation = 328.00
Lowest Elevation = 322.00
Elevation Difference = 6.00
Time of concentration calculated by the Urban
Areas overland flow method (APP X -C) = 10.019 Min.
TC = [1.8 *(1.1 -C) *DISTANCE ^.5) /(% SLOPE-(1/3)]
TC = [1.8 *(1.1- .4500) *( 170.00 ^.5) /( 3.53^(1/3)])= 10.019
100.00 Year Rainfall Intensity(In.4k.) = 4.544
Subarea(Acres) _ .21 Subarea Runoff(CFS) _ .43
Total Area(Acres) _ .21 Total Runoff(CFS) _ .43
TC(MIN) = 10.02
+ + + + + + +. i i i i r, rrTr TTTTTT , r ++
Process from Point/Station 49.000 to Point/Station 50.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 317.00
Downstream point elevation = 297.00
Flow length(Ft-) = 120.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) _ .43
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) _ .43
Normal flow depth in pipe = 1.53 (In.)
Flow top width inside pipe = 6.30 (In.)
Velocity = 9.183 (Ft/S)
Travel time (Min.) _ .22 TC(min.) = 10.24
+++++++ +++ + + + +++ +++ ++++++++ + + +++++++++ +++++++ + + + + + + +++++ ++
Process from Point/Station 49.000 to Point/Station 50.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 4.481
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .33 Subarea Runoff(CFS) _ .67
Total Area(Acres) _ .54 Total Runoff(CFS) = 1.09
TC(MIN) = 10.24
+ ++++ + ++++ ++ + + + +++ ++++++++++ +++++++++++ + + +++++ + + + + + +++ +++++
Process from Point/Station 50.000 to Point/Station 51.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 297.00
Downstream point elevation = 295.30
Flow length(Ft.) = 85.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) = 1.09
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) = 1.09
Normal flow depth in pipe = 4.42 (In.)
Flow top width inside pipe = 7.95 (In.)
Velocity = 5.524 (Ft/S)
Travel time (Min.) _ .26 TC(min.) = 10.49
++ +++ + + + + + +++++++ 1111 1T+ TT +++++++++++++++++ + + + + + + + + +++ + + + + + + + + + + +++ + + + + + ++
Process from Point/Station 50.000 to Point/Station 51.000
* ** SUBAREA FLOW ADDITION **
100.00 Year Rainfall Intensity(InJHr.) = 4.410
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) = .20 Subarea Runoff(CFS) = .40
Total Area(Acres) _ .74 Total Runoff(CFS) = 1.49
TC(MIN) = 10.49
++++++++++++ + + + + + + + +++ + + + ++++++ + i i iTT,! i + + + + ++
Process from Point/Station 51.000 to Point/Station 47.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 295.30
Downstream point elevation = 272.00
Flow length(Ft.) = 87.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) = 1.49
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) = 1.49
Normal flow depth in pipe = 2.55 (In.)
Flow top width inside pipe = 7.46 (In.)
Velocity = 15.570 (Ft/S)
Travel time (Min.) _ .09 TC(min.) = 10.59
Process from Point/Station 51.000 to Point/Station 47.000
* ** CONFLUENCE OF MINOR STREAMS * **
* ** Compute Various Confluenced Flow Values * **
100.00 Year Rainfall Intensity(In./Hr.) = 4.385
ALONG THE MAIN STREAM NUMBER: 1
The flow values used for the stream: 2 are:
Time of concentration(min.) = 10.59
Rainfall intensity (in./hr/) = 4.38
Total flow area (Acres) = .74
Total runoff (CFS) at confluence point = 1.49
Confluence information:
Stream runoff Time Intensity
Number (CFS) (min.) (inch/hour)
-------°----------------------------------------------------------------
1 5.64 21.75 2.756
2 1.49 10.59 4.385
QSMX(1) =
+1.000* 1.000* 5.6)
+ .628* 1.000* 1.5)
= 6.581
QSMX(2) =
+1.000* .487* 5.6)
+1.000* 1.000* 1.5)
= 4.238
Rainfall intensity and time of concentration
used for 2 streams.
Individual stream flow values are:
5.64 1.49
Possible confluenced flow values are:
6.58 4.24
Individual Stream Area values are:
4.32 .74
Computed confluence estimates are:
Runoff(CFS) = 6.58 Time(min.) = 21.753
Total main stream study area (Acres) = 5.06
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii + +++ + + + ++ +++++++++
Process from Point/Station 47.000 to Point/Station 52.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) ' **
Upstream point elevation = 272.00
Downstream point elevation = 262.00
Flow length(FL) = 130.00 Mannings N = .015
No. of pipes = 1 Required pipe flow (CFS) = 6.58
Given pipe size (In.) = 24.00
Calculated Individual Pipe flow (CFS) = 6.58
Normal flow depth in pipe = 5.64 (In.)
Flow top width inside pipe = 20.35 (In.)
Velocity = 11.699 (Ft/S)
Travel time (Min.) = .19 TC(min.) = 21.94
+++t +++++ + + + + + + + + + + + ++t+++++ ++++ ++
Process from Point/Station 47.000 to Point/Station 52.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 2.741
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) = .27 Subarea Runoff(CFS) _ .33
Total Area(Acres) = 5.33 Total Runoff(CFS) = 6.91
TC(M1N) = 21.94
+iii ii+ iiii+;;; i++ TT+ +++++ + +TTTT+ + + + + + + + + + + + + + +,T + + HHHH ++++ + + ++ + + + ++
Process from Point/Station 47.000 to Point/Station 52.000
* ** CONFLUENCE OF MINOR STREAMS * **
------------------------------------------------------------------------
100.00 Year Rainfall Intensity(In./Hr.) = 2.741
ALONG THE MAIN STREAM NUMBER: 1
The flow values used for the stream: 1 are:
Time of concentration(min.) = 21.94
Rainfall intensity (in./hr/) = 2.74
Total flow area (Acres) = 5.33
Total runoff (CFS) at confluence point = 6.91
++++++ TT, rTT +++++++++ Hill ++++++++++++++++++++ + + + + + + + +++ +++ + +++++++ +++++ + + + ++
Process from Point/Station 53.000 to Point/Suition 54.000
* * * INITIAL AREA EVALUATION
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Initial Subarea Flow Dist = 100.00
Highest Elevation = 326.00
Lowest Elevation = 302.00
Elevation Difference = 24.00
Time of concentration calculated by the Urban
Areas overland flow method (APP X -C) = 10.020 Min.
TC = [1.8 *(1.1 -C) *DISTANCE ^ .5y(% SLOPE-(1/3)]
TC = [1.8 *(1.1- .4500) *( 296.00 ^.5)/( 8.11 ^(1 /3)])= 10.020
100.00 Year Rainfall Intensity(In./Hr.) = 4.543
Subarea(Acres) _ .14 Subarea Runofl(CFS) _ .29
Total Area(Acres) _ .14 Total Runofl(CFS) _ .29
TC(MIN) = 10.02
+++++ ++++++++ + + + + + + + + + + +++.Hil + +++++T��TT,-rH + +H ++
Process from Point/Station 84.000 to Point/Station 54.000
* ** TRAPEZOIDAL/RECT. CHANNEL TRAVEL TIME * **
Upstream point elevation = 303.00
Downstream point elevation = 302.00
Channel length thru subarea(Feet) = 70.00
Channel base(Feet) _ .00
Slope or "Z" of left channel bank = 100.000
Slope or "Z" of right channel bank = 2.000
Mannings "N" _ .033 Maximum depth of channel (Ft.) _ .50
Flow(t) thru subarea(CFS) _ .29
Upstream point elevation = 303.00
Downstream point elevation = 302.00
Flow length(Ft.) = 70.00
Travel time (Min.) = 1.71 TC(min.) = 11.73
Depth of flow = .09 (Ft)
Average Velocity = .68 (Ft /Sec.)
Channel flow top width = 9.24 (Ft)
+++++++ TT +TT + + + + + + + +++ + +++
Process from Point/Station 84.000 to Point/Station 54.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 4.105
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff' coefficient = .4500
Subarea(Acres) _ .21 Subarea Runoff(CFS) _ .39
Total Area(Acres) _ .35 Total Runofl(CFS) _ .67
TC(MIN) = 11.73
++++++++++++++++++++++++++++++++++++++++++++ ++ +++++++++++++++ +++++++++++ + ++
Process from Point/Station 54.000 to Point/Station 55.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 297.00
Downstream point elevation = 293.30
Flow length(Ft.) = 119.00 Marmings N = .012
No. of pipes = 1 Required pipe flow (CFS) = .67
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) _ .67
Normal flow depth in pipe = 2.96 (In.)
Flow top width inside pipe = 7.73 (In.)
Velocity = 5.738 (Ft/S)
Travel time (Min.) = .35 TC(min.) = 12.07
+++++++++ +++++ + ++++ + + +++++++ + + +++ + + + + ++
Process from Point/Station 54.000 to Point/Station 55.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 4.029
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) = .17 Subarea RunoTCFS) = .31
Total Area(Acres) = .52 Total RunoMCFS) = .98
TC(MIN) = 12.07
+ + + + + + + + + + + + + + + ;;+;T + ++ + + ++ ++
Process from Point/Station 55.000 to Point/Station 52.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) ss»
Upstream point elevation = 293.30
Downstream point elevation = 262.00
Flow length(Ft) = 75.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) = .98
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) _ .98
Normal flow depth in pipe = 1.84 (In.)
Flow top width inside pipe = 6.74 (In.)
Velocity = 16.186 (Ft/S)
Travel time (Min.) = .08 TC(min.) = 12.15
Process from Point/Station 55.000 to Point/Station 52.000
* ** CONFLUENCE OF MINOR STREAMS * **
* ** Compute Various Confluenced Flow Values * **
100.00 Year Rainfall Intensity(In./Hr.) = 4.012
ALONG THE MAIN STREAM NUMBER: 1
The flow values used for the stream: 2 are:
Time of concentration(min.) = 12.15
Rainfall intensity (in./hr/) = 4.01
Total flow area (Acres) = .52
Total runoff (CFS) at confluence point = .98
Confluence information:
Stream runoff Time Intensity
Number (CFS) (min.) (inch/hour)
1 6.91 21.94 2.741
2 .98 12.15 4.012
QSMX(1) _
+1.000 *1.000* 6.9)
+ .683* 1.000* 1.0)
= 7.585
QSMX(2) _
+1.000* .554* 6.9)
+1.000 *1.000* 1.0)
= 4.812
Rainfall intensity and time of concentration
used for 2 streams.
Individual stream flow values are:
6.91 .98
Possible confluenced flow values are:
7.58 4.81
Individual Stream Area values are:
5.33 .52
Computed confluence estimates are:
Runoff(CFS) = 7.58 Time(min.) = 21.938
Total main stream study area (Acres) = 5.85
,777777 i i i i j i i i i i i i i i i i i i i r L 1 i 14 + + + + + + + + +, TTT + + + + +++ +++++ ++77777,+ + ++
Process from Point/Station 52.000 to Point/Station 56.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 262.00
Downstream point elevation = 261.00
Flow length(Ft) = 60.00 Mannings N = .015
No. of pipes = 1 Required pipe flow (CFS) = 7.58
Given pipe size (In.) = 24.00
Calculated Individual Pipe flow (CFS) = 7.58
Normal flow depth in pipe = 9.01 (In.)
Flow top width inside pipe = 23.24 (In.)
Velocity = 7.042 (Ft/S)
Travel time (Min.) _ .14 TC(min.) = 22.08
+++++++ + + TTT+ +H H! HHHHHH ++++++++++++ + +++++++++ + + + +++ + + + + +++ + +++ + + ++
Process from Point/Station 52.000 to Point/Station 56.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./1Ir.) = 2.729
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .11 Subarea Runof (CFS) _ .14
Total Area(Acres) = 5.96 Total Runoff(CFS) = 7.72
TC(MIN) = 22.08
+ +1114++ T+++ +++++++++++++++++++++++++++++++ + + +++++++++ + + + +++++++ ++++++++
Process from Point/Station 52.000 to Point/Station 56.000
* ** CONFLUENCE OF MINOR STREAMS * **
------------------------------------------------ ------- -------------- - - - ---
100.00 Year Rainfall Intensity(In./Hr.) = 2.729
ALONG THE MAIN STREAM NUMBER: 1
The flow values used for the stream: I are:
Time of concentration(min.) = 22.08
Rainfall intensity (in./hr/) = 2.73
Total flow area (Acres) = 5.96
Total runoff (CFS) at confluence point = 7.72
++++ + ++++ + TT+ +++ +,r1!1!1 +++++++ ++ + + ++
Process from Point/Station 57.000 to Point/Station 58.000
* ** INITIAL AREA EVALUATION * **
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Initial Subarea Flow Dist = 170.00
Highest Elevation = 312.00
Lowest Elevation = 306.00
Elevation Difference = 6.00
Time of concentration calculated by the Urban
Areas overland flow method (APP X -C) = 10.019 Min.
TC = [1.8 *(1.1 -C) *DISTANCE ^.5 )/( * /* SLOPE- (1 /3)]
TC = [1.8 *(1.1- .4500) *( 170.00 ^.5)/( 3.53 ^(1 /3)])= 10.019
100.00 Year Rainfall Intensity(In./Hr.) = 4.544
Subarea(Acres) _ .24 Subarea Runoff(CFS) _ .49
Total Area(Acres) _ .24 Total Runoff(CFS) _ .49
TC(MIN) = 10.02
+++ +++ ++++ + + ++ HHHHHHHHHHHi +++++++ + +++++
Process from Point/Station 58.000 to Point/Station 59.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 301.00
Downstream point elevation = 282.00
Flow length(Ft) = 80.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) _ .49
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) _ .49
Normal flow depth in ;: ?e = 1.50 (In.)
Flow top width inside pipe = 6.25 (In.)
Velocity = 10.818 (Ft/S)
Travel time (Min.)_ .12 TC(min.) = 10.14
+ TTTTT+ T +++++++++++++++++++++++++++++++++++ + +++++ + + + + + + + + +++ + + + + + + ++++ + + ++
Process from Point/Station 58.000 to Point/Station 59.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 4.508
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .26 Subarea RunoTCFS) _ .53
Total Area(Acres) _ .50 Total Runoff(CFS) = 1.02
TC(MIN) = 10.14
+ + + + + + + + +
Process from Point/Station 59.000 to Point/Station 60.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 282.00
Downstream point elevation = 279.60
Flow length(FL) = 116.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) = 1.02
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) = 1.02
Normal flow depth in pipe = 4.19 (In.)
Flow top width inside pipe = 7.99 (In.)
Velocity = 5.499 (Ft/S)
Travel time (Min.) _ .35 TC(min.) = 10.49
. . . . . . . . . . . i 1 1 1 1 1 +++F++
Process from Point/Station 59.000 to Point/Station 60.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In.4k.) = 4.410
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff' coefficient = .4500
Subarea(Acres) = .25 Subarea Runoff(CFS) = .50
Total Area(Acres) = .75 Total Runoff(CFS) = 1.51
TC(MIN) = 10.49
+++++ ++++++++ ++++ +++++ +++++ + + + ++++ + +++ +++ + ++
Process from Point/Station 60.000 to Point/Station 56.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 279.60
Downstream point elevation = 261.00
Flow length(FL) = 56.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) = 1.51
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) = 1.51
Normal flow depth in pipe = 2.43 (In.)
Flow top width inside pipe = 7.36 (In.)
Velocity = 16.892 (Ft/S)
Travel time (Min.) = .06 TC(min.) = 10.55
+++++++++++++++++++++++++++++++++++++++++++++ + + ++++++ + + + + + + +++ + HTT + + + +++ + + ++
Process from Point/Station 60.000 to Point/Station 56.000
* ** CONFLUENCE OF MINOR STREAMS * **
* ** Compute Various Confluenced Flow Values * **
--------------------------------------------------------------------------
100.00 Year Rainfall Intensity(In.4k.) = 4.395
ALONG THE MAIN STREAM NUMBER: 1
The flow values used for the stream: 2 are:
Time of concentration(min.) = 10.55
Rainfall intensity (in./hr/) = 4.39
Total flow area (Acres) _ .75
Total runoff (CFS) at confluence point = 1.51
Confluence information:
Stream runoff Time Intensity
Number (CFS) (min.) (inch/hour)
1 7.72 22.08 2.729
2 1.51 10.55 4.395
QSMX(1) _
+1.000* 1.000* 7.7)
+.621 *1.000* 1.5)
= 8.660
QSMX(2) _
+1.000* .478* 7.7)
+1.000* 1.000* 1.5)
= 5.203
Rainfall intensity and time of concentration
used for 2 streams.
Individual stream flow values are:
7.72 1.51
Possible confluenced flow values are:
8.66 5.20
Individual Stream Area values are:
5.96 .75
Computed confluence estimates are:
RunoTCFS) = 8.66 Time(min.) = 22.080
Total main stream study area (Acres) = 6.71
+ ++++++++++++++++ + + + + + +++++ ++ ++ +++++++ + +++++++
Process from Point/Station 56.000 to Point/Station 61.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 261.00
Downstream point elevation = 258.00
Flow length(FL) = 130.00 Mannings N = .015
No. of pipes = 1 Required pipe flow (CFS) = 8.66
Given pipe size (In.) = 24.00
Calculated Individual Pipe flow (CFS) = 8.66
Normal flow depth in pipe = 8.86 (In.)
Flow top width inside pipe = 23.16 (In.)
Velocity = 8.215 (Ft/S)
Travel time (Min.) _ .26 TC(min.) = 22.34
++++++++++++++++++++++++++++++++++++++++++++ ++++++ + ++++ + + + +++++ ++++++++++++
Process from Point/Station 56.000 to Point/Station 61.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 2.709
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .15 Subarea Runoff(CFS) _ .18
Total Area(Acres) = 6.86 Total Runofl(CFS) = 8.84
TC(MIN) = 22.34
' + + + + ++ + +++ -i i i i - r +++ + '
Process from Point/Station 56.000 to Point/Station 61.000
* ** CONFLUENCE OF MINOR STREAMS * **
100.00 Year Rainfall Intensity(In./Hr.) = 2.709
ALONG THE MAIN STREAM NUMBER: 1
The flow values used for the stream: 1 are:
Time of concentration(min.) = 22.34
Rainfall intensity (in./hr/) = 2.71
Total flow area (Acres) = 6.86
Total runoff (CFS) at confluence point = 8.84
Process from Point/Station 62.000 to Point/Station 63.000
* ** INITIAL AREA EVALUATION * **
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Initial Subarea Flow Dist = 60.00
Highest Elevation = 307.00
Lowest Elevation = 288.00
Elevation Difference = 19.00
Time of concentration calculated by the Urban
Areas overland flow method (APP X -C) = 10.001 Min.
TC = [1.8 *(1.1 -C) *DISTANCE ^.5 )/(% SLOPE^(1/3)]
TC = [1.8 *(1.1- .4500) *( 269.00 ^.5y( 7.06^(1/3)])= 10.001
100.00 Year Rainfall Intensity(In./Hr.) = 4.549
Subarea(A-res) _ .06 Subarea Runoff(CFS) _ .12
Total Area(Acres) _ .06 Total Runoff(CFS) _ .12
TC(MIN) = 10.00
+++++++++ ++ + + + + + + + +++ + + +T,,�r +++++ + +++ + ,+, H +
Process from Point/Station 63.000 to Point/Station 64.000
* ** TRAPEZOIDAL/RECT. CHANNEL TRAVEL TIME * **
Upstream point elevation = 288.00
Downstream point elevation = 287.00
Channel length thru subarea(Feet) = 140.00
Channel base(Feet) _ .00
Slope or "Z" of left channel bank = 2.000
Slope or "Z" of right channel bank = 100.000
Mannings "N" _ .033 Maximum depth of channel (Ft.) _ .50
Flow(t) thru subarea(CFS) _ .12
Upstream point elevation = 288.00
Downstream point elevation = 287.00
Flow length(Ft) = 140.00
Travel time (Min.) = 5.47 TC(min.) = 15.47
Depth of flow = .08 (Ft.)
Average Velocity = .43 (Ft. /Sec.)
Channel flow top width = 7.66 (Ft)
++++++++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + Hill + + + ++++++ + + + + + + + ++
Process from Point/Station 63.000 to Point/Station 64.000
* ** SUBAREA FLOW ADDITION * *s
100.00 Year Rainfall Intensity(InJHr.) = 3.433
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .27 Subarea Runoff(CFS) _ .42
Total Area(Acres) _ .33 Total Runoff(CFS) _ .54
TC(MIN) = 15.47
Process from Point/Station 64.000 to Point/Station 61.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 282.00
Downstream point elevation = 258.00
Flow length(FL) = 70.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) _ .54
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) _ .54
Normal flow depth in pipe = 1.44 (In.)
Flow top width inside pipe = 6.14 (In.)
Velocity = 12.667 (Ft/S)
Travel time (Min.) _ .09 TC(min.) = 15.56
Process from Point/Station 64.000 to Point/Station 61.000
* ** CONFLUENCE OF MINOR STREAMS * **
* ** Compute Various Confluenced Flow Values * **
100.00 Year Rainfall Intensity(In./Hr.) = 3.420
ALONG THE MAIN STREAM NUMBER: 1
The flow values used for the stream: 2 are:
Time of concentration(min.) = 15.56
Rainfall intensity (in./ho = 3.42
Total flow area (Acres) _ .33
Total runoff (CFS) at confluence point = .54
Confluence information:
Stream runoff Time Intensity
Number (CFS) (min.) (inch/hour)
----------------------------------------------------------------------------
1 8.84 22.34 2.709
2 .54 15.56 3.420
QSMX(1) _
+1.000* 1.000* 8.8)
+.792 *1.000* .5)
= 9.271
QSMX(2) _
+1.000* .697* 8.8)
+1.000* 1.000* .5)
= 6.699
Rainfall intensity and time of concentration
used for 2 streams.
Individual stream flow values are:
8.84 .54
Possible confluenced flow values are:
9.27 6.70
Individual Stream Area values are:
6.86 .33
Computed confluence estimates are:
Runofl(CFS) = 9.27 Time(min.) = 22.344
Total main stream study area (Acres) = 7.19
Process from Point/Station 61.000 to Point/Station 65.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 258.00
Downstream point elevation = 254.00
Flow length(FL) = 45.00 Mannings N = .015
No. of pipes = I Required pipe flow (CFS) = 9.27
Given pipe size (In.) = 24.00
Calculated Individual Pipe flow (CFS) = 9.27
Normal flow depth in pipe = 6.46 (In.)
Flow top width inside pipe = 21.29 (In.)
Velocity = 13.599 (Ft/S)
Travel time (Min.) _ .06 TC(min.) = 22.40
....+ + + + + + + + + +,,, +++ + +++;! +
Process from Point/Station 61.000 to Point/Station 65.000
* ** CONFLUENCE OF MINOR STREAMS * **
----------------------------------------------------------------------
100.00 Year Rainfall Intensity(In./Hr.) = 2.704
ALONG THE MAIN STREAM NUMBER: 1
The flow values used for the stream: 1 are:
Time of concentration(min.) = 22.40
Rainfall intensity (in./hr/) = 2.70
Total flow area (Acres) = 7.19
Total runoff (CFS) at confluence point = 9.27
+ " H i i , TT+ + TT, , r H H +,-Tr, ,-T,-+ + + + + + + + + + + +
Process from Point/Station 62.000 to Point/Station 67.000
* ** INITIAL AREA EVALUATION * **
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Initial Subarea Flow Dist. = 80.00
Highest Elevation = 310.00
Lowest Elevation = 290.00
Elevation Difference = 20.00
Time of concentration calculated by the Urban
Areas overland flow method (APP X -C) = 10.014 Min.
TC = [1.8 *(1.1 -C) *DISTANCE ^.5) /(% SLOPE-(1/3)]
TC = [1.8 *(1.1- .4500) *( 275.00 ^.5 )/( 7.27 ^(1 /3)])= 10.014
100.00 Year Rainfall Intensity(In./Hr.) = 4.545
Subarea(Acres) _ .15 Subarea Runoff(CFS) _ .31
Total At*Acres) _ .15 Total Runoff(CFS) _ .31
TC(MIN) = 10.01
+ + + + + + ++ ++ + + ++
Process from Point/Station 67.000 to Point/Station 65.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 290.00
Downstream point elevation = 254.00
Flow length(Ft) = 230.00 Mannings N = .015
No. of pipes = 1 Required pipe flow (CFS) _ .31
Given pipe size (In.) = 24.00
Calculated Individual Pipe flow (CFS) _ .31
Normal flow depth in pipe = 1.10 (In.)
Flow top width inside pipe = 10.02 (In.)
Velocity = 5.979 (Ft/S)
Travel time (Min.) _ .64 TC(min.) = 10.66
+ +++++++ + + + + + + + +++ + + + + + + + + + + + + + + + ++++ ++
Process from Point/Station 67.000 to Point/Station 65.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 4.367
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .26 Subarea Runoff(CFS) _ .51
Total Area(Acres) _ .41 Total Runoff(CFS) _ .82
TC(MIN) = 10.66
++++++++++++++++++++++ + + + ,+ T,.-H + + + + +++++++ ++++ +++ + ++
Process from Point/Station 67.000 to Point/Station 65.000
* ** CONFLUENCE OF MINOR STREAMS * **
100.00 Year Rainfall Intensity(In./Hr.) = 4.367
ALONG THE MAIN STREAM NUMBER: 1
The flow values used for the stream: 2 are:
Time of concentration(min.) = 10.66
Rainfall intensity (in./hr/) = 4.37
Total flow area (Acres) _ .41
Total runoff (CFS) at confluence point = .82
++ + +++ +++ ++++++++ ++ ++ + + ++ + + + + ++ +++ ++++f+ +++++
Process from Point/Station 66.000 to Point/Station 68.000
* ** INITIAL AREA EVALUATION * **
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Area Type is: RURAL(Greater than 1/2 Acre)
Time of concentration computed by the Natural
Watersheds nomograph, (App. X -A)
TC = [11.9 *Length(Mir3) 1(Elevation Change)] ^.385 *60(MIN/HR)
Initial Subarea Flow Dist = 220.00
Highest Elevation = 302.00
Lowest Elevation = 259.00
Elevation Difference = 43.00
TC = [(11.9* .3258 * *3)1( 43.00)]* *..385 = 10.017
100.00 Year Rainfall Intensity(In./Hr.) = 4.544
Subarea(Acres) _ .31 Subarea Runofl(CFS) _ .63
Total Area(Acres) = 31 Total Runoff(CFS) _ .63
TC(MIN) = 10.02
+++++++++++ ++ + + + + + + + + + ++++ ++ ++ ++++
Process from Point/Station 68.000 to Point/Station 70.000
* ** TRAPEZOIDAL/RECT. CHANNEL TRAVEL TIME * **
Upstream point elevation = 259.00
Downstream point elevation = 258.00
Channel length thru subarea(Feet) = 90.00
Channel base(Feet) _ .00
Slope or "Z" of left channel bank = 100.000
Slope or "Z" of right channel bank = 2.000
Mannings "N" _ .033 Maximum depth of channel (Ft.) _ .50
Flow(l) thru subarea(CFS) _ .63
Upstream point elevation = 259.00
Downstream point elevation = 258.00
Flow length(Ft) = 90.00
Travel time (Min.) = 1.98 TC(min.) = 12.00
Depth of flow = .13 (Ft)
Average Velocity = .76 (Ft /Sec.)
Channel flow top width = 13.06 (Ft)
+++++ f + ++++ ++++++++++++++ + + + + + + + + + +++ +++++++
Process from Point/Station 68.000 to Point/Station 70.000
* * * SUBAREA FLOW ADDITION
100.00 Year Rainfall Intensity(In./Hr.) = 4.045
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff' coefficient = .4500
Subarea(Acres) _ .30 Subarea Runoff(CFS) _ .55
Total Area(Acres) _ .61 Total Runoff(CFS) = 1.18
TC(M IN) = 12.00
+++++++++++++++++++++++ + +++ +++++ ++ ++ +++++++++++++++ +++
Process from Point/Station 70.000 to Point/Station 65.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 256.00
Downstream point elevation = 254.00
Flow length(Ft.) = 20.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) = 1.18
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) = 1.18
Normal flow depth in pipe = 2.92 (In.)
Flow top width inside pipe = 7.70 (In.)
Velocity = 10.222 (Ft/S)
Travel time (Min.) _ .03 TC(min.) = 12.03
Process from Point/Station 70.000 to Point/Station 65.000
* ** CONFLUENCE OF MINOR STREAMS * **
* ** Compute Various Confluenced Flow Values * **
100.00 Year Rainfall Intensity(In./Hr.) = 4.038
ALONG THE MAIN STREAM NUMBER: 1
The flow values used for the stream: 3 are:
Time of concentration(min.) = 12.03
Rainfall intensity (in./hr/) = 4.04
Total flow area (Acres) _ .61
Total runoff (CFS) at confluence point = 1.18
Confluence information:
Stream runoff Time Intensity
Number (CFS) (min.) (inch/hour)
1 9.27 22.40 2.704
2 .82 10.66 4.367
3 1.18 12.03 4.038
QSMX(1) _
+1.000 *1.000* 9.3)
+ .619* 1.000* .8)
+.670 *1.000* 1.2)
= 10.567
QSMX(2) _
+1.000* .476* 9.3)
+1.000* 1.000* .8)
+1.000* .886* 1.2)
= 6.273
QSMX(3) _
+1.000* .537* 9.3)
+.925 *1.000* .8)
+1.000 *1.000* 1.2)
= 6.915
Rainfall intensity and time of concentration
used for 3 streams.
Individual stream flow values are:
9.27 .82 1.18
Possible confluenced flow values are:
10.57 6.27 6.91
Individual Stream Area values are:
7.19 .41 .61
Computed confluence estimates are:
Runoff(CFS) = 10.57 Time(min.) = 22.399
Total main stream study area (Acres) = 8.21
i i r;+ +++ + + ++++++ ++ +++++++ ri ++++++++++++ + + + + + ++++ + + + + + +++ + + ++++++ + + + + ++
Process from Point/Station 65.000 to Point/Station 71.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 254.00
Downstream point elevation = 230.00
Flow length(Ft.) = 225.00 Mannings N = .015
No. of pipes = 1 Required pipe flow (CFS) = 10.57
Given pipe size (In.) = 24.00
Calculated Individual Pipe flow (CFS) = 10.57
Normal flow depth in pipe = 6.60 (In.)
Flow top width inside pipe = 21.43 (In.)
Velocity = 15.071 (Ft/S)
Travel time (Min.) _ .25 TC(min.) = 22.65
+ + + + + + + + +++ + +;- rTTTTT
Process from Point/Station 65.000 to Point/Station 71.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./IIr.) = 2.685
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .15 Subarea Runoff(CFS) _ .18
Total Area(Acres) = 8.36 Total Runoff(CFS) = 10.75
TC(MIN) = 22.65
+++F+++ + ++ + + + + ++ + ++
Process from Point/Station 65.000 to Point/Station 71.000
* ** CONFLUENCE OF MINOR STREAMS * **
100.00 Year Rainfall Intensity(In./Hr.) = 2.685
ALONG THE MAIN STREAM NUMBER: 1
The flow values used for the stream: 1 are:
Time of concentration(min.) = 22.65
Rainfall intensity (in./hr/) = 2.69
Total flow area (Acres) = 8.36
Total runoff (CFS) at confluence point = 10.75
++++++++++++++++ + +++++++ + + + + ++ + +++++ +++++++ ++++
Process from Point/Station 72.000 to Point/Station 73.000
* ** INITIAL AREA EVALUATION * **
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Initial Subarea Flow Dist. = 50.00
Highest Elevation = 283.00
Lowest Elevation = 259.00
Elevation Difference = 24.00
Time of concentration calculated by the Urban
Areas overland flow method (APP X -C) = 10.020 Min.
TC = [1.8 *(1.1 -C) *DISTANCE ^.5 )/( *% SLOPE-(1/3)]
TC = [1.8 *(1.1- .4500) *( 296.00 ^.5 )/( 8.11 ^(1 /3)])= 10.020
100.00 Year Rainfall Intensity(In./Hr.) = 4.543
Subarea(Acres) _ .06 Subarea Runoff(CFS) _ .12
Total Area(Acres) _ .06 Total Runoff(CFS) _ .12
TC(MIlN) = 10.02
+ + + + + + ++ ++777777 + +
Process from Point/Station 73.000 to Point/Station 74.000
* ** TRAPEZOIDAL/RECT. CHANNEL TRAVEL TIME sss
Upstream point elevation = 259.00
Downstream point elevation = 258.00
Channel length thru subarea(Feet) = 160.00
Channel base(Feet) _ .00
Slope or "Z" of Ic8 channel bank = 2.000
Slope or "Z" of right channel bank = 100.000
Mannings "N" _ .033 Maximum depth of channel (Ft.) _ .50
Flow(Q) thru subarea(CFS) _ .12
Upstream point elevation = 259.00
Downstream point elevation = 258.00
Flow length(Ft.) = 160.00
Travel time (Min.) = 6.58 TC(min.) = 16.60
Depth of flow = .08 (Ft.)
Average Velocity = .41 (FL/Sec.)
Channel flow top width = 7.86 (Ft.)
+ + + + +++ +++++
Process from Point/Station 73.000 to Point/Station 74.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 3.281
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .30 Subarea Runoff(CFS) _ .44
Total Area(Acres) _ .36 Total Runoff(CFS) _ .57
TC(MIN) = 16.60
++++++++T+; +++ 1 1 1 1 1 1 1 1 1 1 1 +++ + + + + + +++++++++ ++++ ++++++ + + ++
Process from Point/Station 74.000 to Point/Station 71.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 253.00
Downstream point elevation = 230.00
Flow length(FL) = 62.00 Mannings N = .012
No. of pipes = I Required pipe flow (CFS) _ .57
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) _ .57
Normal flow depth in pipe = 1.44 (In.)
Flow top width inside pipe = 6.15 (In.)
Velocity = 13.208 (Ft/S)
Travel time (Min.) _ .08 TC(min.) = 16.68
++++++ + + + + + + + + +++ +++ + + +++ ++++ + +++ HH ++
Process from Point/Station 74.000 to Point/Station 71.000
* ** CONFLUENCE OF MINOR STREAMS * **
* ** Compute Various Confluenced Flow Values * **
100.00 Year Rainfall Intensity(In.ak.) = 3.271
ALONG THE MAIN STREAM NUMBER 1
The flow values used for the stream: 2 are:
Time of concentration(min.) = 16.68
Rainfall intensity (in./hr/) = 3.27
Total flow area (Acres) _ .36
Total runoff (CFS) at confluence point = .57
Confluence information:
Stream runoff Time Intensity
Number (CFS) (min.) (inch/hour)
1 10.75 22.65 2.685
2 .57 16.68 3.271
QSMX(1) _
+1.000 *1.000* 10.7)
+.821 *1.000* .6)
= 11.213
QSMX(2) _
+1.000* .736* 10.7)
+1.000 *1.000* .6)
= 8.480
Rainfall intensity and time of concentration
used for 2 streams.
Individual stream flow values are:
10.75 .57
Possible confluenced flow values are:
11.21 8.48
Individual Stream Area values are:
8.36 .36
Computed confluence estimates are:
Runoff(CFS) = 11.21 Time(min.) = 22.648
Total main stream study area (Acres) = 8.72
++44 11111111111111111111illillilliiiI +++++++++++ +++ + + + + + ++++++++++ + + + + +++ + + ++++
Process from Point/Station 71.000 to Point/Station 75.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 230.00
Downstream point elevation = 224.00
Flow length(Ft.) = 60.00 Mannings N = .015
No. of pipes = 1 Required pipe flow (CFS) = 11.21
Given pipe size (In.) = 24.00
Calculated Individual Pipe flow (CFS) = 11.21
Normal flow depth in pipe = 6.91 (In.)
Flow top width inside pipe = 21.74 (In.)
Velocity = 14.979 (Ft/S)
Travel time (Min.) _ .07 TC(min.) = 22.71
... HH +++++++++++++ + + + + + + + + + + + + + + + + ++++ +++ +++ +++ ++ + HT +++++
Process from Point/Station 71.000 to Point/Station 75.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In.4k.) = 2.680
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (Iota > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .12 Subarea Runoff(CFS) _ .14
Total Area(Acres) = 8.84 Total Runofl(CFS) = 11.36
TC(MQN) = 22.71
Process from Point/Station 75.000 to Point/Station 77.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) * **
Upstream point elevation = 224.00
Downstream point elevation = 204.00
Flow length(Ft) = 190.00 Mannings N = .015
No. of pipes = 1 Required pipe flow (CFS) = 11.36
Given pipe size (In.) = 24.00
Calculated Individual Pipe flow (CFS) = 11.36
Normal flow depth in pipe = 6.87 (In.)
Flow top width inside pipe = 21.69 (In.)
Velocity = 15.310 (Ft/S)
Travel time (Min.) _ .21 TC(min.) = 22.92
+ +++ + + + + ++++++++++++++++
Process from Point/Station 75.000 to Point/Station 77.000
* ** SUBAREA FLOW ADDITION * **
100.00 Year Rainfall Intensity(In./Hr.) = 2.664
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .22 Subarea Runoff (CFS) _ .26
Total Area(Acres) = 9.06 Total Runoff(CFS) = 11.62
TC(MIN) = 22.92
+++++++++++++++ +++++++ + ++++++++++ + ++ + + + + + + ++++ HHHHHHH1 +++++++++ +++++
Process from Point/Station 75.000 to Point/Station 77.000
* ** CONFLUENCE OF MINOR STREAMS * **
100.00 Year Rainfall Intensity(In.4k.) = 2.664
ALONG THE MAIN STREAM NUMBER: 1
The flow values used for the stream: 1 are:
Time of concentration(min.) = 22.92
Rainfall intensity (in./hr/) = 2.66
Total flow area (Acres) = 9.06
Total runoff (CFS) at confluence point = 11.62
++++++++++++++++++++++++++ ++++++ + + + + + + + + + + + + + +++++ +++++++ + , rte + + ++++ + TTTTTT
Process from Point/Station 78.000 to Point/Station 79.000
* * * INITIAL AREA EVALUATION
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Area Type is: RURAL(Greater than 1/2 Acre)
Time of concentration computed by the Natural
Watersheds nomograph, (App. X -A)
TC = [11.9 *Length(Mi) ^3y(Elevation Change)] ^.385 *60(MIN/HR)
Initial Subarea Flow Dist. = 260.00
Highest Elevation = 300.00
Lowest Elevation = 248.00
Elevation Difference = 52.00
TC = [(11.9* .3466 * *3y( 52.00)]* *..385 = 10.001
100.00 Year Rainfall Intensity(In./Hr.) = 4.549
Subarea(Acres) _ .36 Subarea Runoff(CFS) _ .74
Total Area(Acres) _ .36 Total Runofl(CFS) _ .74
TC(MIN) = 10.00
+++++++++++++++ + + Hill + + +++ + + +++ + + + TTTTTT,--r + ++
Process from Point/Station 79.000 to Point/Station 80.000
* ** TRAPEZOIDAL/RECT. CHANNEL TRAVEL TIME * **
Upstream point elevation = 248.00
Downstream point elevation = 247.00
Channel length thru subarea(Feet) = 140.00
Channel base(Feet) _ .00
Slope or "Z" of left channel bank = 100.000
Slope or "Z" of right channel bank = 2.000
Mannings "N" _ .033 Maximum depth of channel (FL) _ .50
Flow(t) thru subarea(CFS) _ .74
Upstream point elevation = 248.00
Downstream point elevation = 247.00
Flow length(FL) = 140.00
Travel time (Min.) = 3.50 TC(min.) = 13.50
Depth of flow = .15 (Ft.)
Average Velocity = .67 (Ft. /Sec.)
Channel flow top width = 15.01 (Ft.)
+ + + + + + + ++++
Process from Point/Station 79.000 to Point/Station 80.000
* ** SUBAREA FLOW ADDITION ' **
100.00 Year Rainfall Intensity(In./Hr.) = 3.749
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL ( lots > 1/2 acre) runoff coefficient = .4500
Subarea(Acres) _ .26 Subarea Runof (CFS) _ .44
Total Area(Acres) _ .62 Total Runoff'(CFS) = 1.18
TC(MIN) = 13.50
++++ iiTTT,i iiiii i iiiii++ -;++++ +++++++++++++++++ ++++ ++++++++++++++ + ++++++++++++
Process from Point/Station 80.000 to Point/Station 77.000
* ** PIPEFLOW TIME (USER SPECIFIED SIZE) *'*
Upstream point elevation = 242.00
Downstream point elevation = 204.00
Flow length(Ft.) = 68.00 Mannings N = .012
No. of pipes = 1 Required pipe flow (CFS) = 1.18
Given pipe size (In.) = 8.00
Calculated Individual Pipe flow (CFS) = 1.18
Normal flow depth in pipe = 1.87 (In.)
Flow top width inside pipe = 6.77 (In.)
Velocity = 18.911 (Ft/S)
Travel time (Min.) _ .06 TC(min.) = 13.56
Process from Point/Station 80.000 to Point/Station 77.000
* ** CONFLUENCE OF MINOR STREAMS *"
*" Compute Various Confluenced Flow Values "*
100.00 Year Rainfall Intensity(In./Hr.) = 3.738
ALONG THE MAIN STREAM NUMBER: I
The flow values used for the stream: 2 are:
Time of concentration(min.) = 13.56
Rainfall intensity (in./hr/) = 3.74
Total flow area (Acres) _ .62
Total runoff (CFS) at confluence point = 1.18
Confluence information:
Stream runoff Time Intensity
Number (CFS) (min.) (inch/hour)
1 11.62 22.92 2.664
2 1.18 13.56 3.738
QSMX(1) _
+1.000* 1.000* 11.6)
+ .713* 1.000* 1.2)
= 12.459
QSMX(2) _
+1.000* .592* 11.6)
+1.000* 1.000* 1.2)
= 8.050
Rainfall intensity and time of concentration
used for 2 streams.
Individual stream flow values are:
11.62 1.18
Possible confluenced flow values are:
12.46 8.05
Individual Stream Area values are:
9.06 .62
Computed confluence estimates are:
Runoff(CFS) = 12.46 Time(min.) = 22.921
Total main stream study area (Acres) = 9.68
+++++++++++++++ +++ + + + +++ +++ + ++++++++++ +++ + + + ++
Process from Point/Station 81.000 to Point/Station 82.000
*'* INITIAL AREA EVALUATION * **
Decimal Fraction Soil Group A = .000
Decimal Fraction Soil Group B = .000
Decimal Fraction Soil Group C = .000
Decimal Fraction Soil Group D = 1.000
RURAL (lots > 1/2 acre) runoff coefficient = .4500
Initial Subarea Flow Dist = 380.00
Highest Elevation = 360.00
Lowest Elevation = 340.00
Elevation Difference = 20.00
Time of concentration calculated by the Urban
Areas overland flow method (APP X -C) = 13.112 Min.
TC = [1.8 *(1.1 -C) *DISTANCE ^ .5y(% SLOPE ^(1 /3)]
TC = [1.8 *(1.1- .4500) *( 380.00 ^.5) /( 5.26 ^(1 /3)])= 13.112
100.00 Year Rainfall Intensity(In./Hr.) = 3.820
Subarea(Acres) _ .94 Subarea Runoff(CFS) = 1.62
Total Area(Acres) _ .94 Total Runofl(CFS) = 1.62
TC(MIN) = 13.11
End of computations.. ,
TOTAL STUDY AREA(ACRES) = 15.80
APPENDIX B
(3. TABLES AND CHARTS)
' A/ EQLIAT /ON 3B5
Feef T H J
! S 000 Tc = Ti ` me 0 ccncenlrafion
1 4000 Z Length of watershed
H • Dillerence %n e%vaficn a/ang
3000 efle-cMv s/ooe line (See 4: ocl&iX X BI J -
L c
tifi /es Feef flours Minufes
1000 4 Z40
3 /BD
/DOD
\ 9DD
Boo
700 /DD
i00 \\ S 90
SOO \ 80
4 70
.300
� SO
200 \ \ 1 40
\ _K0
.fQDD 20
\ \ /e
SO D S \ /a
40 2000 \ 12
.3D NOTE
/QOD 9
FOR NATURAL WATERSFEDSi /?OD B
2D ADD TEN MINUTES TO 9 ODD 7
r MPUTED TIME OF CON - NTRATION_ _ _ _ _ 800
700
600 S
¢DD
300 3
5
2aio
H z T
SAN DI EGO COUNTY NOMOGRAPH FOR DETERMINATION
DEPARTMENT OF SPECIAL DISTRICT SERVICES OF: TIME OF CONCENTRATION (Tc)
DESIGN MANUAL FOR NATURAL. WATERSHEDS
i APPROVED '� �� / �� DATE APPENDIX X
--
i
_ •\ •, ors.
L
Wafe�sfied
Di vide
Aroma /7 "
Aroma B"
H I>csiyn Paii,f
Effecf�ve S /ope Linc ��afersf�cd Duf/ef�
Sfreom / /�
L
i
3 SAN DIEGO COUNTY COMPUTATION OF EFFECTIVE SLOPE
DEPARTMENT OF SPECIAL DISTRICT SERVICES FOR NATURAL WATERSHEDS
- a`� _..�:. DESI MANUAL
{�-
APROVE6 rr v . DATE - APPENDIX X- F ,
- IV -A
HIGHWAY DESIGN MANUAL 810 -11
January, 1987
Figure 816.6A
Overland Time of
Concentration Curves
1000
-
ti
U t
i V
a
800 Z o i LL
CO
CL
LWWL Q O ^q
ti o• O Z
Z .O'
III I Y1 I
L 600 " I 80 Z
Z J
Q W
�- i i >
C0 Q
i i XI I I I Q:
W 400 o, 60 �'
LL
> i p • Zp O
Q G p `
p• �p g
Z 200 S 40
Q i Z
J p'. Q
J
W 'gip W
01 1
> >
O 0 $ O
6
0 20
OF
.9
0
__ 1.8(1.1 —C) (L)
To �S (100)]1/3 Where:
C = Runoff Coefficient
L = Overland Travel
Distance in feet
S = Slope in ft. /ft.
T = Timq in minutes
O 0 4- &- O
0 r C to 0 +•.+ 4- #
r0 >. OL r ^?Z -0 O W r r
• C C: i tp ro ) L K
L cu _ 'O b U r-- O C
t= 7 to O •r +•� C7 U O x
to L C C U aZ L C! r C III O Z
Cn 0 - 4
O Z Q
CJ 4- O r W to r L L r C C [c
C O C Q 00 4J
E cu V C. 4- +F- O -C L #C' I� O,
L s. 4 ►-r 41 4j
C1 U= E �� v O v� C 'C7 L • v1
+j Ci + - j r CS C ' r 1 CJ
W r r0 C C. O O Ca
to r L C - rO C C -r >- O
C Cl C) - 0 c) .� r0 r -r = C r0
O ro = a o ++ a 41 +j +•+ w C - m
4 C L M y 4j +j = C
00 = L r '10 = r -r- r Cf -r
U O O S. C 'O U C = C O C U CL E C U
•r r 4- C CJ O -r r r O C7 r C r r r bJ U L, U U L = C1 O '• Cl
C1 O of Cl Cl O G +J W 0 C .0 O
CL +A L Ln L r L L • +j of Cr C h Cl
G r C a c. CL 0.44 C) vt C E cu ,r Lo
CL 7 L L W C r O t- L Q. �
L r 0 v+ Co 'C -C N b C -r-- r O l.+-
O U E =r C r I- +� L .0 r r-- C) +j lt- O
r-- 0>' rt7 rfl — t tO = L = u C b v v Z
L E +j w - C -r-
164 CL r- C +J r et to to C) 03 0) r- O O +j +J
C L C) b Cm N N C! C +j r- r U of
O E = N M •r = 4j o +J +> > +- N +-) CU / 7 ■
r O d C of -.-7 to V A to O r O to r- -r•7 ■
U t - N} • - 0 C +•+ +•J +-J L1. O N C- Q 4J +-+
CJ r--
L Cl
CL
C IM r-- N l' 1 er ttY Q C
z 6 -Hour Precipitation (inches)
o v, o Ln o to o Lo o L o
to to rs Lf; Q Q C•') tti Cl N r- •--
Lo
ZL td
� fit•. a•+ .T...�:.r:�_ - '__ -- -{— —1�
'. i� 0. -. 'fi T is _L. — •-_� -_ .L_T� Cr)
E 4.11
Cd
t � � i+ ti. �- .i� _ _ — '� -�- � rr i r I:EII 'li I� 1 1
= W
r i r .......: • r- . APP1r11DI�C XI IV
' inn /• / . � J ` �• _�� / `
tE
qr
o
'fir ----�� p • � � i � �' °� ` � � . 1 �� r� `�� --.
co
Cr.! Q °
co
0
• 1 1 Cam. � L I ' � /(.J �� r // , O
W .� •
L • .. 6-1
IZ
cz j
C7 C2
W
_O �+ - F' j
< W l Q
L1
• 'y�j F < Z
< 1 .
t¢ S C O
Q.' < ,
U- -2 t u
0 _ _ _ 4.ux
}. t11 o r� Lf% V < p O
wo
vi o v
c
i w -i h W
h
_ w i
1.
CM �, -. ^ ►
o
� 7 l
Ca
�� Q �.7 J _ ,• `Cr � c�T�
w /1 f
Co
CM
CL
t+�s
�. O� O
N
LLJ
C
<' ° <
O n w
J u r ..t
-• / Y 4J 1 <
U =z
b z
M c ° z
p u>
z U
M W ;
N
CD
LAJ
< r,
Ln 4.
} Ot+JO
94 0
t .7 Y. ! _
J
_ f Y
a .
TT -A-7
TABLE 2
RUNOFF COEFFICIENTS (RATIONAL METHOD)
DEVELOPED AREAS (URBAN)
Coeffi C
Soil Group (1)
Land Use
A B C D
Residential:
Single Family .40 .45 .50 .55
Multi -Units .45 .50 .60 .70
Mobile homes .45 .50 .55 .65
Rural (lots greater than 1/2 acre) .30 .35 ,40 .45
Commerci al (2) .70 .75 .80 .85
80% Impervious
Industria1( .80 .85 .90 .95
905% Impervious
NOTES:
( ' ) Soil Group mans are available at the offices of the Department of Public Works.
( actual conditions deviate significantly from the tabulated impervious-
ness values of 80% or 90°4, the values given for coefficient C, may be revised
by multiplying 80% or 90% by the ratio of actual imperviousness to the
tabulated imperviousness. However, in no case shall the final coefficient
be less than'0.50. For example: Consider commercial property on D soil.group.
Actual imperviousness = 50 °/
Tabulated imperviousness = 80%
Revised C 80 x 0.85 = 0.53
IV -A -9
f APPENDIX IX -B
.. : Rev. 5 /81
Average Values of Roughness Coefficient (Manning's n)
t
Roughness
Type of Waterway Coefficient (n)
1. Closed Conduits (1)
Steel (not lined) 0.015
Cast Iron 0.015
Aluminum .021
Corrugated Metal (not lined) 0.024
Corrugated Metal (2) (smooth asphalt quarterlining) 0.021
Corrugated Metal (2) (smooth asphalt half lining) 0.018
Corrugated Metal (smooth asphalt full lining) 0.012
Concrete RCP 0.012
Clay (sewer) 0.013
Asbestos Cements Pve 0.011
Drain Tile (terra cotta) 0.015
Cast -in -place Pipe 0.015
Reinforced Concrete Box 0.014
2. Open Channels (1)
a. Unlined
Clay Loam 0.023
Sand 0.020
l b. Revetted
Gravel O.O30
Rock 0.040
Pipe and Wire 0.025
Sacked Concrete 0.025
c. Lined
Cotrete (poured) 0.014
Air; Blown Mortar (3) 0.016
Asphaltic Concrete or Bituminous Plant Mix 0.018
d. Vegetated (5)
Grass lined, maintained - .035
Grass and Weeds .045
Grass lined.with concrete low flow channel .032
3. Pavement and Gutters (1)
Concrete 0.015
Bituminous (plant- mixed) 0.016
APPENDIX XVI� .1,
Ernest F. Brater and Horace Williams King
HANDBOOK OF
� r j
Table 7 -14. Values of h' for Circular Channels in the Formula
K
�t
D = depth of water d = diameter of channel
DI
d + .00 .01 .02 .03 .0 .05 .06 .07 I .08 - .09
d I
.0 .00007 .00031 .00074 .00138 .00222 .00328 .00455 .00604 .00775
.1 .00967 .0118 .0142 .0167 .01415 .0225 .0257 .0291 .0327 .0366
..2 .0406 .0448 .0492 .0537 .0385 .0634 .0G8G .0738 .07413 .0849
.3 .0907 .0966 .1027 .1089 .1153 .1218 .1284 .1352 .1420 .1490
.4 .1561 .1633 .1705 .1779 .1854 .1929 .2005 .2082 .21 GO .2238 �
.5 .232 .239 .247 .255 .263 .271 .279 .287 .295 .303
.6 .311 .319 .327 .335 .343 .350 .358 .366 .373 .380 i
.7 .388 .395 .402 (.4041 .416 .422 .429 .435 .441 .447
.8 .451 .458 .463 .4G8 .473 .477 .481 .485 .488 .491
.9 .49.3 .496 .497 .498 .498 .498 .496- - .49.3 .489 .483
1.0 .463
i
tt =rC a
ALLOWABLE FLOW FOR 24 "X24" GRATE INLET ASSUMING 50 9 /0 6 CLOGGING.
ALL SIDES OF INLET ARE UNABUTTED.
P= (24 ") 4 = 8'
2P =4'
USE WEIR FORMULA
Q = CP(H)n3 /2 C= 3.0
,
P= 4.0
H= 0.4
Q= (3.0) (4.0) (0.4) 3/2
= 3.0 CFS for 24 "X24"
1.5 CFS for 12 "X12"
• ID I I I III i iii u
0
w
• 4
P2(a +b)
A6aw
1. _
1 /L
Q
W
U.
Z
z
qK
/P 3. OH
0.1
HEA S U P 0 0. U vE () IE•S
HEADS S A 0 E I. CUR E (b 1 E.S
H EA S B T E a 1. A ION
S OR 8 PE I N 19 IN IN T
1
f
7
I
D19C ARO P JR FO UIP (Q/ ) IS H R E PE T O EA
0.1 .! .3 ,4 .D .6 ,T .1.1 LO L
4 6 t T • 1 10 10
INLET CAPACITY OF GRATE AT SAG
Plaie 2.6 -0658
APPENDIX C