Loading...
1999-6113 GNoText ~~~D GEOTECHNICAL EXPLORATION, INC. SOIL & FOUNDATION ENGINEERING. GROUNDWATER HAZARDOUS MATERIALS MANAGEMENT. ENGINEERING GEOLOGY 29 September 1 998 ) :' ~, Windsor LL C 6027 Firwood Row La Jolla, CA 92037 Attn: Mr. Hamid Kazerouni \:\ : r \~ ., Job No. 98-7343 Subject: Plan Review Comments Parcel 3 1 243 Windsor Road Encinitas, California Dear Mr. Kazerouni: As requested, and as required by the City of Encinitas plan checklist dated August 20, 1998, we are herein addressing the pertinent items. BACKGROUND INFORMATION Our firm explored the soils on the subject site, which includes three lots. The findings, conclusions and recommendations of that soil exploration were presented in our "Report of Soil Investigation...," dated August 20, 1998, Job No. 98-7343. In our soils report we recommended that at least the upper 3 to 3 Y:z feet of on-site soils be excavated, mixed with soils of lower expansion potential, moisture conditioned at a moisture content higher than the optimum, and recompacted. In addition, we recommended that the continuous and isolated foundations be embedded at least 1 5 inches into properly prepared ground. The allowable soil bearing capacity for soils prepared in a proper manner (as described in the soils report) and for footings embedded at least 1 5 inches below lowest adjacent grade 7420 TRADE STREET. SAN DIEGO, CALIFORNIA 92121 . (619) 549-7222 . FAX: (619) 549-1604 ~' ". i . J ¡ ~j REPORT OF SOIL INVESTIGATION 3-Lot Residential Development 1243 Windsor Road Encinitas, California JOB NO. 98-7343 20 August 1998 Prepared for: 1 ìJ 1 Mr. Hamid Kazerouni ~- ,/""'~ 'f;r ~L/_C,; I): MAY 1 8 1999 --- ^ ' OF f}.,t;" , """10"<5""""°',11 ;'\'EY 99- l/t Q~~o ¡ I I , ~ ,-. J ] , ~~~~D GEOTECHNICAL EXPLORATION, INC. D SOIL & FOUNDATION ENGINEERING. GROUNDWATER HAZARDOUS MATERIALS MANAGEMENT. ENGINEERING GEOLOGY 20 August 1998 WINDSOR LLC 6027 Firwood Row La Jolla, CA 92037 Attn: Mr. Hamid Kazerouni Job No. 98-7343 Subject: Report of Soil Investigation 3-Lot Residential Development 1 243 Windsor Road Encinitas, California Dear Mr.Kazerouni: In accordance with your request and our proposal of July 16, 1998, Geotechnical Exploration, Inc. has performed an investigation of the soil conditions at the location of the proposed 3-lot residential project at the subject vacant lot sites. The field work was performed on August 10, 1998. It is our understanding that new pre-manufactured single-family residential structures will be erected at the 3-lot site. The new structures will be of standard- type building materials, utilizing slab-on-grade floors, and continuous concrete perimeter foundations. Our investigation revealed that the site is underlain by 1 foot of poor quality, loose sandy topsoil overlying 2 to 3 feet of expansive sandy clay topsoil of varying density overlying silty, clayey and fine to medium sand terrace soils. The formational terrace soils have good-bearing strength characteristics, are of very low expansion potential and are suitable for support of the proposed new structures. The encountered topsoils are of poor quality and they are not suitable for Support of the new homes in their existing condition. These topsoils will need to be excavated and recompacted to be utilized as support of the new foundations. If clayey topsoils are encountered at a higher expansion potential than those encountered during our investigation, foundations and slabs will require additional size and reinforcement. 7420 TRADE STREET. SAN DIEGO, CALIFORNIA 92121 . (619) 549-7222 . FAX: (619) 549-1604 2 In our opinion, if the conclusions and recommendations presented in this report are implemented during site preparation, the site will be suited for the proposed new improvements. This opportunity to be of service is sincerely appreciated. Should you have any questions concerning the following report, please do not hesitate to contact us. Reference to our Job No. 98-7343 will expedite response to your inquiries. .., 1 1 Respectfully submitted, . ¡ ..J GEOTECHNICAL EXPLORATION, INC. @--<- .", L-<~ Jaime A. Cerros, P.E. R.C.E. 34422/G.E. 2007 Senior Geotechnical Engineer DCV/JAC/klh ,-1 ] , TABLE OF CONTENTS PAGE I. SCOPE OF WORK II. SITE DESCRIPTION III. FIELD INVESTIGATION í IV. DESCRIPTION OF SOILS , V. GROUNDWATER J VI. LA80RA TORY TESTS AND SOIL INFORMATION VII. CONCLUSIONS AND RECOMMENDATIONS 1 2 3 3 4 4 6 V/IL GRADING NOTES 16 IX. LIMITATIONS 17 FIGURES ¡ ] f J J I I. Plot Plan lIa-c. Exploratory Logs /II. Laboratory Soil Data IV. Consolidation-Pressure Curve APPENDICES A. 8. Unified Soil Classification System General Earthwork Specifications ] .J REPORT OF SOIL INVESTIGATION Proposed 3-Lot Residential Development 1 243 Windsor Road Encinitas, California JOB NO. 98-7343 1 I 1 The following report presents the findings and recommendations of Geotechnical Exploration, Inc. for the subject project. i r~-i . . ¡ . j I. SCOPE OF WORK It is our understanding, based on communications with Mr. Hamid Kazerouni, that the vacant 3-lot site will be developed with three pre-manufactured single-family homes. Continuous concrete perimeter footings and slab-on-grade garage floors will be used. At the time of preparation of this report, no plans were available for our review. With the above in mind, the Scope of Work is briefly outlined as follows: 1 . Identify and classify the surface and subsurface soils to depths, in confor- mance with the Unified Soil Classification System (refer to Appendix A). -1 I I -. ] f 2. Recommend site preparation procedures. 3. Recommend the allowable bearing capacity and wall active and passive pressures for the existing soils. 4. Estimate the anticipated settlement of the on-site soils under any new proposed structural loads. - 1 J ! , - - -1 J I 1 , I --.J 3-Lot Residential Development Encinitas, California Job No. 98-7343 Page 2 The scope of this investigation did not include geologic and seismic studies for the site. Additionally, our work was limited to where access allowed. II. SITE DESCRIPTION The property is known as: Assessor's Parcel Nos. 260-191-44, 260-191-45, and 260-191-46, per Parcel Map No.1 0441, in the City of Encinitas, County of San Diego, State of California. The site is located just north of and adjacent to 1261 Windsor Road, in the City of Encinitas. The 3-lot property is currently undeveloped (i.e., vacant). The property is bordered on the south, north and east by developed single-family residential lots, and on the west by Windsor Road (a city street). Freestanding masonry walls exist along or near the east property line on top of a small slope which rises from the subject vacant lot. An asphaltic concrete (AC) driveway bounds the southern property line. This driveway provides access to several single-family homes, including a flag lot, south of the subject sites. Vegetation on the site consists primarily of dried grass, several mature eucalyptus trees on the south property line, and a thick growth of large shrubs on the north property line. The property slopes down gently to the west from the rear (east) portion of the lot and is 3 to 4 feet higher than Windsor Road. Survey information concerning actual elevations across the subject lots was not available at the time of this investigation. -1 I J ¡ 1 j 3-Lot Residential Development Encinitas, California Job No. 98-7343 Page 3 III. FIELD INVESTIGATION Three exploratory trenches were placed across the lot where access allowed, one in each parcel. The trenches were logged by our field representative, and samples were taken of the predominant soils throughout the field operation. Excavation logs have been prepared on the basis of our observations, and the results have been summarized on Figure No. II. The predominant soils have been classified in conformance with the Unified Soil Classification System (refer to Appendix A). Bulk and in-place soil samples were obtained. IV. DESCRIPTION OF SOILS In general, the subject site is underlain by formational soils overlain by varying thicknesses of topsoils. These materials were encountered in all our exploratory trenches. Minor thicknesses of fill may exist along the south property line near the asphalt-paved driveway and on or near the east property line where a small slope supports the freestanding masonry walls. TODSOi/: These materials were encountered in all of our exploratory trenches. The encountered topsoils ranged in thickness from 3 to 3 Yz feet. They consist of an upper orange-brown to gray-brown, silty sand up to 1 foot thick over a 2- to 2 Yz- foot thick sandy clay sand which grades downward into silty clayey and fine to medium sand. They range in consistency from loose (where primarily silty sand) to stiff (clayey soil). The silty materials have marginal bearing strength characteristics which may vary across the site and the clay topsoils have a low to medium potential expansion index. Refer to Figure Nos. I, II, and III. i f¡ . c-J -1 ! J I .1 J I .J 3-Lot Residential Development Encinitas, California Job No. 98-7343 Page 4 Terrace Soils: These soils were encountered in all of our exploratory trenches. They are overlain by topsoils. The encountered terrace soils consist of gray-brown to light brown silty sand, fine to medium sand, and silty clayey sand. These soils have good bearing-strength characteristics and have a very low potential expansion index. Refer to Figure Nos. I, II, and III for details regarding these soils. V. GROUNDWATER No groundwater was encountered during the course of our relatively shallow field investigation and we do not expect groundwater problems to develop in the future - if the property is developed with proper drainage and that proper drainage is maintained on the property. It should be kept in mind, however, that any required grading operations may change surface drainage patterns andlor reduce permeabilities due to the densification of compacted soils. Such changes of surface and subsurface hydrologic conditions, plus irrigation of landscaping or significant increases in rainfall, may result in the appearance of minor amounts of surface or near-surface water at locations where none existed previously. The damage from such water is in general, expected to be minor and cosmetic in nature, if good positive drainage is implemented at the completion of construction. Corrective action should be taken on a site-specific basis if, and when, it becomes necessary. VI. LABORATORY TESTS AND SOIL INFORMATION Laboratory tests were performed on the disturbed and relatively undisturbed soil samples in order to evaluate their physical and mechanical properties and their 3-Lot Residential Development Encinitas, California Job No. 98-7343 Page 5 . ability to support the proposed deck structures. conducted on the sampled soils: The following tests were 1. Moisture/Density Relations (ASTM D1557-91, Method A) 2. Expansion Test (UBC Standard 29-C) 3. Mechanical Analysis (ASTM 0422-90) - , The relationship between the moisture and density of undisturbed soil samples gives qualitative information regarding soil strength characteristics and present soil conditions. Based on our experience and laboratory testing, the on-site terrace sands in general have a very low expansion potential, with an Expansion Index (EI) of 10 per UBC Table 29-C. The tested on-site clay topsoil materials have an EI of 46. Based upon the above laboratory test data, observations of the primary soil types on the project, and our previous experience with laboratory testing of similar soils, our Geotechnical Engineer has utilized conservative values for friction angle and cohesion to those terrace soils which will have significant lateral support or bearing J I functions on the project. These values have been utilized in recommending the allowable bearing value as well as the active and passive earth pressures for wall and footing designs. 1 J The Mechanical Analysis Test was used to aid in the classification of the soils according to the Unified'Soil Classification System. ¡ ,J 3-Lot Residential Development Encinitas, California Job No. 98-7343 Page 6 VII. CONCLUSIONS AND RECOMMENDATIONS The following conclusions and recommendations are based upon the field investigation conducted by our firm (and resulting laboratory tests), in conjunction with our knowledge and experience with the soils in this area of the City of Encinitas. ~ì -' Our investigation revealed that the proposed single-family residential sites are underlain by 3 to 3 Y:z feet of variable quality silty sand and clay topsoils. These soils are underlain by medium dense sand terrace materials. We recommend that the clay topsoils be excavated, mixed with soils of lower expansive potential, moisture conditioned, and ,ecompacted. Final elevations planned for the project þ: should take thi.S. .'..equ. ired fill. removal into account. Should grading be li~ite~ to a ( ~inimum, th,~proposed foundations should penetrate at least 1 foot into the v-.. terrace material. --'-'-'" '--, A. Preparation of Soils for Site Development (Utilizing Conventional Grading Methods) ~ 1 1. Existing site topsoils shall be removed in the building pad area prior to the preparation of the building pads andlor areas to receive structural or rigid J improvements. We recommend the clay topsoil be mixed with soils of lower expansion potential, moisture-conditioned, and be properly recompacted. To provide a more uniform, firm soil base for the proposed structure and associated improvements, the final grade natural terrace soils shall be scarified at least 6 inches and moisture conditioned up to at least 5 feet 3-Lot Residential Development Encinitas, California Job No. 98-7343 Page 7 outside the limits of the new structure area (when feasible), as per indications of our field technician. On-site soils and any imported fill soils (if utilized) shall be watered to at least 4 percent above Optimum Moisture content, and compacted to at least 90 1 ! percent of Maximum Dry Density (MDD). Areas to receive new fill or that will support rigid improvements or proposed retaining structures should be c-¡ prepared in a like manner with all newly placed fill soils compacted to a minimum of 90 percent of MDD. Some topsoils and fill soils may be encountered in unexplored areas during the grading operation. As such, the exposed soils should be observed and proof-rolled with heavy equipment to disclose areas with soft soils or tested by our field technician. If encountered, these areas will require removal and recompaction and shall be prepared as previously described for new fill soils. All on-site soils with medium expansion potential shall be compacted with a moisture content at least 4 percent above the optimum. 3. No uncontrolled fill soils shall remain on the site after completion of any future site work. In the event that temporary ramps or pads are constructed J '] of uncontrolled fill soils during the grading operation, the loose fill soils shall be removed andlor recompacted prior to completion of the grading operation. 4. Any buried objects or particular soft soil areas which might be discovered on the site shall be removed and the excavation shall be properly backfilled with approved on-site or imported fill soils. If imported soils are used, they shall be low-expansive and shall then be compacted to at least 90 percent of Maximum Dry Density. 3-Lot Residential Development Encinitas, California Job No. 98-7343 Page 8 5. Any backfill soils placed in utility trenches or behind retaining walls which support structures and other improvements (such as patios, sidewalks, driveways, pavements, etc.) shall be compacted to at least 90 percent of Maximum Dry Density for low expansive soils. ~l I B. Design Parameters for Foundations and R.,taining Wall!¡ ~i J j 6. The recommended allowable soU bearing value for design of foundations for the proposed new structure is 2,000 pounds per square foot (psf). This allowable soil bearing capacity may be utilized in the design of continuous foundations and spread footings when founded a minimum of 15 inches into the properly prepared natural materials or properly compacted fill, measured from the lowest adjacent grade at the time of foundation construction and a --J I width of at least one foot. An additional 500 psf may be allowed for every additional foot in width and 800 psf for every foot in depth below 1 5 inches for the basic allowable bearing capacity, not to exceed 4,500 psf. This vertical allowable soil bearing capacity may be further increased one-third for design. analysis that include wind or seismic loads. If imported soils are required to bring the site to grade, the imported soils should be low expansive and be obtained from an approved off-site borrow area (E.!. less il ¡ ~" than 50). Based upon our laboratory test results and our experience with the soil types on the subject site, the underlying formational materials and all properly compacted fill should experience a total settlement of less than 1 inch and a differential settlement in the magnitude of approximately 3/4-inch, under a 3-Lot Residential Development Encinitas, California 7. " i i . ¡ \i 7.1 7.2 I l 7.3 , j I -j Job No. 98-7343 Page 9 structural load within the allowable bearing capacity. The angular rotation due to differential settlement is anticipated to be less than 1/300. Due to numerous reasons, footings and slabs occasionally crack. Footings and slabs should therefore contain at least a nominal amount of reinforcing steel to reduce the separation width of cracks, should they occur. A minimum of steel for continuous footings up to 1 5 inches deep should include at least four No.5 steel bars continuous, with two bars 3 inches from the bottom of the footing and two bars near the top. More steel would be required for larger footings. Reinforcing shall be provided per the structural engineer's drawings. Isolated square footings should contain, as a minimum, a grid of No.4 steel bars on 12-inch centers, in both directions, with no less than three bars each way. Garage floor slabs on-grade should be a minimum of 4 inches actual thickness and be reinforced with at least No.3 steel bars on 15-inch centers, in both directions, placed at midheight in the slab. ~ A 4-inch (minimum) base layer shaJl be provided under any new slabs of the driveway and garage to help provide a uniform surface on which to place the fresh concrete. , -..,.. Areas with raised wood floors (if utilized) shall be provided with either isolated piers embedded not less than 1 5 inches into the graded, 3-Lot Residential Development Encinitas, California Job No. 98-7343 Page 10 properly compacted soils or with continuous footings similarly embedded into the compacted soils. Surface piers shall not be used. Perimeter walls shall be supported by continuous foundations, also embedded at least 15 inches into properly compacted soil. l ] We recommend the project Civil/Structural Engineer incorporate isolation joints and sawcuts to at least one-fourth the thickness of the slab in any floor designs. The joints and cuts, if properly placed, should reduce the potential for and help control floor slab cracking. In no case, however, shall control joints be spaced farther than 20 feet apart. Re-entrant corners shall also be provided with control joints or additional steel reinforcing. Due to a number of reasons (such as base preparation, construction techniques, curing procedures, and normal shrinkage of concrete), some cracking of slabs can still be expected. Control joints shall be placed within 12 hours after concrete placement. For large slabs, the reinforcing shall have every other bar Û 1 interrupted at control joints for an effective weak plane result. To prevent moisture infiltration, all exterior slab joints shall be sealed with elastomeric seal material. The sealant shall be inspected every six months and be properly maintained. Furthermore, the slabs may be designed with sufficient steel reinforcement and shrinkage compensating concrete so that no joints are required. NOTE: The project Civil/Structural Engineer shall review all reinforcing schedules. The reinforcing minimums recommended herein are not to be construed as structural designs, but primarily as minimum safeguards to reduce possible crack separations. The actual .j 3-Lot Residential Development Encinitas, California Job No. 98-7343 Page 11 reinforcing schedule shall be as per the direction of the Civil/Structural Engineer. 8. As a minimum for protection of on-site improvements, it is recommended that all non-structural, non-vehicular concrete slabs (such as patios, -'1 , walkways, etc.) be underlain by properly compacted on-site soil, include 6x6- 6/6 welded wire mesh at midheight of the slab, and contain adequate - ! ,.1 isolation and control joints. The isolation joints and control joints shall be provided with a flexible joint filler which should be periodically inspected and be properly maintained. Spacing of control joints shall be 15 feet or the width of the slab, whichever is less. Furthermore, control joints shall be placed at re-entrant corners. Improvements such as adjacent sidewalks should be provided with a drainage slope of at least 2 percent. It should be noted that standard concrete improvements may not perform well on the 1 l ~ '! existing loose surface soils, slab cracking under such conditions should be anticipated. As such, each improvement should be designed to tolerate the on-site conditions, or if a higher risk for damage is not acceptable to the owner, the subgrade soils up to a depth of 2 feet (as a minimum) should be OJ j removed and recompacted. The performance of on-site improvements can also be greatly affected by soil base preparation and the quality of construction, and is therefore the responsibility of the designer and the contractor installing the improvements. We recommend that the slab and footing subgrade soils be checked for proper moisture and compaction by our representative within 48 hours prior to concrete pouring. .1 -1 10. --1 ! L " '] I I 11 . . - 3-Lot Residential Development Encinitas, California Job No. 98-7343 Page 1 2 c. Retaining Walls 9. The active earth pressure (to be utilized in the design of any cantilever walls, allowed to rotate) shall be based on an EquiValent "ufdWeight of 38 pounds per cubic foot (for level backfill only and low to non-expansive imported soils). For walls with sloping backfill, the equivalent fluid active weight is 62 pcf for 2.0: 1.0 slopes, and 70 pcf for 1.5: 1.0 slopes. In the event that a new retaining wall is to be designed for a restrained condition (such as basement walls), a uniform pr,ssure equal to 9xH (nine times the total height of retained wall, considered in pounds per square foot) shall be considered as acting everywhere on the back of the walt in addition to the design Equivalent Fluid Weight. Any other surcharge loads applied within a horizontal distance measured from the face of the wall equal to its height shall be considered in the structural design. The passive earth pressure of the encountered medium dense, natural-ground soils and any recompacted fill soils (to be used for design of shallow foundations and footings to resist the lateral forces) shall be based on an Equivalent Fluid Weight of 276 pounds per cubic foot. This passive earth pressure shall only be considered valid for design if the ground adjacent to the foundation structure is essentially level for a distance of at least three times the total depth of the foundation and is properly compacted or dense native soil. A Coefficient of Friction of 0.40 times the dead load may be used between the bearing soils and concrete foundations, walls, or floor slabs. '] I j , ¡ I ¡l :1 13. 3-Lot Residential Development Encinitas, California Job No. 98-7343 Page 1 3 D. Site Drainage Considerations 12. Adequate measures shall be taken to properly finish-grade the site after the new structure and other improvements are in place. Drainage waters from this site and adjacent properties are to be directed away from foundations, floor slabs, footings, and slopes, onto the natural drainage direction for this area or into properly designed and approved drainage facilities. Roof gutters and downspouts should be installed on the structure, with runoff directed away from the foundations via closed drainage lines. Proper subsurface and surface drainage will help reduce the potential for waters to seek the level of the bearing soils under the foundations, footings, and floor slabs. Failure to observe this recommendation could result in undermining, uplifting and differential settlement of the structure of other improvements on the site. Currently, the Uniform Building Code requires a minimum 2 percent surface gradient for proper drainage of building pads, unless waived by the building official. Concrete pavement may have a minimum gradient of 0.5 percent. In addition, appropriate erosion-control measures shall be taken at all time during construction to prevent surface runoff waters from entering footing excavations and ponding on finished building pads or pavement areas. Due to the possible buildup of groundwater (derived primarily from rainfall and irrigation), excess moisture is a common problem in below-grade structures or behind retaining walls. These problems are generally in the form of water seepage through walls, mineral staining, mold growth and high humidity. In order to reduce the potential for moisture-related problems to develop at the site, proper ventilation and waterproofing shall be provided for 3-Lot Residential Development Encinitas, California Job No. 98-7343 Page 1 4 below-ground areas and the backfill side of all accessible, exposed structure retaining walls should be properly waterproofed and drained. A layer of -, I Miradrain 6000 or J-drain layer, plus protective board, and a subdrain system plus waterproofing shall be placed for building retaining walls. Crawl space perimeter walls (if utilized) shall also be waterproofed and drained if they act as building retaining walls. Furthermore, proper and sufficient cross ventilation shall be provided to crawl spaces. ~, ¡ Retaining walls (if utilized) shall be provided with waterproofing and a subdrain system at the bottom of the wall. The subdrain shall consist of a perforated Schedule 40 PVC pipe or SDR35, placed in an envelope of crushed rock smaller than 1-inch in diameter, and be wrapped with geofabric such as Mirafi 140N or equivalent. The subdrain bottom shall be placed at least 1 foot below the bottom of the slab-on-grade or soil surface being protected. The subdrain shall outlet in an approved drainage facility or into a sump pump pit. 14. Planter areas, flower beds, and planter boxes shall be sloped to drain away from the foundations, footings, and floor slabs. Planter boxes shall be constructed with a closed bottom and a subsurface drain, installed in gravel, l ~,~ ' "J I J with the direction of subsurface and surface flow away from the foundations, footings, and floor slabs, to an adequate drainage facility. i J Any planter areas adjacent to the building or surrounded by concrete improvements shall be provided with sufficient area drains to help for quick runoff disposal. No water shall be allowed to pond adjacent to the building or other improvements. 3-Lot Residential Development Encinitas, California Job No. 98-7343 Page 1 5 E. General Recommendations 15. Where not superseded by specific recommendations presented in this report, trenches, excavations, drilled holes, and temporary slopes at the subject site shall be constructed in accordance with Title 8, Construction Safety Orders, issued by OSHA. This office should be contacted for additional recommen- i ¡ I] dations if shoring is required. For basement level walls, the temporary cuts can be made at a slope ratio of at least 3/4 horizontal to 1 vertical. Removal of adjacent fences and/or extension of the excavations may require permission from adjacent neighbors. Shoring may be required, depending on the extent of excavations and the neighbors cooperation to construction of this project. 1 I J 16. In order to reduce any work delays at the subject site during site development, this firm should be contacted 24 hours prior to any need for ¡ I J observation of footing excavations or field density testing of compacted fill soils. Placement of formwork and steel reinforcement in footing excavations should not occur prior to our observation of the excavations; in the event , -1 that our observations reveal the need for deepening or redesigning foundation structures at any locations, any formwork or steel reinforcement in the _1 '] I J J I affected footing excavation areas would have to be removed prior to correction of the observed problem (i.e., deepening the footing excavation, recompacting soil in the bottom of the excavation, etc.). ; 3-Lot Residential Development Encinitas, California Job No. 98-7343 Page 1 6 VIII. GRADING NOTES Any required grading operations shall be performed in accordance with the General Earthwork Specifications (Appendix B) and the requirements of the City of Encinitas Grading Ordinance. -1 17. Geotechnical Exploration, Inc. recommends that we be asked to verify the actual soil conditions revealed during site grading work and footing 'fl , J excavations to be as anticipated in this "Report of Soil Investigation." In addition, the compaction of any fill soils placed during site grading work must be tested. It is the responsibility of the grading contractor to comply with the requirements on the grading plans and the local grading ordinance. 18. It is the responsibility of the owner and/or developer to ensure that the recommendations summarized in the report are carried out in the field I fl I.;.j "o-j J I .J operations and that our recommendations for design of the project are incorporated in the building and grading plans. It is recommended that we review the grading and foundation plans prior to construction operations to verify that our recommendations are incorporated in the plans, and to verify that any additional or modified recommendations that are warranted are included in the plans. 19. This firm does not practice or consult in the field of safety engineering. We do not direct the contractor's operations, and we cannot be responsible for the safety of personnel other than our own on the site; the safety of others J I .J is the responsibility of the contractor. The contractor should notify the -1 í ¡ -1 , , J J , J J I .J 3-Lot Residential Development Encinitas, California Job No. 98-7343 Page 1 7 owner if he considers any of the recommended actions presented herein to be unsafe. IX. LIMITATIONS Our conclusions and recommendations have been based upon all available data obtained from our field investigation and laboratory analysis, as well as our experience with the soils and native materials located in this area of the City of Encinitas. Of necessity, we must assume a certain degree of continuity between exploratory excavations andlor natural exposures. It is, therefore, necessary that all observations, conclusions, and recommendations be verified at the time grading operations begin or when footing excavations are placed. In the event discrepancies are noted, additional recommendations may be issued, if required. The work performed and recommendations presented herein are the result of an investigation and analysis which meet the contemporary standard of care in our profession within the County of San Diego. This report should be considered valid for a period of two (2) years, and is subject to review by our firm following that time. If significant modifications are made to the building andlor grading plans, especially with respect to the height and location of the proposed structure, this report must be presented to us for immediate review and possible revision. The firm of Geotechnical Exploration, Inc. shall not be held responsible for changes to the physical condition of the property, such as addition of fill soils or changing 3-Lot Residential Development Encinitas, California Job No. 98-7343 Page 1 8 drainage patterns, which occur subsequent to issuance of this report, or any work done without our observations and testing. This opportunity to be of service is sincerely appreciated. Should you have any l questions, please feel free to contact our office. Reference to our Job No. 98-7343 will help expedite a reply to your inquiries. ! ~- Respectfully submitted, GEOTECHNICAL EXPLORATION, INC. ¿ .~ ~y.:;<:1 ,// - -, ;~~: </"':'-- ~-~~-~ Donald C. Vaugh Project Coordina r Jaime A. Cerros, P.E. R.C.E. 34422/G.E. 2007 Senior Geotechnical Engineer DCV IJAClklh J I ] " ,,"-., ;'.-:'-'~"-'-'F¡""~"~", p' ,"\ i'~V -.)')',:r:",~,~ I<~~, ,\-~-.~,<\,,' ",'j,-'" .' ,\<,t 11, !~^' :" r<", ¡-/',?-' ,~",...' ":' ç:;' " ~ ':';:'\ -~:::... \¡ i"--.J;, C\~::,. ,: . II¡' r: .,\ -<0' j' f:,-:: ~; '-', '-"'--'2,rv", ,.. , ,'-, l' . \ [;{r- G'.,:Ju' ':;-; ,: \i"" ",r'. ""-,ju';'9 i',=>",' \'.,:./'\\_",~'.-, .,-" I \ /~"'" ,v, ", I '.~ ';';"'",I',l"J ,~\,: ,r '~',' ' í ~':~,?r"';:- "",," ,/ ! :-1 I ~.~ J J j J -1 I ¡ '" "¡ . ¡ ~_J ] ] J J J j ..17 4 - C +- c: Q) -0 en Q) en a::: +- 0 C)-.J c: :.;:: en x w Existing Residental Lots ~~aJ/ YS~pe y-~ Lot 3 ~1 L,,_,,- ,~ Lot 2 I T-2 - (!) > I"-"-"I~ Lot 1 -0 -<{ \ T-j WINDSOR ROAD LEGEND C +- c: Q) -0 en Q) en a::: +- 0 C)-.J c: :.;:: en x w ì""- ASSUMED PROPERTY BOUNDARY /;1 APPROXIMATE LOCATION OF EXPLORATORY TRENCH SITE Fe Dr Blue Sky Dr f=5ì ~b \.:::!./ ~ Wood/eke Dr '\ ~ H ~ VICINITY MAP ~~, \ SCALE: 1 "=50' NOTE: This Plot Plan is not to be used for legal purposes. Locations and dimensions are approxi- mate. Actual property dimensions and locations of utilities may be obtained from the Approved Building Plans or the "As-Built" Grading Plans. REFERENCE: This Plot Plan was prepared from an existing San Diega County Assessor's Parcel Map provided by the client and fram on-site field reconnaissance preformed by GEl. PLOT PLAN WINDSOR 3 LOT RESIDENTIAL DEVELPMENT 1243 WINDSOR ROAD ENCINITAS, GA. JOB NUMBER 98-7343 f~&ii GEOiECHNICAL ~.~ EXPLORATION INC. ~ v ~=::;- AUGUST 1998 , j -1 J 2 I J 4 J 6 1 .J TEST PIT # LOGGED BY DATE TEST P IT LOG JOB NAME LOCATION Windsor 3-Lot De\ 1243 Windsor Roac Encinitas. CA T-1 DV 8-10-Q8 DIMENSION AND TYPE OF EXCAVATION 0 9' X 4t' X 2' Trench 2 Loo e to medium dense. Bee mes clayey. OPSOIL ~ t; LU u... :!:4 j:!: a.. LU a --- -- -- 6 AND. Mediu ray/orange/ Damp ERRACE LENGTH IN FEET z Sample LULU lLJ lLJ ~~ Q DEPTH en . (,)(2:: ~~ 2(2:: I- lLJ :5~ ::>~ (,) ....J ~ 2- ~ IN a.. DESCRIPTION a..en a.. en ~en -en ~ ,z 1-- i~ FEET CI! ,- a.. 0 N2 zO :!:~ ::> _2 02 0 (,) - ~ In-place density 112.7pcf @ 8.7% moisture - - - FORM-54 GEOTECHNICAL EXPLORATION INC. ..../ PARTICLE-SIZE ANAL YSIS OF SOILS 2- 100 3/4" I.! ~. u.s. STANDARD SIEVE SIZES 4 10 20 30 40 50 100 200 90 80 .... ::J: c.::I 70 LU ~ >- 60 = a:: 50 LU Z 1.1.. 40 .... Z LU 30 u a:: LU 0... 20 10 I I I I I I ....... , I I 1 I I I : I I I I I' I 1 T I I 1 " T 1 I I I I I I : I 1 ~ 1 I I 1 I 1 I 1 I I i1 I 1 I I I! I I I I 1 , I 1 I I I I I I I 1 ' I ~ I I I I 'I! I ~ I I I I I I 1 I I I I :'1 I 1 1 : I I 1 I I : I I I I I I 1 I I ~ 1 1\ I I ! I I I I : I I I I I I I I ,' T I I I I I I I I 1 I I I I I I I 1 I I I I 1 \ I I I 1 I 1 I I I 1 I I 1 I I I 1 I I Î I T If f I 1 I I I I 1 I ! I I 1 I ! I I I I I J I I ,- 'I I I I: 1 I I I I ! I 1 I 1 I 1 ..0,..., IDID ........ ~o,..., aI"" " .... . .. /'0; .. alNaI ... ,..., ~ ~alN =1 ~"N ....O 0 N"""" .. . . ' " 0 0 cco 0 9' 0 I I I 1 I I GRAIN DIAMETERI(mm) I GRAVEL SAND FINES CMRSE FINE SILT ~ ~ * .... 8 . 0 (nvn) 0 =1 ~ CLAY 1 * NOTE: FOR THE UNIFIED SOIL CLASSIFICATION SYSTEM CLAY MATERIALS ARE 0.002 (mm) AND FINER. ,- . J BORING SAMPLE DESC RIPTION OF SOIL NO. DEPTH T-1 Terrace Silty fine to medium sand "1 J I J 1 J FIGURE NUMBER Illb JOB NUMBER 98-7341 GD '1 , _J ,--1 J 2 f J 4 J J 6 J TEST PIT # LOGGED BY DATE T-2 DV 8-10-98 TEST P IT LOG JOB NAME LOCATION Windsor 3-Lot D~ 1243 Wi ndsor ROê Encinitas. CA DIMENSION AND ìYPE OF EXCAVATION 0 10' X 5t' X 2' Trench 2 12 2 4 6 CLAVE SAND. Loo (SM) Orange/yell t::ï lLJ I..L. ~4 i!: a.. lLJ Q dense. 6 8 LENGTH IN FEET Z lLJ lLJ lLJ lLJ ~~ Q DEPTH lLJ en uc::: u~ 2c::: t; S~ =>=> .....J <-! DESCRIPTION S- 21- 2- ~ IN a.. a.. V} a.. V} -V} -V} ~ ~ z 1-- ~~ ÆET :0::° 0..0 M2 => -2 ~~ 02 0 U - - 101.4 17.6% moisture ~ In-p1ace density @ - -5' Expans ion Index 10 - FrJRM-tU FIGURE NUMBER I I b fl;4Si GEOTECHNICAL JOB NUMBER 98-7343 EXPlORATION INC. I , ; 1 ,j 1 1 j I ] J I J TEST PrT # LOGGED BY DATE T-3 Dv 8-10-Q8 TEST PIT LOG ~inn~nr )-lot De 1'4) Wind,or Roa Enr:init;¡~. fA JOB NAME LOCATION DIMENSION AND TYPE OF EXCAVATION 0 21 X 6' X 10' Trench 2 /----- SILTY SAND. t;:j W 4.. ~4 ~ a. w 0 6 8 LENGTH IN FEET 2 z ww W 2~ ~~ 0 Sample u~ u~ 6 DEPTH w vi :5¡:: :5- ~¡:: :::IE- ~ ....J ~ DESCRIPTION a.tn ~tn -tn IN a. a.tn ,z 1-- xz FEET ~ ~ :k° ~~ a.o ~~ ~2 02 0 ~ _2 U - -3' Expans i on Index 46 - - 4 6 fTJRII-!j4 GEOTECHNICAL EXPLORATION INC. ; l , ¡ , I 1 , -1 ] PARTICLE-SIZE ANAL YSIS OF SOILS 28 100 3/48 18! ~8 u.s. STANDARD SIEVE SIZES 4 10 20 30 40 50 100 200 ~ x c.::I LU :a I r I' I I I I ........... ~~ I ' i¡ I I I I I I I I I I I J ~ , I I I I I I " I I I I I : I I I I I I I I II I I I I I ~: I I I I I f I I I I I J I I I I I I I I I I " I I I I I I I I I I I I ' I II ', I I I I I I I I I ', I I , I I I I I I! I I II I I I I I I I , ~: I I I I I I I I I I I I I I I I I I I ' J I I I I ~ I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I II I I I I I I I I I I I I ~J I I I I I I I I I ¡ Ii I I I I I I I I I I I I I , I 90 80 70 >- co r:x: LU z 60 50 ~ ~ Z LU I..) r:x: LU Q.. 40 30 20 10 0 ~ CI lot) .0" . . . lot)alC\/ C\/~~ ICIC " . . I I I I ~- Iot)CI" aI~. . alC\/aI.." co 1ot).C\/ ~o 0 . "" . 0 ClOCl CI cr I GRAIN DIAMETERI(mm) SAND * ~ :5 . 0 ~ ~ 0 lot) g . 0 I I (mm) GRAVEL FINES CLAY CMItS[ FINE SILT * NOTE: FOR THE UNIFIED SOIL CLASSIFICATION SYSTEM CLAY MATERIALS ARE 0.002 (mm) AND FINER. BORING SAMPLE DESC RIPTION OF SOIL NO. DEPTH T-2 -5' S i 1 ty fine to medium sand FIGURE NUMBER Ilia JOB NUMBER 98-7341 "-- L- ............ - L-..-J -,~, , 16 : : I: II II I T T .- I' I I I I ! I I I . . '. - r--. --. : -~ .~ ~ ~ ~ þI"", "l " I I I I" I I I . . . r : I~~ I: I: I i' I' I \. I I I I ' ,,! I . I : ' ~ : . I -.- -.- .""'11 . I I " I ! ! I ' ~ I ~ . : f I~ ,l~ I I I '~ I I I I - : : I: I: .- . . I I I I I I I I . : : : : 'T -.- I I I I I I I I - . : : : : 10 CONSOLIDATION - PRESSURE CURVE NORMAL PRESSURE - LBS.iSQ.IT. 100 1000 10.000 100.000 0 2 4 t- Z w 6 0 0:: LoJ Q.. I 8 z 0 ¡::: 10 ~ c :; ~ 12 z 0 0 14 18 20 0 ORIGINAL MOISTURE . SA ruRA TED ~ CONSOUDATION '- - -.... REBOUND Site Terrace Materia1s RING DIAMETER 2.375 (inches) FIGURE NUMBER III c JOB NUMBER 98-7343 -- - - I j c..J -1 I . ; J I oJ J J J . APPENDIX A UNIFIED SOIL CLASSIFICATION CHART SOIL DESCRIPTION COARSE-GRAINED More than half of material la larger than a No. 200 sieve GRAVELS, CLEAN GRAVELS More than half of coarse fraction is larger than GW Well-graded gravels, gravel and sand mix- No.4 sieve size. but smaller than 3" tures. little or no fines. GP Poorly graded gravels, gravel and sand mix- tures, little or no fines, GRAVELS WITH FINES (appreciable amount) GM Silty gravels. poorly graded gravel-sand-silt mixtures, GC Clay gravels. poorly graded gravel-sand-silt mixtures, SANDS, CLEAN SANDS SW Well-graded sand, gravelly sands. little or no More than half of coarse fraction is smaller than a no fines, No.4 sieve. SP Poorly graded sands. gravelly sands, little or no fines. SANDS WITH FINES (appreciable amount) SM Silty sands, poorly graded sand and silty mixtures. SC Clayey sands, poorly graded sand and clay mixtures. FINE-GRAINED More than half of material la smaller than a No. 200 sieve SILTS AND CLAYS ML Inorganic silts and very fine sands. rock flour, sandy silt and clayey-silt sand mixtures with a slight plasticity, CL Inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clays, clean clays. Liquid Limit Less Than 50 OL Organic silts and organic silty clays of low plasticity. Liquid Limit Greater Than 50, MH Inorganic silts, micaceous or diatomaceous fine sandy or silty soils. elastic silts'. CH Inorganic clays of high plasticity. fat clays. OH Organic clays of medium to high plasticity. HIGHLY ORGANIC SOilS PT Peat and other highly organic soils. APPENDIX B GENERAL EARTHWORK SPECIFICATIONS General The objective of these specifications is to properly establish procedures for the clearing and preparat of the existing natural ground or properly compacted fill to receive new fill; for the selection of the material; and for the fill compaction and testing methods to be used. Scope of Work The earthwork includes all the aetivities and resources provided by the contractor to construct in a go workmanlike manner all the grades of the filled areas shown in the plans. The major items of we covered in this section include all clearing and grubbing, removing and disposing of materials, prepari. areas to be filled, compacting of fill, compacting of backfills, subdrain installations, and all other we necessary to complete the grading of the filled areas. . ì ¡ . Site Visit and Site InvestigatioQ 1. The contractor shall visit the site and carefully study it, and make all inspections necessary order to determine the full extent of the work required to complete all grading in conformance wi- the drawings and specifications. The contractor shall satisfy himself as to the nature, locatioi and extent of the work conditions, the conformation and condition of the existing ground surfacf and the type of equipment, labor, and facilities needed prior to and during prosecution of the worl The contractor shall satisfy himself as to the character, quality, and quantity of surface an subsurface materials or obstacles to be encountered. Any inaccuracies or discrepancies betwee the actual field conditions and the drawings, or between the drawings and specifications, must b brought to the engineer's attention in order to clarify the exact nature of the work to b performed. 2. A soils investigation report has been prepared for this project by GEL It is available for review anc should be used as a reference to the surface and subsurface soil and bedrock conditions on thi~ project. Any recommendations made in the report of the soil investigation or subsequent report~ shall become an addendum to these specifications. -1 I Authority of the Soils Engineer and Engineering Geologist The soils engineer shall be the owner's representative to observe and test the construction of fills. Excavation and the placing of fill shall be under the observation of the seils engineer and his/her representative, and he/she shall give a written opinion regarding conformance with the specifications upon completion of grading. The soils engineer shall have the authority to cause the removal and replacement of porous topsoils, uncompacted or improperly compacted fills, disturbed bedrock materials, and soft alluvium, and shall have the authority to approve or reject materials proposed for use in the compacted fill areas, J f J The soils engineer shall have, in conjunction with the engineering geologist, the authority to approve the preparation of natural ground and toe-of-fill benches to receive fill material. The engineering geologist shall have the authority to evaluate the stability of the existing or proposed slopes, and to evaluate the necessity of remedial measures: If any unstable condition is being created by cutting or filling, the engineering geologist and/or soils engineer shall advise the contractor and owner immediately, and prohibit grading in the affected area until such time as corrective measures are taken. Q~~o J I J Placing and Compacting Fill Material 1. After preparing the areas"to be filled, the approved fill material shall be placed in approximately horizontal layers, with lift thickness compatible to the material being placed and the type of J equipment being used. Uniess otherwise approved bV the soils engineer, each laver spread for compaction shall not exceed 8 inches of loose thickness. Adequate drainage of the fill shall be provided at all times during the construction period. 1 J . . 6. -1 I 7. -~... 8. 9. 83 Fill and Backfill Material Unless otherwise specified, the on-site material obtained from the project excavations may be used as f or backfill, provided that all organic material, rubbish, debris, and other objectionable material containe therein is first removed. In the event that expansive materials are encountered during foundatic excavations within 3 feet of finished grade and they have not been properly processed, they shall t: entirely removed or thoroughly mixed with good, granular material before incorporating them in fills. N footing shall be allowed to bear on soils which, in the opinion of the soils engineer, are detrimentall expansive -- unless designed for this clayey condition. However, rocks, boulders, broken Portland cement concrete, and bituminous-type pavement obtainec from the project excavations may be permitted in the backfill or fill with the following limitations: 1. The maximum dimension of any piece used in the top 10 feet shall be no larger than 6 inches. 2 Clods or hard lumps of earth of 6 inches in greatest dimension shall be broken up befon compacting the material in fill. 3. If the fill material originating from the project excavation contains large rocks, boulders, or hare lumps that cannot be broken readily, pieces ranging from 6 inches in diameter to 2 feet ir maximum dimension may be used in fills below final subgrade if all pieces are placed in such ê manner (such as windrows) as to eliminate nesting or voids between them. No rocks over 4 feet will be allowed in the fill. 4. Pieces larger than 6 inches shall not be placed within 12 inches of any structure. 5. Pieces larger than 3 inches shall not be placed within 12 inches of the subgrade for paving. Rockfills containing less than 40 percent of soil passing 3/4-inch sieve may be permitted in designated areas. Specific recommendations shall be made by the soils engineer and be subject to approval by the city engineer. . Continuous observation by the soils engineer is required during rock placement. Special and/or additional recommendations may be provided in writing by the soils engineer to modify, clarify, or amplify these specifications. During grading operations, soil types other than those analyzed in the soil investigation report may be encountered by the contractor. The soils engineer shall be consulted to evaluate the suitability of these soils as fill materials. Q~f§=Ðo . '1 I i - ¡ I -..J 7. 1 . I -.. .._, J I 8. ] I .J . 84 2. When the moisture content of the fill material is below that specified by the engineer, water sh be added to it until the moisture content is as specified. 3. When the moisture content of the fill material is above that specified by the engineer, resulting inadequate compaction or unstable fill, the fill material shall be aerated by blading and scarifying other satisfactory methods until the moisture content is as specified. 4. After each layer has been placed, mixed, and spread evenly, it shall be thoroughly compacted: not less than the density set forth in the specifications. Compaction shall be accomplished wit sheepsfoot rollers, multiple-wheel pneumatic-tired rollers, or other approved types of acceptabi compaction equipment. Equipment shall be of such design that it will be able to compact the f; to the specified relative compaction. Compaction shall cover the entire fill area, and th equipment shall make sufficient trips to ensure that the desired density has been obtainer throughout the entire fill. At locations where it would be impractical due to inaccessibility c rolling compacting equipment, fill layers shall be compacted to the specified requirements by hanG directed compaction equipment. 5. When soil types or combination of soil types are encountered which tend to develop denseh packed surfaces as a result of spreading or compacting operations, the surface of each layer of fil shall be sufficiently roughened after compaction to ensure bond to the succeeding layer. 6. Unless otherwise specified, fill slopes shall not be steeper than 2.0 horizontal to 1.0 vertical. Ir general, fill slopes shall be finished in conformance with the lines and grades shown on the plans. The surface of fill slopes shall be overfilled to a distance from finished slopes such that it wil allow compaction equipment to operate freely within the zone of the finished slope, and then cut back to the finished grade to expose the compacted core. Alternate compaction procedures include the backrolling of slopes with sheepsfoot rollers in increments of 3 to 5 feet in elevation gain. Alternate methods may be used by the contractor, but they shall be evaluated for approval by the soils engineer. Unless otherwise specified, all allowed expansive fill material shall be compacted to a moisture content of approximately 2 to 4 percent above the optimum moisture content. Nonexpansive fill shall be compacted at near-optimum moisture content. All fill shall be compacted, unless otherwise specified, to a relative compaction not less than 95 percent for fill in the upper 12 inches of subgrades under areas to be paved with asphalt concrete or Portland concrete, and not less than 90 percent for other fill. The relative compaction is the ratio of the dry unit weight of the compacted fill to the laboratory maximum dry unit weight of a sample of the same soil, obtained in accordance with A.S.T.M. 0-1557 test method. The observation and periodic testing by the soils engineer are intended to provide the contractor with an ongoing measure of the quality of the fill compaction operation. It is the responsibility of the grading contractor to, utilize this information to establish the degrees of compactive effort required on the project. More importantly, it is the responsibility of the grading contractor to ensure that proper compactive effort is applied at all times during the grading operation, including during the absence of soils engineering representatives. Q~~o . .' , ~ 6. ,." ¡ J I ] J J J 7. 8. 85 Trench Backfill 1. Trench excavations which extend under graded lots, paved areas, areas under the influence t structural loading, in slopes or close to slope areas, shall be backfilled under the observations ar testing of the soils engineer. All trenches not falling within the aforementioned locations shall t backfilled in accordance with the City or County regulating agency specifications. 2. Unless otherwise specified, the minimum degree of compaction shall be 90 percent of th laboratory maximum dry density. 3. Any soft, spongy, unstable, or other similar material encountered in the trench excavation upo' which the bedding material or pipe is to be placed, shall be removed to a depth recommended b' the soils engineer and replaced with bedding materials suitably densified. Bedding material shall first be placed so that the pipe is supported for the full length of the barre with full bearing on the bottom segment. After the needed testing of the pipe is accomplished the bedding shall be completed to at least 1 foot on top of the pipe. The bedding shall be properl~ densified before backfill is placed. Bedding shall consist of granular material with a sane equivalent not less than 30, or other material approved by the engineer. 4. No rocks greater than 6 inches in diameter will be allowed in the backfill placed between 1 foot above the pipe and 1 foot below finished subgrade. Rocks greater than 2.5 inches in anv dimension will not be allowed in the backfill placed within 1 foot of pavement subgrade. 5. Material for mechanically compacted backfill shall be placed in lifts of horizontal layers and properly moistened prior to compaction. In addition, the layers shall have a thickness compatible with the material being placed and the type of equipment being used. Each layer shall be evenly spread, moistened or dried, and then tamped or rolled until the specified relative compaction has been attained. Backfill shall be mechanically compacted by means of tamping rollers, sheepsfoot rollers, pneumatic tire rollers, vibratory rollers, or other mechanical tampers. Impact-type pavement breakers (stompers) will not be permitted over clay, asbestos cement, plastic, cast iron, or nonreinforced concrete pipe. Permission to use specific compaction equipment shall not be construed as guaranteeing or implying that the use of such equipment will not result in damage to adjacent ground, existing improvements, or improvements installed under the contract. The contractor shall make his/her own determination in this regard. Jetting shall not be permitted as a compaction method unless the soils engineer allows it in writing. Clean granular material shall not be used as backfill or bedding in trenches located in slope areas or within a distance of 1.0 feet of the top of slopes unless provisions are made for a drainage system to mitigate the potential buildup of seepage forces into the slope mass. Q~~o ¡ 1 - -J .J 4. 86 Observations and Testing 1 . The soils engineers or their representatives shall sufficiently observe and test the gradin operations so that they can state their opinion as to whether or not the fill was constructed i accordance with the specifications. 2. The soils engineers or their representatives shall take sufficient density tests during the placemer of compacted fill. The contractor should assist the soils engineer and/or his/her representative b' digging test pits for removal determinations and/or for testing compacted fill. In addition, th contractor should cooperate with the soils engineer by removing or shutting down equipment fro IT the area being tested. 3. Fill shall be tested for compliance with the recommended relative compaction and moisturE conditions. Field density testing should be performed by using approved methods by A.S.T.M. such as A.S.T.M. 01556, 02922, and/or 02937. Tests to evaluate density of compacted fil should be provided on the basis of not less than one test for each 2-foot vertical lift of the fill, bu: not less than one test for each 1,000 cubic yards of fill placed. Actual test intervals may vary as field conditions dictate. In fill slopes, approximately half of the tests shall be made at the fil: slope, except that not more than one test needs to be made for each 50 horizontal feet of slope if, each 2-foot vertical lift. Actual test intervals may vary as field conditions dictate. Fill found not to be in conformance with the grading recommendations should be removed or otherwise handled as recommended by the soils engineer. Site Protection It shall be the grading contractor's obligation to take all measures deemed necessary during grading to maintain adequate safety measures and working conditions, and to provide erosion-control devices for the protection of excavated areas, slope areas, finished work on the site and adjoining properties, from storm damage and flood hazard originating on the project. It shall be the contractor's responsibility to maintain slopes in their as-graded form until all slopes are in satisfactory compliance with the job specifications, all berms and benches have been properly constructed, and all associated drainage devices have been installed and meet the requirements of the specifications. ,"1 All observations, testing services, and approvals given by the soils engineer andlor geologist shall not relieve the contractor of his/her responsibilities of performing the work in accordance with these specifications. ] J J J After grading is completed and the soils engineer has finished his/her observations and/or testing of the work, no further excavation or filling shall be done except under his/her observations. Adverse Weather Conditions 1 . Precautions shall be taken by the contractor during the performance of site clearing, excavations, and grading to protect the worksite from flooding, ponding, or inundation by poor or improper surface drainage. Temporary provisions shall be made during the rainy season to adequately direct surface drainage away from and off the worksite. Where low areas cannot be avoided, pumps should be kept on hand to continually remove water during periods of rainfall. J Q~~o