1996-4864 G/CN Street Address
Category Serial #
- 1 ?6q
Name Description
Plan ck. # Year
recdescv
1
' BARRY AND ASSOCIATES
GEOTECHNICAL ENGINEERING
' P.O. Box 230348
Encinitas, CA 92023 -0348
(760) 753 -9940
1
1 October 16, 1997
1 Harloff Chevrolet
1302 Encinitas Blvd.
Encinitas, California 92024
1 c/o Mike Scott Grading
P.O. 1052
1 Cardiff, CA 92007
Subject. REPORT OF GRADING AND COMPACTION FOR
HARLOFF CHEVROLET LOWER PARKING LOT
1 Encinitas Blvd. and El Camino Real
Encinitas, California
1 Reference: Grading Plan
Prepared by Mort O'Grady
1 Dear Mr. Scott,
In response to your request, we have observed the grading operation
and performed field density testing on the above referenced project.
1 The results of our density tests and laboratory testing are
presented in this report.
1 Based on the results of our testing, it is our opinion that the fill
was placed in an adequate manner and compacted to a minimum of 90
percent of the laboratory maximum dry density.
' If you have any questions, please contact us at (760) 753 -9940.
This opportunity to be of service is appreciated.
1
Respectfully submitted,
1 A.R. BAR AND ASSOCI ESS�
A.R. Ba ry, GE 119
1 Principal En ineer Exp 3/3198 m
7►r
`rr9TOtEC
1
' REPORT OF GRADING AND COMPACTION
Harloff Chevrolet Lower Parking Lot
' Encinitas Blvd. and El Camino Real
Encinitas, California 92024
' Prepared for:
Mike Scott Grading
P.O. Box 1052
' Cardiff, California 92007
' October 16, 1997
W.O. G -1459
t
Prepared by:
' A. R. BARRY AND ASSOCIATES
P.O. Box 230348
Encinitas, California 92023 -0348
1
' October 16, 1997
W.O. G -1459
' Page 1
' INTRODUCTION
This report presents the results of our observations and field
density testing for the grading of the above referenced parking lot.
The project entailed cutting and filling of on site soils in order
' to create a parking lot with a 2% slope and a drainage sump at the
north east corner of the lot. The results of our density tests are
presented in Table I.
'
LABORATORY TEST DATA
' The laboratory standard for determining the maximum dry density was
performed in accordance with ASTM D 1557 - 78. Field density tests
' were performed in accordance with ASTM D 1556. The results of the
' laboratory maximum dry density, for the soil used as compacted fill
on the site, is summarized below:
Maximum Dry Density Optimum
' Description (T)-c.f.) Moisture M
Brown silty sand 127.0 10.2
DISCUSSION
' The following is a discussion of the grading operations, as they
' were performed on the site:
' 1. A keyway was excavated at the base of the fill slope adjacent to
the concrete drainage ditch along the north side of the property.
' October 16, 1997
W.O. G -1459
' Page 2
' The bottom of the excavation was inspected by our field engineer
and approved as competent material to receive the compacted fill.
' 2. The generated fill soil from the excavation was then spread over
the bottom of the keyway in lifts not exceeding 8 inches, watered
as required to achieve optimum moisture content, and compacted by
track mounted and rubber tire roller earth moving equipment.
3. The fill was placed to a minimum of 90 percent of the laboratory
' maximum dry density as indicated by our test results.
' If you have any questions, please do not hesitate to contact us at
(760) 753 -9940.
Respectfully submitted,
' A. R. BARRY AND ASSOCIATES
' A. R. Barry
Principal Eng' eer OE1l9
' Ev. 3131M
cfi N� R
sr � T OOF CAI�F� ��P
Harloff Chevrolet
' Lower Parking Lot
APPENDIX "A"
' LABORATORY TEST RESULTS
TABLE I
Field Dry Density and Moisture Content
Moisture Dry Relative
Test Test Content Density %
No. Location Elev. % (pcf Compaction
1 See Plan Key 13.7 108.5 91
' 2 See Plan Key 12.1 107.3 90
3 See Plan 220 14.3 115.9 91
' 4 See Plan 218 13.1 116.2 92
5 See Plan 216 14.9 120.9 95
' 6 See Plan 223 14.2 118.3 93
7 See Plan 223 13.6 120.2 95
8 See Plan 220 14.3 119.1 94
' 9 See Plan 219 13.9 116.8 92
10 See Plan 223 14.6 117.8 93
11 See Plan 220 12.6 120.3 95
12 See Plan 223 11.3 120.1 95
JOB
SOWARDS AND BROWN ENGINEERING SHEET NO. OF
2187 Newcastle Ave., Suite 103 CALCULATED BY DATE
CARDIFF BY THE SEA, CALIFORNIA 92007 CHECKED BY DATE
SCA
. . . . . . . .
........
..................... . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . ................. . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . ..................... .....
. . . . . . . . . . . . . . . . . . . . . . .............
.................... .. . . . . . . . . . . . . . . . . . . . . . . . . ............ . . . .. -
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
- t - 7
r
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ;
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
........... ... ..... ...
. ......... .............. . ............. ..............
.............
... .. .. ....... .............. .............
. ......... ............. .............. .............. ............. ............. ............. .......... ............... ............ . ....... . ..............
.............
.............. .............. .............. ........... ............. .............
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . .
.......... .......... . . . . . . . . . . . . . . . . . . ........ 4 . .... L
.......... 1 . ............. . ............. ✓ ...................... ............. .............. .............. .............. ............ ............
............................. ..............
...... .. ...........
.......... . ...... I U . ......... .............
............
. .......... .............. .............. ........... ... ......... .......... .............. .......... ....... ..... .. .......... ... ... ............... ............
............... .............. ............. .............. ............. . ..... ..... .............. ............
V
.. .... ....... ............ I ...... ... .. ... ...
.......... ..... . ..... . ............ .................... . . ....
.. .......... ............
..... ........... ..
..... .... .
............. ....... . ........ .............. .... . ....... ................................................ ............. ............
........... . ..... .................. ............. . ... . ....... .
...... ..... . . ................. . .. .....
............. ........... .. .............. ............. ............. ............. .............. ............
..........
. ......... .......... .............. .......... .. ......... ............ I .............. ..........
.......... .... ..... ....... .............. .............. ............. .... ...... ..........
....... .......
........ .
. ......... ............. I L-A ..... ....... ............
Mp .. ......... .............. . . ......... .... . .......... ..............
. ..... .......... — ......... .. . ...... ..... . ........... ............. ............. . ....... ...... ... ........ .......... ............................
... ........ . ............
.......... ....... ... . .. ... ....... .................
. . . . . . . . . .
. .......... ... .......... .... .... ...
......... . .... ....
........... . .............. ..............
. .......... .............. ........................... .............. ............. .. .. - .............
. ... ......... .............. . ... ........ .............
L
. . ........ .............. .............. ............. ............. .............. .... ....... ............. ............. ... .......... ............. ............
.. ...... .. ... ........... . . .... ...
.. ........
.. ..........
......... .... ........ ............. . ..... ........ .. ............ ..... . .... . . ............ .. .. ........... ...............
. . ......... ............
.... ....... . ............. ............. ...........
. ............. ...... .... .......... ... ........... ...... ..... .. . ....... .............
............. ......... .
................. ........... .... ... ..... ..... ... .. . .... ... . ............
.......... ............... .......... ..................... ... . ............. ... .................
.. ......... .............. .............. ................ ........... ... ..........
Z .............. .. ........................ .... ..... ............... .............. ... . ..... . ........ ... ....
V W�3� ESSIO
.............
....... .. .. .............
.. ............ ......... . .... ... .. . ... . ... . .. .. .....
...... ............ ............................
... .. .. ...........
....... .... ..........
t4o i 36190
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ; I I . � I . . ' ; ' . L . L
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . .. .. . .
p 6130100.
.... ...... . .......
........... . ......... . ........ ............
.. .... .......... .............
............ .
..............
. ......... ........ .......... .......... .......... ....
.............. ..............
........... ...... ......... .. ............. . .......... -
0
.. ......... ........ .. ........... ....... ...... ............. .... ...... . .............
............. .
......... .............. ...... ...... . ............ ..............
.....
........... .......... ... ................ .............. .......... ... . ........
L ................................... ............ . ............
.......... .. .............. .............. ............. ............ . ............. .......... ............
.. .. .... ............. .
.............
.. .......
......... .............
...... ... ... ............. ............. .............. .......... .... ... I ....
............ ................... .............. .............. ......... . ....... .. . .............
. ..... ........ ...... ......
....................
oo
......... ............. .............. .... . ..... . .......... . ........ . .......... ... . ...... ....................... ........... ............
. ......... ............. ..... ..... I .......
1 .
.. ......... ............. ............. ............ . ............. ...... .............. ..........
.............
... ..... ..... .......... ... . ............ ............. . ............. ............. ............. ............. ............. ... .......... .............. .............
............ .............
....... .....
..............
........... ..... .............. .. .... .... .............. .......... .
......... ............. .............. .............. .... . . . . ........
. ....... .... .............. .............. ............. ............. . ............. .............. ..........................
............
.............
.. . ......... .. ..... . r .............. ............................... .... .............. r ....... ... ............. .......... .............. ............................
.............. ..... ................. -
.. ........ ........... .. .............. ......... ...
........... . ............. . ............. .............
49 JOB
SHEET NO OF
SOWARDS AND BROWN ENGINEERING CALCULATED BY DATE
2187 Newcastle Ave., Suite 103
CARDIFF BY THE SEA, CALIFORNIA 92007 CHECKED BY DATE
SCA
.. ......... . ........
.................... .. ....... . ....... . . .. .. . . . ....... .. ... .......... ....... ......
..... ... ............. ............. .. ........... .. ........
........... ... . . .. ..................... I ... ..... 4 ...........
.. ........
............... . .... .... ........... .............
.. .........
.. ......... .............. .............. .... ............ .............. ..... ..... ........ .
.... .... . .. . ......... .. ......... . . .......... .............. .............. . ............
.......... . ............. .... ..... . ....... .......... .. ........... .......... ............
.. ......... ..............
V ..................... .............. ..........
............. .............. ............
.... .. . ................ .......... ............. ... ........... .............. ............
.. ......... ............. ............. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
.... ... ...... ............. . .......... ............ .... ....... .... ... ..... .. . . . .......
............. ...... . . . ... . ... 4�
. ... ... ............... ............ ........... .............
......... ............. ............ ........... ............. .............. .............. ............
.............. ........... -4 .............. ............. .. ......... . .. ....... . .......... .............. .... ......... . ......
... . . ..... .............. ...... ...... ............. .............. .............
. . . .. . . ... ......... . ... ...
.......... ............. .............. .............. ............. .............. ..... ...... .......... ............... ............ .... ... ..... . ....... ......
..... .............. .............. ..............
........... ..... ............. ............
.. .......... ............. ............. . ............. ... .. ..... .............. . ......... . ............. ....... ... ..... . .....
........... .. .... ... . ... .......... ......................... . . .4 .......... ... ............. ........... .. . ... ....
.. ......... ............. ............ ........... ..............
........ .............. .... ........ 4 ............. . .. .......... ............ . . ....... .............. .............. ... .. ...... .............. . ...........
............. ............... ........... .......... .............
.. -
. .......... .............. ............. 4 ............. 4 .......... . ..
..................... ... .. .... ......... .............. ........... .............. .... i
.............. .... .. .... .............. .......... ........... ............. ............. ............................ ..... ............
. .......... ............ . ............. ......... ....
............. .................. ............. .............. ........ ..... .............. ............... .............. . .............. .............. ...........
.............. ............. ............. ................. -
.. ......... .. .... . ... 4-- ..........
..... ......... .. ........ ......... . ............. .. .. . ...... ...... ....... .......... .. ...... .......
.............. ..............
.. ......... ............. ............. ..... .. .............. ...... ......
... ....... .......... ... ........... . .............. . .. ..... . ...... .. ...... ... .. ............ . ....... ......... . ........ .... .............
.............. .............. ........... ............. . .........
. .......... ............
............. ............. . ........... . . . ................... .... ... ..... .............. ......... .... ...... .... - ...........
........... . .........
. .......... ............. . ............. ........ .............. .............
................. .............. ................. ......... . ............. .............. . .. .. ........ . . .......... ............. . ........ ............... .............
......... ............ ........ .. . .....
.. ......... .............. ... ............. . .. ..... ..... . . ...
.............. .............. .............. ........... . ............ . .............. ..............
.............. ................... .....
.. ......... .......... ............. ............. .... ........ ............ ............. - ......... .. ... ..... ....... . . ..... ............ . . . ...... ............
............... .............. .............. .............. ........... .. ............
. .......... .............. ............. .... ............... - ............. ...............
........ .... ............
............................ .............
...................... .. .............. ...........
... .. .... ............ .............
........................ .............. . ... .............. ............ ............
.. .......... ....... - . ............. .......... .. ......... ........... .. .......... . . ... .... . .......... ........... .. .............. ........ .............
.............. ............. ... ......... ............
. ..........
............. . .. ..... .. ......... . ........... ..... ..... . ... .... .......... ................ ....... .... ...... ............. . ............
........................... .. ... .. ........... . .. ..... ... .. ... ... ... .. .. . . . .. ..... ....
............ ............ . . ...... ... I ..... ....... .............. .................. ............ .............
... ....... . ........
. ... ........... ............... I
.....................
.... ...... ......... .... ... ........ .
.. ............ .. .. ........
............. ............................. ............. .............
.......... . ...........
. .......... ... ...... ... ............. .. ........
.. .. ........ ........... 0-1-11-1.1 f ..,. ......... .... .......... .. . ................ .. ............ ............
. ......... .............. ................... ..................... ............... ..... ...... . .. ... . ...... ....
... .. ....... .................. .......... ... ........... .................. ...........................
.. ......... .............. ............. .............. ............. .............. .............. ................. .......... - . . ............. ....................... ..........
. .. .......... ........... ...... ......... ......... . . .............
.. ......... ............
.. .............. ............. ............. .............. ............ ........... .................... ..... . ............. ............. ............. ....................
...................................... ............. . ............
.............. .............. 4 .. ..........
.............. .............. .............. ............. ...... ........ .............. .. ........... ...... ....... .............
.. . ... ........... .......... ............. ..... . ............. . .............. -
.............. .............
....... ....... .......................................................... ............. ............. ............. ... ........... .......... ... .............
........ .............. .. ....... .. .. ............. . ............ .............
.............. ............ .............. . .... .. ... ...... ....
......... . ............ ........................... . ...................................... .............. ............. . ............. 4- ......... . ............. ...........
............. ............ . ..... ... . .. .... ......... .. ........... ............................. ..............
.... ...... .. ............. . ............
.. ......... ............ ............. ............. ...................... ............. ........... ..............
. . ......... ............. .............. ..............
........ .... .. .......... ..................... ............. ............. ............. ............... ............. ............. ........ ...................
............. ............
. ............. .............. ..............
.. ..................... .............. ............. ............. . .......... . ............. .. .... . .. .............. .............. . ..... ......... .. .. .........
............. . .......... . ....... ......
.............. .............. .............. ............. 4 .............. ............. ............. .............. ............. ............
. ......... ............. . ....................... .............. ........... .. ............. . ......... ............. ............. .............
........ ...... ......... .............. ...... - ......... .. ............ ............. ......... .......
L
PLA DESILTING BASIN CAPACITY TABLE
ESTIMATED QUANTITIES OF SILT AND DEBRIS
RIS (Cubic Yards)
DRAINAGE
TRACT AREA SOIL CONDITIONS AVERAGE STREET SLOPE
(Acres)
CON
2% 5% 8% 10% 12% 15%
10 Loose Granular 270 350 370 400 450 500
Compacted 100 1,70 200 240 270 300
15 Loose Granular 400 420 460 600 675 750
Compacted 150 255 300 360 400 450
20 Loose Granular 540 700 740 800 900 1000
Compacted 200 340 400 480 540 600
40 Loose Granular -
1080 1400 1480 1600 1800 2000
Compacted 400 680 800 960 1080 1200
80 Loose Granular 2160 2800 2960 3200 3600 4000
Compacted 800 1360 1600 1920 2160 2400 li
100 Loose Granular
2700 3500 3700 4000 4500 5000
Kill. Compacted 1000 1700 2000 2400 2700 3000
'
i• 150 Loose Granular 4000 4200 4600 6000 6750 7500
Compacted 1500 2550 3000 3600 4000 4500
200 Loose Granular 5400 7000 7400 8000 9000 10000
P Compacted 2000 3400 4000 4800 5400 6000
iaEs
tE
NOTE: Always use the value for granular material unless -the project is finished
and the utility trenches are filled with soil which has been compacted to
90% relative compaction.
` The capacity required by the above table shall be in a pit or basin. At the
fl lower end of the basin there shall be constructed an outlet dike with
dimensions as per instructions. The size of the desilting basin may be
reduced by constructing more than one basin. However, the total volume
of basins constructed shall be equal to the estimated volume of rxiof f
solids.
128 _.,y
r�
BARRY AND ASSOCIATES
GEOTECHNICAL ENGINEERING
P.O. Box 348
Encinitas, CA 92023 -0348
(619) 753 -9940
October 3 1996
Harloff BMW - Chevrolet
1302 Encinitas Blvd. p V u
Encinitas, California . _. OC1 3 -
Ou 1 1996
Subject: UPDATED GEOTECHNICAL EVALUATION SER �IGES
Proposed Parking Lot EN G EER1NG
Encinitas Boulevard. C` v OF EN
Encinitas, California
Reference: 1. REPORT OF SOILS INVESTIGATION
Proposed Parking Lot
Encinitas Boulevard
Encinitas, California
Prepared by Southern California Soil and Testing
Dated: June 9, 1989
Gentlemen,
This letter has been prepared at your request and presents the
results of our updated geotechnical evaluation for the proposed
parking area adjacent to and east of the Dealership office, 1302
Encinitas Boulevard, Encinitas, California. This study is based on
a site inspection, review of the above referenced report, and
review of the grading plan prepared by Morton S. O'Grady.
SITE CONDITIONS
The site inspection made on September 30, 1996 revealed that the
site is basically the same as shown on the referenced report. We
also observed that no new construction or grading operations from
adjacent properties has taken place which would impact the
construction of the proposed parking lot.
October 3, 1996
W.O. P -1459
page 2
PROPOSED CONSTRUCTION
See referenced Report Of Soil Investigation.
GEOTECHNICAL CONDITIONS
See referenced Report Of Soil Investigation.
PAVEMENT SECTION
R -value tests will be performed on subgrade soil samples at the
time of grading. Recommended pavement sections presented below are
based on an assumed conservative R value of 40, and a traffic index
of 6 for the entry way and that area used by heavy truck traffic as
indicated on the grading plan. The remaining pavement section will
utilize a traffic index of 4.5
1. (Traffic Index of 7.0, R -value of 40 (Terrace Deposit)
3 inches of asphaltic paving on
9 inches of select base (Class II) on
12 inches minimum of recompacted terrace deposit
2. (Traffic Index of 5, R -value of 40, terrace deposit)
2 inches of asphaltic paving on
6 inches of select base (Class II) on
12 inches of recompacted terrace deposit
Subgrade soils should be compacted to the thickness indicated in
the structural section and left in a condition to receive base
October 3, 1996
W.O. P -1459
page 3
materials. Class II base material should have a minimum R -value of
78 and a minimum sand equivalent of 30. Subgrade soils and base
materials should be compacted to a minimum of 95 percent of their
laboratory maximum dry density.
INSPECTIONS
Grading must be certified by a licensed civil engineer and a soil
compaction report filled with the city of Encinitas.
If you have any questions, please do not hesitate to contact our
office at 753 -9940.
The opportunity to be of service is greatly appreciated.
Respectfully submitted, QRgFESSlpN
A.R. BARRY AND ASSOCIATES R.
GE 119
* EXP. 3131158
A.R. Barry, RCE 2 683, GE 119 \
Principal Engine
i
1
REPORT OF
1 some
PROPOSED PARFUM Ir
1 II�IIUTAS BOLKEVARD
ENCMMS, CMZFaU A
I
' PREPARED FOR:
1 Harloff BMW - Chevro
1302 Encinitas Boulevard
Encinitas, California 92024
PREPARED BY:
1 Southern California Soil & Tes " tang , Inc.
Post Office Box 20627
6280 Riverdale Street
San Diego, California 92120
1
1
I
S O U T H E R N 4S. -r..
C A L I F O R N I A S O I L AND T E S T I N G , I N C.
6280 RIVERDALE ST. SAN DIEGO, CALIF. 92120 TELE 280 -4321 P.O. BOX 20627 SAN DIEGO, CALIF. 92120
6 7 B E N T E R P R I S E S T. E S C 0 11 D I D 0, C A L 1 F. 9 2 0 2 5 I T E L E 7 4 6 - 4 5 4 4
June 8, -
1989
Harloff BMW Chevrolet SCS &T 8921075
1302 Encinitas Boulevard Report No. 1
Encinitas, California 92024
SUBJECT: Report of Soil Investigation, Proposed Parking Lot, Encinitas
Boulevard, Encinitas, California.
Gentlemen:
I In accordance with your request, we have perfonTed a soil investigation for
the proposed project. we are presenting herewith our findings and
recommmendations.
In general, we found the site suitable for the proposed development provided
the recommendations presented in the attached report are followed. Portions
of the site were found to be underlain by up to 8.5 feet of fill deposits.
This condition will require special grading consideration as described
herein. An additional consideration is an existing utility line easement
located along the northern property line where a cribwall is proposed. This
condition will require special consideration as described herein.
If you have any questions after reviewing the findings and recommendations
contained in the attached report, please do not hesitate to contact this
office. This opportunity to be of professional service is sincerely
appreciated.
Respectfully submitted, ESSI
IFO SO & ING, INC. 4 B A p��Fyc
oQ F�
Daniel B. 'Adler, .C.E. 3 037 N0. 36031
♦c
EXP. 6-30-92
I DEA:JRH: nr CIVIIL Submitted OF CA�����
(5) Biggs Engineering Corporation
1
1
' S O U T H E R N C A L I F O R N I A S O I L A N D T E S T I N G, I N C.
! TAEffZOF CONTENTS
PAGE
Introduction and Project Description ......... ..............................1
ProjectScope ................................ ..............................1
! Find Description ......................... ..............................2
SoilDescriptions ........................ ..............................3
Conclusions andRecom- en, dations .3
..........................
General.. • .............. ... .3
Grading.................................. ..............................4
SitePreparation .................... ..............................4
! Surface Drainage .................... ..............................4
Earthwork. . .
.4
SlopeStability ..................... ..............................4
Foundations............................................................ .......................... ............................... 5
General.
.5
Cribwalls........................... ..............................5
ExpansiveCharacteristics ........... ..............................5
Settlement Characteristics .......... ..............................5
GradingPlan Review.. ...... ..............................5
EarthRetaining Walls .................... ..............................6
PassivePressure .................... .........6
ActivePressure .. ..................... , 6
Backfill............................ ..............................6
! Safety
Limitationsns . .. ...•... .. ..............................7
.................. ,7
Review, Observation and Testing .......... ..............................7
Uniformity of Conditions ................. ..............................7
1 Change in Scope .......................... .......7
Time Limitations.. ....................... ,g
ProfessionalStandard .................... ..............................8
Client's Responsibility .................. ..............................8
' Field Explorations ........................... ..............................9
LaboratoryTesting ........................... ..............................9
ATTACHMENTS
FIGS
Figure 1 Site Vicinity Map, Follows Page 1
PI,ARES
Plate 1 Plot Plan
Plate 2 Subsurface Exploration Legend
Plates 3 -8 Trench Logs
Plate 9 Grain Size Distribuition
Plate 10 Maxi nm+ Dry Density and Optint3m Moisture Content
Plate 11 Direct Shear Swmary
Plate 12 Slope Stability Calculations
Plate 13 Re tainin g Wall Subdrain
! APPENDIX
Recoamended Grading Specification and Special Provisions
!
1
4S� -Cl�
1.
S O U T H E R N C A L I F O R N I A SOIL A N D T E S T I N G , I N C.
6280 RIVERDALE ST. SAN DIEGO, CALIF. 92120 TELE 2BO -4321 P.O. BOX 20627 SAN DIEGO, CALIF. 92120
6 7 8 E N T E R P R I S E S T. E S C N D I D O, C CA Amm L II FF.* 9 2 0 2 5 T E L E 7 4 6 - 4 5 4 4
SO IL 1.,6\
PROIPOSED PA WJNG IAT
E IN= Ro
MINIMS, CALIFORNIA
IlTICN AND PROJECT GF,sc�
This report presents the results of our soil investigation for the proposed
parking lot to be located adjacent and north of Encinitas Boulevard, west of
its intersection with El Camino Real in the City of Encinitas, California.
The site location is illustrated on the following Figure 1.
It is our understanding that the site will be developed to receive a parking
lot. A cribwall up to 20 feet high and masonry retaining walls are
proposed. Grading will consist of cuts and fills up to seven feet and 10
feet deep, respectively.
To assist in the preparation of this report, we have been provided with a
grading plan prepared by Biggs Engineering Corporation. A site plan
depicting the site configuration, topography and approximate location of our
subsurface explorations is provided on the attached Plate Number 1.
PIC= SCOPE
This investigation consisted of: surface reconnaissance, subsurface
explorations, obtaining representative disturbed and undisturbed samples,
S U T H E R N C A L I F O R N I A S O I L A N D T E S T I N G, I N C.
--
t _ •�'"
vt
GaWRTA • ❑ --
111 ler„ 9 !•..tea —�—
\ m{n • J S I 44
u RW{ Ir cu •. 1 Tt•R+11 f 4T1 I I w 7r• T� gyp./ I i7 gi
EL
'Damn AV u TROY cT • t1
I
li > IV NMA Ia.NRD
sit —
♦ L I I ( � ^I
D 1
Y 1
1 '�ai� t ♦0 �� � ` a ® I ��
lolr. vl. { T i f,`E�•"•o+ d C 1� J � /' ItD d♦r M
4 a • / I�ou�uw
1�I�TsO rr�•a 3 ra•n•�•uu
•�— Alt ro w
E iN
z S � "� J. • O b � y am— J/ \ %1
z � I
I $ I100 ENCINtTAS L at 1 `7V /\
• y �nTJn ,M � °•�s � ILB � { 1 � ��tw''� �- �� a' '
M �' I ♦ �i �t� � (! t,��� !C
a r o.�+l{ i '� / ►AStn opal o r
oo
so
8
FL f
TORRET
OR 11 uwr•J, •fir. w 1
1 � -- I (O♦ �Jt�
rt w
2411 S j 3'i pow vtw►
SOUTHERN CALIFORNIA H ARLOFF BMW — CHEVROL
SOIL S TESTING, I NCr. By: DBA DATE: 6 -08 -89
ion NUMSER: 8921075 Figure N 1
SCS &T 8921075 June 8, 1989 page 2
laboratory testing, analysis of the field and laboratory data, and
preparation of this report. More specifically, the intent of this analysis
was to:
i
a) Explore the subsurface conditions to the depths influenced by the
proposed construction.
b) Evaluate, by laboratory tests, the pertinent engineering
properties of the various strata which will influence the
development, including their bearing capacities, expansive
characteristics, and settlement potential characteristics.
1 c) Develop soil engineering criteria for site grading and provide
design information regarding the stability of cut and fill slopes.
d) Address potential construction difficulties and provide
recommendations concerning these problems.
e) Reccnrw d an appropriate foundation system for the type of
structures anticipated and develop soil engineering design
criteria for the recommended foundation design.
1 FINDINGS
' SIZE 2UIMON
The project site consists of a vacant lot located east of and adjacent to
the existing Harloff Chevrolet /BW dealership in the Encinitas area of the
County of San Diego. The lot is nearly rectangular in shape, and is
located on the north side of Encinitas Boulevard approximately 375 feet west
of E1 Camino Real. Existing comnercial development is located to the north
and east of the site. Topographically the site consists of several small
level pads.
1
SCS &T 8921075 June 8, 1989 Page 3
SOIL D FRTPTI ON
The subject site was found to be underlain by fill deposits, topsoils and
Torrey Sandstone deposits. The existing fills exist at random areas
throughout the site, primarily along the north and northeastern portion.
Fill deposits attain a maximum depth of 8.5 feet and, consist of brown, gray
brown and tan, moist, loose to medium dense, slightly silty sand. Topsoils
were encountered underlying fill deposits in Trench Number 3. The topsoils
have a thickness of two feet and consist of dark brawn, moist, loose, silty
sand. Formational deposits consisting of Torrey Sandstones underlie the
aforementioned surficial deposits. This material consists of green- brawn,
tan and rust, moist,_dense to very dense slightly silty sand.
CCNCLUSICNS AMID RF OOMME ,nAmr
I MERAL
In general, no geotechnical conditions were encountered which would preclude
the development of the site as presently proposed provided the
recommendations presented herein are followed.
I The main considerations for site development are the presence of existing
fill deposits at the site and an existing utility easement located along the
northern property line. Minor loose topsoils were also encountered in Trench
Number 3. Existing fill and topsoil deposits are considered unsuitable, in
their present condition, for the support of settlement sensitive
improvements and will require removal and replacement of compacted fill.
The existing utility line easement will limit this operation along the
northern property line. Furthermore, a cribwall up to 20 feet in height is
proposed adjacent or near the easement. It is recommended that grading
operations only extend to the edge of the utility easement. In addition, the
cribwall should be founded at a nunimaun depth of six inches below a 1:1
plane extending upward to the bottom interior edge of the existing utility
line trench.
SCS &T 8921075 June 8, 1989 Page 4
GRADING
SITE Site preparation should begin with the removal from the
areas of the site to be developed of all existing vegetation and deleterious
matter detrimental to the proposed development. Existing fill and topsoil
deposits underlying the proposed settlement- sensitive improvements should be
ranoved to firm natural ground. Based on our findings, maximum, removal
depth will 8.5 feet. Mi_niman horizontal removal limits should be five feet
beyond the perimeter of the improvement or property line, which ever is
less. The bottom of the excavation should be scarified to a depth of 12
! inches, moisture conditioned and recompacted to at least 90 percent as
determined in accordance with ASZM D1557 -78, Method A or C.
! SURFACE DRATNAGE: It is reccnmended that all surface drainage be directed
! away from earth retaining structures and the top of slopes. Ponding of water
should not be allowed adjacent to the foundations.
EAR: All earthwork and grading contemplated for site preparation
should be accomplished in accordance with the attached Reccnrended Grading
Specifications and Special Provisions. All special site preparation
recommendations presented in the sections above will supersede those in the
standard Recommended Grading Specifications. All embankments, structural
! fill and fill should be compacted to at least 90% relative compaction at or
slightly over optinamn moisture content. Utility trench backfill within five
' feet of the proposed structures and beneath asphalt pavements should be
compacted to minim:, of 90% of its maximum. dry density. The upper twelve
inches of subgrade beneath paved areas should be compacted to 95% of its
maximum dry density. This compaction should be obtained by the paving
! contractor just prior to placing the aggregate base material and should not
be part of the mass grading requirements. The maximum dry density of each
soil type should be determined in accordance with A.S.T.M. Test Method
D- 1557 -78, Method A or C.
SLOPE STABILITY: Cut and fill slopes will be constructed at a 2:1
(horizontal to vertical) will possess an adequate factor -of- safety to a
height of at least 30 feet (see Plate Nummber 12).
1 SCS &T 8921075 June 8, 1989 Page 5
FOUNDA,TIMS
GENERAL: Shallow foundations may be utilized for the support of the proposed
1 retaining wall. The footings should have a mininu depth of 12 inches
below lowest adjacent finish grade. A mininnun width of 12 inches and 24
I inches is reccnmended for continuous and isolated footings, respectively. Pmt � Y• A
bearing capacity of 2500 psf may be assumed for said footings. This bearing
capacity may be increased by one -third %hen considering wind and/or seismic
t forces. A min num horizontal setback of ten feet should exist between the
face of slopes and the portion of the footing developing passive pressure.
catrRWa S : A bearing capacity of 4000 psf may be used for the design of
proposed cribwalls. This value may be increased by one -third when
considering wind and /or seismic forces.
EXPANSIVE CS: The prevailing foundation soils were found to be
nondetrimentally expansive. The recommendations contained in this report
' are applicable to this condition.
0 6 = CS: The anticipated total and/or differential
settlements for the proposed structure may be considered to be within
1 tolerable limits provided the recommendations presented in this report are
followed. It should be recognized that minor hairline cracks on concrete due
to shrinkage of construction materials or redistribution of stresses are
i normal and may be anticipated.
GRADING PLAN REVIEW
' The grading plans should be submitted to this office for review to ascertain
that the recommendations of this report have been implemented and the
assumptions utilized for their preparation are still appropriate.
1
SCS &T 8921075 June 8, 1989 Page 6
i EMM RETAINIM NUIS
PASSIVE PRESSURE: The passive pressure for the prevailing soil conditions
may be considered to be 400 pounds per square foot per foot of depth. This
pressure may be increased one -third for seismic loading. The coefficient of
friction for concrete to soil may be assumed to be 0.62 for the resistance
to lateral movement. When combining frictional and passive resistance, the
latter should be reduced by one - third. The upper 12 inches of exterior
retaining wall footings should not be included in passive pressures
i calculations.
' ACTIVE PRESSURE: The active soil pressure for the design of earth retaining
structures with level backfills may be assumed to be equivalent to the
pressure of a fluid weighing 32 pounds per cubic foot. An additional foot
of wall height should be assumed to account for loads resulting from light
vehicle parking adjacent to this wall. This pressure does not consider any
other surcharge. If any are anticipated this office should be contacted for
the necessary increase in soil pressure. This value assumes a drained
backfill condition. Waterproofing details should be provided by the project
architect. A wall drainage detail is provided on the attached Plate Number
13.
i
FILL All backfill soils should be compacted to at least 90% relative
compaction. Expansive or clayey soils should not be used for backfill
material. The wall should not be backfilled until the masonry has reached
an adequate strength.
FALL CF SAFETY: The above values, do not include a factor of safety.
Appropriate factors of safety should be incorporated into the design to
' prevent the walls from overt and sliding.
SCS &T 8921075 June 8, 1989 Page 7
I IITATICNS
REVIEW, FJMCN AM TESi'IIG
The recommendations presented in this rt are contingent upon our review
repo ge po
of final plans and specifications. Such plans and specifications should be
made available to the soil engineer and engineering geologist so that they
may review and verify their compliance with this report and with Chapter 70
of the Uniform Building Code.
It is recommended that Southern California Soil & Testing, Inc. be retained
to provide continuous soil engineering services during the earthwork
' operations. This is to observe compliance with the design concepts,
specifications or recommendations and to allow design changes in the event
that subsurface conditions differ from those anticipated prior to start of
construction.
UNIFUM= OF C CINDMCNS
The recommendations and opinions expressed in this report reflect our best
estimate of the project requirements based on an- evaluation of the
subsurface soil conditions encountered at the subsurface exploration
locations and the assumption that the soil conditions do not deviate
appreciably from those encountered. It should be recognized that the
' performance of the foundations and/or cut and fill slopes may be influenced
by undisclosed or unforeseen variations in the soil conditions that may
occur in the intenrediate and unexplored areas. Any unusual conditions not
covered in this report that may be encountered during site development
should be brought to the attention of the soils engineer so that he may make
modifications if necessary.
' MOM IN Sa1PE
This office should be advised of any changes in the project scope or
proposed site grading so that it may be determined if the recomedndations
contained herein are appropriate. This should be verified in writing or
modified by a written addendum.
SCS &T 8921075 June 8, 1989 Page 8
T= r.rnrr=
The findings of this report are valid as of this date. Changes in the
condition of a property can, however, occur with the passage of time,
whether they be due to natural processes or the work of man on this or
adjacent properties. In addition, changes in the State -of- the - Practice
and /or Government Codes may occur. Due to such changes, the findings of
this report may be invalidated wholly or in part by changes beyond our
control. Therefore, this report should not be relied upon after a period of
two years without a review by us verifying the suitability of the
conclusions and recommendations.
' PROFESSICEML S
In the perfo of our professional service, we comply with that level of
care and skill ordinarily exercised by members of our profession currently
practicing under similar conditions and in the same locality. The client
' recognizes that subsurface conditions may vary from those encountered at the
locations where our borings, surveys, and explorations are made, and that
our data, interpretations, and recommendations are based solely on the
information obtained by us. We will be responsible for those data,
interpretations, and recommendations, but shall not be responsible for the
interpretations by others of the information developed. Our services
consist of professional consultation and observation only, and no warranty
of any kind whatsoever, express or implied, is made or intended in
connection with the work performed or to be performed by us, or by our
proposal for consulting or other services, or by our furnishing of oral or
written reports or findings.
I CUOT' S RESPCN SIB
It is the responsibility of Harloff Sin- Omvrolet, or their representatives
to ensure that the information and recommendations contained herein are
i brought to the attention of the engineer and architect for the project and
SCS &T 8921075 June 8, 1989 page 9
incorporated into the project's plans and specifications. It is further
their responsibility to take the necessary measures to insure that the
contractor and his subcontractors carry out such recommendations during
' construction.
FIEED EXP AILI OI CNS
Nine subsurface explorations were made at the locations indicated on the
attached Plate Number 1 on May 10, 1989. These explorations consisted of
trenches dug by means of a backhoe. The field work was conducted under the
observation of our engineering geology personnel.
' The explorations were carefully logged when made. These logs are presented
on the following Plates Number 3 through 8. The soils are described in
' accordance with the Unified Soils Classification System as illustrated on
the attached simplified chart on Plate 2. In addition, a verbal textural
description, the wet color, the apparent moisture, and the density or
I consistency are provided. The density of granular soils is given as either
very loose, loose, medium dense, dense, or very dense. The consistency of
silts or clays is given as either very soft, soft, medium stiff, stiff, very
stiff, or hand.
1 Disturbed and undisturbed samples of typical and representative soils were
obtained and returned to the laboratory for testing.
LABOP -XTM TESTING
Laboratory tests were performed in accordance with the generally accepted
American Society for Testing and Materials (A.S.T.M.) test methods or
suggested procedures. A brief description of the tests performed is
1 presented below:
a) CLASSIFICATICN: Field classifications were verified in the
i laboratory by a visual e The final soil classifica-
tions are in accordance with the Unified Soil Classification
' System.
SCS &T 8921075 June 8, 1989 Page 10
b) NDISTUBE- DENSITY: Field moisture content and dry density were
' determined for representative samples obtained. This information
was an aid to classification and permitted recognition of
variations in material consistency with depth. The dry uni
weight is determined in pounds per cubic foot, and the field
' moisture content is determined as a percentage of the soil's dry
weight. The results are summarized in the trench logs.
' c) GRAM SIZE Up T The grain size distribution was
deternni.ned for representative samples of the native soils in
accordance with A.S.T.M. Standard Test D-422. The results of
these tests are presented on Plate Number 9.
d) CCIPAMCN TES.P: The maximum dry density and optimm moisture
' content of typical soils were determined in the laboratory in
accordance with A.S.T.M. Standard Test D- 1557 -78, Method A. The
results of these tests are presented on Plate Number 10.
e) DOS= SW-PR 7ES15: Direct shear tests were performed to
' determine the failure envelope based on yield shear strength.
The shear box was designed to accommodate a sample having
diameters of 2.375 inches or 2.50 inches and a height of 1.0
inch. Samples were tested at different vertical loads and a
saturated moisture content. The shear stress was applied at a
constant rate of strain of approximately 0.05 inch per minute.
The results of these tests are presented on attached Plate Number
11.
J
SUBSURFACE EXPLORATION LEGEND
UNIFIED SOIL CLASSIFICATION CHART
SOIL DESCRIPTION GROUP SYMBOL TYPICAL NAMES
' I. COARSE GRAINED, more than half
of material is lar er than
No. 200 sieve size.
GRAVELS CLEAN GRAVELS GW Well graded gravels, gravel -
re than half of sand mixtures, little or no
coarse fraction is fines.
larger than No. 4 GP Poorly graded gravels, gravel
sieve size but sand mixtures, little or no
smaller than 3 ". fines.
GRAVELS WITH FINES GM Silty gravels, poorly graded
(Appreciable amount gravel- sand -silt mixtures.
of fines) GC Clayey gravels, poorly
graded gravel -sand, clay
mixtures.
SANDS CLEAN SANDS SW Well graded sand, gravelly
More than half of sands, little or no fines.
coarse fraction is SP Poorly graded sands, gravelly
smaller than No. 4 sands, little or no fines.
sieve size.
SANDS WITH FINES SM Silty sands, poorly graded
(Appreciable amount sand and silty mixtures.
of fines) SC Clayey sands, poorly graded
sand and clay mixtures.
II. FINE GRAINED, more than
half of material is smaller
than No. 200 sieve size.
SILTS AND CLAYS ML Inorganic silts and very
fine sands, rock flour, sandy
silt or clayey- silt -sand
1 mixtures with slight plas-
ticity.
Liquid Limit CL Inorganic clays of low to
less than 50 medium plasticity, gravelly
clays, sandy clays, silty
clays, lean clays.
OL Organic silts and organic
silty clays or low plasticity.
SILTS AND CLAYS MH Inorganic silts, micaceous
' or diatomaceous fine sandy
or silty soils, elastic
silts.
Liquid Limit CH Inorganic clays of high
greater than 50 plasticity, fat clays.
OH Organic clays of medium
to high plasticity.
HIGHLY ORGANIC SOILS PT Peat and other highly
I organic soils.
-i — Water level at time of excavation CK — Undisturbed chunk sample
or as indicated BG — Bulk sample
US — Undisturbed, driven ring sample
SP — Standard penetration sample
or tube sample
1 SOUTHERN CALIFORNIA HARLOFF CHEVROLET /BMW
SOIL A TESTING er: DBA DATE: 6 -01 -89
JOB NUMBER: 8921075 Plate No. 2
z
_ a ° TRENCH NUMBER 1 �- W v � �' z
> Q z CC z z N — W O
►" U W W W fn
= J O LL ELEVATION a N y W Uj
a a y N a CL
0 a y a c 1 N W a
J a
W 2 Q Q Q z z W 2
O < J O 0 0 O
N v
° DESCRIPTION v V v
l SM/ FILL, Tan and Brown, SLIGHTL Moist Loose to
SP SILTY SAND Medium
1 Dense
2
3
K
4 AG
5
K SM/ TORREY SANDSTONE, Tan, SLIGH- Humid to Dense 109.7 6.4
AG SP TLY SILTY SAND Moist
6
7
Trench Ended at 7'
1
TRENCH NUMBER 2
i
SM/ TORREY SANDSTONE, Tan, SLIGH- Humid Dense
K SP TLY SILTY SAND 114.9 3.2
1
i 2
Very
3 Dense
Trench Ended at 3'
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL & TESTING,INC. LOGGED BY JBR DATE LOGGED: 5
JOB NUMBER: 8921073 Plate No. 3
z ae
TRENCH NUMBER 3 Z z Z W W o
a - 0
` ~ J V W W W Z Z _ H
= J U- ELEVATION Q y y Z W U) Z 4 U OC
a W O v N W 4
~a a N N a O a Z } a O ~ W d
p a a a a 0 0 O O
O N v DESCRIPTION U V v
FILL, Brown and Grey Brown, Moist Loose to
SILTY SAND Medium
1 Dense
K
2 AG
3
' 4
5
6
SM TOPSOIL, Dark Brown, SILTY Moist Loose
AG SAND With Roots
7
8
K SM TORREY SANDSTONE, Rust and Moist Dense 99.0 14.8
AG Green Brown, SILTY SAND
9
Trench Ended at 9'
i
1
1
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL & TESTING,INC. LOGGED BY: JBR GATE LOGGED: 5_10_89
JOB NUMBER: 8921075 Plate No. 4
z
_ a °- TRENCH NUMBER 4 ►- W v } -
z
_ > ~ Z OC z z I- W W O
Q W W W N N
J U F-
= W O ELEVATION Q y v ~ j z W 1 Z 1- U
h" a (n a a u' o c a y~ J a
CL G a a Q a 0 0 ac O W O
N U DESCRIPTION v U U
O
SP/ TORREY SANDSTONE, Tan, SLIGH- Humid to Dense
SM TLY SILTY SAND Moist
1
K Very 107.7 8.4
2 Dense
Trench Ended at 2'
TRENCH NUMBER 5
I 0
SP/ FILL, Brown to Light Brown, Moist Loose to
SM SLIGHTLY SILTY SAND Medium
1 Dense
2
3
1 4
5
6
SM TORREY SANDSTONE, Tan and Moist Dense
7 Rust, SILTY SAND
8 Very
Dense
Trench Ended
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
< > SOIL & TESTINC,INC. LOGGED BY: JBR DATE LOGGED: 5 -10 -89
JOB NUMBER: 8921075 Plate No. 5
z aQ
Uj TRENCH NUMBERS Z Z Z �_ W �? W o
- J V
W W W N
= W - ELEVATION ~ ~ Z Z Z
_ < (n N W F- Z H U
0 LL
a a N N a 0 a y c o L y W a Q
0. W. N Q 2 Q Z � Y Z W 2
G Q J O Cr. O cc O
N v DESCRIPTION U v v
0 SP/ FILL, Brown to Light Brown,
g Moist Loose to
SM SLIGHTLY SILTY SAND Medium
1 Dense
2
3
■ 4
5
6
8
9 SM I TORREY SANDSTONE, Rust, SILTY Very Dense
SAND Moist
Trench Ended at 9.5'
i
i
I
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL & TESTING,INC. LOGGED BY JBR DATE LOGGED: 5 -10 -89
' JOB NUMBER: 8921075 Plate No . 6
y ° Z _ ae
W w
TRENCH NUMBER 7 � �- v
> Q Z Z Z w— w 0
_ Ul Uj _
J < fA Z W Z
= J 0 LL ELEVATICN q _ w
a W N a a y a c a y w a
a N a O a
W Q _ Cr Z r W
C Q Q Q O � O cc � 0
O N U DESCRIPTION U U v
SP/ FILL, Brown, SLIGHTLY SILTY Humid to Loose
SM SAND Moist
1
2
3
4
5
SM/ TORREY SANDSTONE, Tan, SLIGH- Humid to Dense
SP TLY SILTY SAND Moist Very
6
Dense
Trench Ended at 6'
TRENCH NUMBER 8
O -
SM/ TORREY SANDSTONE, Tan, SLIGH Humid Dense
SP TLY SILTY SAND to Very
1 Dense
BAG
2 CK 112.6 3.6
3
T rench Ended at 3'
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL A TESTING,INC. LOGGED BY dBR DATE LOGGED: 5 -10 -89
JOB NUMBER: 921075 Plate No. 7
z ;i
_ W o TRENCH NUMBER 9 w —
_ > ~ Z Z Z ~ w w O_
Q (n cc
= J O U- ELEVATION a w U 2 t` V
- a a w c C N w a s
a a N a 0 a Z¢ s a O Z W 2
D a < a a 0 0 Cr O Cr O
U DESCRIPTION U U U
D SM/ FILL, Dark Brown, SLIGHTLY Humid Medium
SP SILTY SAND Dense
1
2 CK
BAG
3
4
Trench Ended at 4'
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL & TESTING,INC. LOGGED BY: JBR DATE LOGGED: 5 -10 -89
' JOB NUMBER: 8921075 Fl ate No. 8
F
h 4
0 0 0 o 0 0 0 0
y0 m ao n a....•.. ' Lo v M a O O_
a —
O
N
— H7
...... n
ro
O
i
.... N J
i
1
.. /.. N r
o W
ac m_ J Z N
e
i
° .... ...... ....,.. W W
Ln
° W
Ln
cq o m O_ 2 V1
* n ` E
cn — i
Cry �/ � ....:.... .... .... ........ .... .... .... .... p � o O
v i
J a 0
_� .... .... .... .... .... .... .... .... m
.... .... .... .... .... .... .... .... .... --� J U.
ci
....I.... N Q
a �
N N
O = ct
.... .... .... a a I .... .... .... .... .... ....
b
a n C m m cz
M .... .... .... .... .... .... .... .... 30 M
° N �--4 M 00
F—
m I
iu y V N I
n ( I
ip mOp m
O 0 0 Or tp n cu O O O
uau1-d luaouad
SOUTHERN CALIFORNIA
SOIL & TESTING a INC. HARLOFF CHEVROLET /BMW
BY JBR DATE 5 -10 -89
GRAIN SIZE DISTRIBUTION JOB NO 8921075 Plate No. 9
MAXIMUM DENSITY & OPTIMUM MOISTURE CONTENT
A S T M:..R 57- 78M¢thod:.....A........_
Maximum Optimum
SAMPLE DESCRIPTION Density Moistyre
( c f) Cont.(•l. )
T1 @ 3' -4' Tan Brown Slightly Silty Sand 11600 11.5
T8 @ l' -2' Tan Slightly Silty Sand 111,0 12.3
j
1
SOUTHERN CALIFORNIA HARLOFF CHEVROLET /BMW
T SOIL & TESTING,INC. Br: JBR DATE: 5 -10 -89
J08 NUMBER - 8 921 0 7 5 D late No. 10
i
■■■■■ II■■■■■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■
■■■■■ I imams ■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■ 1 1■■■■■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■
■■■■■ II■■■■■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■/
■■■■■ II■■■■■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■�■
■■■■■ II■■■■■■■■■■■■■ ■■■■■■ ■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■■■■.■■
■■■■■ II■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■ ■■ ■■��■■■■
■■■■■ II■■■■■■■■■■■■■ ■■■ ■ ■ ■ ■ ■■■■■■■■ ■■ ■■ ■■��■ ■ ■■■��■
■■■■■ ll■■■■■■■■■■■■■ ■■■■■■■■■ ■■■■■■ ■ ■ ■■ ■�� ■■■■ ■�� ■■
emsommusom
mammal B■■■■■■■■■■■■■ ■■■■■■■rw■■■nd■/w■■■■■■■ ■■ ■■ ■■■
■■■■■ IN■■■■■■■■■■■■ ■■■■■NRa■■ /9■ri■■■■■■■ ■■ ■ ■ ■ ■ ■ ■■
Osumi 1■■■■■■■■■■■■■ ■�� ■�� ■i / ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■
■■■■■ 11■■■■■■■■■■■■■ i / ■/. %�� ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■
Mammal Bosom ■■■■■■■ II ■ /�■VAG■■■■■ /■■■■■■■■■■■■■■■■■■■
■■■■■ Ie■■■■■■■■■■/.%■ cscii■■■■■■■■■■■■■■■■■ moons ■ ■MEN
gonna[ ■■■■■■■■■■ t/% / %■■■■■■■■■■■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■■
0010011011■■■■011 ■■ ■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■
■ ■ ■■ ■1■■ ■ ■PA I%i■■■■■■ ■■■■ ■ ■ ■ ■■■■■■■■■■■■■■■ ■■ ■ ■ ■■■ ■■
Os umi ■ /I' /.%■■■ ■■■N■■ ■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■
■■ r// 1 Imam ■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■■■■■■■■ ■■
■/ i■■ 1 ■■■■■■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■■
PrA dommIN0011011011
•
• CALIFORNIA " 1 CHEVROLET/B
• • :DATE: 5-10-89
NUMBER: 8921075 Plate No.
SLOPE STABILITY CALCULATIONS
Janbu's Simplified Slope Stability Method
j
\,,C,p = WH C an FS = Ncf ( WH )
Assume Homogeneous Strength Parameters throughout the slope
. � ( C(psf) W * (pcf) Incl H (ft) FS
32 100 112 2:1 30 1.7
Where: 0. - Angle f
g e o Internal Fa ction
C - Cohesion (psf)
W = Unit weight of Soil (pcf)
H = Height of Slope (ft)
FS = Factor of Safety
SOUT149MM CALIFORN HARLOFF BMW - CHEVROLET
SOIL A TSSTING sr DBA DATE 6 -08 -89
JO• NUMBER: 89 21075 Plate No.
— WATERPROOF BACK OF WALL PER
ARCHITECT'$ SPECIFICATIONS
S/4 INCH CRUSHED ROCK ON
0 = . MIRADRAIN 6000 OR EQUIVALENT
0 o- -�
OEOFABRIC BETWEEN ROCK AND $OIL
. , ice .:•
1 _,� , t- 4 •• DIAMETER PERFORATED PIPE
•' - - SLAS- ON -ORAOE
i
RETAINING WALL
SUBDRAIN DETAIL
NO SCALE
<* S OUTHERN CALIFORNIA HARLOFF BMW - CHEVROLET
> SOIL A T INC. Br: DBA DATt: 6 -08 -89
JOB mumilm: 8921075 Plate No. 13
PROPOSED PARKING LOT, ENCIN BOULEVARD, ENCINITAS
RDC7CMMENIDID GRADING SPECIFICATIMS - ORAL PROVISICN;S
CAL INTENT
The intent of these specifications is to establish procedures for clearing,
compacting natural ground, preparing areas to be filled, and placing and
compacting fill soils to the lines and grades shown on the accepted plans.
The recommendations contained in the prel iminary geotechnical investigation
report and/or the attached Special Provisions are a part of the Recd
Grading Specifications and shall supersede the provisions contained
hereinafter in the case of conflict. These specifications shall only be
used in conjunction with the geotechnical report for which they are a part.
No deviation from these specifications will be allowed, except where
specified in the geotechnical soil report or in other written communication
signed by the Soil Engineer.
j IMEMPATION AM
Southern California Soil and Testing, Inc., shall be retained as the Soil
Engineer to observe and test the earthwork in accordance with these
specifications. It will be necessary that the Soil Engineer or his
representative provide adequate observation so that he may provide an
opinion that the work was or was not accomplished as specified. It shall be
the responsibility of the contractor to assist the soil engineer and to keep
him appraised of work schedules, changes and new information and data so
that he may provide these opinions. In the event that any unusual
conditions not covered by the special provisions or preliminary soil report
are encountered during the grading operations, the Soil Engineer shall be
contacted for further recommendations.
If, in the opinion of the Soil Engineer, substandard conditions are
encountered, such as; questionable or unsuitable soil, unacceptable moisture
(R -8/87)
SCS &T 8921075 June 8, 1989 Appendix, Page 2
content, inadequate compaction, adverse weather, etc., construction should
be stopped until the conditions are remedied or corrected or he shall
recommend rejection of this work.
Test methods used to determine the d of compaction should be formed
agree oa�a Per
in accordance with the following American Society for Testing and Materials
test methods:
Maximum Density & Optimum Moisture Content - A.S.T.M D - 1557 - 78.
Density of Soil In -Place - A.S.T.M. D- 1556 -64 or A.S.T.M D - 2922.
All densities shall be expressed in terms of Relative Compaction as
' determined by the foregoing A.S.T.M. testing procedures.
PREPARATICK OF AREAS TO RECEIVE F 11L
All vegetation, brush and debris derived from clearing operations shall
be ren►7ved, and legally disposed of. All areas disturbed by site grading
should be left in a neat and finished appearance, free from unsightly
debris.
After clearing or benching, the natural ground in areas to be filled shall
be scarified to a depth of 6 inches, brought to the proper moisture content,
compacted and tested for the minimum degree of compaction in the Special
Provisions or the recomnendation contained in the preliminary geotechnical
investigation report. All loose soils in excess of 6 inches thick should be
removed to firm natural ground which is defined as natural soils which
possesses an in -situ density of at least 90% of its maximum dry density.
When the slope of the natural ground receiving fill exceeds 20% (5
horizontal units to 1 vertical unit), the original ground shall be stepped
(R -8/87)
SCS &T 8921075 June 8, 1989 Appendix, Page 3
or benched. Benches shall be cut to a firm competent soil condition. The
lower bench shall be at least 10 feet wide or 1 1/2 times the the equipment
width which ever is greater and shall be sloped back into the hillside at a
gradient of not less than two (2) percent. All other benches should be at
least 6 feet wide. The horizontal portion of each bench shall be compacted
prior to receiving fill as specified herein for compacted natural ground.
Ground slopes flatter than 20% shall be benched when considered necessary by
the Soil Engineer.
Any abandoned buried structures encountered during grading operations mist
be totally removed. All underground utilities to be abandoned beneath any
proposed structure should be removed from within 10 feet of the structure
' and properly capped off. The resulting depressions from the above described
procedures should be backfilled with acceptable soil that is compacted to
the requirements of the Soil Engineer. This includes, but is not limited
to, septic tanks, fuel tanks, sewer lines or leach lines, storm drains and
water lines. Any buried structures or utilities not to be abandoned should
be brought to the attention of the Soil Engineer so that he may determine
if any special recam endation will be necessary.
All water wells which will be abandoned should, be backf illed and capped in
accordance to the requirements set forth by the Soil Engineer. The top of
the cap should be at least 4 feet below finish grade or 3 feet below the
bottom of footing whichever is greater. The type of cap will depend on the
diameter of the well and should be determined by the Soil Engineer and/or a
qualified Structural Engineer.
F I T. MA7ERTAL
Materials to be placed in the fill shall be approved by the Soil Engineer
and shall be free of vegetable matter and other deleterious substances.
(R -8/87)
SCS &T 8921075 June 8, 1989 Appendix, Page 4
Granular soil shall contain sufficient fine material to fill the voids. The
definition and disposition of oversized rocks, expansive and/or detrimental
soils are covered in the geotechnical report or Special Provisions.
Expansive soils, soils of poor gradation, or soils with low strength
characteristics may be thoroughly mixed with other soils to provide
satisfactory fill material, but only with the explicit consent of the soil
engineer. Any import material shall be approved by the Soil Engineer before
being brought to the site.
PLACING AMID COMPACTION OF FILL
Approved fill material shall be placed in areas prepared to receive fill in
layers not to exceed 6 inches in compacted thickness. Each layer shall have
a uniform moisture content in the range that will allow the compaction
effort to be efficiently applied to achieve the specified degree of
compaction. Each layer shall be uniformly compacted to a minimum specified
degree of compaction with equipment of adequate size to economically ccmpact
the layer. Compaction equipment should either be specifically designed for
soil compaction or of proven reliability. The minimum degree of compaction
to be achieved is specified in either the Special Provisions or the
recomirendations contained in the prel iminary geotechnical investigation
report-
When the structural fill material includes rocks no rocks will be allowed
to nest and all voids must be carefully filled with soil such that the
minimum degree of compaction recommended in the Special Provisions is
achieved. The maximum size and spacing of rock permitted in structural
fills and in non - structural fills is discussed in the geotechnical report,
when applicable.
Field observation and compaction tests to estimate the degree of compaction
of the fill will be taken by the Soil Engineer or his representative. The
(R -8/87)
SCS &T 8921075
June 8, 1989 Appendix, Page 5
location and frequency of the tests shall be at the Soil Engineer's
discretion. When the compaction test indicates that a particular layer is
less than the required degree of compaction, the layer shall be reworked to
the satisfaction of the Soil Engineer and until the desired relative
compaction has been obtained.
Fill slopes shall be compacted by means of sheepsfoot rollers or other
suitable equipu ent. Compaction by sheepsfoot rollers shall be at vertical
intervals of not greater than four feet. In addition, fill slopes at ratios
of two horizontal to one vertical or flatter, should be trackrolled.
Steeper fill slopes shall be overbuilt and cut -back to finish contours
after the slope has been constructed. Slope compaction operations shall
result in all fill material six or more inches inward from the finished face
of the slope having a relative compaction of at least 90% of maximum dry
density or that specified in the Special Provisions section of this
s p ec ification. The compaction operation on the slopes shall be continued
P� .
until the Soil Engineer is of the opinion that the slope s will be stable in
regards to surficial stability.
Engineer during construction of the
the Soils En
Slope tests will be made by g
slopes to determine if the required compaction is - being achieved. Where
failing tests occur or other field problems arise, the Contractor will be
notified that day of such conditions by
written comrauLication from the Soil
Engineer or his representative in the form of a daily field report.
If the method of achieving
the required slope compaction selected by the
Contractor fails to produce the necessary results, the Contractor shal
rework or rebuild such slopes until the required degree of compaction is
obtained, at no cost to the Owner or Soils Engineer.
(R -8/87)
SCS &T 8921075 June 8, 1989 Appendix, Page 7
s
rd GRADING SPBCIFICATICNS - SPBCIAL PROVISIMS
R1ff.A CCIMPACTICN: The minimum degree of compaction to be obtained in
compacting natural ground, in the compacted fill, and in the compacted
backfill shall be at least 90 percent. For street and parking lot subgrade,
the upper six inches should be compacted to at least 95% relative
compaction.
FXPANSM SOILS: Detrimentally expansive soil is defined as clayey soil
which has an expansion index of 50 or greater when tested in accordance with
the Uniform Building Code Standard 29-C.
CAnMSI MMMIAL: Oversized fill material is generally defined herein as
rocks or lumps of soil over 6 inches in diameter. Oversize materials should
not be placed in fill unless recomrendations of placement of such material
is provided by the soils engineer. At least 40 percent of the fill soils
shall pass through a No. 4 U.S. Standard Sieve.
TRADSITICN LOTS: Where transitions between cut and fill occur within the
proposed building pad, the cut portion should be undercut a minim= of one
foot below the base of the proposed footings and reconpacted as structural
backfill. In certain cases that would be addressed in the geotechnical
report, special footing reinforcement or a combination of special footing
reinforcement and undercutting may be required.
(R -8/87)