SEPTEMBER 19,1991
1 OF '?
HYDROLOGY STUDY
FOR
THE KIRBY RESIDENCE
DESCRIPTION:
SINGLE FAMILY RESIDENCE
375' NIO DUSTY TRAIL & COPPER CREST
OLIVENHAIN - CITY OF ENCINITAS
PARCEL 1 OF P.M. 14479
APN 264-220-86
ENGINEER:
OWNER:
MIKE & FRAN KIRBY
1217 MEADOW WOOD PLACE
ENCINITAS, CA 92024
619-942-4831
LOGAN ENGINEERING
120 BIRMINGHAM DRIV ,
CARDIFF, CA 92007
619-942-8474
EXP. DATE
120 Birmingham Dr., Suite 110 . Cardiff-by-the-Sea, CA 92007 . 619-942-8474
2: of~
.::C. . 1)E~16J C:R 11G~IA
$~
jIL,
~.P. Ct1J41'-j 11'DE-Slt..J ~ ?RoCEWRE ;..~AA\uÞct...\\
1<A1IOJ Ä-L ~I\AÙLA : Q ::CI A
tRU'RAL 1<.ESI1)f,41'IAt: c~ o.Ae;
«-1'1)1<0 l1J6'1 ~U'D"'¡
A, = Î.. L..-AC
1c.. -:; [6 (D M ,J
'1 -:; g 11 ~ ,~ / fJ.e.
L::;: I A. 'J 0 '
AH:: r;~r;- ~1D -= \~?'
[;)100 -:: D,Ä'? (~.1b ) ( 1.1- '):: Il,Z-.: f"S
~ -rD1ZA ù L. \ e CAU. S
-c.~ECH -Ht,J t Dù1L£í J~u>c.'~'1 of" lØ11 C-LJLVEQ).
tÁ% -= (.1l-
~ w ~ 1.17..- 6.?) -; '2-.!'ß
}\ vJ A"~IL -.:: ?e~ ...~t4 = c? f /' Z-,(jØ /
~ of "3
1/t))~ 1)eij1¿:J
Diameter (inches) ... 18 Mannings n ....... .016
Slope (ft/ft) ....... 0.1050 Q (cfs) ........... 12.20
depth (ft) .......... 0.70 depth/diameter ... 0.47
velocity (fps) ...... 15.15 \ Velocity head .... 3.56
Area (Sq. Ft.) ...... 0.81
critical Depth ...... 1.32 critical Slope ... 0.0184
critical Velocity ... 7.40 Froude Number .... 3.64
~\ t'- <¡2A-P
U t;f -7
1/.z. ¡(oj i21"P- ~A r
"I:;. ~/Å1 (~~ ~A1tf)
. '.
}
.~
I
I
,
!
--
A:!d the following table to Section 200-1.6 (P~ge 1) in the Sta.'"\dard Sp~a.1- -.
Provisions. . ".".-"'-
.-/ -r--
;....A , r- - I
Selection of Riprap and Filter Elanket f.Jé\terial
Filter Blanket (3) ~
Upper Lay~r(s) 1
¡
'.elocity Rock Riprap OpLion 1 ,IOption 2 ¡Option 3 Lc...~:: :
.
I Pc/Sec. 0), Class(2) Thickness T '4)Sec.200.(4)S~c.400! (5) L:l:.'e~":51
A~Eiñir£ Sr2. & , I
6-7 No.3 Back':' .6 3/l6" C2 D. C. ': .:"""
ing
/---..... .- I
7-$ /0 No.2 Back- 1.0 1/4" B3 D. G. ) -
,
---------- I
ing - - -- I
t
8-9.5 Facing 1.,4 3/811 - D. C,¡ - f
,
, 0 !
. ~
9.5-11 Light 2.Ç) 1/2" - 3/4'~1.~" P. B - I
...
,',
I _11':'13 .
% Ton 2.7 3/4" - II ~" " " S::..:è ~
I .
13-15 ~ Ton 3.4 pi - II ei(" P.B. It :
.
I 15-17 1 Ton 4.3 l~" - Type ß S2..;"1~ .
.
1ï-20 2 Ton 5.4 2'" II II S::.-,d '
- .
I :
. ;
!
t.
O~71 "'-"¿if t¡ 01"1 ðf- qð&1< E¡,SII ro.d;:. /r
i
I
!
i
i
!
.
~ T
P~a=Lical use of this table is li~ited to sitU2~io~5 ~~e~c T is less t~a~ D.
t\O~S :
(1) .
(2) .
'.
I
~ '. \
Average vcloêity in pipe or bottom velocity in energy'rlissipator~~~i~~-
c\'er is greater. (See "Riprap. Selection Hethods"~ D. S&FC~ Coun~.ì. of S.D.)
.0
If rlesired riprap and filter blanket class is n~~ aYailaòle~ use
laorl\er. class..
. .
(3). . Filter bl~L~et thickness = 1 Foot or T~ ~hicheve~ is less.
(4) .-
(5) .
(6).
Standard specifications for.public ~orks cons~ruction of Southern C~li-
fornia Chapter of AP1'iA and AGC. See. ~. 4.b ,
D. C. = Decomposed Granite~ 1 t.N to 10 ~.!:.f
P. B: = Processed Miscellaneous Base
T)~e B = Type.B bedding ~aterial. usually 2vaila~!e locally (mini=~
75~ crushed particles.. 100% passing 2~" sic...e. 10% passing 1" sic-:::)
Sand 75% retained on ~200 sieve
"
"
'. . ¡
.-'
TABLE 2
RUNOFF COEFnCIENTS (RATIO"'L I£THOO)
.
.DEVELOPED AREAS (URBAN>'
Coefflcfent, C
Soil Group -(ï)
land Use
A
-
!
c
- -
Resi denti al:
. Single Fami Iy
Hul ti-Uni tS
."0
."S
."5
.50
.50
.60
Hobi Ie homes
. ."5
.30
.50
. .35
_.55
."0
Rural (IoU. greater than 1/2 acre)
...
c_rcial (2)
, 80% Impervi ous
I ndustri a 1(2)
9~ Impervi 01.15
.70
.75
.80
.85
.90
.80
..
-
- 0
-
.55
.70
~.
~
.85
. .95.
HOTES:
(1) Soil" Group ma1?s are available at ~he offices of ~he Department of Public: Werks.
. (2~h~re actual conditions. deviate significantly from the tabulated i~pe~ious-
ness values of 8~ or 9~. the values given for coefficient C. may be revised
by IllUltiplying 80% or 9~ by the ratio of actual hapervious.ness to the'
tabulated imperviousness. However, In no case shall the final coefficient
be less than 0.50. for exaaple:, Consider commercial property on D soil.ITOUP.
Actual I~perviousness
-so-.
Tabulated h..perviousness - so-.
. .
Revised C - jQ'x 0.8S - 0.53
80
. ...
"
. ;
.
. .
JV-A-9
...
, APPENDI X tX-B
Rev. 5/81
-
,.--
.
.-
-
-
-
----.
-
I
~
-
.. . '.
COutrrv OF SAN ,DIEGO'
DEPARTHEHT OF SANITATION ~
FLOOO COflTROL .
4S'
!.
"
.
15' :
I
r
.
,"'-
I
3t
45'
.
--.......-. .... ...- -, . i..
p",. ,4 '" .
U.S.'DEPART"£N r Of' CO"Uf£RCE:
. "ATlOJfAI. oeltA",e AND AT, o...nCM'C AD~':fIST.ATlON
IPIe1ALnvo,CI .IAMCH. OFFICI or.. ".aLaay. IIATIO""I. WCATIIC. IIU""CI
30'
Þ4
Þ4
.
>
,
-...
1181
l¡S'
30'
IS'
, 117-
)0'
IS'
116-
-
-'-
-. -' -' -. -,
COUNTY OF SAN "DIEGO
OEPART"EHT OF SANITATION ~
fLOOD CONTROL I " '
.
.
1,5'
'.
ItS'
]0. ,
IS'
,,8
P""'~'. "
U.S. D&PART~'~N .' OF COMMERCe:
.."no""10 OCtCAl'ClC AND AT' ....'IICIUC ADWIHII',.."TIUH
IPICI"" ITVDIU .."lfell. orrl'. or II DIIOI.ØOY. "ATID""&' ."ATIICIt """'CI
30'
I
...
...
,
)8
.
I1n8
'I~' ,
'0'
1"1
1178
II~ .
)01
I~'
1168
"'f
"
,
H
EGlI/lTION
Tc. (l/tLJ) .38S
lê. 7ime IJI' L:1J/1~t!A¡ln:zT'òn
L. Le/79111 ø/ weú~r.rh~eI
H r fJ¡/I't!!/"encl!! ;n 4'~~'ðn c/iV1~
dl't"dIY4!' S/P.De Ii~ {Se4!' Aþpum~ )(.IJ) 1;
L 't:
M//I!!s ;4'4'1- Hov~s Minule4
" 240
(
'- lððð
-, 9ao
SOD
701)
_DO "
S/)() "
I()(J ~
"'~
~.
,
,
,
,.
,
"
,
I
\.
NOTE
-
IFõR ÑÄTUAAL Wm Rš' HËDS]
ZI) I ADD TEN MINUTES ::JTO .
~COMPUTED TIME OF CON-
CENTRATION.
~.--
II)
5
(
H
" 5/)t)()
..
4~/J
,
J()()(} ,
"
,
,
,
L
.3
184
2
IPO
-I
G()
S/J
J!()
111
Iii
/~
/2
II)
!1
11
7
-
s--(!)
".
3
SAN 01 EGO COUNTY
DEPARTMENT OF SPECIAL DISTRICT SERVICES
DES IGN MANUAL
APPROVED ,5. H. /~ ",'If ~
ié
NOMOGRAPH FOR DETERM I NATION
OF TIME OF CONCENTRATION (Te)
FOR NATURAL WA TERSHEOS
DATE /2./1/69 APPENDIX X-A
V-A-IO Rev. 5/81
. ... .
JNTENSITY-DUp.¡\TIUri DESIGN CHART
....
< 1-1-+-.-1-1-
>'
~10' 15
40 50' 1
20
2
30
. 3
4
5
6
.Not Appl1cab1e to Desert Region
APPENDIX XI
IV-A-14
OF CULVERTS
Page
liar Corrupted Metal Pi¡x Projecting
, ,.,...,........,................... .-188
¡Jar Corrugated Metal Pi¡x Projecting
, ""..........".,................. ..189
IIlar Corrupted Metal Pi¡x Headwall
..,........................ ............190
Jlar Corrupted Metal Pi¡x. Headwall .
. "., , ..........,........,.,......... ..191
ul4f Corrugated Metal Pi¡x Headwall
. , ,.. ",., ..,." .,...,......,....... ..192
:uh'ens Flowing Full. n = 0.024,.........195
)hs for Circular Corrugated Metal
-Structural Plate
Ie Circular Corrugated Metal Pipe.
" .,.."....",..................... ...194
lie Circular Corrugated Metal Pipe.
.,:'" , , , .." ....,....,...,.,.,..,. -.. ...195
lie Circular Corrugated Metal Pipe.
......' ,............................ ...196
!Ie Circular Corrugated Metal Pipe.
'"" ,., ..,.. ...... "......,............ .197
IIgaled Metal Pi¡x Cuh'erts Flo1ring Full.
, , .,. . . , .., , ,.......,................. .198
:2phs for Corrugated Metal Pipe-
Culverts
>e - Arch Culverts with Inlet Control, , . .. .199
rrugaled Mrtal Pi¡x - Arch. Projecùng
'..."."",.,...,...,...... ..... .......200
rrugated Metal Pi¡x - Arch. Projecting
"".... . ",..,., ,.....,.............., ..101
.rrugated Metal Pi¡x - Arch. Headwall
"".,....,........,...,..,..-...........202
.rrupted Metal Pi¡x - Arch, Headwall
"...,.."..............,.... .,. ..........105
- Arch Culveru Flowing Full. D = 0.D24,..204
ugated Metal Pi¡x - Arch Culwau.
; Full. n = 0.0527 to 0.0'06.. . . . . . .. . . . . . .105
th for Various Discharges
phs wbell outlet ia uDlubmer¡a1)
........................................106 '
Horizontal. Criûcal Depth. . . .. . . .. . .: .. .107
Venieal. Criûcal Depth. . . . . . . . . . . . . . . . ..108
'ûcal Ðepth.............................1D9
.CriùcalDepth....................,.....tIO ¿
J.
r
~
I
t
"."
'.
.'
j
i
I
J
APPENDIX
.
110
III
1111
144
ill
110
loa
I'
14
.. n
OIl
z
u
æ ..
10 ..
æ u
ë 14 ~
.. ê
., CI //;
~
~ ./ :
u z
Ct u
, ~
c
.,
OIl ,.
...
OIl
a n
..
ëi
10
11
..
III
175
CHART I
(I) Ii (3)
I.
I,
I. ,I,
I. C,
8,
C.
J,
J.
J,
-,:'
1.1 1.1
.-/
1.0
1.0
10,-
1,- u....u
1.- ...r -....-,
1,- eo_.., .
C,- If. -
-
1.- .., 1.1 ..8
1,- .. 8.1 7..
III 8-r 7.7
....-
1.-
100
100
800
coo
,/'/
//
..~v
/' '
100 /
./
/'
SOlI
100
10
ENTRANCE
TYPE
10
_. - ....
_"
.,
...
...
i
..
OIl
&
1.0
..
-...-
_u
--
-'..
.1
.1
I
I
C
.--11"'111-
---"'-11'.-
-...-...- ---
'---'."---
-...
.1
.1
.1
..
I
.1
.?
.r
I
.
...
.r
.1
.1
j
I
¡
I
¡
I
.1
.1
.1
81
HEADWATER DEPTH 'OR
CONCRETE -PIPE CULVERTS
WITH INLET CONTROL
-...._c_--
S III.. 'n~s'n~lts ~ .
"'~','.o.~...
11421 Woodside Avenue, Suite C
Santee, California 92071
(619) 562-05UO
January 20, 1992
P.O, Box 1195
Lakeside, California 92040
Mike & Fran Kirby
1217 Meadow Wood Place
Encinitas, California 92024
Subject:
Project No. 25E2-89
File No. 8685
Earthwork Quality Control
Residential Building Site
Copper Crest Road
City of Encinitas
Dear Mr. & Mrs. Kirby:
This is to report the results of soil tests, observations and
inspection of earthwork construction at the subject site. The
work was performed during the period between December 4, 1991 and
January 15, 1992. The site is located at Copper Crest Road, City
of Encinitas, a brief legal description is:
APN 264-220-86
To briefly summarize the work, we found the earthwork to conform
to the recommended and approved grading specifications and
current standard practices and to conform with the applicable
codes of the jurisdictive governmental agencies.
SECTION No.1. SCOPE
Our function consisted of providing the engineering services
involved with determining the degree of compaction of fill placed
on the site.
The results of the field density tests are presented on Page T-1
under "Table of Test Results". The laboratory determinations of
the maximum dry densities and optimum moisture contents of the
fill soils are set forth on Page L-1 under "Laboratory Test
Results". The approximate locations of the filled ground and the
field density tests are presented on Plate No.1 entitled
"Location of Field Density Tests".
Kirby
Project No. 25E2-89
1/20/92
The grading was performed for the purpose of providing level
building pads for the construction of the proposed single family
residence.
SECTI.GN NQ.~~~.QI~._Ç.QJiQJTION_$
Soils used in the fill were those generated from the on-site
excavation and imported from off-site.
EARTHWORK
Preparation: Prior to placement of fill, the areas to receive
fill were scarified, watered and compacted to 90 percent.
Natural ground to receive fill was tested to determine its
relative compaction. Native soils having a relative compaction
of less than 85 percent were removed, replaced and compacted to
90 percent.
Placing and compacting fill: Fill soil was placed, watered and
mechanically densified in the areas indicated on attached Plate
No.1 entitled "Test Location Sketch". During grading, any fill
found to have a relative compaction of less than 90 percent was
reworked until the proper density of 90 percent had been
achieved.
Field density test results: To verify compaction, field density
tests were performed in accordance with applicable American
Society of Testing and Materials (ASTM) test methods. Test
method ASTM D1556 was used at the indicated locations.
SECTION No.3. SUMMARY AND RECOMMENDATIONS
Based on the work and tests described hereinbefore and work
description set forth in Section 1, 'Scope', we conclude:
1 .
The filled ground has been compacted to 90%.
2.
The earthwork has been accomplished in accordance with
the grading specifications and with current standard
practices.
3.
Spread footings will have a minimum allowable bearing
value of 2000 pounds per square foot. The allowable
bearing value will be considerably more for footings
larger than 12 inches wide and/or 12 inches deep. If
loads heavier than 2000 pounds per square foot for
continuous footings area anticipated, we should be
contacted for an increased bearing value.
2
I ,
Kirby
Project No. 25E2-89
1/20/92
4.
Expansive soils were removed from the final 3 feet
below finish grade.
5.
The grading operation was interrupted by up to 1.5
inches of heavy rain. The interruptions occurred when
the rock undercut phase of the grading operation was
being performed. It was observed that free water was
flowing across the fresh rock outcrop located in the
house area. The water was following on top of the
impervious rock that also extends up the hillside to
the north of the pad.
It is recommended that a system of subsurface drains be located
o~ the north edge of the house pad. By laying a perforated pipe
directly on top of the rock, some 2 to 3 feet below the ground
surface, future ground water will be directed away from the house
foundations and floor slabs in the living areas.
Additionally, it is recommend that four to six inches of 3/4 inch
rock be located immediately beneath the slab areas. This will
help allow any ground water to flow beneath the slabs and prevent
migration of water into the living areas. The proposed drainage
plan should be submitted to our office for review prior to
installation.
SECTION No.4. LIMITATIONS
UNIFORMITY OF SOIL CONDITIONS:
The values presented in this report are based on our evaluation
of the observed, exposed soil conditions. We have assumed that
the soil conditions in the remaining portions of the site can be
interpolated without significant deviation in physical
properties. We have made a conscientious effort to select
representative test locations and to provide enough tests for a
statistically adequate population in excess of current standard
practices. However, parameter values may be substantially
different in other areas due to unforeseeable variations in the
soils. Also, the parameters are affected in time by the
moisture-expansion(volume)-pressure changes that seriously affect
the tested values.
ENGINEERING INTERPRETATION:
Faulty interpretation and/or diagnosis by uninformed so-called
experts produce most of the engineering problems. We are
available for consultation and should be made aware of any
pertinent condition or problem. Our conclusions will be re-
evaluated and any problem or potential problem solved with a
minimum effort and cost before it gets out-of-hand.
3
Kirby
Project No. 25E2-89
1/20/92
TIME LIMITS:
This report presents conclusions and findings that are valid as
of this date. Changes on this site and adjacent property
including grading, improvements, drainage, erosion, etc. may
directly affect the findings, conclusions and recommendations
presented herein. Subsequent alterations or conditions may
invalidate these recommendations and values. The values in this
report will probably remain applicable for one year provided the
site conditions remain unaltered. After this period, we should
be contacted to inspect the site and review this report so that
we may verify its validity.
WARRANTY:
Certain risks are involved with geotechnical and soil engineering
work which should be recognized by those involved. We have
performed our services in accordance with current standard
practices and procedures. These practices and procedures are
those presently utilized by members of our profession in this
region. We do not express or imply a warranty or guarantee
regarding these services.
OUTSIDE RESPONSIBILITY:
It is the responsibility of the client (firm or person to whom
this report is submitted) to insure that the information
presented herein is made available to the concerned parties. In
addition it is the client's responsibility to make certain that
any construction reflect any applicable requirements.
PROJECT CONCEPT:
We should be notified of any changes in the proposed structures,
construction, or site grading, or project concept so that any
addendum or modifications to this report may be provided as
necessary.
Summary of the
GRADING SPECIFIÇATIONS USED
for
~ARTHWORK QUALITY CONTRO~
for
Residential Building Site
Copper Crest Road
City of Encinitas
SOIL TEST METHODS:
Maximum Density & Opt Moisture -- ASTM 01557-70
Density of Soil In-Place -- ASTM 01556
Soil Expansion -- UBC STANDARD 29-2
Shear Strength -- ASTM 03080-72
Gradation & Grain Size -- ASTM 01140-71
4
Kirby
Project No. 25E2-89
1/20/92
Capillary Moisture Tension
-- ASTM 02325-68
Expansive Soils
Insufficient Fines
Oversized Particles
LIMITING SOIL CONDITIONS:
Minimum Compaction -- 90% for "disturbed" soils. (Existing
fill, newly placed fill, plowed ground,
etc. )
-- 84% for natural, undisturbed soils.
-- 95% for pavement subgrade within 2' of
finish grade and pavement base course.
-- Expansion index exceeding 20
-- Less than 40% passing the #4 sieve.
-- Rocks over 10" in diameter.
PREPARATION FOR FILL:
Brush, trash, debris and detrimental soils were cleared from the
area to receive fill. Detrimental soil was removed to competent
soil. Slopes exceeding 20% were stepped with benches 10' or
greater in width. The area to be filled was scarified to a 6"
depth and compacted.
FILL MATERIAL:
Contained sufficient fines and did not contain oversized
particles or excessive organics. Special attention was given to
the disposition of any oversized rock, organic soils and
expansive soils.
Please read this report carefully. If you have any questions,
please contact our office. This opportunity to be of service is
sincerely appreciated.
Page L-1, Page T-1 and Plate No.1 are parts of this report.
Respectfully submitted,
-1/
onsulting Engineer,
JCS/mlj
cc: (3) submitted
5
Kirby
Project No. 25E2-89
1/20/92
Page L-1
LABORATORY TEST_ß~SUhI~
The maximum dry densities and optimum moisture contents of the fill materials as
determined by the A.S.T.M., D1556-70, Method C, which uses 25 blows of a 10 pound
rammer falling from a height of 18 inches on each of 5 layers in a 4 inch diameter
1/30 cubic foot compaction cylinder, are presented as follows:
Soil Type
Maximum
Dry Density
lb/cu. ft_.
Optimum Moisture
C9nt~JJ:Lç1 ry wt.
Dark brown, silty, fine to
medium sand
120.0
11.4
2
Red brown, clayey, fine to
medium sand
124.1
10.4
3
Brown, clayey, fine to medium
sand with rock
122.6
10.9
4 Grey brown, silty, fine to
medium sand with gravel
120.9
9.5
5
Tan, silty, fine to medium
sand
117.0
9.0
Kirby
Project No. 25E2-89
1/20/92
Page T-1
TABLE OF TEST RESULTS
A.S.T.M.. 01556-82
DEPTH MAXIMUM
OF FILL FIELD DRY DRY
TEST SOIL AT TEST MOISTURE DENSITY DENSITY PERCENT
NO. TYPE IN FEET % P.C.F. P.C.F. __...sOMPACTION
1 3 +2 11. 7 112.1 122.6 91. 5
2 3 +4 11. 9 111.3 122.6 90.8
3 2 +2 17.9 114. 1 124.1 91. 9
4 +4 16.0 97. 1 120.0 80. 9 see .5
5 3 +4 16.0 110.7 122.6 90. 3 retest H
6 3 +6 14.0 111.1 122.6 90.6
7 3 +8 11. 7 111.1 122.6 90.6
8 4 +10 f.g. 6.5 117.0 120.9 96.6
9 4 +2 f. g. 9.8 117.0 120.9 96.6
10 4 +2 f.g. 9.8 116.0 120.9 95.9
11 5 +3 f. g. 6.5 107.0 117.0 91.8
f. g., = finish grade
~
)~
, ,"~
I
I
--
PROPERTY LINE
. fiELD DENSITY TEST
b;,;.!1r~vtJ~:~;í'.;~'-~Â I eOMf'ACTED FILL
\T --v- --V 7()P or SLOpe
--L -L --L Toe OF Slope
JOB NO.
'25é'Z-B
BY
~J
DATE
1-20-92
filii
LOC!A7/0N OF
ñ UJ OENSITY T€STS
S'tll~ TI~STßI.S
~ ....f, .
11421 Woodside Ave" Suite C
Santee, California 92071
(619) 562-0500
N 14 E IS
0
�0
E ED
C
1 17' 13'30 1 17 13'15" 1 17) 13'0 0 1 17 1 2'4 5 117 12'30"
334N
T
x
-LEGEND-
Z
N
A)
Horizontal Control Monument
V)
N
v
I h,rd Ordor
t4
:X.:
N
Vertical Control Monument
4.
St On,l ()ro'er Of Bt�ItOf
X.
W 4 ",
Hor zontai Control MOnHolent
(7:
T
t :
Se� wlo
s:
% x
VprTi( al Control Monument
r
1t)1rd 0,(Jef wr
t 1 1,
Horizontal Control Monument 'M
K
See omf Order or Better
3 3 0 0 4'4 5
A
Hor zontal Control MonUnlel
I it Bench Mark
Se( wO Order or Better
7m,
X%X
Horizontal Control Monument V
Q
Third order
Horizontal Cont ol Monument & Bench Mark
Th ird Ordt, r
Bench Mark
Spcood order or Better
----------
Vert cal Control Monument
Third Order pox 38 0
Property Corner Found Coordinated
(Calitorma Coordinate System, Zone 6)
5
D s Found Section, Grant or
1 1 S SUbd v s on Corner
Photograph, Nad r Point
7777
Geographic Tick
..........
..........
....... ...
..........
BOUNDARIES IN ORDER OF PRECEDENCE
(Latid LIties S�iown ve ApproxImate) �NN
025
Nat onal
N,ime 025
County
7, 77
015"
city
332N
N,ime w!thin BdrV.
R eservat'o 11
015"
......... i"
N,ime withio Bdry
33004'3011
National, State or County Park Nnf wtthlr7 Bdry
Land Grant .0 15
T 2 S
Tomiship, Rancle or Sect
Oil
T 3 S 15
%
0
-Ilk PREPARED UNDER THE DIRECTION of 73. >
DEPARTMENT OF PUBLIC VVORKS
C o, u n t y o f S a n D i e g o
... . ......
:yy &
CONTROL DATA FURNISHED
3
0
y
- - --------
SURVEY SECTION
rkS PL1hhC WO
, .0"
Department o
HORIZONTAL CONTROL BASED
Of?
r
VERTICAL CONTROL BASED
0 . t7
ORTHOPHOTO IMAGE PREPARED
from APRIL 19, 1982
by ... ..... .........
I IN C.
SAN- -0 AERIAL SURVEYS
TOPOGRAPHY COMPILED .......... . ......
. . ..........
.. . . ....
by
T,
frot 7 7 331;04'1
I A R! 19 19 8'�
b LO AERIAL SURVEYS, INC.
SAN
FINAL MAP PREPARED
by
MAPPING SECTION
!N
Department of Public Works
330N
i701E I 703F 1705E 1707E
This Alaj) Colol)lios with '4'ALE 1-. 2400 (1 200')
NATIONAL MAP ACCURACY STANDARDS INDEX TO ADJOINING SHEETS SAN D 1 0 COUNTY
INDEX CONTOUR INTERVAL� 25 FEET
CONTOUR INTERVAL� 5 FEET 334-1695 334-1701 334-1707
400 CALI RNIA
200 600 800 1000
200 0 TWO THOUSAND FOOT CALIFORNIA RECTANGULAR GRID (ZONE VI)
(Fee t)
330-1695 330-1701 330-1707
&N'A 06r,
C:CE J Lq C �: ;7- 3 1 F
9C )m H
300
100 0 100 200
THE RECTANGULAR COORDINATE VALUES ARE SHOWN ON THE SOUTH AND WEST MARGINS
-1695 -1701 326-1707
326 326
G INS SHEET NO, 330-1 701
THE GEOGRAPHIC VALUES ARE SHOWN ON THE NORTH AND EASi MAR,