1997-5024 G/I/PE/VA/EX
Street Address
3/&1
,
Jjtz/ I} /
Serial #
Category
Qfô-O32 fÞ111U/O£, V
,
Name
Description
(qqr;
Plan ck. #
Year
recdescv
. .
r' 'W
Phuoc V. Pham
James A. Lare~ P.E.
!£eI ~inee~Út! C¡¡¡~any 1 #nO.
Wayne W. Wheeler, P.L.S.
Dennis R. McCarty, P.L.s.
CIVIL ENGINEERING. LAND PLANNING. SURVEYING. G.P.S. SURVEYING
July 30, 1998
Job No, 531
REVISED DRAINAGE CALCS
OLiVENHAIN SELF-STORAGE
5024-G
OillWater Separator
This facility is intended to collect low initial rain runoff flows for separation of the road oils
from the rain water. Peak 100-year storm flows will bypass this system and traverse
directly into the water treatment wetland areas proposed per 5024-G for eventual
discharge into Encinitas Creek. The Olivenhain Self-Storage Facility has constructed its
driveways, parking areas and driving surfaces with 6" P,C.C. concrete, Therefore, a
substantial amount of the expected roadway oils typically generated from asphaltic paving
is not expected from the subject due to the use of these concrete driving surfaces, Further,
the entire driving surface area drains to the most westerly end of the developed site which
allows for the installation of oil/water separation facilities and water treatment wetland
facilities in one location.
In accordance with the California Storm Water 8est Management Practice Handbook
(8.M.P.) Chapter 5, Pages 1 and 2, the suggested design frequency storm is a 1-year
storm, The paragraph reads as follows:
Design Storm Size: It is commonly thought by those unfamiliar with urban
runoff quality management that design storms for sizing water quality
controls should be the same as those used for the design of drainage
facilities, This is not true, The damage done to a receiving water by the
pollutant wash-off of a 25 year storm (commonly used to size a drainage
system) is inconsequential to the potential hydraulic damage. Of concern to
water quality control are the small frequent events, smaller than the 1-year
storm, that carry the vast majority of runoff and pollutants. There is little or
no incremental benefit from sizing facilities to treat the extreme events.
The Home Depot oillwater separator system as installed was designed using a 2-year, 6-
hour frequency storm because 1-year frequency storm tables are not provided in the
County Hydrology Manual used by the City of Encinitas. The Home Depot facility collects
Page 1 of 3
5708 Calzada Del Bosque P.O. Box 9661 Rancho Santa Fe CA 92067 6197569374
FAX 6197564231
8
8
r '
..
this initial flush of oils and pollutants from a large asphalt parking area which experiences
heavy daily traffic use, Therefore, the amount of first flush oils and pollutants from the
Home Depot site is expected to be well in excess of the oils and pollutants that will be
generated from the Olivenhain Self-Storage site due to the concrete driving surfaces and
an Average Daily Traffic count far lower than that of the Home Depot site.
For the purposes of the design for the oillwater separator for the subject property we have
used the 2-year 6-hour precipitation storm which was determined to be 3.3 CFS from
previous calculations,
ie: OZYR= C 1A where C = ,85 12 = 2.25 in/hr and A = 1.75 AC therefore
O;ý(l..= (.85) (2.25) (1.75) = 3.34 CFS
The intent is to capture and treat the runoff from the first ten minutes of rainfall. Therefore,
the first 10 minute runoff of a 2-year 6-hour storm, from previous calcs, attached hereto,
is 1 ft3/sec. Therefore the oil/water separator should be designed with an inlet capacity of
over 1 ft 3/sec and an outlet capacity of over 1 ft 3/sec. The separator is proposed to have
a 6" diameter outlet pipe which will drain into the treatment pond. From previous calcs, the
peak carrying capacity of a 6" P.v,C, pipe is 1.1 CFS. This therefore meets the design
requirements of the facility. The oils and pollutants will be trapped in the oil/water
separator by the baffle wall installed in the modified Type "B" inlet as proposed and shown
on Grading Plan 5024-G.
The oil/water separator is to be constructed of a 5' Type "B" curb inlet per SDCRSD No.
D-2 and modified as shown on the attached sheet to include a 6" thick baffle wall.
Assuming a 3" headwater depth at the curb inlet opening equates to a carrying capacity
of the inlet in a sump condition as follows:
At 3" depth of water at inlet with a 10" high curb per SDCRSD D-2 the
capacity of curb inlet = .5 CFS/foot of opening,
Opening length = 4' therefore capacity = 4 x ,5 CFS/ft2 or 2 CFS capacity,
2 CFS > 1.0 CFS required, therefore OK.
The outlet 6" PVC pipe will control the flow characteristics through the oil/water separator
and will set the separator capacity at 1,1 CFS which is in excess of the 1,0 CFS first flush
storm water runoff,
The 0100 flows to the oil/water separator as determined previously are as follows:
Page 2 of 3
, ,
~
8
8
0100 = C IIOO A where
C = .85
IIOO = 4,9 and A = 1,75 AC
Therefore 0100 = (.85) (4,9) (1,75AC) = 7,3 CFS
The flow through the oil/water separator is 1.1 CFS therefore
0 into treatment pond = 0100 - Ooil = 7.3 - 1.1 = 6.2 CFS
From previous calcs the depressed concrete curb length = 13.5' and is to be depressed
from 6" to 3" high as shown on the revised plans, This will allow approximately 6.2 CFS
to pass from the parking area directly into the treatment pond. The total flow into the
treatment pond for 0100 is 1.1 CFS from the separator and 6.2 CFS from the parking lot.
The outlet spillway from the treatment pond should carry 7.9 CFS according to our
previous calcs which exceeds the 0100 of 7,3 CFS therefore it is OK.
Based upon our proposal to install a 5' Type "B" curb inlet, the depressed concrete curb
and the treatment pond with outlet spillway as reflected on the revised grading plans
(5024-G) the 100 year storm flows from the site can be adequately handled onsite,
Additionally, should these facilities be constructed as proposed, the first flush oils and
pollutants created onsite can be adequately contained within the oil/water separator as
directed by the California Storm Water Best Management Practice Handbook. These
facilities as proposed are ther e dequate for these intended uses.
fi7TACh'"AAE7v/S
C:\DA T AIGENNOTES\531 OIL. WTR
Page 3 of 3
I
.
.
.
.
.
.
.
.
.
.
1.,
':-4iT AC#//lF/l/TS I,
FRo/i,f .6" ÐtfPoT SPECIFIC
'il .
PL84
, .
~
/ ð{? 8
O¿/I/ENHAIN
SeLF STORAóé
SITE
\
\
\
\
\
\
\
-... - 18d- -
-
1 tJlJ&. ---=-- tJlJ&.
2 zs....... 0.-_.- 21.9-
3 IU"'" 0.-_.- 11~.....
4' ~.II\1I'It- u.....
leu.....
0.-- e.ø.....
THE HOME DEPOT
Encinitas I CA
Exhibit II-I
Master land Use Plan
fI9 !I/IJlIUII J ~
I
;' ."
i -- . ~
r.:-:-::, ¡-:-:.--:¡
r-,-!
! . l
i
,
" .1
COUNTY OF SAN DIEGO.
DEPARTMENT OF SANITATION &
'FLOOD CONTROL
""
'-
45~
'.
)0'
IS'
.
,
'. .. '.
\
-'
~
338,
45'
. I
E'repa...d by
I
0,5, DEPARTMENT OF COMMERCE
NATIONAL OCEANIC AND AT~IOSPHERIC AD~I/NISTRATlO(
SPECIAL STUDIES BRANCH, OFFICE OF HYDROLOG\', NATIONAL "'EATHER SERVICE
, ,.
301
..,."
"...'
.~
0:>
.....
.....
1
:Þ
I
CD
1180
li5 I
30'
151
11]0
1~5 I
301
151
1160
-
/..-
COUNTY OF SAN DIEGO
DEPARTMENT OF SANITATION $0.,
FLOOD CONTROL
L:.;'~ r~':J:,', r:.~ rl
.. :t'~:~1!~f\i':, ',::,~.-',
~
. '", "
i_.; ;:i
...-,~
t." J
~
'. .-...!
~
. ,0,"
,~;=:l
r....-¡
'.. ,l
k'~,' J
;:,.';. ::.]
"::::~J
, '. ,', r--\ "- ' .
.! J" .,i
338,.
.
,. -;.
-oJ
,
..
, ..
;<'~
- .,
, . -.~
30'
15'
.'
45'
P~p~..d 'b,.' ,"-
. :.' U,S. DEPARntENT OF COMMERCE
. HAnONAL OCEANIC A..'fD ATI.IOSPHERIÇ ADw:-tISTRAnOH
SPECIAL STUDIES BRANCH. OFFICE OF IIYDROLOCi\'. IfATIONAL WEATHER SERYJCK
. I' . !
30'
H
H
I
»
I
N
IIBO", 1.51
, :;~':~\'::;,~;:~:~1~~'ii~\'\:'\
301 '
151
. - , .~;
. ' ' ,
.,' ',.'1.\. I
ibo . '1.51
30'
. ,
. - -. . - - -.
~ -. - :---'---:"
>cJ - - .
~2
~ --
><
H
'"
-
111111
.,.
Directions for Application: ~ .-
1) From precipitation maps determine 6 hr. ~nd
24 hr. amounts for the selected frequency.
These maps are'printed in the County Hydrology
Manual (10,50 and 100 yr. maps included in tt
Design and Procedure Manual),
2) Adjust 6 hr. precipitation (if necessary) so
that it is within the range of 45% to 65Z of
the 24 hr. precipitation. (Not «rrlicable
to Desert)
3) Plot 6 hr. precipitation on the rioht sijlt
of the chart.
4) Draw a line through the point parallel to the
plotted lines.
5) This line is the intensity-duration curve for
the location being analyzed.
*Not Applicable to Desert Region
~
7-"---
H
<: - 0-__' . ...
"',1
~ 10 15 20'. .' 30 40 50' 1 ' 2 ,. 3 4 5 6
Hntl rs
-
.4.
f),..,
\~~
APPENDIX XI .
IV-A-14
Revised 1/85
INTENSITY..OUMT!ON DESIGN CHART
-,._,..,~,..,."".,.,.
.1.1 I.I~"'.
~ ËI~EL~~:~:~_""'~"-I.
'CI
~,2
H
x
X
I 1-'-.1-'-1-1-1..0-""0.11-1 "'.".0-
.,,~'.'.
-0..'-1-'.
-~'-"""'."'.'-
,
.>
3) t :; /0 min.
c
4) I:; 4. 9 i n/hr. U\
~
*Not Applicable to Desert Region ~.
tb-
APPENDIX XI
IV-A-14
p",,; ",,(] 1 Inr
','
-..<
--'
r--A
8. .-
Mð~'O
(0 of 8
-----
,
I ~'M'anh,jje frame
and ~over see
rawing M-2
M
~I .(' .... G",P,Jl.c. 1/ 4 n d '
r" ~ aroun opening Transition to normal
I I . / curb height in 5' ft.
I / on bot~ sides unless
~' otherwise noted
I '
t - 1 )\1 -ðAFFéL WALL
)j I ~ /:--
--L. -
M'"
I
I
eo2.J ./:i -----
IÉ fÕI,9
OVTt.l:T i\.
....
,
'"
Galv. steel angle
continuous and
protection bar.
r See drawing 0.12
4Lf @õ
C ..
C
Curb Line
~.. radiys ~.IT ,,"
T 4-
----
l..-A
PLAN
5'
8¡(5J
roc.
#4
8/'.!' r.C.
.. P'
;,. .
-"--'--"
,
,
It)
n)
~"l
'!L~
'P',: ..
~TL
(p"
". -
.. '.
~
. . -~.
..,.;.: ,-.-,
I 4'. 0" .1 T l::-
J.--/.5'
SECTION A-A
y::4' JTL
,..
SECTION C-C
NOTES:
1. See Standard Drawings 0.11 & 0.12 for additional notes and details.
2. Types art designated as follows: (no wing) H, (one wing) 8-1, (two wings) B.2-
3. Exposed edges of I.ontrlte shall be rounded with a radius of 1/2".
4, When V exceeds 4' steps shall be installed. Sit Standard Drawing 0.11 for details.
5. Contrite gutter to match adjacent goUln.
&, An expansion joint shall be placed at the ends of the inlet whert the curb is to adjoin,
7, Provide 1/4" tooled groove in top slab in line with back of adjacent curb.
8, Surface of top slab shall be sidewalk finished to drain toward street at a slope of 1/4" per foot,
9, Maintain 1 1/2" clear spacing between rainforcing and surface unless otherwise nand,
LEGEND. ON PLANS
15' Type B.l inllt
fT1-,
~
RECOMMENDED IV THE SAN DIEGO
REGIONA~ STANDARDS COMMITTEE
DRAWING
NUMBER
0-2
CURB INLET - TYPE B
Revision By Approved Date
Notes. PS. 7-7'9
Referance 11( .ð. /,,~tZ
Rebar ~ð. ~
Dash line ¿J, I-f. 7-88
SAN DIEGO REGIONAL STANDARD DRAWIN9
C14./t? ~ ~. Ins
~ II.C.(. 191111 0..
"
. '
'",' .
, ,
10
8
48
7 of tj-
:!i
i¡
, OVERFLOW W 6/1< DEsIGNS
F~O/l1 TR£f1.T)4 EN T PéJAj Do- :
aloe) :: C-L~ /1 ~ é, 8S){ '7', 'lXI. 7S) = 7..3 cis
¿¿/h-er<::' c =0.8S- -hr CcJh?flìé3-rC/a/ cb ve/CJj/fi7cn t
!;r C<-. broC(d- Crested W€/r
Q.: C L H ¥z. , C :: Z,70 (k./;z;}s.. ~b/ ~ S-3)
Q = (2. 70)( ~-: 0 ):". 7 ) Yz, (Q7TC1Cj,ç:d)
-= 7 9 c¡:.=- > 7. 3 cf.$ O/é-
-
-
I
SO,7
:'Jc; . ,
~ 0 5
I ~o ,0
, .c 0 )
,Th'Rf.I Cu¡eß AT INLET .ßOX:
;
::
!I ,
---- ----_o----__n_:IT-__---_o_------------------
- ----- - -.It-___QoVer'f/o'-V-_::-_--qloo -=-cZc::porof-o,- --'------- -- - 0
!' I
0 -- -Un ----- --+~o_--- 0__--0______---=_7: 3_(;'¡~--~--I._l-cl.:; _0 __n_;;_--- 6" 2 c.¡s_-------- ---
I ./ L = 13. S- '
1 ' , OoZS-'~ 1
~'\ ¡--hot>' í r' -
...Q.-;;:.CLH v~ I I C ~ 3. ¿,8
*L~C)iH % I /NLe-r 8ox I H:; (). 2~- I
" -- (P,2/ -%. L --1
-... /(3.tøa){o,zs) , - -
I
.De.:s131'7 cc.¡rb depn::.:s.s-/on lor /OO./,eor S-70rrn
.../YJ¡nu s: -¡Iou..; .acce¡okd by - 0/1 :S<:2?o;""o-/r;r:
n______----- -, _u_-------
-- -- --------
" '.'. . , .. ,
I ," I
8
8
ð6F8
WEILAN D_r3IiA_L/fd£LLT D.E.Z£"~.?lÇ2~O-AI.D__- ---------
--'- ---....-
--'------------'------- ---"p-..
'- -----__n--__--...------------------- ....---------- ------ -...
-' The w._e"floa..d__-freafment dé!fertt/DI1_¡;.onci.;,s 1-0. be
"s;'zed +0 delQ/n The f;'rst /0 rn//IuTe rC/l?off of
.-. fhe:: :2~-/-Ç5t)~.1 ¿,- hDurSTorrn.TÁe /O/Y)/l7uf-e.
_0- run olf_cu/ / ¿ be re/eClsc:,d ._£r£?rn__rh_e__?orJ d_-I-h ru..
njn¡'¡,liro'fio~ of The?o~'1.d ÞaitoJYJQr.é'£¿.- Overflow
"in c::.x-ce.SJ' 0 f the 10m/oCAte - t/t)/uh1e 61//// /;e
... c/./sc.Äac!}c. d fro,;y¡ fhé! .fJor;d b77:he VJ_r= of
,
... a... VJ ~I r .
\'
__Iofq I_volvr'r) dO f /Q-~ÞrJ.l~J..A f-e f¡'r:;t_I/!.A..$b /~2x20_--t6 3
I
---0 Pond..dep-fh +0 be 2.4s:
Wé1//5 of po/?d 1-0 b<:; s/C)p~d err 2:/
B..Ll. / I I
.n olTOrn d;'rl")(2/J s/Ol? S ~ -¿:,-~ - 5 )i 8 '..
--- --... - ------Vo/Ui'Yu:._-Ç)_£__L:)(J'1_d -~-~_ZO--tt:__2__3r2o_--f:£~_-Q~- ------
f .
-- - - .-
-- n --- ...---
------ --- -------- -- --_h__. ---
-----
_n ------- -.. - ----- -
-....-. -- -"-__h____- - -----
---- -
..-----
- ---------------------
_,
I~
- no_- --------
,--
jI
I!' ,NE1L:rI2.ÆTLt2N RA r,.=:- o£ßo7rONf AREA OF PðN D :
ii
'! ¿¿s.<=-.Dnr~/I~ Ef~ ~: Ak ~
---- ------------w)u:~L~A -= /70 -PI::. 1:. --- ----
0 - - ---- - -u_-- -------~- -- <tf,_.8--2_£j;/dCLy-_L:s~~~ii~chc:.d_SÇ_S..1~fyrc_c_/c;ss lis-:
.. --- -- ----- -0- -- ---- Gf.,----=--.L.---------- -~----- --.-- --.------ --..
----- -------------a:: (/z..Q~')(~J3_ZÆ/-d.ç.-7;(I) -= ~Z8~p.-Y --------
:J
-- - ---------..-- -.:j;>-_rim_c:...._-fo_£~ ~-----=-- 570 +; ----::---! -do.y--- - --------
. -- --------------_U"-------_--_h_- 5_?f!_~)1 - - ~--- -.-- .
, . ' . ... . ,
. .
If. .,
8
/~F ;!. 3>
8
DESIGN FOR THE
TREATMENT OF ON-SITE RUNOFF
FOR
OLiVENHAIN SELF STORAGE
GRADING PLAN NO. 5024-G
. '" ,
-,
J. .. I
8
8
¥Z3
DISCUSSION OF DESIGN PARAMETERS
The project site is within Planning Area 4 of the Home Depot Specific Plan, The Specific
plan calls for projects to provide an oil/water sediment separator along with a wetland
treatment system to mitigate harmful pollutants such as landscaping fertilizers and
pesticides, Please refer to the attached pages taken from the Home Depot Specific Plan
which discuss these objectives.
The source of these solids and pollutants will be the building and paved surfaces of the
site to include the on-site landscaped areas.
DESIGN APPROACH
The first task is to remove the oils and silts which will be washed from the paved surfaces
during rains. This is a relatively small site consisting of 1,75 acres of drained area. Due
to this small area, the first ten minutes of rainfall would be adequate to flush the
contaminants from the site. This "first flush" treatment approach is discussed and
advocated as part of the Home Depot Specific Plan and was employed as part of the Home
depot site development.
The following design is intended to capture and treat the runoff from the first ten minutes
of rainfall. The 2-year, 6 hour storm was selected as the basis for this "first flush",
The wetland treatment pond is designed to retain this same "first flush" volume. Treatment
for this runoff volume is adequate for the site due to the very small areas of landscaping
which would carry the potential for fertilizer and pesticide pollutants.
The evaluation and design of overflow runoff of the treatment systems will be based on the
peak flows for the 100-year, 6-hour storm.
letters\oliven.stu
. . ". ',". ,FROM HOM£ D'OT SpeCIFIC Pt.rJN
8
3.'¿::Z3
fØ.øN1
t18U'~
I
I
I
I
I
I
I
---Þ-
sufficiently to eliminate the risk of flooding the structure and parking lot. The
finished floor elevation for the Home Depot pad is to be 92 feet. The parking lot
elevations will range from 92.0 feet at the building to a low of about 83.0 feet
adjacent to the wetlands area. Parking lot grades shall be kept as low as
possible while still maintaining sufficient grade to provide positive drainage to
the creek. This will reduce to a minimum the amount of fill needed within the
floodplain area. A portion of the floodplain will be excavated to provide a more
suitable area for wetlands revegetation. The excavated material will be used to
raise portions of the parking area above the anticipated flood level.
3.
Nuisance Water Treatment
Commercial development significantly alters the characteristics of storm runoff.
Large paved parking areas collect motor oil and other products associated with
automobile usage. Landscaped areas contribute fertilizers and pesticides. The
accumulated impacts of such contaminants can have a detrimental effect on
downstream water courses. Other less harmful materials such as silt, sand and ,"
ash tend to be transported more quickly to natural water courses across the
impervious paved surfaces thereby adding to the problem of siltation of the
stream beds and downstream lagoons.
There are two basic objectives to be met. The first objective is to treat the runoff
from the Home Depot site to remove harmful pollutants. The second objective is
to minimize the amount of silt and other solids which are deposited in Encinitas
Creek as a result of the project development.
Control of silt and other solids is a two-fold problem. The first occurs during
construction when grading is in progress and the ground has been disturbed.
Construction related silt will be controlled through conventional desilting basins,
silt fences and sandbagging. Also, grading is proposed to be performed during
the drier season of the year. Long term control of silt and debris from the
developed site will be accomplished by the use of oiVwater separators in
conjunction with a routine parking lot maintenance and sweeping program,
The oil/water separator system is designed to protect the adjacent Encinitas
Creek from the "first flush" storm runoff which typically contains oils and other
deposits from the pavement and other hard surfaces. The system consists of oil
interceptors similar to septic tanks which separate the oily substances from the
water. The oily residue collects in the upper portion of the interceptors and is
periodically pumped out and removed to an approved disposal site. Sediment
will collect in the bottom of the interceptors and will also be pumped out and
removed. An oiVwater separator is illustrated on Exhibit 11-9.
11-16
sp~. -, ~T.
.
cßF Z 3
, ", FROM IfO,J/lDéPoT SPECIFIC p~
. \ ,
, J . I
,"
to
---- First flush flows and other minor flows will pass through the separators. Treated
effluent from the separators will then be routed to a nuisance water treatment
wetlands area for further treatment prior to entering Enclnitas Creek. These
wetland treatment areas will contain marsh-type vegetation which has a
capacity to treat contaminants In the water. A typical nuisance water treatment
pond area Is'shown In section on Exhibit 11-9. The FreshwaterlBrackish Marsh
plant palette Is described In Chapter III, Section C. Larger storm runoff volumes
will bypass the olVwater separators and go directlY to the wetlands tre~tment
area. Concrete overflow weirs are provided for major storm flows which exceed
the holding capacity of the wetlands treatment area. ' . "
F. OPEN SPACE
The Home Depot Specific Plan consists of approximately 55.4 acres, of which about
44.3 acres or 80 percent will remain In some form of open space. The open space
system serves two primary functions. Arst, It aets as an aesthetic amenity to the
community. Second, it assures the preservation of significant environmental habitats.
Open space areas have been divided Into three categories within the Specific Plan:
Wetlands Open Space, Upland Open Space, and Refined Open Space. Open Space
locations are Illustrated on Exhibit 11-10.
1.
Wetlands Open Space
The Implementation of 'the Home Depot Specific 'Plan will result In the
preservation of approximately 17.9 acres of wetlands open space. The
. wetlands habitat which occurs within the Specific Plan area is a result of the
Enclnltas Creek drainage system. Within the' Specific Plan approximately 11.3
acres of wetlands open space Is located In Planning Area 3 and 6.6 acres Is
located In Planning Area 4. For further details regarding the wetlands area,
refer to the Wetlands Program described in Section D of Chapter III.
2.
Upland Open Space
Areas designated as upland habitat open space within the Specific Plan area
are located on the west- and north-facing slopes of Planning Area 2, and the
north-f~clng slopes of Planning Area 4. Approximately 25.3 acres will be
placed in 'open space easements as a result of Implementation of the entire
Specific Plan area. This will include 23.9 acres In Planning Area 2 and 1.4
acres in Planning Area 4. These open space slopes consist primarily of
Chaparral vegetation.
II
11-18
'\ "
FI<OM Ht7UAt:>£PoT SPEC/PIC
RA~
5øF23
1 "
N~ Fr~
-- -¡- --
5 ft.
~
6ft. 0
Capacity 1,600 Gal,
AsSumed Aow-650 GPM -1,5 cis
Plan
8 ft.
"
Section
End
Typical Oil/ Water Separator
Prepared Soil
Flow Through Pond Section
Nõt to Scale
NUISANCE WATER TREAIMENT
. . . , . , . . . . . . . '. ,..........
. : The: HQl1le .Depot: : :
::Encinîta:s~CA':::::::::.::: .:::::....
, Exhibit ß-9 æ
.~ THE
~ AUSTIN
---., H A N S E N
-..:..c'_- G R 0 U P
. . . . .
. . . . ;;¡;¡¡¡;-- ...
-
""""'-
.
.
.
'\' "
FROM.OM¿:- DEPtJT SPirC/F/~ PiAN
bð¡:J"23
I ,.
should be maintained at an elevation that promotes flowage and reduces
back-flooding, The flooding that has Occurred In the past in Planning
Area 4 will be reduced by the dredging beneath and just upstream of the
EI Camino Real bridge, The project applicant for Planning Area 4 will be
responsible for maintaining the channel on-site along the frontage in
Planning Area 4.
b.) Wate( Qualit}!
. Sedimentation of Encinitas Creek:
(1.) An erosion control plan shall be designed and Implemented for
Planning Area 4. The plan should be prepared by a registered civil
engineer and approved by the City of Encinltas. The plan shall Include all
necessary erosion control measures, and monitoring shall be done
before. during and after grading to ensure that the necessary measures
have been implemented and are effective. The on-site erosion control
plan should be revised as necessary to ensure that It Is achieving its
purpose,
(2.) All grading should be accomplished during the dry months, from
approximately April 15 to October 15 unless a specific erosion control
plan and program have been approved by the City Engineer and Director
of Community Development and all necessary erosion control devices
are in place, The grading periOd may also require alteration for the
protection of sensitive species. ' In order to provide the most protection,
grading should be completed by mid-summer so that areas to be planted
may be established prior to the rainy season. The fm for any surcharge
operation may remain in place during the wet months providing proper
erosion control measures are provided as required by the City Engineer.
(3.) All erosion control measures and devices m.rst be periodically
monitored after project completion to ensure that they are In working
order and are successful. Defective and/or damaged devices must be
replaced, Monitoring and maintenance should continue throughout the
life of the project, and if ownership Is changed, the new owner must be
notified of these requirements and must agree to continue the
monitoring and maintenance. A covenant to be recorded with the
property title will alert future property owners of.these requirements.
(4.) All graded and cleared areas must be revegetated immediately upon
the COmpletion of grading. The fill used for any surcharge operation, as
well as exposed slopes, should be immediately reseeded with a suitable
erosion control ground cover.
(5.) The future development of Planning Area 4 should include an
oillwaterlsediment separator system and nuisance water treatment
wetland area similar to that planned for Planning Area 1 for any area of
development adjacent to wetlands that will drain toward the wetlands
and/or creek. It should treat all runoff from Planning Area 4.
111-63
I '0
FROM8/fOM¿=- LJéPt;iT SPéC/'C
7r;F23
~AN
c.)~
. Indirect impacts from water quality degradation:
(1.) Grading should be restricted to the period from April 15 through
October 15 to minimize the Indirect Impacts of erosion and sedimentation
on biological resources unless a specific erosion control plan and
program have been approved by the City Engineer and Director of
Community Development and all necessary erosion control devices are In
place, The grading of the upland areas should be limited to late summer
and early fall to avoid conflicts with the California Gnatcatcher breeding
season or as directed by the U.S. Ash & Wildlife Service,
(2.) Temporary deslltation basins and standard construction
sedimentation control measures should be Implemented to prevent
siltation of Encinitas Creek. Èxposed slopes should be immediately
reseeded with a suitable erosion control ground cover after completion of
grading. long-term sedimentation and water quality Impacts should be
addressed by ensuring slope stability, adequate slope drainage systems,
and effective revegetation of exposed slopes.
(3,) An erosion control plan approved by the City Engineer should be .
implemented,
. Wetlands impacts:
(1.) The area south of Encinitas Creek In Plaming Area 4 indicated as
developable in the Specific Plan Includes approximately O.2-acre of
wetlands. The northern limit of the developable area should be scaled
back, at a minimum, to the wetland'boundary.
(2.) The designated developable area south of Encinitas Creek includes
approximately 1.3 acres of steep slopes. It is recommended that the
uses of the steep slopes be restricted to those which do not require
grading or exposure of the soil.
(3.) A nuisance water treatment wetland similar to that designed for
Planning Area 1 should be constructed and maintained for any
development in Planning Area 4. It should be designed when
development is proposed.
(4.) The degraded wetlands should be used for buffering the existing
wetlands.
(5,) If the developable areas are not reduced as recommended in # 1 and
#2 above, mitigation for the loss of wetlands within Planning Area 4 may
require off-site mitigation.
111-64
.
.
.
I
I
I
I
I
I
"., I,'
F!<o/t/ Até DePoT Spec/PIC
Ikr'!.','~~
J ""
- '" 1- .....'
/'
8dF23
P.8N
OlI1/6NHA/N
Sét..r STORA6t£"
SITE
\
\
\
\
\
\
\
\
\
\
\
~ - Land 11M -
-
1 f.7 AI;. - ~ CenIor f.7 Ac.
2 ZS,9 Ac. 00Ien -- . - ZS,9....
3 11.3 Ac. 00Ien -- - - 11.3 Ac.
4 1Q.SAc. ~-IIhI-- UAc.
00Ien -- 1.0 M.
THE HOME DEPOT
Encinitas, CA
Exhibit fl-!
Master 'Land Use Plan
EI9 !IIII/IUII J ~
. "" f,'
, " I
Ii!
----~--------------~ 'W_-----.......
8
ß,c2~
8
OIL ~PA RA TOR.
.sIZING jDES/6.,V
SIZE O/(.. SEPI1í<¡c) ì?J/2. To /9CCOMOOI'9TE THE
FI.t?sr /0 MIA/ViES OF 77/E Z-YI< (a-HR. SìORA4.
"I
U..JE' 77-IE COV/!/7"Y OF S/fN D/E6CJs SI/-</9/6//T
a/vii /"/)--'£)1<',)6£/'9,£))/ .~ .Þe'TE.c~..-1//Vg 77-I/s VOLc.//V16"
/}¡'JI,) Pc:"AK FLOv/.
Qp
¡~
~
& = /. Ú 7 tp
'4ofq / ~ q, fì .: 0. 4 ¡~)(¡. 7 S 1Ic)( 43.1 5'(0{) -Pi!') 10. 088 -Ci ì
- 8 858 -Pt ~ l- /1" -;
/
= 328 c,1".
q p~ ~ ~. 3 c-f! s
/ - 2 Vp
T:..r -
Qp~
é 2 ) (. 37S-t 8.1 858 -r-i 3)
= -
3. 3 ~/~ec
33. S- /?'?';',
Q/o /C) :::; t¡o Q...p
-t~
_(10 n1/n) ( 5. 3 -ft /see)
33. 5" 11?1~.
= j f6 /sec
V aloe 610
/0;: 1
2
~ (J ft; /s e,J( IOn¡ /~)( &/0 :,~ C j ,,3CO -{i 3
2-
-
~ Z 45" "qOfls
AU1At.tBRA FOUNDRY t.tOOEL A-1494
t.tANHOLE FRAt.tE Ie COVER v"TH
INSPECTION HOLE, OR ÈaUAl.
ADJUST TO FINISH GRADE.
PRECAST CONCRETE RISERS AS
NECESSARY TO REACH FINISH GRADE.
"
8
, "
I- 8'-0. -I
ri"---¡
~68 OUTLET I I
I
~ I ~I
L L~L___J
PlAN VIEW
I
.
N
"
.. 1 SLOT
01 . 4. X 308
, ~
~
- .
0 l~
J I
in ~~
L
INLET ELEV.
PER DATA
TABLE.
CJ .
" INLET
'f
.
~
N
I
in
---1
28 X 68 REDWOOD SLEEPER
SAN AND OIL INTERCEPTOR TANK TO BE
PRO-CAST t.tODEL 8PC-SG-1500. t.tODIFIED
AS SHOWN, OR EQUAL. t.CODIFICA TlONS TO
BE THE DELETION OF SAt.tPLE BOX, USE OF
88 INLET AND 68 OUTLET, AND USE OF' CIRCULAR
RISERS. TANK AND t.tANHOLE RISERS TO .
BE DESIGNED F'OR H-20 LOADING, INLET AND
OUTLET OPENINGS TO BE CORED AFTER l' RISER
IS INSTALLED.
1.500 GAL. PRECAST SAND & OIL INTERCEPTOR TANK
8
1t1()f?~ .
.
.?/
,
I
I
,
"
./:
I
,I
"
I
'I
,I
'I
0
--'--
I 1
I (28,91 SF) I
I I
L____~
Ii
I'
END VIEW
,¡
¡.j
(!
Ii
"~"--- -" -
ill
'. ",,' .'
8
I .,
- - - - - - - - - - - - - - - -- - - - ~ .
8
/1t1p ,23
/i/ ¡hcJ /'01., 'I--h e all separa -10 r -fa/? /.: co /?
hold af>l'rox, I.- .5"00 JYCi"/s-, /-1 can 'pro ces s
. ,I,' I / (! -r / ""/"
ap¡:;/'ox/h:1Qìe,)/ . c.::-s, / n ere ¡,)/"è) /:;J/"7 C
~ 5:'00 -:}a// On --j--¿¡./}k: C-ù,,// be odet'--'of.e tf,
hC?líd/e The pee/K. /0 !?-?/nu1-e rC/I7CJff,
C/}LCU¿J9 713." SIZE O¡:-' CONT,Æ:.¿¿
OUTL ET PIPE To /HE 0/ ¿
-::- .r- 0.1"1, r.,:' /': ~,"'\ I::? .,-
.....;..or¡-"7/,N/V,,_,
I-ltJU/ /é?o~/r;"",
/r; I e.-t
,
hox
.......
I
or::>
be?
0;0 ¡o ~ I c {..s .
Manning Pipe Calculator
Given Input Data:
Shape. . . . . . . . . . . . . . . . . . . . . . . . . . .
Solving for .....................
Diameter. . . . . . . . . . . . . . . . . . . . . . . .
Depth ...........................
Slope. . . . . . . . . . . . . . . . . . . . . . . . . . .
Manning's n .....................
Computed Results:
Flowrate ........................
Area ............................
Wetted Area .....................
Wetted Perimeter .........,..,...
Per i meter. . . . . . . . . . . . . . . . . . . . . . .
velocity....................,.,.
Hydraulic Radius ""'" "" .,..,
Percent Full,..................,
Full flow Flowrate ..............
Full flow velocity..............
Circular
Flowrate
6 .0000 in ~
5.8000 in
0.0200 ft/ft
0.0100
/'
USE 1 Ú /)IA
PVC PIPE
1.1017 cfs -
0.1963 ft2
0 . 1943 ft2
16.6463 in
18.8496 in
5.6687 fps
1.6812 in
96.6667 %
1.0316 cfs
5.2538 fps
Q
III
-----~----------------
. ',' ,
8
8
/21J¡:: 23
. , '.'
I '
::SIze INLET BoxEs To BR/Néi
FIRsT /0 MIN. RfJ~J()FF 70
aiL- 5òP,c;/¿A 'TOl2 5
?eat /0 m/nu/-e +'/oUJ = / c-ls
19 SS c'¡ Ir) e 0, Z 5 iðù t 0 I c.,lja -I~, Qve r /17 / e. -t q rQ f ~ ,
'-'"
/) 8 ,I ¡- I I r: .
~5e roo/( -,-"Iet Dox /v'). /2/2
/"' J " . .
c..-7 rC1 Te.. i"../ /I"YJ e n :s /:;) h"::; :
1111111 IS>
/s /I
From of/ached inleT d/schorq<"".. qro~h:
v '-" ,
p;: 2 (;, zs / ;x I. 2 :;,- ) ::; .s--It
Vse 0, S x P ~,.. C/O83/'y h cl::.iel"')<"~:2 efleci/ve
O/':;;"c;-(, ///;ermlS -t-erø
y C#ect//~ P -=- 2. S- 'It
.'. retv/re,d d/scho~e tel': fOð t tJ f e flð:. t:/ve: ¡Der;m(!;t:er
== / c-Fs /2.S it o. 0, 40 c-ts /-PocJ-t
rh/.s 3ro te. U/,'/ / accef't
" ;I
:. /~- ~ IS- IYJ/e f
0, 41- c:/ s ¡:; e r k t (tOH1 c/x;,-t)
OK-
rof-a/ Inlet Co¡:;âC/~
(), 1~ ~ /. Z~-1.x4 .::: OZ, 2 c{.s
OIL
-.:.~
" .'
"
, "
Curb,
"
~rn(B(
. --f LENGTH (l~) f-
P.2B+LII
A.. AREA OF CLEAR OPENING IN GRATE
TO ALLOW FOR CLOGGING DIVIDE P OR
A BY 2 BEFORE OBTAINING d.
WITHOUT CURB P.2CB+lb)
I-
LLJ 10
LLJ 9
u..
Z 8
7
LLJ 6
~
a:: 5
<.:)
a:: 4
LLJ
>
a 3
a::
LLJ
~ 2
==
u..
0
- 1.5
~
;; 1.0
I- 09
a. 0.8 I
LLJ 3 4 5 6 7 8 9 10 15
C DISCHARGE PER SQUARE FOOT OF
EFFECTIVE CLEAR OPENING
0.8
~
-
I I r I ì , r II lilT I .;,"
- CURVE (AI ..,. '
,
- I I I I_lt~ .......'
....'
I 1/ I
,/' I
d ~ ~ ._' ,; I
' .. (/.
/./
I I
17 ì I
V ~-. 1' . ff' 11 c-+-y'
~ oj I
I I
I rHS OVER
USE CURVE (AI FOR DEF
GRATE LESS THAN O.B T.
I I ' i ' I J, ! I
I-
LLJ 0.6
LLJ
u..
Z
- 0.4
LLJ
~
a::
<.:)
ffi 0.2
>
0
a:.
LLJ
I-
~ 0.1
u..
0
:I:
I-
a.
LLJ
C
0.1
0..15 0..2 0..3 0.4 O~ 0.6 0.7 0.8091.0 l5
DISCHARGE PER FOOT OF EFFECTIVE PERIMETER
3
2
BUREAU OF PUBLIC ROADS
REv. AUG. 1968
HYDRAULIC CAPACITY OF GRATE
INLET IN SUMP
12-12
---------- .--
. .,
/3(~¿3
Chart 3
20
d ~ O. 25
- ..
....
. .
II
~ ---------~---~ --..-.------. ---.......
, . 0; .'
8
8
/~p' 23
. " .
OveR.FLOvt/ W £//< D£.5/6/J.s
F¡:OM TR£A-TUGNT Pé)/'jD :
O/t?C) :: C ~ /l ~ é. 8S){ -7. 'V~.>. 7 S) = 7..3 cis
I r - :J ,- --hI'
,.Jher('3 ",,- -,0.,"'1- "r --," ,,' ,"
'"'t./ '/, ~.' u . , , . .
'. cb ve/cYéJO7cn t..
hr ex. brOCtd- Crcs.ted ,!./J€,',
,3/
Q.:: C¿H 72.
", , Yz
Q = [' /' 7:;',,"// <,:-" /J,{' 7)
'- <- ' ~/ , --- , ,,' ~ '
.=: 7. 9 c{.~ > 7..3 cf.s
c ;: Z, 70 ():::.1-"'7:; " 1-0.6/ I!? S- 3)
/' '-' ' ,
, --"""")
'- /" ,./-/':: "'),.../
Ok...
-==-
I
-1- 0.7
,',':. J~ .. ,s,
l~. . '
'-0 ' J
TIIJ<.LI CU¡<'. ß Æ T INLET .ßOX:
D~3&n c:.¡rb a'epYc:;?,,::;..:,'i'/,on lor /OO-/eo/ -==-::ir...-y}
/y)/I?US f'/OU/ ac::c¡of~(d b/ O"/s<::;¡:;o,r-o;Lor:
~verflo(..<./ -:::
í
~'\
Q~CLH .y1..
:::¡, L ~ Oy{; H %.
-- (po 2/ .1/z
--- /C3.&8){O,Zs)
~ / 3. S I
--====0
4/00 - ~<3l"orQf.o,...
7.:3 c.¡. s - /. I c I.:; .:::~, 2 cl's
L. = /3. S- : í
D. 25' ~
t t2
1~,Z5" r -- -
I I C~ :3.cP8
/N¿ET Sox I H (J - I
I .:: . 2~
L__--1
-
I '\,'"
8
8
/56F23
, "
WETLA/vO
TREA7/1./1£//T DETE/l.5/:?,I.¡/ ,":::::?}.:D
TAe UJsf!o/)(/ -!rc.ofn-;er/¿ dé:fentt'O/î ror;d IS -fa be
s/zed +0 de/ain -fhe frsf l't) l1?i'r)(",fe r:.¡'n,-'?':'~ _Î~
,
þ¡'¡" ,.a
,,",'-0
/' " .' -¡r'/ I ,-'
¿-/'(;??/ '_::,,-;-; ,?'/r :::;-rorn-:. /I?e Ie; r/J/I?/.Fe
rj/7)1~A cu/// be r -1¿~qs"':J' -/;-OYh i-he Fond,' -I-hrv-:.
In' .1¡/frr->.....t/O'r> Of ~ie ;"~"~(:i.,..........,,, <..:?/'".'"I.. /)vc::rJlO"1
I. c,.,# I - ¡ ,.. f"(?/ì ,,::) f- ',/ V'r ! - V rl vv
~/; (,' /0 rn"n.-//e ./tJ/:-I)/)C'
/r;
,~--,,-,Ce .':~ ,,:'
?
/"///
¿.c
. '
Ct. .. ::;c n,::,
0-'
I I)
,,'] ",. .
-t./
¡ 1'7:3
r::) r ()
b;y t-he j~' e
,"') .~
'-
Q... C/Je,ir.
-r- ...i
;' ¿) / ,:'
\'-
:' ,
I "
¡ ') - '-. /'. ". ~' ','e>
1../ , r. r ¡ ../: . ~~
-1,/' -'J
i - r- j..,
415'; I~ 3:?o -Æ 3
n...¡..¡..
Do l I (}"..; ('-=1 .. I"ì? e /:;:, i .) r::
I
Pone/ c.:i~f"'.'/ì 7õ C!:'- 2... 4S
WQ//5 c?l' f../JI/O' 'ì~ be s/oí(}(-=d o.G
I I
I I I 8 I
Ì'J b ("3 5 )t
Vo I Un; c :J f' P/),":i ~: S70 ff 3
""". /
¿.../
<'
> 3 ..£.1 ~
00 \ V
or:-.
-
I
de:: 2,.45"
.
¡ç
LIJFILTf;¿¡t:¡T/?/-/ RATE of 130/'T7:..J"/ /-! .~/;;.c t:JP' //0,;',- ..
Use. Darc,/,5 £[UC;¿OI7
,~Jhcre: A.:: /20 ft
j( : 1-. 8 2 'Pi/clo/
r::h :: L
ê?:A,k~
--.L...L I , ..I :
::sr': .; :7::;':/:-:'::1 ,"; 'r-:: -,: Tex: TT.ÁI'C C k7-"---:' /51.;.!
/") /" I .":' " -
:..x~:: ~.~ ¡ «:...:J < -:
-; '3 ~ -~- /!
~ - -./ "-/' .-",
~ ' /, -,,-. Q
::7' 7ïmc -/'o ¿n¡::>
.::::
^'ì! .c: I
" --=" 5 7 8~'-j:~
,
570 it / de>,y
578 -ft/:ky;:: ,,~
. , I \, .,' .
..
8
8
. . " I
/{,1F1l3
Såturated hydraulic conductivity K depends on site-specific soil types. It
can be estimated from soil borings or in situ tests such as with double-baITel infil-
trometers. Such tests involve expenses, and do not always give consitent results.
An alternative method is to identify soil types from SCS soil surveys or (prefera-
bly) on-site examination, and then to estimate I by association with soil texture.
The table below lists average conductivities found in the laboratory by highway
drainage engineers and USDA soil scientists. When on-site data are extremely lim-
ited, OIÙY very conservative assumptions would be prudent: for a wet pond, assume
soil texture with permeability as high as can be found in the region; for a dry basin,
. assume texture with permeability as low as can be found.
Hydraulic conductivity 1<
in! hr ft! day
Crushed stone: 4.S1:M stone size;
No.3 stone 50,000
No.4 stone 40,000
No.5 stone 25,000
No.6 stone 15,000
100,000
80,000
50,000
30,000
Natural..lJlß: SCS texture c/ius.;;.
Sand
f Loamy sand
Sandy loam
Loam
Silt loam
Sandy clay loam
Clay loam
Silty clay loam
Sandy clay
Silty clay
Clay
8.27
2.41
1.02
0.52
0.27
0.17
0.09
0.06
0.05
0.04
0.02
16.54
4.82
2.04
1.04
0.54
0.34
0.18
0.12
0.10
0.08
0.04
SIoa8 cl.ala inCcmd (RIIQ H.R. Ccdcrpœ IIId cxbc:n. 1972. GIIiMIüou 10' IIw O"i,1I o{ SlIIuwfau DruiNJ,. S}sú-/o, Hi,lt-r SlrucIWøJ S.C/lQJII,
RepeIIINo. FHWA.RJ).3o. WulliallGll: Fcdcn1 HiaJ¡way AclmiNsualion Office 0" K-.ch 4I1d I)cYe!opmau; oød
T.b18 2.1 afH.R. ÇodCr¡na.19T1, su,..,..O'aüta,.,IIII4F/QwN.u, New York:Wjlcy.
Sail conducliyWca fn>m W.J. Rawla. Dl.. Brakauick and K.E. SU1GR,1982, Esumauon o(Soi! WalCC ~
rr_1itHu ofllw AMuicMS«:Nl1of ""~£II'ÎItun. vol. 25, no. S, pal- 1316-1320 IIId 132&.
75
Water Balance
..'
r
en
I
:c
0
c
-s
"0
-s
to
n
""
"t:I
""
r+
6.0 ~
5.5 o'
5.0 :::J
4.5 - '
4,.0 ;;. , App1 ication Form:
3 5 n " '
4 ¡ 0) Sel ected Frequency 2-
3.0 ~, ,
'2.5 ,1) P6= /.4 in.. P24= 2.1
.-
L
::s
,.:,g
..~ . "r. ,~ I U~"",lrTirhni
. -on T'rrlTnmdll'¡~"1'""",III""""lIlIhll -, , .. '64'S
Je. '-rr¡ : I I . -.
,}~~~; ~:I~:r.':,i Equation: I ,,= 7.44 P6 D " .',
~.~~I'b':i'r . I " I a Inten~ity (In./Hr.)
~~[':t-r ,=.-,:', I.I~~- P III 6 Hr. Precipitation (In,')
6.. N f" ~I N.. "'to. I 'I I II :f~I' 6 : .
Iì'.~ ""IL'~ I 1ft¡, .
I'- ' .... "',"', ,!Iii r ' I~ " -',
"""" r:~:, ~ I ¡{[)-:: >, [:i;! 'ii; 'w ", D = Dur":t10n, (Mln.) , !'
7'-. 'I. .",' N.I.!. r ,.( I I I . I!J ! ¡Ù, . , r'" ';r. !
'I ¡-Ii.; '1- I I, 11/1"'1 II'lriW ~I'.,,' II' , ,-~.:': ,': ~1:: ,', :' lit!
3. [ffi- f, ~1"~"r' .lH: ~1'~: I~'tffilll'!o '/1::::..:1: :::1:r~J. ,~,I,l' {H.
cr- ""/[['/1 'I, 'I f~ 11__,_., ~=i:, ..,.-r'rm
".I:"'" :' j '. 1", I "'!!:'~""~'-""-':,:I."" <,'1¡'r!!
~\~iriy, lIlt ~¡ ¡1:P!mP lil~ ~~~~~::J' 'Li' !!1!1¡l: m)
, '-, $~~I IILI' 11' Jh1'Ñ:!h~¡'o - f. 't.~tS:!0 ::1,,::
=:-.*-:tl "~.~~ iill 'f; 11 TIfJ;J¡~'!It 'Itk1- ßìilli. I;. ~~ !iii'
:~r1"~r~J. I 1~1' ~¡I'II¡ 1~11~/II~II~/I~~IIIL-lI 1~~Oi: :~~
. 11-""11 '. I. 11I1:1':'01!.. 1 -I. 'II"!:.I
1. ï~.~~-"lll'~>1' 1. tltr~¡,¡~b'lll¡-. ~r. i !If,¡¡:~..j.. j"1-;i RL~i-¡-!IM1I"i I ;,.:'. i'!J~1
9 '-1.+.,_- -f- H I:'\~ IIIII HJ.TtI ' "'I~~)f', . '.,"', '" fiX
1 i ~I~" J I !~11 'I, If. 11':'1:
. '- -~.. .. ~',I . ~ I ". . ~ ,"." "i' "."
:, ':;" J >,,- I-I ,-', I~: ;:IJI~L~,-r.."I"'f';' !I.- 1f!~I':';."
r,~-.~,.:._,-:-:" :" I . - "'!I'¡"':"~~fL"I-;'~t" L-,~I~'-'!;¡'I'
.. , - , - .... I ". lit, ,,'
'---o-,u':',-, "'~"",', 11I'!!,II:,:
-:', ' ::':, ~",':'" ~I'I-Uu." , ~I-'~', '+Þ.~,I,.'I'I;~j!.::¡~'
i~.t,.¡._. " " -~~:mu"'lllill'I¡'"
'., , ... "¡'~"" . I "It
""". ",..'. ',.. -..-1-'... "'~-,I+~ '-~
7,.( :, ".., ", . ", ".co-""!;; 'j.. l.f'IIII~!
I,. "'I"'" " "', -"'o..;..t:Ì-:~' ,~'I'II:!lì
':::","':""0"" ::",' '::::::""""-':-::,' 1tI,~II'
-,--- ~" '" ,,- ,.""",.- ."~
,.. " , .. ..,.."""" , , : " ..: = I:: ," . .. " ,', '.
,..,.. -.. ""'. , "", '-"~""..".. T 'I
~~~Ò~~L,:;:-:: .'. '.. ':,:; ...-1->-" ~.':":;"l :¡I:
' -
------,~_. - '.., o'..Mfa . ',,' ,
~- .,-- 0.. , ,
r- '.. - '.
-1- -, - - , , ,
-
......
CI)o
'CU
.c
'U
c::
....,
-
'~
,,4.J
-....
~
c
GJ
4.J
C
,-
~
"Ø
~
t-i
><
'><
1-4
I-f
<
,
>0
,
~10
15 20
Minut'es
40 50' 1
30
2
, , 3
4
5 6
n- --- -...... -..
Hours
2.0
:
.5
.0
Directions for Application: - ;
1) From precipitation maps detenmine 6 hr. ~nd
24 hr. amounts for the selected frequèncy.
These maps are'printed in the County Hydrolog
Manual (10,50 and 100 yr. maps included in t
Design and Procedure Manual). -
2) Adjust 6 hr. precipitation (if necessary) so
that it is "lith in the range of 45% to 65% of
the 24 hr. precipitation. (Not aprlicab1e
to Desert)
3) Plot 6 hr. precipitation on the rioht Si~
of the chart.
4) Draw a line through the point parallel to the
plotted lines.
5) This line is the intensity-duration curve for
the location being analyzed.
2) Adjusted *P6= /, 5
3) tc = /0 min.
4) I III Z,?':;- in/hr.
yr.
*
. P 6 c ii!.J;:,
P 24 ------
in. '
.............
*Not Applicable to Desert Region ~
~
AP~ENDIX XI ()J
IV-A-14
Revised 1/85
...
ò""
".,. ."
r.,:-~. ,.
~~
, ,..
~
.,
tcl
..' j
.,'j
j
" ..
COUNTY OF SAN DIEGO.
DEPARTMENT OF SANITATION &
FLOOD CONTROL
-.
45~
r
.
- .
"
, 30'
IS'
.
"
... ..'
\
./
..
33-'
.,
.
.
.
45'
. I
Prep.red by
I
U.S, DEPARTMENT OF COMMERCE
NATIONAL OCEANIC AND ATt.IOSPHERJC ADMINISTRATION
SPECIAL STUDIES BRANCH. OFFICE OF HYDROLOGY. NATIONAL .'EATHER SERVICE
, "
....
....
,
»
,
())
1 18°
ItS'
30'
IS'
1 17°
45'
30'
IS'
~
'~
N
116o\)J
30'
~""~
"/~.,,,
::.::,"7;
.~-'..,...- :
, ' .,d ' ': .',',>.::
L-J
ç ,:: :..1
L.,,; ;j
f ""j
:,'~:J
.,-..,--,
:,,;';';,~
C.i-_,B
i,,' J
(-i ,~'J
.~
,:,~';.:".J
'=:;;~J
~l .:;--.-,
IS'
.
.
.
~ .
.
- .t"t
.
.
COUNTY OF SAN DIEGO
DEPARTMENT OF SANITATION ~
FLOOD CONTROL
-0 -'i
. 30'
330,
4S'
Ph"""'" by
U,S, DEPARTMENT OF COMMERCE
HAnoHAL OCEANIC A.'CD AnIOSPHERIC ADU&'IISTRAnOH
SPECIAL STUDIES BRANCH, OFFICE OF IIYDROLOG\', NATIONAL WEATHER SERVICE
' '" !
M
....
1
»
1
N
30'
" .
118°
1.5 '
30'
15'
:' .'.. \. '. . ,
11]° 45'
30'
.'15'
116.
. .
JNTENSITY,..DUAATiON DESIGN CHART
-h".,."".
~ I=Et£EI:IIL:':/.J:l:..,., ,
tT1 -
Š2
H
><
><
H
., ,.,.,.,..
., .,., -'.".M ,.
._-,.+-~.
H
<
:1,...1
I
~ 10 15 20 30 40 50 1
t:1iwL.fes -. ,
2
Hours
3
4
5
r
0
I
C'\
I
:c
0
s:::
-s
"
-s
ro
n
"'"
Directions for Application:
1) From precipitation maps determine 6 hr. and
24 hr. amounts for the selected frequency.
These maps are printed in the County HydroloQ
Manual (10,50 ñnd 100 yr. maps included in t
Design and Procedure Manual).
2) Adjust 6 hr. precipitation (if necessary) so
that it is within the range of 45% to 65% of
the 24 hr. precipitation. (Not ùprlica~
to Desert) .
3) Plot 6 hr. precipitation on the rioht side
of the chart.
min.
~
~.
~
~
i n/hr.
*Not Applicable to Desert Region
APPENDIX XI
IV-A-14
D~H~ ~~..J , Inr-
,< .','
i~ -'---
-
r--- ' - '
- -" -. -" -" -' '-----'
,-
COUNTY OF SAN DIEGO
DEPARTMENT OF SANITATION &
FLOOD CONTROL'
P,.paf4 b,
U.S. DEPARTMEN r OF COMMERCE
, NATIONAL OCt:A:'>IC ANO AT' OSPHERIC ADMINISTRATION
SPECIAL STUDIES BRA~CII. OfflCK 0,. "fOROI-OOV. NATI~NAL "!tATtlER S.ERVICE ,
, 30' -I'
M .
H ,
,
>
.
451
30'
J 51
,338
45'
-
L.. .
. ,
-, ,
" -.
..
. . ..
~
.-1-
IIU.
115 '
3D'
117. .
.
IS'
I,!i .
)0'
116-
l!i'
~
,
,. " ..;
cour,
DEPARTMENT OF SANITATION &
FLOOD CONTROL
..
451
'.f
-.
&
,S
" ,.
33°
------..---. ,'... '-- - p'e~fl1!dbr;
U.S. DEPARTMEN r OF COMMERCE
NATIONAL OC£A~IC AND AT, OSPIfEHIC ADr.:INISTRATlON
SPECIAL STUDIES DRASCH. OFFICE Of' II OROLOGY. NATIONAL "'EATHER SERVICE
I-C
I-C
I
»
I
'l
ItS'
45'
301
151
11]°
30'
151
~
.. N
~
N
II 6° ~
301
5-40
'" ,
HANDBOOK OF HYDRAULICS
Table 5-3. Values of C in the Formula Q - CLH'" fw Broad-
crested Weirs' ...\. .'
Meaøured
head
in
feet,
H
0,2
0.4
0.6
0,8
1.0
1,2
1,4
1,6
1.8
2.0
2,5
3.0
3,5
4.0
4,5
5,0
5,5
Jheadth of _t of weir in feet
0, 5OF11. 0011,5012.0012.5013,0014,0015.00110 i 00115,
2.80 2,75 2'69.~'62 2.M 2.(8 2.« 2'88~'3' 2,49 2.
2,922.80 2,72 2,M 2.612,60 2,118 2.M 2.50 2,56 2,71
3,08 2,89 2,75 2.M 2.612.60 2.68 2.69 2.70 2/10 2,71
3,30 3.CK 2,85 2.68 2,60 2,60 2.67 2.68 2.68 2,69 2.
13.32 3.14 2,98 2.75 2.66 2.M 2.65 2.67 2.68 2,68 2.
3,32 3,20 3.08 2.86 2.70 2.65 2.M 2.67 2.661
3,323.26 3,20 2.922. '17 2.68 2.M 2.65 2,65:
3,32 3,29 3.28 3.07 2.892.752,68 2.66 ,65'
3,323,323,313,07 2.88 2.74 2,68 2.66 2,65
3.323.313.30 3.03 2.85 2.76 2.72 2.68 2,65
,3,823,32 3.813.28 3.07 2.89 2.81 .72 2.67,
3,323,32 3,32 3.32 3,203,05 2,92 2.73 2.66
3,32 3.32 3,32 3.32 3.32 3.19 2,97 2,76 2.68
3.32 3.32 3,~ 3.32 3.32 ~.32 .07\2,79 2.701
3,32 3,32 3,3)13.32 3.32 3,32 3.32 2.88 2,7i
3,323,32 3,32\3,32 3.32 3,32 3.32 3.07 2,79
3,323,32 3,32 3,32 3,32 3.32 3,32 3,32 2.88
2.69 2.
2.67 2.
2,M 2"
2~M 2,
2.M 2.
'I
2,~~,
2\oM 2,
2~M 2.
2,M 2.
2.M 2.
2,(Ii 2,
2,M 2,
Table 5-4, Values of C in the Formula Q ... CLH% for Models
of Broad-crested Weirs with Rounded Upstream Corner
i A:I A. Head in feet, H
'õi .;
Name of 'õ";; A- 'õJ! ..1. ,1,.,1, "\" '\"+ ++,1,.,
experimenter !'~ +><1 +><1
].;: .c.~
:at> .~.¡¡
..~ f'¡¡
~,, ~IJ tlh
Buin... ,... ... 0,33 2,112 2.46 2.113 2,117 2,98 3,01 3.CK
Buin...,...... 0.33 6,56 2,'6 2.70 2.82 2,87 2,89 2.112
U. S, Deep
Waterways... 0.33 2.112 4.67 .... 2.77 2.80 2.83 2,112 3,00 3,08 3,17 3,84 3,60
U.S. Deep
Waterways. .. 0.33 6.56 4.56 2,83 2.83 2,83 2,82 2,82 2.82 2.82 2,81
WEIRS
5-41
J
Table 5-5, Values of C in the Formula Q - CLH% for Broad..
crested Weirs with Crests Inclined Sli~htly Downward
(0)
Energy head - H.
Crest
0.5 0,6 0.7 0.8 0.9 1.0 1.2 1.4 1.5
- - - - - - - -
LeveL,...............,. 2.78 2.79 2.80 2.81 2.82 2.83 2.85 2.85 2.85
Slope - 0.004....,...... 2.95 2.94 2.93 2.92 2,Jl1 2.90 2.88 2.87 2.87
Slope - 0.026........... 3.07 3.06 3.05 3.04 3.Ò3 3.02 3.00 2,99
(b)
Slope of Length Head in feet, H
of weir
creet in feet 0.1 0.2 O,3 0.4 0.510.61°,7
12 to 1...,....,.., 3,0 2,58 2.87 2,57 2.60 2,84 2.81 2.70
18 to 1......""., 3.0 2,91 2.92 2,53 2.60 2,80 2.74 2.62
18 to 1......,.. , ., 10.0 2,52 2.68 2.73 2.80 2,90 2,80 2,68
Table 5-6, Values of C in the Formula Q ... CLH% for Weirs of
Triangular Cross Section with Vertical Upstream Face
and Sloping Downstream Face
i
Slope of Height Head in feet, H
down- of weir
atream in feet, 0.2/°.3 O,4 1°,51°.6 10.7/°,8 10.9 1.0 1.2IU~
face P
Hor, Vert. 3,8513.85 3.8513.85 3,85/3,85 3.8513,&
lto1 2.46 3.88 3,& 3.85
2to1 2.46 3.48 3.48 3,49 3.49'3.50 3,50 3.50 3.50 3.50 3.513,51
2to1 I.M 3.56 3.47 3.47 3.51 3.M 3.57 3,118 3.58 a.58 3.69 3,57
8to1 10M .... 2.90 3.11 3,22 3.26 3.33 3.37 3.40 3.40 8,41 3,41
Sto1 2.46 .... 3.08 3.06 3.05 3.05 3.07 3.09 3.12 3.13 3.13 3.13
10 to 1 2.46 .... 2.82 2,83 2.84 2.86 2.89 2.90 2.111 2.ln 2.92 2,93
~" SOUTHERN CALIFORNIA8
"\. / SOIL & TESTING, INC.
6280 Riverdale Street, San Diego, CA 92120
P.O. Box 600627, San Diego, CA 92160-0627
619-280-4321, FAX 619-280-4717
8
July 7, 1997
Mr, Robert Halliday
4285 Ibis Street
SCS&T 9511218
San Diego, California 92103
Report No.8
SUBJECT:
Report Clarification, Proposed Self-Storage Facility, Olivenhain Road, Encinitas,
California.
REFERENCE:
"Summary of Field Observations and Tests for Relative Compaction, Mass
Grading Operations, Proposed Self-Storage Facility;" by Southern California Soil
and Testing, Inc" dated June 6, 1997, 9511218-6.
Ladies/Gentlemen:
In accordance with your request, this report has been prepared to update the items requiring
additional grading operations contained in the "Remaining Work" section of the above referenced
report~.
The project site was recently observed by a member of our staff along with a representative from
Halliday Construction,
Our observations, along with the information provided by Halliday
Construction, indicated that the loose soils existing on the proposed building pads will be removed
when the building foundations are excavated. It should be noted, however, that the foundation
excavations should be observed by a member of our engineering/geology staff subsequent to their
excavation to verify removal of the loose soils, In addition, the loose soils existing on the proposed
driveway areas and on the temporary fill slopes located above the loffel block walls will be removed
and replaced as compacted fill in conjunction with the raising of said walls and as part of paving
operations, Our firm should be contacted when the aforementioned operations are performed in
order to verify that they are done in accordance with job requirements and local grading ordinances.
, 10
8
SCS&T 9511218
July 7, 1997
8
Page 2
If you should have any questions regarding this report, please do not hesitate to contact this office.
This opportunity to be of professional service is sincerely appreciated.
Respectfully submitted,
SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
7~~~
Michael B, Wheeler, RC,E. #45358
MBW:GET:mw
cc: (6) Submitted
"