Loading...
1992-2955 TE Street Address glÚJ1 Category / 323(/J5 Serial # c¡ (-- ! 5(c; ill () j? / Name Description Plan ck. # ¡qq( Year recdescv ARTIM & ASSOCIATES Geotechnical and Environmental Consultants Project Number 91-27a August 21, 1991 Mr. John Robinson 507 West A Street Encinitas, California 92024 Subject: Geotechnical Engineering Report Sea Bluff Erosion Mitigation 507 West A Street Encinitas, California Dear Mr. Robinson: In accordance with your request, we are pleased to submit . the following report describing the site geotechnical conditions, and providing our opinions and recommendations to mitigate the erosion of the sea bluff on the subject site. This report contains a summary of our field findings, our recommendations for mitigation of the existing erosive condition, a site plan depicting mitigative locations, detail drawings, and specifications, as appropriate. Should you have any questions, please do not hesitate to contact us at your convenience. Very truly yours, ~~m CEG 1084; expo 6-30-92 ,/~ ~ CharlesJ. Randle RCE 22096; expo 9-30-93 Distribution: (5) addressee (1) Schmidt Design Group Attn: Glenn Schmidt 2655 Fourth Avenue San Diego, California 92103 635 "C" Street. Suite 405 . San Diego. California 92101. (619) 544-9155 GEOTECHNICAL ENGINEERING REPORT SEA BLUFF EROSION MITIGATION 507 WEST A STREET ENCINITAS, CALIFORNIA INTRODUCTION In accordance with your authorization, we have completed our study at the subject site. The purpose of our work was to assess site soil conditions regarding sea bluff erosion, prepare reports outlining our findings, and provide recommendations to mitigate ~ea bluff erosion. A list of reference documents is included in Appendix A. Our geotechnical evaluation (dated April 26, 1991/Revised May 20, 1991) of the site is attached as Appendix B. Our report dated August 15, 1991 is attached as Appendix C. Drawings and diagrams of mitigative methods are shown in Appendix D. A general site plan is presented as Plate 1 at the end of this report. The site plan depicts as accurately as possible the existing topographic and geological conditions, as well as locations for mitigative methods. PROJECT LOCATION According to Reference 1 in Appendix A, the property at 507 West A Street is assessor parcel number 258-042-20. The legal description includes Lot 1, Block 47 Encinitas, in the County of San Diego, State of California, according to Map No. 148, filed in San Diego County June 12, 1883. The property is located south of the western extension of A Street, west of 5th Street, and north of the Moonlight State Beach area in the City of Encinitas, California. The western portion of the property is a sea bluff down to the Pacific Ocean. A site location map is presented as Figure 1 in Appendix B. SITE GEOLOGICAL CONDITIONS The geological conditions reported and observed at the site are included as pages 2 through 6 in Appendix B, and in Appendix C. The general geologic conditions are shown in Appendix B as Figure 2. Figure 3 in Appendix B depicts our interpretation of the subsurface geological conditions present at the site. Page 3 Project Number 91-27a August 21, 1991 CONCLUSION OF STUDIES The results of our studies indicate on-going soil erosion of the sea bluff at the subject site. The cause of the erosion includes poor surface drainage from this and an adjacent site to the north, the steep configuration of the sea bluff, the lack of vegatative growth cover on the slope, and other factors including human foot traffic and digging on the slope. If some types of mitigation are not implemented, erosion will likely continue unchecked at a relatively rapid rate and affect existing site improvements. RECOMMENDATIONS The following recommendations are provided as methods to mitigate the rate of erosion at the site. These methods are intended to provide temporary, short term control of the erosion at the site, while the other longer term solutions are being considered and planned. All such protections should be considered temporary since, in our opinion, no protective erosion control device along eroding coastal bluffs can be considered permanent. LONGER TERM SOLUTIONS 1. Base Protection The base of the bluff at the site is composed of Torrey Sandstone that will erode and retreat at relatively slow rates as compared to the overlying friable sands. The slow rate of erosion of the Torrey Sandstone will eventually cause a response erosion of the overlying friable sands. Some type of base protection might be considered to be installed to lessen and/or slow the rate of retreat of the Torrey Sandstone. Such measures to consider might include rip-rap armour to blend into an existing rip-rap armour . along the base of the bluff just south of the site, sea wall, and/or other types of devices. 2. Upper Property Protection A longer term solution for protection of the property at the top of the bluff might include relocation of the existing residence such that the present east-west alignment is north-south and the structure set back from the existing westerly foundation location. This consideration would Page 4 Project Number 91-27a August 21, 1991 involve encroachment onto the property north of the subject lot. Relocation of the residence in such a manner would result in a longer time use of the property as residential. Another method to consider for the longer use of the upper property might include the closure of A Street, installation of a east-west aligned retaining wall north of the lot, and lowering the upper portion of the lot by 10 to 15 feet with access from 5th Street. SHORTER TERM SOLUTIONS The following recommendations are to be implemented at your request. The locations for mitigative devices or site improvement is shown on the site plan, Plate 1. Drawings depicting detail and specifications, as appropriate are included in Appendix D. 1. Site Drainage Positive surface drainage shall be established for the site. Positive surface drainage for this report is defined as drainage away from the residential foundation and sea bluff top at a gradient of at least 2 percent for at least 5 feet and directed to a suitable outlet. The establishment of positive surface drainage will include the area to the immediate north of the lot, since runoff from the adjacent site directly influences erosion of the sea bluff on the site. The lot near the bluff top shall be resloped toward the east to concrete lined drainage ditches. A concrete lined drainage ditch shall also be installed near the top of the bluff north of the lot. The locations for the ditches are shown on Plate 1. A detail drawing for the ditches are shown as Figure D-l. The ditches shall be sloped to drains at the locations shown on Plate 1. A detail drawing for the drains is shown as Figure D-2. All drainage devices shall have a minimum gradient of at least 2 percent toward the east and 5th Street. Downspputs for the residence shall be directed to discharge away from the foundation, and into either the concrete lined drainage ditches, or the drains depicted on Plate 1 and Figure D-2. 2. Slope Mitigation Mitigation for the sea bluff erosion will consist of the following basic procedure. Removal of the debris cone at the base of the bluff. Hydroseeding of the sea bluff face above elevations of about 30 feet. Covering the exposed Page 5 Project Number 91-27a August 21, 1991 soil between elevations of about 30 and 7C ~et with a degradable cover. Selected hand plantings ~lthin erosion scar areas. Slope watering will be avoided. The general locations for the procedures outlined above are shown on Plate 1 for information only. The general concept plans and specifications being prepared by the Landscape Architect shall be utilized for the actual field construction. The procedures outlined are intended to avoid, as much as possible, slope disruption during installation operations and immediately thereafter. 1. The removal of the cone of slope debris must be performed to remove the reason for persons to jump onto and slide down the slope. The material can be removed to another area or spread as a thin cover over the beach gravels. As a safety measure, it may be prudent to request closure of A Street west of 5th Street, except for residents, until the mitigative work has been completed and the results established. This may involve a few to several months of time. 2. The hydroseeding operation is expected will cover most of the exposed slope areas between elevations of about 30 to 70 feet. Seed, mulch, and nutrient mixture and actual coverage will be established by the Landscape Architect. 3. The placement of a cover onto the slope shall be performed in a manner to avoid, as much as possible, disruption of the slope soils. We recommend a product such as Erosion Control Blanket C-125 by North American Green, or an approved equivalent. The covers shall also be placed to avoid disruption of significant areas of established vegetation. The blanket recommended is intended to reduce rainfall impact, reduce the velocity of runoff water, shield the surface soils from wind, and provide a temporary shield to allow for the growth of hydroseeded vegetation. The product recommended, when properly installed will blend well with the existing and a~jacent slope areas. The cover should consist of a lower layer applied in a horizontal direction with the slope across the erosion scar area. A second layer should cover the lower layer as well as other areas bare of vegatation. Page 6 Project Number 91-27a August 21, 1991 The covers should be overlapped as recommended by the manufacturer with at least a 4 to 6 inch overlap. The fabric should be stapled as recommended by the manufacturer with at least 3.5 staples per square yard. As recommended by the manufacturer, because of local loose soil conditions, the use of 18 inch or longer staples may be required. The tops of the covers shall be stapled with at least two levels of three foot long pins spaced every 3 feet horizontally, and offset one foot for the second level three feet below the first level. An outline of the material specifications is contained as Figure 0-3. 4. Selected handplantings shall be performed within the erosion scar areas as shown on the plans being prepared by the Landscape Architect. The handplantings will be performed in such a manner as to avoid impact to the work previously performed. Slope watering will be avoided. The work proposed is expected will occur in the late summer to early fall of 1991. 3. Safety The safety of personnel on-site, and adjacent to the work area, during installation activities is the responsibility of the contractors performing the installation of devices as described on pages 4, 5, and 6. We cannot be responsible for the safety of personnel, including our own personnel, during the installation of devices described on pages 4, 5, and 6. 4. Earthwork Except for the work as described herein, no significpnt earthwork is planned for the installation of erosion control devices described herein on pages 4, 5, and 6. 5. Performance of Work All installation work shall be performed in accordance with this report, and the plans and specifications being prepared by the Landscape Architect. All installation work shall be performed utilizing sound construction practices, in accordance with the manufacturer minimum requirements for Page 7 Project Number 91-27a August 21, 1991 the product. 6. Observation Services All work described herein on pages 4, 5, and 6 shall be performed under the observation services of the engineer. All slope mitigation work performed with the plans and specifications prepared by the Landscape Architect shall be performed under the observation service of the Landscape Architect. 7. Limits of Work No other work shall be performed at the project site except as described on pabges 4, 5, and 6 herein. Any changes or deviations from the work as described herein shall be approved by the engineer, or for aspects regarding the plans and specifications of the Landscape Architect, by the Landscpae Architect. Ui ,-,:;¡ ~ , " --~~6" . í .c " J c.. ;" ,,¡!:~ ' . , ---~1¡-"'~ ._~~" ' "", '~.~., ,,', ,; , \.' ' /, ~, \ ""': , ! :,':;~,:..: ~1 . "",}! ']i'J,:,""i"" W . ,." ; -=~;'~~ :,":~ , "":""""'I"",~,.,.,.,1"',,~ ",,':1 ',~,I,.,."""l,,""("":"'I,'\,1 - ;, ':,," ~\,::':Ä~4,~~Cf,:', :",..,,~\\: 'i,'I, \ />,: ,'.>~;~>:r\':1 '\{ .'.-', ,(-'t" " ,".', ,';"'t.,¡"',,!I:,:,.'_¡,::~:,1 ,,';'C<. " ",' .. ~ :: .,...., ; ", 1/J.33UJ.S H.l9 " J : ' : . " 7, ' " ", .... - .. .;,. , .~ -~.--:..::.- -" '., --", , ' ~ ' .. \, ' ',"', ,. ", , ," " ,"'" .. " "'" ",.'. ,'~~~I.,. ~- I": ", I ! "";"';, ~ ,.~..' .' " r t, i " ,,',' "I~,t ',;, , ., t ',", ',' '" " \' ,t,"'," ;" .~~" " .', ~' 'h"""'" "',', 'to'...: : ¡, '~.'<',,'.. : , . '" ,',' J j: : I ,\ t -:, ' '. , " , " .. """,.. . :-.. " '¡" , ',' I , 0 I&J '" 0:' ~ (.) C ... to- ~ ', ': ,r d ,:' :! " " ., "! ,/ '. ", ;', ' ., :, ,'" r ',~ ,_:':'..' " " ...' . . -~ .,.. : '" ..,. ,,' t '; ... .. ..' ,. ""..-' ,,0 .' ..".. ,¡-", " :,'~';~ ,--;--" ,:/~;:'~':'~~~:_'~"""':""'" . '.. '",'" ":"""" '-,"~,!, ,.,.."..",'.!"J : ", / --:.:~::.:..:::~<,::... ' "/,, , -'C'" " ' i ~:~~~;::_,- -':~~- ," ""'.' :~~~, "','~ ,-~. ~~~-,~ .,'~: -" ~- ~- ': ',:~, =~~~~':~:::Et..r:!:?~~~~:(;! '.~,=,.~~~~~':_"'~.'.',o"~..~, .~;;~ :)U\~,..d ~,.--", . /_~~~~,,-""'~~~-~'~~~.',o,:---~'" . ':~' ,;; 11_.___. ...-- .." - ~ -,,- ~ .. ..,....-.--""'" ..,-.-..;.--"...,-.....-' li,-, ---,',-";"',,"--"-: ' , ,~---- . ,..." -,.' ,.,...- .-.....- ,-", .-' " ,... . .' " I--.-,-::-",,_o,~::'-.."'" ..----...--.."...-' - ",..' ..-----" I" ...-""'" r- ..,-,...---... ,,-,"-"---"-"- ," ~? : ,. . ..- :"', '., ..", ... .....,'-. . , ' . ~ .- . I I. .. ....-.-'-' L..-....-.-'" ,. ! '~ 'f:..: ,: .. .... " ".":.":1/ "",,;"':'..'," ,,>r;.b ,:",J",...,-~,...\.J . . ,:~ .<;:;);~;::tft'\I¡r . ' , I ò' ~ f , >' ..f ' : .' . : 1', f '. if ...< .. . , . .,' ,/,." /:" . '" ;':; ','" :..:;.; ,'. .. ,':.' ¡ "',', '., .(. ';r., 4i1i.ih ¡¡~ rü ~~ "',~!':l1,"f.~":'.t',;..:.\ '.'. :,.:0 ..,.',,'..' - .1 "'" , '. " '!.:,- ,; . .~~ . ,)ii,::N' .' ," "..' 2 .,.' " ','i', , " ',., .. ~"!' ., Ii f. , ,"', " . ." '. Project Number 91-27a August 21, 1991 Legend for Site Erosion Mitigation This plan has been modified from the Topographic Plan prepared by La Costa Engineering. A geological map and cross section are presented as Figure 2 and 3 in Appendix B. Symbols ..... "" I£] c ). 0 ~ ~~->"~""~","'~ .. ~ ".. ~ .. "." "" c .,..'" ">~"".">." "'"",1."~"~":.>,, ".... ~ .. "'.. ?.A .. ..".. ~"..,. ~.,.." .. ""'" ~ " ..'.. ~. >c'.. ...," ...A... ",,'A.,...'."....""., .. ."A"..,,:.....AC,'" ,","."~"':.c I""~'C".,... oJ 0 0 0 0 . . 00 00" 0 . 0 ... 0 ~ 0.0: .. o' . 0 000 00 o. 0 0- 0 00.. 0 0 - ~ 0.. Description Location for the installation of drainage ditches - see detail Figure D-1. Location for the installation of 24 inch area drain - see detail Figure D-2. Location for the installation of 6 inch area drain for downspout discharge. Location of 6 inch diameter pipe drains to street, Schedule 40 PVC or approved equivalent. See detail Figure D-4 for subsurface placement. Arrows indicate planned flow direction. Location of pipe outlet to street. See detail Figure D-5. Area to reslope to surface drain to the east. Area to be hydroseeded, selected areas to be covered, and handp1anted. Refer to the plans and specifications being prepared by the Landscape Architect. Cone of Slope Debris to be removed or leveled. Plate 1: Site Plan - 507 West A Street, Encinitas, California APPENDIX A REFERENCES 1. Artim and Associates, 1991a; Geotechnical Evaluation, 507 West A Street, Encinitas, California; Project number 91-27, dated April 26, 1991/Revised May 20, 1991. 2. Artim and Associates, 1991b; Site Observations - Sea Bluff, August 13 and 14, 1991, 507 West A Street, Encinitas, California; Project number 91-27, dated August 15, 1991. 3. Eisenberg, L.I., 1983; Pleistocene Marine Terrace and Eocene Geology, Encinitas and Rancho Santa Fe Quadrangles, San Diego County, California; San Diego State University, Masters Thesis, 386 pages. 4. Geotechnical Exploration, Inc. 1991; Geotechnical Investigation of Coastal-Erosion and Bluff-Stability, Stroscher Residence, 1118 Neptune Avenue, Encinitas, California; Job number 90-5877, dated March 15, 1991. 5. Kuhn, G.G. and Shepard, F.P., 1984; Sea Cliffs, Beaches, and Coastal Valleys of San Diego County; University of California Press. 6. La Costa Engineering, 1991; Topographic Map, 507 West A Street, Encinitas, California; scale 1"=20'. 7. Lough, C.F., 1979; Assessment of Degree of Risk Along Coastal Bluffs in Unincorporated Portion of San Diego County; San Diego County Department of Planning and Land Use. 8. San Diego Association of Geologists, 1989; The Seismic Risk in the San Diego Region; Proceedings of Workshop, June 29-30, 1989. 9. Wilson, K.L., 1972; Eocene and Related Geology of a Portion of the San Luis Rey and Encinitas Quadangles, San Diego County, California; University of Californiad Riverside; Masters Thesis, 135 pages. APPENDIX B Project Number 91-27 April 26, 1991/Revised May 20, 1991 Mr. John Robinson 507 West "A" Street Encinitas, California 92024 Subject: Geotechnical Evaluation 507 West "A" Street Encinitas, California References: 1. Eisenberg, L.I., 1983, Pleistocene Marine Terrace and Eocene Geology, Encinitas and Rancho Santa Fe Quadrangles, San Diego County, California; San Diego State University, unpublished Masters Thesis, 386 pages. 2. San Diego Association of Geologists, 1989, The Seismic Risk in the San Diego Region; Proceedings of Workshop, June 29-30, 1989. 3. Wilson, K.L., 1972, Eocene and Related Geology of a Portion of the San Luis Rey and Encinitas Quadrangles, San Diego County, California; University of California, Riverside; unpublished Masters Thesis, 135 pages. Introduction In accordance with your authorization of April 5, 1991, we have performed a geotechnical evaluation of the property located at 507 West "A" Street, Encinitas, California. The purpose of our work was to assess the general site and soil conditions and to prepare a report outlining our findings as well as recommendations for mitigation and/or repair of potential problem features observed. The property is assessor parcel number 258-042-20. The legal description includes Lot 1, Block 47 Encinitas, in the County of San Diego, State of California, according to Map No. 148, filed in San Diego County June 12, 1883. The property is located south of the western extension of "A" Street,-west of 5th Street, and north of the Moonlight State Beach area. The western portion of the property is a sea bluff down to the Pacific Ocean. A site location map is presented as Figure 1. The base map utilized was page 24 of The Thomas Guide San Diego County, 1991 edition. A general site plan was prepared for reference of location of, and presentation of observations, test excavations, and geological units. The site plan is presented as Figure 2 and the base map was a topographic map prepared by La Costa Engineering, Page 2 Project Number 91-27 April 26, 1991/Revised May 20, 1991 undated. A cross section of the site depicting our interpretation of the subsurface conditions is presented as Figure 3. Project construction plans and documents were not readily available for review. Soils reports including any compaction results for the site were not available for review. Scope of Services The scope of our services has included the following tasks: * Review available pertinent reports relative to geotechnical cond~tions at the subject site. * Perform a visual site assessment of the site setting, and general conditions. * Perform a field analysis of the on-site subsurface soils including geological logging and description of soils in the sea bluff, and two shallow test excavations to examine, sample, and test the foundation soils of the site building pad. All logging and descriptions were performed by a certified engineering geologist. * Laboratory testing of representative soils including expansion index, grain size (seive), and direct shear. * Analysis and interpretation of our field findings and laboratory test results. Evaluation of data and preparation of this report with recommendations for mitigation and/or repair of certain observed features. * Processing and preparation of this report. Site Geologic Setting The site is located in an area identified by Eisenberg (reference 1) to be underlain by a Pleistocene Beach Ridge and deposits. Eisenberg also identifies that the Beach Ridge deposit is about 40 to 50 feet thick in the site area and is underlain by the Eocene Torrey Sandstone. Our review of reference 2 indicate that there are no known active faults in the vicinity of the site. Wilson (reference 3) reports a northeast trending fault near the site. at Moonlight State Beach; however, Eisenberg notes (page 38) that the fault "does not cut the Pleistocene terrace". Eisenberg also notes Page 3 Project Number 91-27 April 26, 1991/Revised May 20, 1991 that the bedrock along the base of the sea bluff contains faults, "none of which can be seen to cut the Pleistocene terrace." The closest active faults to the site include the Elsinore Fault about 35 to 40 miles northeast of the site; the Coronado Bank Fault about 20 to 30 miles southwest of the site; and the offshore projected extension of the Rose Canyon Fault about 3 to 5 miles west of the site. There are many other active faults in the southern California area that could generate ground shaking at the site; however, for purposes of this report reference 2 contains information to suggest that ground shaking at this site would be greatest from a maximum probable earthquake generated on one of the branches of the Rose Canyon fault within 10 miles of the site. Information in reference 2 suggests that the maximum probable earthquake for the Rose Canyon Fault is about a 6.5 Richter Magnitude event. The occurrence of such an earthquake within 10 miles of the site could generate ground acceleration at the site of greater than about 0.5g. The conditions to consider at the site from the aspects of earthquakes and faulting include ground fault rupture, liquefaction, ground shaking, and ground failure. Since there are no known or mapped active faults on the site the probability of ground fault rupture appears to be very low. Since the soils that underlie the site are medium dense to dense sand the probability for liquefaction appears to be low. From the aspects of ground shaking this site is no different than numerous other sites around the Encinitas area and the site should perform as well as other sites in Encinitas with similar geological conditions. From the aspects of ground failure the site condition to consider will include the sea bluff along the west part of the property and the water seepage near the contact of Pleistocene deposits and the Torrey Sandstone. The regional ground be at and just above sea water are known to occur above the contact of the Sandstone. water table in this area is expected to level. Local perched and seasonal perched within the sea bluff area, and especially Pleistocene deposits and the Torrey. Site Field Conditions Site field work was performed on April 8 and 10, 1991. During our field work we observed the following: * The site is located south of the west extension of "A" Street. The extension consists of asphalt driveway access to the subject property and a property located north of Page 4 Project Number 91-27 April 26, 1991/Revised May 20, 1991 the "A" Street extension. * Surface drainage from the extension area appears will flow east, west toward the sea bluff, and south toward the site. No provisions were observed in the "A" Street extension area to divert runoff away from the sea bluff or property to the south and toward 5th Street. * The lot was noted to be about 9 to 12 feet above 5th Street to the east. * The site is developed with a single story residential structure. The structure includes a basement area with access from the east. * A retaining wall about 6 to 8 feet high is located just south of the south property boundary. The adjacent pad to the south of subject site is at an elevation below the subject site. * Site development includes a concrete drive/parking area; wood fence to northwest corner of residence; deck area on south side of residence; and two low retaining walls near southeast and northeast corners of residence. * Elevations for the subject site pad are from about 82 feet near northwest corner of residence to about 70 feet near northeast access drive. The pad has two general levels: the west level varies from about 79 to 81 feet; and the east level varies from about 70 to 75 feet. * The top of bluff is about 15 to 18 feet from the main floor of the residence, but the foundation of the basement area is likely about 20 to 25 feet from the face of the bluff. * We observed that at least two slope failures had occurred on the bluff face during and immediately after the heavy rains- of March 1991. The failure areas were about 3 to 15 feet wide, about 1 to 3 feet deep, and several feet long. Secondary accelerated erosion has also occurred during the rainstorms. * The materials in the bluff are composed of the approximate sequence of description from top to the bottom. The upper 8 to 10 feet of soils are composed of light reddish-brown, silty sand. These soils are lightly cemented with iron- oxide. The materials tend to erode and stand temporarily Page 5 Project Number 91-27 April 26, 1991/Revised May 20, 1991 for longer periods of time than the underlying material. * Underlying the reddish-brown silty sand is about 35 to 40 feet of pale brown, very fine sand. These soils are clean and friable with virtually no cohesive material. A grain size test of this material is included in the back of this report. * Underlying the pale brown sand is about 20 feet of very dense sandstone of the Torrey Sandstone. The contact of the upper Torrey Sandstone is delineated by a stained red-brown layer about 2 feet thick likely a result of water seepage. This bedrock unit stands in relativily more stable steep inclinations. We did not observe any fracture zones or faults in this unit. * The base of the bluff is marked by piles of eroded sand and debris from the bluff. Below the base to the water is a beach composed primarily of cobbles. Figure 4 presents a photograph presentation of the bluff face and beach area. * The bluff face is nearly void of vegetation. Some growths of ice plant grow from the top of the slope, but otherwise the bluff face is bare of vegetation. * Test excavations T-l and T-2 were made at the locations shown on Figure 2. Each excavation was made to a depth of 4 feet, soils examined, described, and sampled. * Our knowledge of the site area indicates that sea bluffs along this area suffer ~from irregular and episodic failures, especially along the tops of the bluff. The average rate of retreat of the base appears to vary from about 1/2 to 1 inch per year up to about 6 inches per year. The upper bluff however, as the lower bluff retreats, often remains in an unstable condition for some time until an erosive force from the top of the bluff causes a large section to fail and "run" down the slope. * We observed that erosion appears to be more rapid at this site than at the adjacent nearby sites. * This section of sea bluff will continue to erode at a rate more rapid than adjacent properties unless some type of mitigation is implemented. * Except as described herein there are no other geological hazards known to be present on the site. Page 6 Project Number 91-27 April 26, 1991/Revised May 20, 1991 * The slope at the subject site is as steep as 65 feet vertically along a horizontal depth of about 60 feet. This inclination is slightly steeper than l:l( horizontal to vertical). The lower Torrey Sandstone is capable of standing in the near vertical for long periods of time: however, the overlying friable sands will tend to erode to an angle of repose of about 26 degrees. In addition, the upper friable sands are extremely prone to rapid erosion. * During a walking review of the approximate 2 miles of bluff north of Moonlight State Beach in March, 1991, we observed several sites at which vegetative growth was well established in the friable sands. Certain species of small trees and shrubs appeared to be concentrated at the contact between bedrock and friable sand. Water seepage at these areas appeared to be not present, or less than adjacent sites. Certain species of shrubs appeared to be well established within the friable sand zone. * The test excavations encountered medium dense to dense, reddish-brown, slightly silty sand. The upper several inches in each excavation appeared to be loose and disturbed, possibly as a result of landscaping and/or site construction activities. An expansion test on the soil in T-l indicated they have a very low potential for expansion. A direct shear test of soil at the base of T-2 indicated an angle of 31 degrees and 100 pounds cohesion. Summary of Key Site Conditions The site slope is about 65 feet high at an approximate 1:1 inclination. The upper 40 to 50 feet of the slope is underlain by friable sands. The angle of repose for these sands is likely about 26 degrees. These soils are actively eroding. A set back line of 2:1 horizontal to vertical (26 degrees) from the approximate contact of the Torrey Sandstone and friable sands would extend to the base of the existing structures basement foundation. Mitigation of the present erosion conditions should be implemented to protect the property at the upper portion of the lot. Such protections should be considered temporary since, in our opinion, no protective devices along eroding coastal bluffs can be permanent. Page 7 Project Number 91-27 April 26, 1991/Revised May 20, 1991 Conclusions and Recommendations The results of our study indicate on-going soil erosion of the bluff at the subject site. The cause of the erosion includes poor surface drainage from this and an adjacent site to the north, the steep sea bluff on the west part of the site, the friable nature of the upper sands in the bluff, and the lack of vegetative growth on the slope. If some types of mitigation are not implemented, erosion will continue and affect site improvements. We recommend that the following be utilized for mitigation of the site erosion conditions. 1. Positive surface drainage should be established for the site. Positive surface drainage for this report is defined as drainage away from foundations and sea bluff top at a gradient of at least 2 percent for at least 5 feet. Establishment of positive surface drainage will also need to include the site area immediately adjacent to the north of the lot, since runoff from the adjacent site directly influences erosion of the site bluff. All areas near the bluff top should be regraded to slope toward the east or into concrete lined drainage swales away from the sea bluff top. All drainage should have a minimum gradient of at least 2 percent toward the east and 5th Street. Eave gutters and downspouts should be installed on the residence with downspouts discharging away from the foundation and sea bluff top and utilizing non- erosive devices. Installation of positive drainage will likely include several area drains and/or collection points discharged to 5th Street. 2. Soil samples of the friable slope sands should be collected and an analysis performed to assess the type of vegetation that may survive, and thrive, at the site slope conditions. The species of vegetation that appear to be performing well in similar slope and soil condition along the bluff north of the site should be analysed to evaluate their suitability to adapt to this site. Based on this study a landscape plan should be developed and implemented at the subject sea bluff slope. Such a plan should avoid, as much as possible, slope disruption during planting operations. Slope watering should be avoided if possible, and if deemed necessary might consist of a degradable drip system. . 3. The base of the bluff area is composed of Torrey Sandstone that will erode and retreat at relatively slow Page 8 Project Number 91-27 April 26, 1991/Revised May 20, 1991 rates. The slow retreat will continue to cause a response erosion of the upper bluff friable soils. However, when the recommendations contained in numbers 1 and 2 above are implemented, the resultant erosion will be better controlled. Some type of base protection might be installed to lessen and/or slow the rate of retreat of the Torrey Sandstone base. Such measures could include rip-rap armor to blend into an existing armor just south of this site. 4. For safety of the property at the top section of the bluff and to persons at the base of the slope, we strongly recommend that planning and implementation of at least the first two recommendations begin immediately. 5. For longer term protection of the property, other considerations include relocation of the existing residence such that the present east-west alignment is north-south and set back from the present foundation. This consideration would involve encroachment onto the property north of the subject lot. Relocation of the residence would result in a longer time use of the residential property. 6. The final mitigation plans and specifications should be prepared by this firm and approvals obtained prior to the order, or purchase, of any materials or construction. 7. We assume no responsibility or liability for work performed by others at the subject site. 8. Safety of personnel on-site during mitigation construction is the responsibility of the contractor performing the work. 9. Should you desire, we can obtain cost estimates for mitigation recommendation number 1, and cost estimate to perform the additional study for recommendation 2. Otþer course of actions will be dependent on the directions and requirements of the City of Encinitas and the Coastal Commission. 10. Additional services may be required dependent upon the directions and requirements provided from the City of Encincitas and the Coastal Commission. Page 9 Project Number 91-27 April 26, 1991/Revised May 20, 1991 Should you have any questions or require additional service, please do not hesitate to contact us. Very / ~~--, // I ./ / I' / // / //~' . .' . -~ ,~¡~ / / I ( ',,---.. Charles J. Randle RCE 22096; expo 9-30-93 ~~~ Ernest R. Artim CEG 1084; expo 6-30-92 Distribution: (3) addressee Page 10 Project Number 91-27 April 26, 1991/Revised May 20, 1991 ~ '" ~ - - C":. ..... ,......" '-- ... SITE c ,....." -- .. ~~ > z Base Map: The Thomas Guide 1991 edition San Diego County, North page 24 Scale: 1 inch 2900 feet Figure 1 : Site Location Map 507 West "A" Street, Encinitas, California Page 11 Project Number 91-27 April 26, 1991/Revised May 20, 1991 Legend for Figure 2 and 3 Qb Beach cobble and sand deposit Qt Quaternary Beach Ridge deposits Tt Torrey Sandstone ~' / geologic contact ~ ,. 2:1 erosion line no fractures were observed at site exposures no faults were observed at site exposures no joints were observed at site exposures bedding is generally cross-bedded or massive contact between Torrey Sandstone and friable sand is relatively horizontal T-2 x approximate location of test excavation A AI Igeological cross-section scale of original drawings is 1 inch = 20 feet reduced scale of report drawing is the same horizontally and vertically. Refer to bar scale on Figure 2. Figure 2a: Legend for Figures 2 and 3 UHI! S H¡ ç I "- I } ~:'- §-Y- ~ \ , \ \ \ I I I I ---- . ~ :! 0 u "- ..,) ïJ ¡; ---~ " ------- ~ --------- ~ ~ 0 ~ « - J i iC'l ~ , ! feet 100 80 0, .....' //F-2: 1 ,,' ,,' ,,' ,,' ....' ....." ~.:.. - ~Qi1J:act 60 40 TI 20 0 Residence bãsement " erosion line Qt 100 80 5th 60 40 20 0 feet Generalized Geologic Cross- Section, A-A' A"""'D ¡, OOow.,. IIw¡¡ö 010-.0 "'.N' Page 14 Project Number 91-27 April 26, 1991/Revised May 20, 1991 Figure 4: Photograph view of slope and base area. The subject site is the central section of the slope. Note the cobble beach area; the eroded sand at the base of the slope as a cone shape; and the reddish-brown stained contact of the Torrey Sandstone below contact and the friable sand above. Also note the lack of vegetation along this segment of bluff. The palm trees and brush at the top of slope are an adjacent property, and the debris sand cone to the right of photograph is an adjacent property to the south. The view also includes the rip-rap armor near the adjacent southern property. Page 15 Project Number 91-27 April 26, 1991/Revised May 20, 1991 LABORATORY TEST RESULTS Expansion Testin9 Sample Location Description Expansion Index Classification T-2 0-4 feet Fine sand -0- Very Low Direct Shear Test Sample Location Friction Angle Cohesion T-2 4 ft depth 31 degrees 100 Grain Size (as a percent passing the listed screen size) Sample Location #4 #8 #16 #30 #50 #100 #200 10 below top of slope 100 98 92 80 30 16 7 APPENDIX C Project Number 91-27 August 15, 1991 Mr. John Robinson 507 West A Street Encinitas, California 92024 Subject: Site Observations - Sea Bluff August 13 and 14, 1991 507 West A Street Encinitas, California Reference Report: Geotechnical Evaluation, 507 West A Street, Encinitas, California; prepared by Artim and Associates, project number 91-27, dated April 26, 1991/Revised May 20, 1991. This letter will serve to document observations made on August 13 and 14, 1991 at the subject site area. On August 13, 1991, we had made a visit to obtain measurements of the residence from the top of bluff for use in preparation of plans and specifications for mitigation of sea bluff erosion. At the time of our visit, we observed what appeared to be a new slope failure. We observed that the bluff in an area of friable sand appeared to have failed and undermined the top of the slope. However, upon closer examination we observed footprints, both bare and with shoes, from a rough path area into the undermine area. The footprints appeared relatively small and we assume the prints were made by children. We also noted evidence for digging in the undermine area, which we assume had been done by the children who had left the footprints. Because of our concern for our safety, we did not make any ventures into the back portion of the undermine area; however, we could clearly observe footprints near the rear of the undermine area. The footprints appeared to originate from a brush covered top of slope at the extreme west end of the A Street extension. On August 14, 1991, we returned to obtain measurements of the undermine area. Utilizing a light pole with a tape measure attached, we were able to obtain rough measurements of the amount of soil erosion involved in the apparent vandal damage. We obtained measurements of an undermined slope area of about ,3 to 5 feet deep, 5 to 9 feet high, and about 9 to 12 feet wide. We estimate that about 25 cubic yards of soil erosion by vandals occured recently at the subject site. The undermine area poses an immediate threat to persons at the top of the bluff, as well as to persons at the base of the bluff. The undermine area also might impact the methods being considered for mitigation of slope erosion. . Based upon our conversations with persons at the base of the slope, young people have been observed to slide down the slope Page 2 Project Number 91-27 August 15, 1991 onto the debris cone at the base of the slope. Alledgedly, this type of activity has been common ever since the cone formed in February to March, 1991. Therefore, a significant portion of the debris created since the initial failure of February to March, 1991, may in fact be the result of human vandal related activities, and not "natural" erosion forces. We also noted on August 14, 1991 after a section of the undermine area failed, that the soils appeared to be very moist. This seemed to be unusual for the type of material and the weather at this time of year. The very moist area appeared to be about 13 feet below the pad of the lot. This elevation for moisture, the type of material, and the time of year suggest another source for the moisture in the slope. It may be prudent to check water lines in the adjacent A Street and 5th Street, including service lines, for possible leakage. If necessary, repairs should be performed as quickly as possible. We will incorporate the information observed into our plans and specification for site erosion mitigation. Should you have any questions, please do not hesitate to contact us. Very truly yours, U\~ Ernest R. Artim CEG 1084; expo 6-30-92 Distribution: (2) Addressee ProJect Number 91-27 August 15, 1991 Photograph depicting the undermined area apparently created as a result of digging on the slope by persons. Assess appears to have been from the upper left of the photo along a foot trail identified at the base of the vertical exposure at the top of the bluff. The excavated and subsequently collapse soils have collected at the base of the slope onto the previous debris cone created by the slope failure of February to March, 1991. Photographs of the slope taken in July, 1991 indicate their was no digging or undermining activity prior to those photos. APPENDIX D Project Number 91-27a August 21, 1991 .. Co 0 õi 3' min Ditch bottom may be rounded at the option of the contractor. 3" 47D.C.2DDD concrete or 3" 2500 psi, air placed concrete with 1\t,"xl~" 17 gage stucco nettingo TYPE A 5' min .u ,20m;," ' ,~,~'~; ~.\/:% .'. "¡;"}~."; 'l '~. " "" .,,¿ slope 3" 470.C.2000 concrete or / 3" 2500 psi, air placed concrete with IYJ"xIYl" 17 gage stucco netting. c 'e 3' min bottom may be rounded at the option of the contractor. TYPE B TYPE C NOTES 1. Longitudinal slope of lined ditch shall be 2% minimum. LEGEND ON PLANS ~ ===::> . ~ Figure D-1: Description and Specifications of Drainage Ditches Project Number 91-27a August 21, 1991 LEGEND ON PLANS :-.~ SECTION A-A - - -- B - II 'I A - J- - I- - _..it -, A I I J, I ,~ , I L-----___I -. B - PLAN --- Finish Grad, - i "3 .. Õ ,! Õ ë.. 14t:::;¡ 17 bend down 8" inlO will l 1 YJ" IJp, [ T I--T Figure D-2: Description and Specifications of Drains 1 Rounded Pipe Ends. "1 ß::! 2: 1 I .. . '.. . ....-- J .. TJ I 2' SECTION B-B Project Number 91-27a August 21, 1991 Purpose The purpose of the material is to reduce rainfall impact to the surface soil, reduce the velocity of runoff water, shield the surface soils from wind, and provide a temporary shield to allow for the growth of hydroseeded vegetation. Composition The product erosion control blanket C125 by North American Green is recommended by the manufacturer for areas of "high velocity runoff and extreme slopes". The product is made of "tough, long-lasting coconut fiber, non photodegradable netting and is sewn together. Although coconut fiber is degradable, it will not disintegrate for several years". Specifications Material Content Coconut Fiber Weight Netting (heavy wt) Thread 100% 0.50 Ib/sq. yard both sides UV stabilized 100% polyester Physical Specs Width Length Weight Area 6.5 feet 83.5 feet 30 Ibs 60 sq. yards Figure D-3: Description and Specifications of Slope Cover Material Project Number 91-27a August 21, 1991 ~ C'I invert elevation ~ ~ 4" clearance {minI SECTION NOTES {O¡ indicates minimum relative compaction. Figure D-4: Description and Specifications of Drain Outlet Pipe Placement Project Number 91-27a August 21, 1991 A Sidewal k cuts per Std. Dwg. G.l1 "..- ---------.2 -- L--------- ---- B B '" .S; .... ~ ¡¡¡ Co C ci: A PLAN ... .S; .... .Q :; c..:> Gutter SECTION . "., .. . ' ¡/ Pip I to bl finishld flush with curb. c: E ~ Gutter '. L.. 3 112" ... ~ ~.'" ...?~~min .,:l5r.'.~. ~i.,D '" . ..., 6" ."" . Typ. SECTION A-A . ""'.' .'.' . ',..' '.. OpllOnll bruk linl for cuts in ,.iSling curb Ind gutter. SECTION B-B APPROVED DRAIN PIPE SIZES J" 6" to 8" CURB FACE 4" 8" CURB FACE 6" 10" CURB FACE NOTES 1. Pipe shall be one continuous length from property line to curb line. 2- Multiple pipes to be set a minimum distance of 0/2 apart. J. Concrete shall be 520-C-2500 4. Pipe shall be circular asbestos cement. cast iron or rigid plastic. Figure D-5: Description and Specifications of Drain Pipe Outlet to Street I I I I I I I I I I I I I I I I I I I ARTIM & ASSOCIATES Geotechnical and Environmental Consultants Project Number 91-27b November 15, 1991/Revised December 19, 1991 Mr. Paul B. Webb Coastal Planner Califor~ia Coastal Commission San Diego Coast Area 3111 Camino Del Rio North, Suite 200 San Diego, California 92108-1725 Subject: Emergency Permit Request - On Site Drainage Improvements 507 West A Street Encinitas, California Reference Report: "Geotechnical Engineering Report, Sea Bluff Erosion Mitigation, 507 West A Street, Encinitas, California", Artim and Associates, Project number 91-27a, dated August 21, 1991. Dear Mr. Webb: In conformance with the request of our client, Mr. John D. Robinson, and your letter dated October 23, 1991, we are issuing this request for an emergency permit to mitigate bluff erosion at 507 West A Street. This action is necessary because of vandal activity on the slope. This activity constitues a sudden and unexpected occurrence that presents and/or poses a hazard to the structure and improvements at 507 West A Street, and to persons at the top of the bluff as well as on and/or below the bluff, and demands immediate action to prevent or mitigate loss or damage to life, health, property. This report lists those actions proposed to be taken under the emergency permit. 635 "C" Street. Suite 405 . San Diego. California 92101. (619) 544-9155 I I I Page 2 Project Number 91-27b November 15, 1991jRevised December 19, 1991 I Should you have any questions, please do not hesitate to contact us. I I Very truly yours, ~~ I I I I I Ernest R. Artim CEG 1084: expo 6-30-92 & Charles J. Randle RCE 22096: expo 9-30-93 I I I Distribution: I I I I I (2) addressee (1) Mr. John D. Robinson 507 West A Street Encinitas, California 92024 (2) Mr. Bill Weedman City of Encinitas 527 Encinitas Boulevard Encinitas, California Major Use Permit Application Number 91-156 MUP I I I I I EMERGENCY PERMIT WORK SEA BLUFF EROSION MITIGATION ON SITE DRAINAGE IMPROVEMENTS 507 WEST A STREET ENCINITAS, CALIFORNIA I I INTRODUCTION I I I I I I I I I I I I The geotechnical conditions at the subject site including the project location, site background, conclusions, and the geotechnical conditions are documented and described in the reference report. The reference report includes a summary of the field findings, recommendations for mitigation of the existing erosive condition, plan depicting mitigation locations, detail drawings and specifications, as appropriate. This report lists the nature of the emergency at the site, the potential hazard to existing structures and improvements, and the potential hazard to persons at the top of the bluff as well as on and/or below the bluff. This report also outlines only those actions to be taken under the emergency permit. NATURE OF EMERGENCY On or before August 13, 1991 vandals had excavated into the bluff at the subject site. The vandalism was reported in our letter dated August 15, 1991. The excavation was at least 3 to 5 feet deep, 5 to 9 feet high, and about 9 to 12 feet wide made into the side of the slope creating an undermine area. The undermine area was reported to pose "an immediate threat to persons at the top of the bluff, as well as to persons at the base of the bluff." The potential for, and the subsequent, accelerated erosion also poses an immediate threat to the property improvements and residential structure at 507 West A Street, Encinitas, California. At the time of the vandalism, recommendations were already being prepared to mitigate and control erosion of the sea bluff at the subject site. Those recommendations are contained in the reference report. EMERGENCY PERMIT WORK The following conditions will be addressed by the emergency permit work. Poor surface drainage from this and an adjacent site I I I I I I I I I I I I I I I I I I I Page 4 Project Number 91-27b December 19, 1991 to the north will be controlled. All improvements will be on site at 507 West A Street, Encinitas, California. Positive surface drainage shall be established for the site. Positive surface drainage for this report is defined as drainage away from the residential foundation and sea bluff top at a gradient of at least 2 percent for at least 5 feet and directed to suitable outlets. The lot near the bluff top shall be sloped slightly toward the east to a concrete lined drainage ditch and covered with a blanket of 10 to 12 mil visqueen. The visqueen shall be overlapped by at least 6 inches and shall be pinned to the ground surface and covered with pea gravel or wood bark. A concrete lined drainage ditch shall be installed along the north property line near the bluff top to divert off site runoff from the slope face to area drains. All drainage devices shall have a minimum gradient of at least two percent toward the east and 5th Street. Downspouts for the residence shall be directed to discharge away from the foundation, and into either the concrete lined drainage ditches, one of the two area drains depicted on Figure 1, or tightlined to the drain outlet pipes. A legend for Figure 1 is shown as Figure la. Detail for the concrete lined ditches, area drains, drain outlet pipes and other detail are show~ as Figures 2 through 5. PERFORMANCE OF WORK All installation work shall be performed in accordance with this report. All installation work shall be performed utilizing sound construction practice, and in accordance with the minimum requirements of the manufacturer of the products. All work described herein shall be performed under the observation of the geotechnical consultant. A report of observation of installation and as-built configuration shall be submitted upon completion and approval of the work outlined herein. I I I I ,I I I I I I I I I I I I I I I \, ,!-n. L . - I . -. ""--- , .. ..-, .. ~~ ¡ '0 ::~::~':1'~~:=~~?: :~~!~:(: ' ,~_/ ¡,' Crr' \ ' ~ 83-'Z5/1 W : /f')") , ------- -- .., -, .-,.-.,-.. -..' ...~ LOT '-,. ':~ u-=~ -.. . , .' - , ,- O. 17 ACRES --' " I ' : , ,- I' ,---- 'i' , ,-, I} I;', .--, " ,,_. ~lqn, , -, ~ - ---+ - , - 1- .--.' , , i I , I --_I . ,7r &;, Figure 1: Site Plan for On Site Drainage Improvements 507 West A Street, Encinitas, California - -¡ . . I / I- W w a: t- en / .- 1 --:.: - ... .' .... t t- Lt) . . , \ I ( . í '< I ~ I I I I I I I I I I I I I I I I I I I Symbols Description ...... ./ Location for the installation of drainage ditches - see detail @] Location for the installation of 24 inch area drain - see detail c Location for the installation of 6 inch area drain for downspout discharge. > Location of 6 inch diameter pipe drains to street, Schedule 40 PVC or approved equivalent. See detail Figure D-4 for subsurface placement. Arrows indicate planned flow direction. 0 Location of pipe outlet to street. See detail ~ Area to res10pe to surface drain to the east. Figure la: Legend for Figure 1- On Site Drainage Improvements 507 West A Street, Encinitas, California I I I I .. Q, 0 .. I ~ 18 " min I Ditch bottom may be rounded at the option of the conlractor. 3" 470.C.2000 concrete or 3" 2500 psi, air placed concrete I I TYPE A I 18" min TJ. .;:~. 1:1 . . ..:.i I I . bottom may be rounded at the option 01 the contractor. I TYPE B TYPE C I I NOTES 1. Longitudinal slope of lined ditch shall be 2% minimum. LEGEND ON PLANS I ====- ==:!:> ===- I I Figure 2 : Description and Specifications of Drainage Ditches I I I I I I I I I I I I I I I I I I I I I LEGEND ON' PLANS :..~ SECTION A.A Figure 2 : Description and Specifications of Drains - - -- B - II 'I A _J_- f----iL-, A ! I Ai I I' A~ , I , I 1 " I I I 1 , , I , 1 1 1 I ;1 T L__- --___1 - B - PLAN --- Finish Grid. j =' .. ë; ~ 0 Q. I "1 &:12:1 I ~ . ., Rounded Pip. Ends. . -r--: - T TJ I 2' SECTION B.8 114 101, 4 14 t:::ì 17 bend down 8" inlO will . #. I')' Iylp, [ T ¡ ¡..- T I I I I I I I I Pipe 0.0. I I I ~ C"I inverl ,I'villOn I I L 4" clearance (mln) I SECTION I NOTES I (O¡ indicates minimum relative compaction. I Figure 4: Description and Specifications of Drain Outlet Pipe Placement I I I I I A I Sidewalk cuts per ----_:~w~:12 -- C -------- <---- a B I --- ------ ... .= -' I ... = -' >- ;¡; 0.. Q It A PLAN .Q Gutter I ú I SECTION I ... = ..... .Q :; U Prgl to bl linishld Hush With curb. c ë I Gutter .... ". '" - - '. L. 3 1/2" ... !.r -:,,9 ...~.. ~.. . ~.~LUr. " . " . .. 6" ,N '. Typ, SECTION A-A I .. . I . '. . '.. . ' . ' , .... , . . I OptlOnll bruk Ilnl for cuts in exlSltng curb end gutter. SECTION a-a I APPROVED DRAIN PIPE SIZES J" 6" to 8" CURB FACE 4" 8" CURB FACE 6" 10" CURB FACE NOTES 1. Pille shall be one continuous length from property line to curb line. 2. Multigle pipes to be set a minimum dinance of 0/2 apart. J. Concrete shall be 520.C.2500 4. Pipe shall be circular :ement. cast iron or rigid plastic. I I I Figure 5: Description and Specifications of Drain Pipe Outlet to Street I I I I I I I I I I I I I I I I I I I I I ARTIM & ASSOCIATES Geotechnical and Environmental Consultants Ý ! - I 'It; ^1 ¡J r~ Project Number 91-27b November 15, 1991/Revised December 19, 1991 Mr. Paul B. Webb Coastal Planner Califor~ia Coastal Commission San Diego Coast Area 3111 Camino Del Rio North, Suite 200 San Diego, California 92108-1725 Subject: Emergency Permit Request - Off Site Rip Rap Wall 507 West A Street Encinitas, California Reference Report: "Geotechnical Engineering Report, Sea Bluff Erosion Mitigation, 507 West A Street, Encinitas, California", Artim and Associates, Project number 91-27a, dated August 21, 1991. Dear Mr. Webb: In conformance with the request of our client, Mr. John D. Robinson, and your letter dated October 23, 1991, we are issuing this request for an emergency permit to mitigate bluff erosion at 507 West A Street. This action is necessary because of vandal activity on the slope. This activity constitues a sudden and unexpected occurrence that presents and/or poses a hazard to the structure and improvements at 507 West A Street, and to persons at the top of the bluff as well as on and/or below the bluff, and demands immediate action to prevent or mitigate loss or damage to life, health, property. This report lists those actions proposed to be taken under the emergency permit. 635 "C" Street. Suite 405 . San Diego. C aliromia 92101. (619) 544-9155 I I I I I I Page 2 Project Number 91-27b November 15, 1991/Revised December 19, 1991 Should you have any questions, please do not hesitate to contact us. Very truly yours, I I I I I I I I I I I I I Y4~ Ernest R. Artim CEG 1084~ expo 6-30-92 - -:.;. ~ . '", .~;:~~ t5:.Jj,.' '. ~/<")"_"1'7""..:"::"':¡" , o"},' t<;::"" JJH~" . ,," 1';!<'.;'(~~ '".',\<-",', ~- "') ':/,'v 'Ý. '\ ','" .. sf'. , , .. ë:i'l ~ 'r-.::.', . a &'I'.':".!~.\3.""C".1'~'1'~:'~:J{~' . . ...,. '...www l.' . J .\ " , "', ' ' ~\."'::.:, 0:1-";;)-:;') /,' :~.' " ' :'.. ~ C ! 1/ : \.¿"- . -;,,~ Charles J. Randle . "1;.(' õtci.l\~<~' RCE 22096~ expo 9-30-93 Distribution: (2) addressee (1) Mr. John D. Robinson 507 West A Street Encinitas, California 92024 (2) Mr. Bill Weedman City of Encinitas 527 Encinitas Boulevard Encinitas, California Major Use Permit Application Number 91-156 MOP I I I 'I I I EMERGENCY PERMIT WORK SEA BLUFF EROSION MITIGATION OFF SITE RIP RAP WALL 507 WEST A STREET ENCINITAS, CALIFORNIA I I I I I I I I I I I I I INTRODUCTION The geotechnical conditions at the subject site including the project location, site background, conclusions, and the geotechnical conditions are documented and described in the reference report. The reference report includes a summary of the field findings, recommendations for mitigation of the existing erosive condition, plan depicting mitigation locations, detail drawings and specifications, as appropriate. This report lists the nature of the emergency at the site, the potential hazard to existing structures and improvements, and the potential hazard to persons at the top of the bluff as well as on and/or below the bluff. This report outlines only those actions to be taken under the emergency permit. NATURE OF EMERGENCY On or before August 13, 1991 vandals had excavated into the bluff at the subject site. The vandalism was reported in our letter dated August IS, 1991. The excavation was at least 3 to 5 feet deep, 5 to 9 feet high, and about 9 to 12 feet wide made into the side of the slope creating an undermine area. The undermine area was reported to pose "an immediate threat to persons at the top of the bluff, as well as to persons at the base of the bluff." The potential for, and the subsequent, accelerated erosion also poses an immediate threat to the property improvements and residential structure at 507 West A Street, Encinitas, California. Erosion of the base of the bluff has progressed to a level that requires protection of the base of the bluff in order to protect property and persons at the top of the bluff as well as persons on and/or below the bluff. Recommendations have been prepared to mitigate and control erosion of the sea bluff at the subject site. Those recommendations are contained in the reference report. I I Page 4 Project Number 91-27b December 19, 1991 I I I I I I I I I EMERGENCY PERMIT WORK The following conditions will be addressed by the emergency permit work. The base of the bluff will be protected by a rip rap wall. All work performed at the base of the bluff will be off site of 507 West A Street, Encinitas, California. Mitigation of sea base retreat and protection of the base of the sea bluff will consist of placement of a rock revetment. The area of placement will require excavation of the loose beach sand and cobbles to form a key into formational bedrock. In addition, the sand debris cone at the base of the slope will be removed by spreading it around the local beach area outside the limits of the proposed rip rap revetment. All excavated loose sand and cobbles will be spread out around the local beach area outside the limits of the proposed rip rap revetment. The top of the rock revetment will extend to an elevation of approximately 25 feet (MSL). The location of, and plans and specifications for the rip rap wall are attached. PERFORMANCE OF WORK I I I I I I I I All installation work shall be performed in accordance with this report. All installation work shall be performed utilizing sound construction practice, and in accordance with the attached plans and specifications. All work described herein shall be performed under the observation of the geotechnical consultant. A report of observation of installation and as-built configuration shall be submitted upon completion and approval by the consultant of the work outlined herein. -- ,- - '---.--, "---- ..,.---'1' ,-' , \ . I \ \ \ \ \ ~~ ~~ ~ ~ ,iP H! ~~ I F a; 2 r !J -t rt~ ~ ~'n\ ~~~ ~ ';j 0 1)' ~ ~ ~ ~ .J ~ ,-_.. - -- - -- -.. - -- ~ 1- ~n'~ d~~ rr6~ ~,~ ~ ~ , .. ~ í ï P ~~ .. ~ ~ I~ 0 I ~ I ~ I ... 0 õ ~ :' '!' ~ ~ :- ~x ... ci:-~ t!::! ~~~::! " VI" 0'" 0"""" ." "'... 0"<'" -..." ,'" 3 -'" '" ...-~ .. 30 .. "'3" "'... '" - XOO- < VI VI .. 0" . 0 x . ~ ... -~~ "'VI'- 0<'" .. --.." VI""" "03" .. . X-" ..~ID VI""" "'0'" ...' ~." x ...'" 0 ,,-- c c " ... 0 """".. ...'" "'"... .. ,,'" x n... . Z" c '" VI u, "0 ... ...-- OVl" x ~ z o-~ - ","'0 "'NO 0 ...0 VI""" '" "'" , 0 0 co ... c~ c"' ~ .."" -:0 ~ "'~.. ...0 '" ...... X3 .. .. 3,.,C 0 ~ ". ." x VI C:C'" " .,,-'" , ~... 0 XVI ... ...- 0 C3N ID ~;;~ . VI~ ::!;J ..,g 0 ~: ~ ~ 0.. 0 C""'" 0" c: "'...-- x'" ... -~.... VlO 003 ...~ VI X'" ID ~ ~ b ;"" B 0 -.. C"', "'0 '" -'" -x ..... OVl'" X-I> X 0 ~ . ~... ... 3~0 -VI X ... --ID "z, !j~;;; 0- ...~N ID""" "" 0" ... 0 XIDO -~'" 0 . "'VI XOID "'-r' VI"'~ VI x ..,."" x", 0'" g>;; VI "'X ,.,0 ..c: ..' ... 0 0 c:.. xo'" 00)( "'... 3 '" ~...x )(00 ZID'" C:"'O " ...0 . 00 ... x ... -VI x... C ~~ ~ ,.,... - VI 00 Z ox ~ Z ... ..0 ... "'VI .. ....., OX '" ~;! ¡¡ ~~ g 0'" .. 0" '" '" - ..'... <, " .. '" ... C.. 0.... -0 C ...'" C ........ 0 X'" ... C ... 0 X 0'" '" ...... ..~ 0 X- 0 """ "'< ~ '" ~ ",., ... ~x VI ,., 0" VI VI "'~ 0 !(¡b ; ~... ;; ,.,.. ~ '" 0'" VI ... 0 - ~' ... ... ."VI." '" - X",' ... " ~~ ~ .; .. ...... "'.. - VI VI 0"'" VI x'" ~ 0 0 VI X C- - 0 ..... x ~ - ~ ~ 1\ ~ "'.. 0 0' .. ... x '" '" " '" " -Z X~ ,)( "3 ..C: ~" b ..~ c: :¡~ ~ ID", ¡;;~ ~ 0 ~ ~ ,., " -----¡ GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS, ARTIJvI & ASSOCIATESi 635 "I::' STREET, SUITE 405, SAN DIEGO, CA 92101 II TELEPHONE (619) 544-9155 CIVIL ENGINEERING CONSULTANT CHARLES J. RANDLE. PE 325E> WIN'" STRf.ET, SUITE f, (), ;,AN DlmO, CII !1~lln TELEPHONE (619) 221-0878 '--' ,-- PROPO:.:tD 6\--\ORêLII---l E YRO1 EC'.. T l ON ( \<.1 P .. KN") '. I H I ~ \ , \i I' Ii I I ltit t i I f õ ~~ 6 ~ P\..A'¥. f")K \ ,_0' .,,- .,.' ..,.-- " .-- " -- -.-' ",,- [' - ..-- - "---' ---- ----,' ,,'" -' '-:,: /--'.' ,- --' .' ,,',"::: ,/ " -- --- ~--" ------- ~ ~ " -- ......-" ~ " '--:- -:::. " " \ ~I ~1n "~I' , ~~~'~ i M- t , ~ " ¡' I) -' ~I '/" '-.. --,--ðo I~ ," +-" \.' ' i~ I '-' I' II~ . ' - -_: ,,' ' Ii " -" t. ' ~~~:_-: /, -I ~ ~~, ,..,..~" ( '\ : "I~' ,-.:,'j /"- _J u~ " -"',~ " ,....:::o!"<!{" e' - ," '\' . I ,,' ---I ' \' ( . "" . . , . --~, " (', . \,:, \ ¡ ,5TH STREIT' ì ' " ¡, ,:' \ ~ ...' \ . " , ' ',°' ',,- ,,( \1' ,";Þ, , , L ~' t 1~"" rr1 'I ~ . 'J . , ,. ~ ~. 0""'" ."n, ."". ~""« '" ~ s... ~ 'Are M>\)~_', '!o"'='- , ".J:)7 WF-~,'Â "'::>ilZE.ET ENCINITA.":> ,Cp.... ~2.0Z4 ~: l".>B-04?'-20 I eo!" I JOe<"" \ OW o, ~', JOHN ROßH"'¡€:OI.J !lCALË.: N.J NDæD a"'if.: /I.O;-q/ -.._---,_. -".-..-' .._- --- --_.... . ARTIM & ASSOCIATES Project Number 91-27 Geotechnical and Environmental Consultants . April 26, 1991/Revised May 20, 1991 Mr. John Robinson 507 West "A" Street Encinitas, California 92024 . Subject: Geotechnical Evaluation 507 West "A" Street Encinitas, California References: . 1. Eisenberg, L.I., 1983, Pleistocene Marine Terrace and Eocene Geology, Encinitas and Rancho Santa Fe Quadrangles, San Diego County, California; San Diego State University, unpublished Masters Thesis, 386 pages. . 2. San Diego Association of Geologists, 1989, The Seismic Risk in the San Diego Region; Proceedings of Workshop, June 29-30, 1989. . 3. Wilson, K.L., 1972, Eocene and Related Geology of a Portion of the San Luis Rey and Encinitas Quadrangles, San Diego County, California; University of California, Riverside; unpublished Masters Thesis, 135 pages. Introduction . In accordance with your authorization of AprilS, 1991, we have performed a geotechnical evaluation of the property located at 507 West "A" Street, Encinitas, California. The purpose of our work was to assess the general site and soil conditions and to prepare a report outlining our findings as well as recommendations for mitigation and/or repair of potential problem features observed. . The property is assessor parcel number 258-042-20. The legal description includes Lot 1, Block 47 Encinitas, in the County of San Diego, State of California, according to Map No. 148, filed in San Diego County June 12, 1883. . The property is located south of the western extension of "A" Street, west of 5th Street, and north of the Moonlight State Beach area. The western portion of the property is a sea bluff down to the Pacific Ocean. A site location map is presented as Figure 1. The base map utilized was page 24 of The Thomas Guide San Diego County, 1991 edition. . A general site plan was prepared for reference of location of, and presentation of observations, test excavations, and geological units. The site plan is presented as Figure 2 and the base map was a topographic map prepared by La Costa Engineering, . 635 "C" Street. Suite 405 . San Diego. California 92101. (619) 544-9155 . ARTIM & ASSOCIATES . Page 2 Project Number 91-27 April 26, 1991/Revised May 20, 1991 Geotechnical and Environmental Consultants undated. A cross section of the site depicting our interpretation of the subsurface conditions is presented as Figure 3. . Project construction plans and documents were not readily available for review. Soils reports including any compaction results for the site were not available for review. Scope of Services . The scope of our services has included the following tasks: * Review available pertinent reports relative to geotechnical conditions at the subject site. . * Perform a visual site assessment of the site setting, and general conditions. . * Perform a field analysis of the on-site subsurface soils including geological logging and description of soils in the sea bluff, and two shallow test excavations to examine, sample, and test the foundation soils of the site building pad. All logging and descriptions were performed by a certified engineering geologist. * Laboratory testing of representative soils including expansion index, grain size (seive), and direct shear. . * Analysis and interpretation of our field findings and laboratory test results. Evaluation of data and preparation of this report with recommendations for mitigation and/or repair of certain observed features. * Processing and preparation of this report. . Site Geologic Setting . The site is located in an area identified by Eisenberg (reference 1) to be underlain by a Pleistocene Beach Ridge and deposits. Eisenberg also identifies that the Beach Ridge deposit is about 40 to 50 feet thick in the site area and is underlain by the Eocene Torrey Sandstone. . Our review of reference 2 indicate that there are no known active faults in the vicinity of the site. Wilson (reference 3) reports a northeast trending fault near the site at Moonlight State Beach; however, Eisenberg notes (page 38) that the fault "does not cut the Pleistocene terrace". Eisenberg also notes . 635 "C" Street. Suite 405 . San Diego. California 92101. (619) 544-9155 . ARTIM & ASSOCIATES . Page 3 Project Number 91-27 April 26, 1991/Revised May 20, 1991 Geotechnical and Environmental Consultants that the bedrock along the base of the sea bluff contains faults, "none of which can be seen to cut the Pleistocene terrace." . The closest active faults to the site include the Elsinore Fault about 35 to 40 miles northeast of the site; the Coronado Bank Fault about 20 to 30 miles southwest of the site; and the offshore projected extension of the Rose Canyon Fault about 3 to 5 miles west of the site. There are many other active faults in the southern California area that could generate ground shaking at the site; however, for purposes of this report reference 2 contains information to suggest that ground shaking at this site would be greatest from a maximum probable earthquake generated on one of the branches of the Rose Canyon fault within 10 miles of the site. Information in reference 2 suggests that the maximum probable earthquake for the Rose Canyon Fault is about a 6.5 Richter Magnitude event. The occurrence of such an earthquake within 10 miles of the site could generate ground acceleration at the site of greater than about 0.5g. . . . The conditions to consider at the site from the aspects of earthquakes and faulting include ground fault rupture, liquefaction, ground shaking, and ground failure. Since there are no known or mapped active faults on the site the probability of ground fault rupture appears to be very low. Since the soils that underlie the site are medium dense to dense sand the probability for liquefaction appears to be low. From the aspects of ground shaking this site is no different than numerous other sites around the Encinitas area and the site should perform as well as other sites in Encinitas with similar geological conditions. From the aspects of ground failure the site condition to consider will include the sea bluff along the west part of the property and the water seepage near the contact of Pleistocene deposits and the Torrey Sandstone. . . The regional ground be at and just above sea water are known to occur above the contact of the Sandstone. water table in this area is expected to level. Local perched and seasonal perched within the sea bluff area, and especially Pleistocene deposits and the Torrey . Site Field Conditions Site field work was performed on April 8 and 10, 1991. During our field work we observed the following: . * The site is located south of the west extension of "A" Street. The extension consists of asphalt driveway access to the subject property and a property located north of I 635 "C" Street. Suite 405 . San Diego. California 92101. (619) 544-9155 . . ARTIM & ASSOCIATES . Page 4 Project Number 91-27 April 26, 1991/Revised May 20, 1991 Geotechnical and Environmental Consultants the "A" Street extension. . * Surface drainage from the extension area appears will flow east, west toward the sea bluff, and south toward the site. No provisions were observed in the "A" Street extension area to divert runoff away from the sea bluff or property to the south and toward 5th Street. . * The lot was noted to be about 9 to 12 feet above 5th Street to the east. * The site is developed with a single story residential structure. The structure includes a basement area with access from the east. . * A retaining wall about 6 to 8 feet high is located just south of the south property boundary. The adjacent pad to the south of subject site is at an elevation below the subject site. . * Site development includes a concrete drive/parking area; wood fence to northwest corner of residence; deck area on south side of residence; and two low retaining walls near southeast and northeast corners of residence. . * Elevations for the subject site pad are from about 82 feet near northwest corner of residence to about 70 feet near northeast access drive. The pad has two general levels: the west level varies from about 79 to 81 feet; and the east level varies from about 70 to 75 feet. . * The top of bluff is about 15 to 18 feet from the main floor of the residence, but the foundation of the basement area is likely about 20 to 25 feet from the face of the bluff. . * We observed that at least two slope failures had occurred on the bluff face during and immediately after the heavy rains of March 1991. The failure areas were about 3 to 15 feet wide, about 1 to 3 feet deep, and several feet long. Secondary accelerated erosion has also occurred during the rainstorms. . * The materials in the bluff are composed of the approximate sequence of description from top to the bottom. The upper 8 to 10 feet of soils are composed of light reddish-brown, silty sand. These soils are lightly cemented with iron- oxide. The materials tend to erode and stand temporarily . 635 II C" Street. Suite 405 . San Diego. California 92101. (619) 544-9155 . ARTIM & ASSOCIATES . Page 5 Project Number 91-27 April 26, 1991/Revised May 20, 1991 Geotechnical and Environmental Consultants for longer periods of time than the underlying material. . * Underlying the reddish-brown silty sand is about 35 to 40 feet of pale brown, very fine sand. These soils are clean and friable with virtually no cohesive material. A grain size test of this material is included in the back of this report. . * Underlying the pale brown sand is about 20 feet of very dense sandstone of the Torrey Sandstone. The contact of the upper Torrey Sandstone is delineated by a stained red-brown layer about 2 feet thick likely a result of water seepage. This bedrock unit stands in relativily more stable steep inclinations. We did not observe any fracture zones or faults in this unit. . * The base of the bluff is marked by piles of eroded sand and debris from the bluff. Below the base to the water is a beach composed primarily of cobbles. Figure 4 presents a photograph presentation of the bluff face and beach area. . * The bluff face is nearly void of vegetation. Some growths of ice plant grow from the top of the slope, but otherwise the bluff face is bare of vegetation. . * Test excavations T-l and T-2 were made at the locations shown on Figure 2. Each excavation was made to a depth of 4 feet, soils examined, described, and sampled. . * Our knowledge of the site area indicates that sea bluffs along this area suffer from irregular and episodic failures, especially along the tops of the bluff. The average rate of retreat of the base appears to vary from about 1/2 to 1 inch per year up to about 6 inches per year. The upper bluff however, as the lower bluff retreats, often remains in an unstable condition for some time until an erosive force from the top of the bluff causes a large section to fail and "run" down the slope. . * We observed that erosion appears to be more rapid at this site than at the adjacent nearby sites. * This section of sea bluff will continue to erode at a rate more rapid than adjacent properties unless some type of mitigation is implemented. . * Except as described herein there are no other geological hazards known to be present on the site. . 635 "C" Street. Suite 405 . San Diego. California 92101. (619) 544-9155 . ARTIM & ASSOCIATES . Page 6 Project Number 91-27 April 26, 1991/Revised May 20, 1991 Geotechnical and Environmental Consultants . * The slope at the subject site is as steep as 65 feet vertically along a horizontal depth of about 60 feet. This inclination is slightly steeper than l:l( horizontal to vertical). The lower Torrey Sandstone is capable of standing in the near vertical for long periods of time; however, the overlying friable sands will tend to erode to an angle of repose of about 26 degrees. In addition, the upper friable sands are extremely prone to rapid erosion. . . * During a walking review of the approximate 2 miles of bluff north of Moonlight State Beach in March, 1991, we observed several sites at which vegetative growth was well established in the friable sands. Certain species of small trees and shrubs appeared to be concentrated at the contact between bedrock and friable sand. Water seepage at these areas appeared to be not present, or less than adjacent sites. Certain species of shrubs appeared to be well established within the friable sand zone. . * The test excavations encountered medium dense to dense, reddish-brown, slightly silty sand. The upper several inches in each excavation appeared to be loose and disturbed, possibly as a result of landscaping and/or site construction activities. An expansion test on the soil in T-l indicated they have a very low potential for expansion. A direct shear test of soil at the base of T-2 indicated an angle of 31 degrees and 100 pounds cohesion. . Summary of Key Site Conditions . The site slope is about 65 feet high at an approximate 1:1 inclination. The upper 40 to 50 feet of the slope is underlain by friable sands. The angle of repose for these sands is likely about 26 degrees. These soils are actively eroding. . A set back line of 2:1 horizontal to vertical (26 degrees) from the approximate contact of the Torrey Sandstone and friable sands would extend to the base of the existing structures basement foundation. . Mitigation of the present erosion conditions should be implemented to protect the property at the upper portion of the lot. Such protections should be considered temporary since, in our opinion, no protective devices along eroding coastal bluffs can be permanent. . 635 II C" Street. Suite 405 . San Diego. California 92101. (619) 544-9155 . ARTIM & ASSOCIATES . Page 7 Project Number 91-27 April 26, 1991/Revised May 20, 1991 Geotechnical and Environmental Consultants Conclusions and Recommendations . The results of our study indicate on-going soil erosion of the bluff at the subject site. The cause of the erosion includes poor surface drainage from this and an adjacent site to the north, the steep sea bluff on the west part of the site, the friable nature of the upper sands in the bluff, and the lack of vegetative growth on the slope. If some types of mitigation are not implemented, erosion will continue and affect site improvements. . We recommend that the following be utilized for mitigation of the site erosion conditions. . 1. Positive surface drainage should be established for the site. Positive surface drainage for this report is defined as drainage away from foundations and sea bluff top at a gradient of at least 2 percent for at least 5 feet. Establishment of positive surface drainage will also need to include the site area immediately adjacent to the north of the lot, since runoff from the adjacent site directly influences erosion of the site bluff. All areas near the bluff top should be regraded to slope toward the east or into concrete lined drainage swales away from the sea bluff top. All drainage should have a minimum gradient of at least 2 percent toward the east and 5th Street. Eave gutters and downspouts should be installed on the residence with downspouts discharging away from the foundation and sea bluff top and utilizing non- erosive devices. Installation of positive drainage will likely include several area drains and/or collection points discharged to 5th Street. . . . 2. Soil samples of the friable slope sands should be collected and an analysis performed to assess the type of vegetation that may survive, and thrive, at the site slope conditions. The species of vegetation that appear to be performing well in similar slope and soil condition along the bluff north of the site should be analysed to evaluate their suitability to adapt to this site. Based on this study a landscape plan should be developed and implemented at the subject sea bluff slope. Such a plan should avoid, as much as possible, slope disruption during planting operations. Slope watering should be avoided if possible, and if deemed necessary might consist of a degradable drip system. . . 3. The base of the bluff area is composed of Torrey Sandstone that will erode and retreat at relatively slow . 635 "C" Street. Suite 405 . San Diego. California 92101. (619) 544-9155 . ARTIM & ASSOCIATES Geotechnical and Environmental Consultants . Page 8 Project Number 91-27 April 26, 1991/Revised May 20, 1991 . rates. The slow retreat will continue to cause a response erosion of the upper bluff friable soils. However, when the recommendations contained in numbers 1 and 2 above are implemented, the resultant erosion will be better controlled. Some type of base protection might be installed to lessen and/or slow the rate of retreat of the Torrey Sandstone base. Such measures could include rip-rap armor to blend into an existing armor just south of this site. . 4. For safety of the property at the top section of the bluff and to persons at the base of the slope, we strongly recommend that planning and implementation of at least the first two recommendations begin immediately. . 5. For longer term protection of the property, other considerations include relocation of the existing residence such that the present east-west alignment is north-south and set back from the present foundation. This consideratiön would involve encroachment onto the property north of the subject lot. Relocation of the residence would result in a longer time use of the residential property. . 6. The final mitigation plans and specifications should be prepared by this firm and approvals obtained prior to the order, or purchase, of any materials or construction. . 7. We assume no responsibility or liability for work performed by others at the subject site. . 8. Safety of personnel on-site during mitigation construction is the responsibility of the contractor performing the work. . 9. Should you desire, we can obtain cost estimates for mitigation recommendation number 1, and cost estimate to perform the additional study for recommendation 2. Other course of actions will be dependent on the directions and requirements of the City of Encinitas and the Coastal Commission. 10. Additional services may be required dependent upon the directions and requirements provided from the City of Encincitas and the Coastal Commission. . . 635 "C" Street. Suite 405 . San Diego. California 92101. (619) 544-9155 . . ARTIM & ASSOCIATES Geotechnical and Environmental Consultants . Page 9 Project Number 91-27 April 26, 1991/Revised May 20, 1991 Should you have any questions or require additional service, please do not hesitate to contact us. . Very truly yours, . /...> //// // . // --_/ ¡:~L._L ýjr"--:'__Ji,¿ /'-- Charles J. Randle RCE 22096; expo 9-30-93 . ~~ . Ernest R. Artim CEG 1084; expo 6-30-92 Distribution: (3) addressee . . . . . /-, 635 II C" Street. Suite 405 . San Diego. California 92101. (619) 544-9155 . . II It þ II . 1 n . . . ARTIM & ASSOCIATES Geotechnical and Environmental Consultants . Page 11 Project Number 91-27 April 26, 1991/Revised May 20, 1991 Legend for Figure 2 and 3 . Qb Beach cobble and sand deposit Qt Quaternary Beach Ridge deposits Tt Torrey Sandstone . " / geologic contact ". ,. 2:1 erosion line no fractures were observed at site exposures . no faults were observed at site exposures no joints were observed at site exposures bedding is generally cross-bedded or massive . contact between Torrey Sandstone and friable sand is relatively horizontal . T-2 x approximate location of test excavation A A' Igeological cross-section scale of original drawings is 1 inch = 20 feet reduced scale of report drawing is the same horizontally and vertically. Refer to bar scale on Figure 2. . . . Figure 2a: Legend for Figures 2 and 3 . 635 "C" Street. Suite 405 . San Diego. California 92101. (619) 544-9155 . Hnl! S . , ..... , ' ,- - - - - } ~~'- g-Y ~ \ /~. '-- ,,) l J iN --- ~ /". ¿'J. / . . . . . ---- R ~-~ ---- ~ ~: . ------- ~ . --------- ~ ~ c ------ . -.:- HlIIOfil" . HL ç " » -0( j~ . 100 feet . . 80 60 40 20 0 . . . , 01 ",' //r(2:l ,. ," ," ," "," ",.,." ~..:..- ~Ql1.t act TI . Residence basement erosion line . . . 5th Qt Generalized Geologic Cross- Section, A-A' ".., """"0 ., 0... . 100 80 60 40 20 0 feet OIAWN .' "~"O ........ ~_. . . . . 1 Ii . c . . .. . ARTIM & ASSOCIATES Geotechnical and Environmental Consultants . Page 15 Project Number 91-27 April 26, 1991/Revised May 20, 1991 LABORATORY TEST RESULTS . Expansion Testing Sample Location Description Expansion Index Classification T-2 0-4 feet Fine sand -0- Very Low . Direct Shear Test Sample Location Friction Angle Cohesion T-2 4 ft depth 31 degrees 100 . Grain Size (as a percent passing the listed screen size) Sample Location #4 #8 #16 #30 #50 #100 #200 . 10 below top of slope 100 98 92 80 30 16 7 . . . . t 635 "C" Street. Suite 405 . San Diego. California 92101. (619) 544-9155