1999-5843 G
APR. 13. 2000
1:49PM
CTE ESCOND I DO
NO. 2641
P, 1/16
~
~
CONSTRUCTION TESTING & ENGINEERING,
2414 VINEYARD AVE, STE. G
ESCONDIDa, CA 92029
(760) 746-4955
FAX (760)746-9806
INC.
"'
FACSIMILE TRANSMITTAL SHEET
'1\).
Jeff Garami
FROM:
Dale Binder
(:I)~1PANY:
City of Encinitas
])1\TE:
4/13/00
FAX NUMBER:
TOTAL NO. OF PAGES INCLUDING COVER:
760-633-2818
i'IIUNE NUMJlF.R:
SENDER'S REFERENCE NUMBER:
10-3028
KF:
YOUR REFERENCE NUMBER:
Filips Residence
0 URGENT. FOR REVIEW
0 PLEASE COMMENT 0 PLEASE REPLY
0 PLEASE RECYCLE
N\ n'ES/COMMENTS.
Pad compaction report attached as requested by Larry from L T Construction for residence at
1401 Akita Lane, Encinitas.
DALE BI!'. )ER
SOIl, FTELD MANAGER
APR. 13.2000
1 :49PM CTE ESCONDIDO NO. 2641 P.2/16
CONSTRUCTION ]ÈSTING & ENGINEERING, INC.
r
,
§
~
~
t?
§
Cì
ENGINEERING, INc.
~
SAN DIEGO, CA . RIVEKSIDE, fA . VENTIlKA. CA . TRACY, CA . LANCASTER, CA
2414 Vineyard Ave. 490 E. Princcland CL L64S Pac:ific Ave. 242 W.I.arch 42156IO1h 51. W,
Suilc G Sui~ 7 Suilc IOS Suite F Unit K
K'!Condido, CA 92029 Corona, CA '.11719 Oxnard. CA 9303.i Tracy. fA 95376 L~nc~lér, CA 93534
(760) 746-4955 (909) 371-11190 (6611 486.6475 (209) 839.28911 (661) 726-9676
1760) 746-9~ ru (~) J7J.2168~.\X (661) 486-9016 FH (2091839.28'.15 fAX (661) 72(,,9676 ~U
REPORT OF TESTING OF COMPACTED FILL. BUILDING PAD
PROPOSED FILIPS RESIDENCE
1401 AKITA LANE
ENCINIT AS. CALIFORNIA
PREP ARED FOR:
MR. LARRY TRUJILLO
L T CONSTRUCTION
7338 JUNCUS COURT
SAN DIEGO, CALIFORNIA 92129
PREP ARED BY:
CONSTRUCTION TESTING & ENGINEERING, INC.
2414 VINEYARD AVENUE. SUITE G
ESCONDIDO, CA 92029
CTE Project No. 10-3028
April 11, 2000
F:\!O-.IO28\Rpl_Compac!cd Fill, Building Pad.doc
GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION
APR. 1 3. 200 0
NO. 2641 ---Po 3/16 -- -
1: 50PM
CONSTRUCTION ]ÈSTING & ENGINEERING, INC.
eTE ESCOND I DO
.
,
SAN DIEGO, CA
2414 Vineyard Ave.
Soil. G
Escondido, CA 92029
(760} 746-4955
(760) 746-9806 fAX
. RIVERSIDE, CA
490 K Princcland CL
Suite 7
Corona, CA 91719
1909) 371-lg90
1909) 371-2168 FA~
VENTUKA, CA
1645 Pacil1c A,'e.
Suite 105
Oxnard, CA 93033
1661) 4116.6475
(661) 486-9016 fAX
. 'fRACt', fA
242 W. Larch
Snitd"
1ì'acy, CA 95376
(209) 839-2890
(209) 839.2895 fU
. LANCASTER, CA
42156 10th SL W.
Uni!K
Lancas!er, fA 93534
(61111726-9676
166)} 726-9676 FAX
...
April 11,2000
CTE Project No.1 0-3028
Mr. Larry Trujillo
L T Construction
7338 Juncus Court
San Diego, California 92129
Subject:
Report of Testing of Compacted Fill, Building Pad
Proposed Filips Residence
1401 Akita Lane
Encinitas, California
Refeœnced
Report:
Preliminary Geotechnical Investigation
Proposed Residence
1401 Akita Lane
Encinitas, California
By CTE dated April 27, 1999
Mr. Trqjillo:
At your request, we have performed earthwork testing during grading at the site. Attached is our
report of the observations and tests perfonned to date on fill materials for the building pad. Based on
our testing and observation, earthwork was perfonned in general accordance with the
r~commendations provided in our referenced Preliminary Geotechnical Investigation.
Respectfully submitted,
CONSTRUCTION TESTING & ENGINEERING, INC.
F:\IO-JO28\Rpf_Compaclcd Fill. BUIlding Pad,dol:
GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION
APR. 13.2000
1: 50 PM
CTE ESCOND I DO
NO. 2641
P. 4/16
,
'\
...
TABLE OF CONTENTS
1.0 PROPOSED DEVELOPMENT... """"" ""'" """"" "'" """""'" """" .... ........... .... """" ""'" ....1
2 . 0 F r L L P LA CEMENT.. ...... .... ..... . . ..... ... .. ..... .. .. . .. .. ... .. ... '" ..... ... ... ...... .. . "'" . .. ... .. .. . .. . . ..... . . , .. .. ... ... 1
3.0 TESTING ......,.............. .n............ .... """"""""""'" .................... """""" ........... n..... ...... .... ......1
4.0 TREATMENT OF BUILDING PAD... """"""""" .... """ """"""'" """ .......... ........................2
5.0 FOUNDATION AND SLAB RECOMMENDATIONS .........................................................2
5. I Foundations............ ......... """'" ....... ........... ............ """""""" """"" .... """"'" .......... "'..n. ...2
5.2 Foundation Setback............... ....... """" """""'" ..n......... ""'" ... ........ ........... "'" ... .... 'n... .......3
5.3 Lateral Resistance and Earth Pressures.......................n........................................,..............3
5.4 Concrete Slab-an-Grade ........... """"""""" ..... "'" "'" ..........,... ................... """""""" ......,..4
5.5 Exterior Flatwork and Improvements............................ """ ..................................... ...........4
6.0 ADDITIONAL CONSTRUCTION OBSERV A TION............................................................5
7.0 SURFACE AND SUBGRADE DRAINAGE """""""""".....................................................5
8.0 LIMIT A TrONS """ """"" ""'" ..... """""" ..................... """"""" """"'" ................ """"""""" 6
TABLES
TABLE I
TABLE 2
COMPACTION TEST SUMMARY
COMPACTION TEST DATA
FIGURES
FIGURE 1
FIGURE 2
FfOURE 3
SITE INDEX MAP
COMPACTION TEST LOCATION MAP
RETAINlNG WALL DRAINAGE DETAIL
F:\IO.JIJ211\Rpl_Compactcd Fill, Building Pad,doc
APR. 13. 2000
1: 51 PM
CTE ESCONDIDO
NO. 2641
P. 5/16
,
^,
Report of Testing of Compacted Fill. Building Pad
Proposed Filips Residence
140 I Akita Lane Encinitas, California
April 11.2000
Page 1
CTE Job. No. 10-3028
1,0 PROPOSED DEVELOPMENT
The site is at the south end of Akita Lane, south of Fortuna Ranch Road in Encinitas, California
(Figur~ I). The proposed development consists of a single-family. wood-fi'amed residential structure
with an attached garage. Associated improvements include driveways, landscaping, and utilities.
2.0 FILL PLACE:rvŒNT
Compacted fill was placed during recent grading to prepare the site for the construction of the
proposed structure. Fill material was derived from on site sources. Fill was generally placed in
compacted J ifis at or near optimum moisture content. Grading was perfonned using standard heavy-
duty construction equipment.
3.0 TESTING
Testing was generally performed to supplement field observations and aid in promoting compliance
with the applicable project requirements. Testing of compacted fill addressed by this report was
conducted between March 15 and 28, 2000. Field testing of the compacted £11 material was
conducted in accordance with ASTM D2922 and D3017 (nuclear method) along with AASHTO
T224 (rock correction), Results of the field testing indicate that tilJ materials were compacted to a
minimum of90 % of the laboratory maximum dry density as determined by test method ASTM 0-
1557,
Tabulated results of the field compaction testtng pertonned are provided in the attached Table l.
R~fer~nce compal:tion values tor the tì1J materials are provided in Table II. Approximate test
locations are graphlc::lIly depicted on Figure 2,
f'\IO-JO2S\Rpl_Compil.;tc:d Fill. IJuilding Pad. do.;
APR. 13. 2000
1: 51 PM
CTE ESCONDIDa
NO. 2641
P. 6/16
Report of Testing of Compacted Fill. Building Pad
Proposed Filips Residence
140 I Akita Lane Encinitas. California
April l i. 2000
Page 2
CTE Job. No. 10-3028
4.0 TREATMENT OF BUILDING PAD
To prepare the building pad, areas receiving fill were overexcavated to the depth of competent
natural material. This generally consisted of solid Jurassic Santiago Peak Volcanics. Based on site
preparation and location at the site we anticipate footings will be founded entirely in properly
compacted fill materials or into formational soils depending on footing depths.
5.0 FOUNDATION AND SLAB RECOMMENDATIONS
5. I Foundations
Continuous and isolated spread footings embedded a minimum of 12 inches into Jurassic Santiago
Peak Votcanics or 18 inches into properly recompacted fill are suitable for use at this site, However,
footings should not straddle cut/fill interfaces. If transitional conditions are encountered during
footing excavation reviews than mitigative measures will be required. These measures may include.
but ar<;: not limited to. placing additional reinforcement or deepening footing excavations.
Foundation dimensions and reinforcement should be based on allowable bearing values of 2000
pounds per square foot (pst) for footings founded on properly compacted fill. For footings founded
directly on the Jurassic Santiago P~ak Volcanics an allowable bearing value 0£3000 psfmay be used
to calculate foundation dimensions and reinforcement. The allowable bearing value may be
increased by one third for short duration loading which includes the effects of wind or seismic
tlm:c:-\.
F,\I(-JO28\Rpt_Lompactc:d Fill, Building rad,uoc
APR. 13. 2000
1: 51 PM
CTE ESCONDIDO
NO.2 6 41
P. 7/16
Report of Testing of Compacted Fill, Building Pad
Proposed Filips Residence
140 I Akita Lane Encinitas, California
Apri I I I, 2000
Page 3
CTE Job. No. 10-3028
Footings should be a minimum of 12 inches in width. Minimum reinforcement for continuous
footings should consist of four #4 reinforcing bars; two placed near the top and two placed near the
bottom. Isolated footing reinforcement should be designed by the project structural engineer. The
structural engineer should also provide recommendations for reinforcement of any deepened spread
footings and footings with pipe penetrations.
5.2 Foundation Setback
Footings should be designed such that the minimum horizontal distance from the top of the adjacent
slope to the outer edge of the footing is a minimum of 10 feet. Where this distance cannot be
attained. the footings should be deepened to a depth where the horizontal distance from the face of
the adjacent slope to the outer edge of the footing meets the 10-foot minimum distance.
).3 Lateral Resistance and Earth Pressures
The following recommendations may be used for shallow footings on the site. Foundations placed in
firm. well compacted till material or competent formation may be designed using a coefficient of
friction of 0.35 (total frictional resistance equals coefficient of friction times the dead load). A
design passive resistance value of 300 pounds per square foot per toot of depth (with a maximum
value l)f 1200 pounds per square foot) may be used. The allowable lateral resistance can be taken as
the sum of the frictional resistanœ and the passive resistance, provided the passive resistance does
not ~xçeed two-thirds of the total allowable resistance.
Retaining walls up to ten feet high and backfilled using generally granular soils may be designed
using the equivalent nuid weights given in the Table below.
1':\ I ().J02~\R(1t_Compaclcd Fill, Building I'au,'¡nc
APR, 13.2000
1: 52 PM
CTE ESCONDIDO
NO, 2641
P, 8/16
"
R~port of Testing of Compacted Fill, Building Pad
Proposed Filips Residence
I ~O I Akita Lane Encinitas, California
April] I. 2000
Page 4
CTE Job. No. 10-3028
,",","""
, ,"
""'"'""',":i"""""" "
::i,:\:,
"';;,,;;,;"
GHTS
WALL TYPE
LEVEL BACKFILL
CANTILEVER WALL
(YIELDING)
RESTRAINED WALL
38
SLOPE BACKFrLL
2:1 (HORIZONTAL: VERTICAL)
60
58
90
The values above assume non-expansive backfill and free draining conditions. Measures should be
taken to prevent a moisture buildup behind all retaining walls. Drainage measures should include
free draining backfi 11 materials and perforated drains. Provided on Figure 3 is recommended gravel
and perforated pipe drainage system. These drains should discharge to an appropriate onsite
location.
5.4 Concrete Slab-an-Grade
Lightly loaded concrete slabs should be a minimum of 4 inches tlúck and be reinforced with #3 or
#4 reinforcing bars placed on 18 or 24 -inch centers each way. All slab reinforcement should be
supported to ensure placement near mid-height of the concrete. All slab areas should be underlain by
a minimum of four inches of clean. compacted sand. For all slabs. a vapor barrier consisting of a
minimum often mil visqueen or equivalent membrane with all laps sealed should underlie moisture
sen::¡itivc Hoor areas. The membrane should be placed at mid-height in the sand layer discussed
above.
5 ,5 E~t~rior Flat\No~ and Improvements
To redll¡;e the potential for distrc;:ss to exterior flatwork caused by subgrade movement. we
r~col1lmenù that improvements be installed with crack-control joints at appropriate spacing as
F\().)O18\RpI_Cornpill;lcd Fill. Building Pild,doc
APR. 13. 2000
1: 53 PM
CTE ESeOND I DO
NO. 2641
P. 9/16
r,
Report of Testing of Compacted Fill, Building Pad
Proposed Filips Residence
1401 Akita Lane Encinitas. California
April II. 2000
Page 5
CTE Job. No. 10.3028
designed by the project architect. Flatwork. which should be installed with crack control joints.
includes drìveways. sidewalks, and architectural features. All subgrades should be properly moisture
conditioned and prepared according to the earthwork recommendations previously given before
placing concrete. Positive drainage should be established and maintained adjacent to all flatwork.
Positive drainage means drainage away from improvements at a gradient of at least 2 percent for a
distance of at least five feet.
6.0 ADDITIONAL CONSTRUCTION OBSERVATION
All additional grading and backfilling should be observed and tested to assure confom1ance with
recommendations presented herein. All footing trenches should be examined before placement of
steel reinforcement. All graded slopes should be planted and maintained with erosion resistant
vegetation.
7.0 SURFACE AND SUBGRADE DRAINAGE
Foundation and concrete-slab-on grade performance depends greatly on how well the runoff waters
drain from the site. This is tme both during construction and over the entire life of the structure.
The ground surface around structures should be graded so that water flows rapidly away from the
structures without ponding. The surface gradient needed to do this depends on the landscaping type.
In gt:llcral, the pavements and t1owerbeds within five feet of buildings should slope away at
graJíçnts of at least two percent Densely vegetated areas should have minimum gradients of five
percent away from buildings if doing so is practica1.
':\1O-3028\R!I_COl11pact\:d Fill, Building P"d,doc
APR. 13.2000
1: 53 PM
eTE ESCOND I DO
NO. 2641
P. 10/16
\,
Report of Testing of Compacted Fill. Building Pad
Proposed Filips Residence
140 I Akita Lane Encinitas, California
April 1 J. :WOO
Page 6
CTE Job. No. 10-3028
Planters should be constructed so that water from them will not seep into the foundation areas or
beneath slabs and pavement. In any event, iITigation should be limited to the minimum actually
necessary to sustain the landscaping plants properly. Should excessive irrigation. waterline breaks,
or unusually high rainfall occur, saturated zones and groundwater may develop. Consequently, the
site should be graded so that water drains away readily without saturating the foundation or
landscaped areas or cascading over slope faces. Potential sources of water. such as water pipes and
drains should be frequently examined for signs ofleakage or damage. Any such leakage or damage
should be repaired promptly. The project Civil Engineers should thoroughly evaluate the on-site
drainage and make provisions as necessary to keep surface waters from affecting the site.
8.0 LIMITATIONS
As limited by the scope of the services that we agreed to perfoml. our opinions presented herein are
based on our observations, test results, and understanding of the proposed site development. Our
service was performed according to the currently accepted standard of practice and in a way that
provides a reasonable measure of the compliance of the grading operations with the job
requirements. No warranty, express or implied. is given or intended with respect to the performance
of the project in any respect. Submittal of this report should not be construed as relieving the
grading contractor of his responsibility to comply with the project requirements.
Tht;: opportunity to be of service is appreciated. If you have any questions regarding testing
conducted. observations made during construction or recommendations presented herein, please do
not hl.:sitate to contact this office.
F\ I O.JO2¡¡\Rpl_Compa..:I..:11 Fill, BUllllins I'ild,doc
APR. 1 3. 20 0 0
1: 53 PM
CTE ESCONDIDO
\,
.
Report of Testing of Compacted Fill. Building Pad
Proposed Filips Residence
1401 Akita Lane Encinitas, California
April 11,2000
NO. 2641
P. 11/16
Page 7
CTE Job. No. 10-3028
Respectfully submitted,
CONSTRUCTION TESTING & ENGINEERING, INc.
fl-I£-¡ ð-I
~ódney D. J{¡l~, GE #2173
Geotechnical Engineering Manager
"I
\.~
J U~athan Goodmacher. CEG #2136
Se ior Engineering Geologist
F:\!O-JO28\Rpl_Compm:tcd Fill. Building I'ad,doc
APR. 13. 2000
"
.
Job Narne:
Job Address:
Date
J/15/00
3/15/00
3/ I 5/00
3/15/00
3/17/00
3/17/00
J/ 7/00
3/17'00
J/17/O0
J/17/00
)/17/00
3/20/00
3:20100
3/22/00
3/22/00
3/23/00
J/23/00
3/27/00
3/27/00
3/27/00
.3í:moo
ynoo
](27/00
3;27'00
.3'28/00
3/28/00
3~8/00
1: 54PM
en ESCOND I DO
TABLE I
COMPACTION TEST SUMMARY
FIL1P~RESIDEN
ENC1191TAS; C
Test .;,,",
No.
4&\)H
."
"'
i1
'....' ';'
j) / '.',',. .,...'..
'.'"X ~
'..
I KEYW A Y NE SIDE
2 KEYW A Y NE SIDE
3 IŒYW A Y NE SIDE
4 KEYW A Y NE SIDE
5 KEYW A Y N SIDE
6 KEYW A Y NW SIDE
7 KEYW A Y NW SIDE
8 RETEST OF # 7
9 KEYWAY @ DRIVE
10 KEYW A Y (ã) DRIVE
II KEYWAY@DRIVE
12 DRIVEWAY AREA
13 DRIVEWAY AREA
14 PAD SOUTH SIDE
15 PAD NORTH SIDE
16 DRIVEWAY AREA
17 DRIVEWAY AREA NORTH
18 DRIVEWAY AREA
19 DRIVEWAY AREA
10 DRIVEWAY AREA
.2 I PAD EAST OF CENTER
22 PAD NORTH SIDE
23 PAD SW CORNER
24 PAD CENTER
25 DRIVEW A Y AREA
26 DRIVEWAY AREA EAST
27 DRIVEWAY AREA WEST
.. ('ISI' F\lI.U). SIT RUESI'
;
'i;I..I/JR..'
El~:e~~ ,'", ,',..".!¡~~'
415,0 117.4 8.9
416,0 114,9 8,7
4[6.5 116,8 9,0
418,0 115,3 ] I J
416,5 120,0 10,(
416,0 114,9 10,8
415.0 109.4 (3.7
4]5,0 121.3 12.8
417,0 120.5 12,5
417,0 1]8,7 ]1.0
417,0 1168 107
415,0 120,9 9,2
416.0 ]21.9 8,9
417,0 1270 8,4
418.0 125,8 9.7
414.0 118,2 10,5
4[25 ]200 97
415,0 120,2 9,8
417,0 ]22.6 7,8
417,8 120,9 8,5
FG 126,0 68
FG 121.3 7.4
FG 124.0 72
FG 118.6 8.4
FG 1 ¡ 6,0 9,2
FG [24,9 7,8
FG 122,8 83
NO. 2641
P. 12/16
<<,'~~ "...,..' .....',
.."....',.> . ,..,'.
c~!Pít., ..
92%
90%
92%
90%
92%
90%
84%**
93%
92%
91%
92%
91%
92%
94%
93%
91%
92%
90~io
92%
91%
95%
91%
93%
91%
91%
94%
92%
2
2
2
2
3
2
3
3
3
3
2
4-
4
5
5
3
3
4
4
4
4
4-
4
3
')
4
4
APR. 13. 2000
1: 55 PM
eTE ESeOND I DO
NO. 2641
P. 13/16
..
'..
TABLE II
LABORATORY TEST DATA
.
SampIê No; .
J4Pj'N~ø;~ ....'...
j()b:A!ðdtçss: .,,'
124,5 12,0 Red brown silty SAND
2 127.5 12.0 # 1 With 10% rock correction
3 130.5 12.0 #1 With 20% rock correction
4 133.0 12.0 #1 With 30% rock correction
5 135.5 12,0 # 1 With 40% rock correction
1
APR. 13.2000
1: 56 PM
eTE ESeOND I DO
NO. 2641
P. 14/16
"
.
.
~~!ii. V.~Vì£:!X: .., ""., [ , 01 , .7ÔOrD
. .. ~,iiJ ri":-) , '\ ¡ g 21 O~
'b~ ~I\ '9~ I ' 18 ~
-~~ ~. ~ \ - "~ ~g
.l.CJ . .r¡}. /::':./'Á.:' v I '\'¡J~
,~ W, '.:"'/ / m
\p~.¿.:/ / ',s>". .s'
~ r;;'// -----" liE -~~~ ~~. l
°k"-- ,. ,..- I '" ~ -$ ~~,
<~. þ\"~&.,-.r~ ~~.. it/I--' (
,;i~('4~~. ), -; ~~.c:>~ ~t~. ~'./D..r ,/,;t;:-:'....
1/;-f~(p,,1tei' ,; I, '- \F'" COI' ' (O,tJ ì"""""'\-o i--_. \
~~ .sy"". ~--- S ,t!. r~ jr: ~:§ ~ j ~)~........~
,<.,' <, ~. " II> r')J \ c:. "" ~ -t""-'J =:ì- ~
-.- / '- '." Dus\Y 11\ 57~) .g III )' ( "JI~ ,,);/è
,'" ( :, Ø3!1) ði ~ -L ~......~)'!.. ---.. IV
'f'r.-;~ l ¡;- íc.., .I '- 0 f n'I
Lf;>5';§~'~,~( \ 3 (- ~ ¡r --,b ¡.4.... O~O æ
-;/."'.>fi I ~ il ::J ~,--~, ---i~- I ri,_,-, ~~~'I \"\ r¡
"...,"r'" ,;ffl.-._~---ýo,~ -J 0 -" ¡~.-"'.. I" -- \ ,)
- ð¡l:ì '-.J1tí.r )~-. Q I ~Ò ,I r- S... I"T. E ~,\"--. . ~--
\1, g. c \ ~C~--'" ~=:ì ,'. ê c.... I.Jj
~~i":\1 /~ ~'\ If--.~~. Fo~una h ' ... I&: 8;
'..«.:..;;..t'F J'C1Jù \ ,'1: .l § QJ l
,A~'~\- /.-l J '\ ./ , ~l
~1;!'~\ F~ I ~w~ "'t----1t(ji---;'-,) ~ ~ J !!~ \-
".. 1"'( ...- v, i '~o/~ -L-- 3
/~'~/' tj",-,.. \', - #.- ~- ,lg \I"~sW"-~~ I
I.' ;,).".;.'.~~.*~09'. . '-"'- .' OJ ~fr- ) I; V~~ (.."-. i~ ~ ",ì,,"~
, ¡ , \ ......../"'"--./..... .... I~. ~" ;:., \ --" \.~ . ~ ...~..,--",
I'~ (~\~' ) <) """,,""If. "',~ .::.:¡ ~\I/"
,-i -.." ..-~b:',' I /.-1 l..... ~ '---, ". ~~3 "lr' <11 (.'~ C-
, 0:- -"'" I 1,1/1 ",,--^,.......J. 1\ CI
-'~"j "'" " " h', . ã: ',,---1. ',"---
j " "-¡l-----..I Via d~ G9-DaIIo ~ -", -2 AvQnida OQI Duq,UG -¿..~3 '
, -.~- II)'~I . J <, -";) ~Q-'=>--!1r Galls R.6'.lna ~ I cY...-'iY' ---,
,-;,.1 "'i??;,: I ~ /",--- .~. ø".. )-'---',6.: ---'\~ );j ~ ."--', \
',. ~ ~.,' I'~ G~) . ....~'" f'":r, 'I. 0> ..wJ ~" \
- ,,- {J , r--. æ. -' di"\9-1' ~ \.' . f.{]./I. "
':~~~Z)d~~nhlain ~-:~~~~""'j1~ '\ "":-7',: ....... ...-.>.)~]",...,""" \~~ ~...._-j
.--....../ ,,'7-1-' .J .,/\~ 0 ,-~~,~" ~/ -""'...9"-. j t6. í '\ \~o
-.;t¡~ ,'- J Ce"~- ~.~~ J>~.;~ ~~'J \1,~ . t~
"'. f~;t...f>1 çJÞ,-/ -rh.. -""" ()~O¡j-i' ~}r.~,I?,!;e~gl,!it,d~~ö \. \("
f/: <":::;1 "" '/ ~-1\~~ . . Ir ", .'~"~ \, '-
.f"" - '--, ....Q) . \" ' \ ."", ' ':"~'" ....
i,I,. ,", -<,-'" ..' ~.~.."... . \)J---..a ~1'1~~?.. ./ :,fÍ5 . Vis~~ncho C. t\..-
'f'\-' --""'. ~..5~~~ J:r6~ r- -,' . . . L.£-,"", l_-=-'.' H."w. . .so-=f:'
, '~. ~~..~- "-;'~.I ,,' .;:F" -~""",~~Oica5~..' n
('¡) 1999 MI!IpQue:st.com. Ino,. C ,g~g NavQatiJn Teohnoboiiis ... ",'¿.,_i" ! -""",=,"T~-=- ,/ l
~ CON~I~~~r~~~(\~~~~!~£;~B~t1~~~~~~~~;,,~C.
II>«IIIftIIItmQJN(; J,II,IVINBY,\lW \VI<NUG.9TI:G ESCI.>Nm{Jt)c, "'""'j""'7,"."".,
SITE INDEX MAP
FILII'S RlsmENCE
1"01 AKJT,\ L.\NE
ENCINITAS, CALIFORNIA
.10 N"
10-3028
AS SHOWN
1
\11 \/'ROIBC1'S\III-JIIZW\lNUEXMAf"CNV
",10
.'
APR. 13.2000
1: 57 PM
CTE ESCOND I DO
NO, 2641
~
«
...J
-<
E-
S2
-<
P, 15/16
prope~ ~o~~~~ - - - - - - - - - - - - - - - - - - - - -
'- -- -- -- -- -- -- ----
,
~~
"ð'
=',
21
Ë;
<\)
0.'
81
0.,
- - - - - - - - - - -
-------
-------
--.- --
------
--------
------
.-----
----------
(&*
j1Þ ~~ CON~EY1~C~~!~~~o~~~~~~~EE~~~~~~~~~~E?~(~c.
~ 20<.. VINEYARD ,'VI!NUI!. STI! G I!$CONf>IDO CA, '12020 (700) 7....."B
DNOOOBR)/(,IN(',
,'FE JOII NO
10-302&
,\ é
NO SCALE
DATE PI
4/00 2
e APPROXIMATE TEST
LOCA nON
COMP ACTION TEST LOCATION MAP
FrUPS REsmENCE
I~OI AKlT..\ LANE
ENCINITAS, C.\LIFORNJ..\
\If ~.It()BCTS\I"""2". CC IMI'LOCCNV
APR, 13. 2000
1:57PM
CTE ESCONDIDa
NO, 2641
P, 16/16
...
....,
.'
RETAINING W AL
3/4" GRAVEL SURROUNDED
BY FILTER FABRIC (MlRAFI
140 N, OR EQUIVALENT)
FINISH GRADE
WALL FOOTING
MINIMUM 6" LAYER OF
FILTER ROCK UNDERLYING
PIPE
àit'
¡; ~~ CONSTRUCTION TESTING & ENGINEERING, me.
J ""', (;E(rrsCHN1C,\L. ,INn CONSTRUCTION ENGINEERING 'rESTJIoIOINL> INSPECTION.
HI~ VINEY 1M!) AVENUE. S'rEG ESCOND1IJ() ('A "2~2') (7("J)7~h"¡'¡SS
1!N000ep.R'NO.lNC
RETAINING WALL DRAINAGE DETAIL
fllLIrs RF..SmENCE
1401/\KIT.-\ L.,\NE
ENCINIT!\S. C\LIFORNI.\
~
r.... ~""""U""""""""."n"'M"'.ItT....""",\".. , rll'
I §
~
ú
I ~
t?
&'
Cì
I ENGINEERING, INc.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CONSTRUCTION ]ÈSTING & ENGINEERING, INC.
SAN DIEGO, CA .
2414 Vmeyanl.Ave.
Suite G
Escondida, CA 92029
(760) 746-4955
(760) 746-9806 Fax
CTE Job No.1 0-3028
RIVERSIDE, CA
490 £, Princeland Ct,
Suite 7
Corona, CA 91719
(909) 371-1890
(909) 371-2168 Fax
VEN11J RA, CA
1645 Pacific Ave.
Suite 105
Oxnard. CA 93033
(805) 486-6475
(805) 486-9016 Fax
TRACY, CA
242 W. Larch Rd.
Suite F
Tracy. CA 95376
(209) 839-2890
(209) 839-2895 Fax
LANCASTER, CA
42156 10th St. W.
Unit K
Landcaster. CA 93534
(805) 726-9676
(805) 726-9676 Fax
f\
March 22, 1999
Hydrology Study
Filips Residence
1401 Akita Lane
Encinitas, California
Drawing No. 5842-GR
Prepared For:
Gary & Cindy Filips
Prepared By:
Construction Testing & Engineering, Inc.
2414 Vineyard Avenue, Suite G
Escondido, CA 92029
~~~~~~P:14~~
1/\'<" "'~¿; \j. 0,- """" ~.\',
ï , (;,' ,4/" oJ -1~.\ -;v ,~,
,",/"".," ;' /Á . ()'.'11::~..
t'¡ '~';j,/.zJ;.' rí'\ \ ':." \,
""', /.:.) , ~'!, \
';'; ,;¡U J:"' . r"\ j
\,,0> ,'"~I 4~B2 '" :J' "
~ ,-",.. ';\, ' ' "
\ <,",1 ~".',\"\,,,".,E,- x,' ),- q ,l,__,',!""~y,ï,.,}.'",,,/
\\ ,J,'~,.., /(l,'~';'
,c,- >" '¡V\\.......{</'o' I'
\¡ " ; ,/> ,,' ----- ,;. '<;';'J
",,','(.,,"'~'-'C~"l:l \\;',',),',',." /,'
""",,- .,.j (.\.\ /",'
r "T ,', -~"øo'L
~V",i-U~
GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE OF CONTENTS
Section
0 BJECTIVE
ASSUMPTIONS
HYDROLOGY CALCULATIONS
A TT A CHMENTS
ATTACHMENT 1- PRECIPITATION MAPS
ATTACHMENT 2 - INTENSITY-DURATION CHARTS
ATTACHMENT 3 - HYDROLOGY MAP
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Hydrology Study
Filips Residence
Encinitas, California
March 22, 1999
OBJECTIVE
To calculate 1O0-year flow for 1401 Akita Lane in Encinitas, California.
ASSUMPTIONS
1.
Flow calculations per San Diego County Hydrology Manual (1985)
F:\lG-3O28\HydroIotY SIudy,doc
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CONSTRUCTION 1ÈSTING & ENGINEERING, INC.
SAN OlIGO, CA . IMISIDI, CA . YlNTVti, CA . TRACY, CA 1ANCASTD, CA
2414 VIneyri Ave. 490 Eo Prtnœbnd Ct. 1645 PadIIc Ave. 392 Y. 1mb Id. 4Z1S6101b sa. Y.
SuiteG Suite 7 Suite IOS Suite 19 Valli
f.tœÐdIdo. CA 92029 Corona, CA 91719 Omard, CA 93033 Trxy. CA 95376 laaster. CA 93534
(760) 7464955 (909) 371-1890 (80S) ~75 (209) 839-Z890 (80S) 726-9676
(760) 746-9806 FAX (909) 371.2168 fAX (80S) 486-9016 FAX (209) 839-Z89S FAX (80S) 72&9676 FAX
BASIN 1
1. AREA (A) 43560 FT2IACRE = ~ACRES
2. COEFFICIENf OF RUNOFF (C) COEFFICIENf "C"
LAND USE SOIL TYPE (1)
RE S ID ENTIAL: A ~ ~ Q
SINGLE FAMILY .40 .45 .50 .55 =
MULTI-UNITS .45 .50 .60 .70 =
MOBILE HOMES .45 .50 .55 .65 =
RURAL (LOTS GREATER @= O.~5
THAN Y2 ACRE) 30 .35 .40
COMMERCIAL (2)
80% IMPERVIOUS .70 .75 .80 .85 =
INDUSTRIAL (2)
90% IMPERVIOUS .80 .85 .90 .95 =
C= O.~)
3.
TIME OF CONCENfRA TION (TC)
HIGH POINT (Hw _422..5" LOW POINT (Hd
H=HH-HL= -¿1.) FEEf
L = 500 FEEf
5280 FEETIMILE
TC= 60 (11.9(L3)1H)°'38S+1O = _1 ), 0 MIN
INTENSITY (1) FOR FREQUENCY YEAR lQ.(L
MILES
,1Q,O
O.OQ5
4,
SEE A IT ACHMENT 1 FOR PRECIPITATION MAPS FROM THE SAN DIEGO COUNfY HYDROLOGY
MANU AL
A) P6 = 3 . n
P2<4 = J. 0
~ð-= _O, 'O
P2<4
B) P6 (ADJUSTED) =
C) I=--A,2
3,0
IN.
IN/HR (SEE AITACHMENT 2 FOR INTENSITY-DURATION CHARTS)
5.
RUNOFF (Q)
Q=CIA=~CFS
II<D -- ~ ..
GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
A IT ACHMENT 1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-,
COUllTY OF SAN 0 IEGO
DEf'ARTI1f:NT OF SANITATION &
FLOOD COIITIWL
I
I
45'
-0-
:
1-0-
I
15' ~.
I
-o-
j
33°
--.--- .. ---' ... -. ,-- -
- ,
P,.pnf'd by
u,s, DEPARHIENjl' OF COMMERCE I
I
tUT'O:f^L OCI'^,~IC IINO AT, OSI'IIEWIC AO~:I:-IISTRATION :
SPECIAL STUOIES URA~CII. OffiCE Of II UROLOGY. NATIONAL "'E"TIIER SERVICE
....
H
I
»
,
"
301 J J'.' I
1 18'
liS'
, 30'
151
3D'
IS'
116°
, I
I
I
-
- .-
-
-
-
-
-
-
-,.-
i-'
-
-
-
-
-
-
-
-
COUNTY OF SAM DIEGO
DEP^RTHENT OF SANITATION &
FlOOO CONTROL
H
t-t
t
).
t
, 'II"
'I~ I
)0'
I'i I
117°
, I ~i '
101
I~'
II f,"
I
. I
-~
,.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
A IT ACHMENT 2
D~SIGtY. CHART
JNTENSITY-DURATl~
;Þ
'\:
'\:
m.2
a
......
x
x
......
,....,
<
>,1
~ 10
~
2
5
6
30
. .. ~-
'.'".. ,
Hn'lrc:;
",~~:",
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ATTACHMENT 3