1999-5984 G
4
VINJE & MIDDLETON ENGINEERING, INC.
2450 Vineyard Avenue, #102
Escondido, California 92029-1229
Phone (760) 743-1214
Fax (760) 739-0343
Job #99-261-F
Mr. Michael Lyon
3260 West Fox Run Way
San Diego, California 92111
August26,1999
AS-GRADED COMPACTION REPORT FOR PROPOSED SINGLE FAMILY RESIDENCE
LOCATED OFF DUSTY TRAIL ROAD. CITY OF ENCINIT AS DRAWING #5984-G
In accordance with the Grading Ordinance for the City of Encinitas, this as-graded
compaction report has been prepared for the above referenced project. We have
completed engineering observation and testing services in conjunction with the grading
operations. This report summarizes the results of our tests and observations of the
compacted .fills. The compacted fills in the subject areas was placed periodically from
August 6, 1999 through August 19, 1999. Actual dates are shown on the enclosed
compaction test result sheet.
I. GRADING INFORMATION/GROUND PREPARATION
Grading plans for this project were prepared by NASLAND Engineering.
The following listed reports were reviewed by this office as part of this project:
A "Preliminary Geotechnical Investigation Parcel B, Dusty Trail (AP.N. 264-222-40)
Olivenhain, City of Encinitas" report, prepared by this office, dated January 1 0,
1999, Job #98-369-P.
Prior to grading operations, the site in the immediate vicinity of the proposed building pad
was cleared of vegetation. All questionable loose and compressible soils were also
removed from the areas receiving fill. Adequate keys or benches were constructed a
minimum of 2 feet into firm, undisturbed natural ground or formational soils prior to fill
placement.
As-Graded Compaction Report
Dusty Trail Road, Encinitas
August 26, 1999
Page 2
Through removal and recompact of the underlying soils and the placement of import soils,
no cuUfill or daylight line exists within the house area.
Site preparation and grading were conducted in substantial conformance with the Grading
Ordinance for the City of Encinitas and our above listed preliminary geotechnical report.
All inspections and testing were conducted under the observation of this office. In our
opinion, all embankments and excavations were constructed in substantial conformance
with the provided grading plan, and are acceptable for their intended use.
II. FILL PLACEMENT
Fill was placed in six to eight inch lifts and compacted by means of heavy construction
equipment. Field density tests were performed in accordance with ASTM Method D-1556-
90 sand cone method as the fills were placed. The moisture content for each density
sample was also determined. The approximate locations of the field density tests are
shown on the attached drawing.
The locations of the tests were placed to provide the best possible coverage. Areas of low
compaction, as indicated by the field density tests, were brought to the attention of the
contractor. These areas were re\tVOrked by the contractor and retested. The test locations
and final test results are summarized on the compaction test result table. The results of
our field density tests and laboratory testing indicate that the fills at the site were
compacted to at least 90% of the corresponding maximum dry density at the tested
locations.
If the building pad should undergo any seasonal wetting and drying periods prior to
construction, remedial grading could be required depending on the site soil characteristics.
Depths of removal and recompact can best be determined just prior to construction by
appropriate inspection and testing.
III. APPROPRIATE LABORATORY TESTS
A. Maximum Dry Density Optimum Moisture Tests: The maximum dry density and
optimum moisture contents of the different soil types used as compacted fill were
determined in accordance with ASTM Method D-1557 -91.
B. Expansion Tests: Expansion tests were conducted per 1994 UBC Standard
Procedure 18-2 on representative samples of the on site clayey soils during the
preliminary investigative phase of the project. As the import soils used in the upper
VINJE & MIDDLETON ENGINEERING. INC. 2450 Vineyard Avenue, #102. Escondida. California 92029-1229 . Phone (760) 743.1214 . Fax (760) 739-0343
GEOTECHNICAL INVESTIGATIONS
GRADING SUPERVISION
PERC TESTING
ENVIRONMENTAL INVESTIGATIONS
As-Graded Compaction Report
Dusty Trail Road, Encinitas
August 26, 1999
Page 3
3 feet of the building pad area where visually classified as granular non expansive
soils, no additional testing was conducted.
C. Direct Shear Tests: A direct shear test was also performed on a representative
sample of the on site "medium expansive" soils during the preliminary investigative
phase of the project. No additional testing was conducted on the import soils as
UBC minimums will be used to provide the allowable bearing capacity.
IV. RECOMMENDATIONS
The following minimum foundation recommendations for very low expansive import soils
(Expansion Index less than 20) from our "Preliminary Geotechnical Investigation" report
should be adhered to, incorporated into the foundation plans, and submitted to our
office for review and approval prior to construction.
A. Foundations and Slab-on-Grade. Monolithic Pour System
1. Continuous strip foundations should be a minimum of 12 inches wide by 12
inches deep, and 15 inches wide by 18 inches deep for one and two story
structures respectively. Interior and exterior spread pad footings should be at
least 24 inches by 24 inches wide and 12 inches deep, for one and two story
structures. Minimum depths are measured from the lowest adjacent ground
surface, not including the sand under the slab. Exterior continuous footings
should enclose the entire building perimeter, to include the garage entryway.
2. Use two #4 reinforcing bars in all interior and exterior stud bearing wall footings.
Place one bar 3 inches below the top of the footing, and one bar 3 inches above
the bottom of the footing. Reinforcement for isolated square footings should be
designed by the project structural engineer.
3. All interior slabs must be a minimum of 4 inches in thickness reinforced with #3
reinforcing bars spaced 18 inches on center each way, placed midheight in the
slab. Use 4 inches of clean sand (SE 30 or greater) beneath all slabs. A six-mil
plastic moisture barrier must be placed midheight in the sand.
Provide re-entrant (:t270° corners) reinforcement for all interior slabs as
generally shown on the enclosed "Isolation Joints and Re-Entrant Corner
Reinforcement" detail. Re-entrant corners will depend on slab geometry and/or
interior column locations.
VINJE & MIDDLETON ENGINEERING. INC. 2450 Vineyard Avenue, #102. Escondida. California 92029.1229 . Phone (760) 743-1214 . Fax (760) 739-0343
GEOTECHNICAL INVESTIGATIONS
GRADING SUPERVISION
PERC TESTING
ENVIRONMENTAL INVESTIGATIONS
As-Graded Compaction Report
Dusty Trail Road, Encinitas
August 26, 1999
Page 4
4. The minimum steel reinforcement provided herein is based on soil
characteristics only, and is not intended to be in lieu of reinforcement necessary
for structural considerations.
5. Provide contraction joints consisting of sawcuts spaced 10 feet on center each
way within 24 hours of concrete pour for all interior slabs. The sawcuts must be
a minimum of % inch in depth and must not exceed 1 X inch in depth or the
reinforcing may be damaged.
6. All underground utility trenches beneath interior and exterior slabs should be
compacted to a minimum of 90% of the maximum dry density of the soil. Care
should be taken not to crush the utilities or pipes during the compaction of the
trench backfi II. .
7. Exterior Flatwork and Driveways:
a) Walkways, patios, etc. must be a minimum of 4 inches in thickness reinforced
with 6x6/1 Ox1 0 welded wire mesh carefully placed two inches below the top
of the slab. Provide contraction joints consisting of sawcuts spaced 10 feet
on center (not to exceed 12 feet maximum) each way within 24 hours of
concrete pour. The sawcuts must be a minimum of % inch in depth and must
not exceed 1 X inch in depth or the reinforcing may be damaged.
b) Concrete driveways and parking areas should consist of 5 inch thick concrete
reinforced with #3 reinforcing bars spaced 18 inches on center each way or
#4 reinforcing bars spaced 24 inches on center each way placed mid height
in the slab. The concrete should be placed over 6 inches subgrade
compacted to a minimum of 95% of ASTM 1557-91. Provide contraction
joints consisting of sawcuts spaced 10 feet on center (not to exceed 12 feet
maximum) each way within 24 hours of concrete pour. The depths of the
sawcuts should be as described in Item #a) above.
c) Asphalt concrete (AC) driveways and parking areas should consist of 3
inches AC over 6 inches Cal Trans Class II aggregate base compacted to a
minimum of 95% over 12 inches subgrade compacted to a minimum of 95%
of ASTM 1557-91.
Unless requested, recommendations for a future swimming pool or spa were not
included in this report. Prior to their construction this office should be contacted
to update conditions and provide additional recommendations.
VINJE & MIDDLETON ENGINEERING, INC. 2450 Vineyard Avenue, #102. Escondida, California 92029.1229 . Phone (760) 743.1214 . Fax (760) 739-0343
GEOTECHNICAL INVESTIGATIONS
GRADING SUPERVISION
PERC TESTING
ENVIRONMENTAL INVESTIGATIONS
As-Graded Compaction Report
Dusty Trail Road, Encinitas
August 26, 1999
Page 5
8. This office is to be notified to inspect or test the following prior to
foundation concrete pours:
a) Inspect the plumbing trenches beneath slabs after the pipes are laid and
prior to backfilling.
b) Test the plumbing trenches beneath slabs for minimum compaction
requirements.
c) Inspect the footing trenches for proper width, depth, reinforcing size and
placement. Inspect the slabs for proper thickness, reinforcing size and
placement, sand thickness and moisture barrier placement.
9. The following allowable foundation and lateral pressures may be used for design
of foundations on certified soils for structures which have continuous footings
having a load of less than 2,000 plf and isolated footings with loads of less than
50,000 Ibs.
a) Per 1994 UBC Table #18-I-A an allowable bearing capacity of 1,500 psf for
continuous and isolated footings may be used. The allowable soil bearing
pressure provided herein is for dead plus live loads and may be increased
by one-third for wind and seismic loading.
b) The allowable soil bearing pressure provided herein was determined for
footings having a minimum width of 12 inches and a minimum depth of 12
inches below the lowest adjacent ground surface. This value may be
increased per Uniform Building Code for additional width and depth if
needed.
c) An allowable lateral bearing pressure of 150 psf per foot of depth may also
be used for all structures except retaining walls. The lateral bearing earth
pressure may be increased by the amount of the designated value for each
additional foot of depth to a maximum of 1,500 psf.
B. Retaining Walls. Lateral Load Parameters
1. As no retaining walls are planned for this project, appropriate testing was not
conducted in order to provide recommendations. If walls are planned at a later
date, appropriate testing and recommendations can be provided if requested.
VINJE & MIDDLETON ENGINEERING. INC. 2450 Vineyard Avenue, #102. Escondida. California 92029-1229 . Phone (760) 743.1214 . Fax (760) 739-0343
GEOTECHNICAL INVESTIGATIONS
GRADING SUPERVISION
PERC TESTING
ENVIRONMENTAL INVESTIGATIONS
As-Graded Compaction Report
Dusty Trail Road, Encinitas
August 26, 1999
Page 6
C. Setbacks
1. Footings located on or adjacent to the top of slopes should be extended to a
sufficient depth to provide a minimum horizontal distance of 7 feet or one-third
of the slope height, whichever is greater (need not exceed 40 feet maximum)
between the bottom edge of the footing and face of slope.
2. The outer edge of all slopes experience "down slope creep", which may
cause distress to structures. If any structures including buildings, patios,
sidewalks, swimming pools, spas etc, are placed within the setback,
FURTHER RECOMMENDATIONS WILL BE REQUIRED.
**A COpy OF THIS REPORT MUST BE PROVIDED TO THE PROJECT
ARCHITECT/STRUCTURAL ENGINEER TO ENSURE THE
THE ABOVE FOUNDATION RECOMMENDATIONS ARE INCLUDED IN
APPROPRIATE PLANS**
The concrete reinforcement recommendations provided herein should not be
considered to preclude the development of shrinkage related cracks, etc.; rather,
these recommendations are intended to minimize this potential. If shrinkage cracks
do develop, as is expected from concrete, reinforcements tend to limit the
propagation of these features. These recommendations are believed to be
reasonable and in keeping with the local standards of construction practice. Special
attention should be given to any "re-entrant" corners (:1:270 degree corners) and
curing practices during and after concrete pour in order to further minimize
shrinkage cracks.
D. Slopes
All slopes should be landscaped with types of plants and planting that do not require
excessive irrigation. Excess watering of slopes should be avoided. Slopes left
unplanted will be subject to eròsion. The irrigation system should be installed in
accordance with the governing agencies.
Water should not be allowed to flow over the slopes in an uncontrolled manner.
Until landscaping is fully established, plastic sheeting should be kept accessible to
protect the slopes from periods of prolonged and/or heavy rainfall. Berms should
be constructed along the top edges of all fill slopes. In no case should water be
allowed to pond or flow over slopes.
VINJE & MIDDLETON ENGINEERING, INC. 2450 Vineyard Avenue, #102. Escondida, California 92029-1229 . Phone (760) 743.1214 . Fax (760) 739.0343
GEOTECHNICAL INVESTIGATIONS
GRADING SUPERVISION
PERC TESTING
ENVIRONMENTAL INVESTIGATIONS
As-Graded Compaction Report
Dusty Trail Road, Encinitas
August 26, 1999
Page 7
Brow ditches should be constructed along the top of all cut slopes sufficient to guide
runoff away from the building site and adjacent fill slopes prior to the project being
completed.
E. Drainage
The owner/developer is responsible to insure adequate measures are taken to
properly finish grade the building pad after the structures and other improvements
are in place so that the drainage waters from the improved site and adjacent
properties are directed away from proposed structures in accordance with the
designed drainage patterns shown on the approved plans.
A minimum of t\tVO percent gradient should be maintained away from all foundations.
Roof gutters and do\lVl1spouts should be installed on the building, all discharge from
do\lVl1spouts should be led away from the foundations and slab to a suitable location.
Installation of area drains in the yards should also be considered.
Planter areas adjacent to foundations should be provided with damp/water proofing,
using an impermeable liner against the footings, and a subdrainage system within
the planter area.
It should be noted that shallow groundwater conditions may still develop in
areas where no such conditions existed prior to site development. This can
be contributed to by substantial increases of surface water infiltration
resulting from landscape irrigation which was not present before the
development of the site. It is almost impossible to absolutely prevent the
possibility of shallow groundwater on the entire site. Therefore, we
recommend that shallow groundwater conditions be remedied if and when
they develop.
The property owner should be made aware that altering drainage patterns,
landscaping, the addition of patios, planters, and other improvements, as well as
over irrigation and variations in seasonal rainfall, all affect subsurface moisture
conditions, which in turn affect structural performance.
V. GENERAL INFORMATION
It should be noted that the characteristics of as-compacted fill may change due to post-
construction changes from cycles of drying and wetting, water infiltration, applied loads,
VlNJE & MIDDLETON ENGlNEERlNG, lNC. 2450 Vineyard Avenue, #102. Escondida, California 92029.1229 . Phone (760) 743-1214 . Fax (760) 739-0343
GEOTECHNICAL INVESTIGATIONS
GRADING SUPERVISION
PERC TESTING
HNIRONMENTAL INVESTIGATIONS
As-Graded Compaction Report
Dusty Trail Road, Encinitas
August 26, 1999
Page 8
environmental changes, etc. These changes can cause detrimental changes in the fill
characteristics such as in strength behavior, compressibility behavior, volume change
behavior, permeability, etc.
The owner/developer should be made aware of the possibility of shrinkage cracks in
concrete and stucco materials. The American Concrete Institute indicates that most
concrete shrinks about '/8 inch in 20 feet. Separation between construction and cold joints
should also be expected.
The amount of shrinkage related cracks that occur in concrete slab-on-grades, flatwork
and driveways depend on many factors, the most important of which is the amount of water
in the concrete mix. The purpose .of the slab reinforcement is to keep normal concrete
shrinkage cracks closed tightly. The amount of concrete shrinkage can be minimized by
reducing the amount of water in the mix. To keep shrinkage to a minimum, the following
should be considered:
A. Use the stiffest mix that can be handled and consolidated satisfactorily.
B. Use the largest maximum size of aggregate that is practical, for example concrete
made with 3/8 inch maximum size aggregate usually requires about 40 pounds
(nearly 5 gallons) more water per cubic yard than concrete with 1 inch aggregate.
C. Cure the concrete as long as practical.
The amount of slab reinforcement provided for conventional slab-on-grade
construction considers that good quality concrete materials, proportioning,
craftsmanship, and control tests where appropriate and applicable are provided.
This office is to be notified no later than 2 p.m. on the day before any of the
following operations begin to schedule appropriate testing and/or inspections.
A. Fill placed under any conditions 12 inches or more in depth, to include:
1. Building pads.
2. Street improvements, sidewalks, curbs and gutters.
3. Utility trench backfills.
VINJE & MIDDLETON ENGINEERING. INC. 2450 Vineyard Avenue, #102. Escondida, California 92029.1229 . Phone (760) 743-1214 . Fax (760) 739-0343
GEOTECHNICAL INVESTIGATIONS
GRADING SUPERVISION
PERC TESTING
ENVIRONMENTAL INVESTIGATIONS
As-Graded Compaction Report
Dusty Trail Road, Encinitas
August 26, 1999
Page 9
4. Retaining wall backfills.
5. The spreading or placement of soil obtained from any excavation (footing or
pool, etc.).
B. Inspection and testing of subgrade and basegrade beneath driveways, patios,
sidewalks, etc., prior to placement of pavement or concrete.
C. Moisture testing.
D. Foundation inspections.
E. Any operation not included herein which requires our testing, observation, or
inspection for certification to the appropriate agencies.
VI. LIMITATIONS
Our description of grading operations, as well as observations and testing services herein,
have been limited to those grading operations performed periodically from August 6, 1999
through August 19, 1999. The conclusions contained herein have been based upon our
observations and testing as noted. No representations are made as to the quality or extent
of materials not observed and tested.
The attached drawing details the approximate locations of cuts, fills, and locations of the
density tests taken and is applicable to the site at the time this report was prepared. This
report should be considered valid for permit purposes for a period of six months and is
subject to review by our firm following that time. IF ANY CHANGES ARE MADE, PAD
SIZE, BUILDING LOCATION, ELEVATIONS, ETC. - THIS REPORT WILL BECOME
INVALID AND FURTHER ENGINEERING AND RECOMMENDATIONS WILL BECOME
NECESSARY.
If you have any questions or need clarification, please contact this office at your
convenience. Reference to our Job #99-261-F will help to expedite our response to your
inquiries.
VINJE & MIDDLETON ENGINEERING, INC. 2450 Vineyard Avenue. #102. Escondida. California 92029-1229 . Phone (760) 743.1214 . Fax (760) 739.0343
GEOTECHNICAL INVESTlGATIO:-lS
GRADING SUPERVISION
PERC TESTING
ENVIRONMENTAL INVESTIGATIONS
As-Graded Compaction Report
Dusty Trail Road, Encinitas
August 26, 1999
Page 10
We appreciate this opportunity to be of service to you.
RMV/MS/mpr
!
t
~-
Distribution: Addressee (6)
mpr\fillcont\99-261-f.ag1
,
GEOTECHNICAL 1:-"VESTlGATIO:-JS
GRADING SUPERVISION
VINJE & MIDDLETON ENGINEERING, INC. 2450 Vineyard Avenue. #102. Escondida. California 92029.1229 . Phone (760) 743-1214 . Fax (760) 739.0343
ENVIRONMENTAL INVESTIGATIONS
PERC TESTING
JOB NO: 99-261-F
NAME: Mr. Michael Lyon
LOCATION: Dusty Trail Road
Field Density Tests Results: Pad Construction
08/06 1 House pad, Northern fill slope, Eastern half 367 24.8 95.8 115.1 83.2 Failure, bot. of keyway @ 365 ft
08/06 2 House pad, Northern fill slope, Eastern half 367 19.0 104.0 115.1 90.4 Retest of #1
08/06 3 House pad, Northern fill slope, Eastern half 369 18.9 102.5 110.2 93.0
08/09 4 House pad, Northern fill slope, Western half 367 17.6 106.9 115.1 92.9 I Bottom of keyway @ 365 ft
08/09 5 House pad, Northern fill slope, Western half 369 19.7 103.6 115.1 90.0
08/10 6 House pad, Northern fill slope 371 24.0 99.2 110.2 90.0
08/10 7 House pad, Northern fill slope 372.5 19.0 102.3 110.2 92.8
08/11 8 House pad, Eastern transitional area of pad 371 21.2 104.0 110.2 94.4 I Bottom of undercut @ 369 ft
08/12 9 House pad, Northern fill slope 373 17.6 105.7 151.1 91.8
08/13 10 House pad, Western transitional area of pad 373 16.3 107.7 115.1 93.6 I Bottom of undercut @ 371 ft
08/13 11 House pad, Northern fill slope 375 16.4 103.6 115.1 90.0
08/16 12 House pad, Southern area of pad 376.5 6.4 116.4 125.6 92.7 Nonexpansive import material #1
08/16 13 House pad, Northern area of pad 377 8.7 120.9 125.6 96.3 Nonexpansive import material #1
08/18 14 House pad, Western area of pad 379/FG 7.0 130.2 136.2 95.6 Nonexpansive import material #2
08/18 15 House pad, Eastern area of pad 379/FG 7.5 131.6 136.2 96.6 Nonexpansive import material #2
08/19 16 Driveway, sta. 12+50 377/FG 5.3 130.6 136.2 95.9 Bottom of undercut @ 376 ft
08/19 17 Drivewav, sta. 10+60 386/FG 6.3 123.0 136.2 90.3 Bottom of undercut ~ 385 ft
Bot = Bottom
FG = Finish Grade
Sta = Stationing
CBM\grading\pads\OO-261-F .tr1
RETAINING WALL DRAIN DETAIL
Typical - no scale
,,--//
n--<'
.. .
. , . '.'. ';~.. . .,.- '. ... .
. '. . . .
"N°
""". ~-
Waterproofing
Perforated drain pipe
Filter Material. Crushed rock (wrapped in
filter fabric) or Class 2 Permeable Material
(see specifications below)
.:::::.:.::......:.:.::::::.:::::::::.::::::.:::::::.;::.;::.::::::::.;::::::::::::::::.:::
: i ~f,~~lJ~':A'~.~~}.~:i::I:.¡.
..¡öîu1£~b_:¡::i:~.:¡:::¡::ii¡.:..::::'::.::::::..:::.......
.!~;.Lj:¡:.;.;;;¡.:¡:¡¡::..¡...:¡:.@:~~JÑ.:.:.::.
..~i8nn::n:.::::::::::::::.nn:..:'::::.~iOö:',..:
:.H(i;.4:..:......n.::'.:::.:..:....::.{2~/H,:
:¡~~J~â.:..::,.::...::::i:::i..i..:.:.'..::..:¡~~~...:..:..
..N'ôl'so ::nn:n.{.nn{n::{{:n:{:..Q~i:::......
::Nôi:;iöö...'..':':::::'::::::::.'.::..::..nUß:';3...:
..... .............
.. ..........
.... .
........ . . . ......
..........."........................... ...
.... .'..9~9Â:E~4~y~I~~tt7s,.
. .......
....... ............ .......
Competent, approved'
soils or bedrock
CONSTRUCTION SPECIFICATIONS:
1. Provide granular, non-expansive backfill soil in 1:1 gradient wedge behind wall. Compact backfill to minimum 90% of laboratory
standard.
2. Provide back drainage for wall to prevent build-up of hydrostatic pressures. Use drainage openings along base of wall or back
drain system as outlined below.
3. Backdrain should consist of 4" diameter PVC pipe (Schedule 40 or equivalent) with perforations down. Drain to suitable outlet
at minim u m 1 %. Provide W - 1 W crushed gravel filter wrapped in filter fabric (Mirafi 140N or equivalent). Delete filter fabric
wrap if Caltrans Class 2 permeable material is used. Compact Class 2 material to minimum 90% of laboratory standard.
4. Seal back of wall with waterproofing in accordance with architecfs specifications.
5. Provide positive drainage to disallow ponding of water above wall. Lined drainage ditch to
minimum 2% flow away from wall is recommended.
* Use 1 ~ cubic foot per foot with granular backfill soil and 4 cubic foot per foot if expansive backfill soil is used.
VINJE & MIDDLETON ENGINEERING, INC.
".;i .0 .
PLATE 11
.
ISOLATION JOINTS AND RE-ENTRANT CORNER REINFORCEMENT
(a)
RE-ENTRANT CORNER---
REINFORCEMENT
NO.4 BARS PLACED 1.5"
BELOW TOP OF SLAB
NOTES:
Typical - no scale
(b)
ISOLATION
JOINTS
CONTRACTION
(c)
RE-ENTRANT
CORNER CRACK
1. Isolation joints around the columns should be either circular as shown in (a) or diamond shaped as shown in (b).
If no isolation joints are used around columns, or if the corners of the isolation joints do not meet the contraction
joints, radial cracking as shown in (c)may occur (reference ACI).
2. In order to control cracking at the re-entrant corners (:t270° corners), provide reinforcement as shown in (c).
3. Re-entrant corner reinforcement shown herein is provided as a general guideline only and is subject to verification
and changes by the project architect and/or structural engineer based upon slab geometry, location, and other
engineerin:g and construction factors.
VINJE & MIDDLETON ENGINEERING, INC.
PLATE 12
f
JOB NO: 99-261-F
NAME: Mr. Michael Lyon
LOCATION: Dusty Trail Road, Olivenhain
LABORATORY COMPACTION TEST RESULTS:
Soil Type 1:
Soil Type 2:
Soil Type 3:
Soil Type 4:
Brown Silty Clay **
Maximum Dry Density: 115.1 pcf
Optimum Moisture: 15.5%
Olive Green to Pale Gray Siltstone/Claystone **
Maximum Dry Density: 110.2 pcf
Optimum Moisture: 18.6%
Tan to Light Brown Silty Sand (import)
Maximum Dry Density: 125.6 pcf
Optimum Moisture: 11.3%
Brown Silty Sand, Decomposed Granite (import)
Maximum Dry Density: 136.2 pet
Optimum Moisture: 7.6%
** From our Preliminary Geotechnical Investigation Report, dated Jan. 10, 1999.
CBM\gradinglpads\99-261-F .p11
('
"
8
8
City ð.fGINEERING SERVICES DEPARTMENT
Encinitas Capital Improvement Projects
District Support Services
Field Operations
Sand Replenishment/Stormwater Compliance
Subdivision Engineering
Traffic Engineering
,
RE:
Tract 18660 (TPM)
Boundary Adjustment 94-034
Grading Permit 5984Gl
{3126 Dusty Tr/Lyon, Michael & Ka ren}
A.P.N.264-222-40
Final release of security
~
~ -¡¡~ ;:J/~
b¡ ~ //,~
up ?-Z7-0? ~ ~
~ -/tJ ðJ~
~.
July 26, 2001
Wells Fargo Bank
262 North El Camino Real
Encinitas, CA 92024
Final release of security
Permit 5984GI authorized earthwork, private drainage improvements, and erosion
control, all as necessary to build described project. Final, acceptance, and warranty
inspections have all been completed to the satisfaction of the Field Operations Division.
Therefore, release of the remainder of the security deposit is merited.
Certificate of Deposit Account 1946049350-000, in the amount of $7568.00, has been
cancelled by the Financial Services Manager and is hereby released for payment to
the depositor. The document original is enclosed.
Should you have any questions or concerns, please contact Steve Vargo at (760) 633-
2770 ext. 2808 or in writing, attention the Engineering Department.
Sincerely,
/111. M 1-
Masih Maher
Senior Civil Engineer
Subdivision Engineering
..-".
(- /'¡ . / ( \.
. /.-./ .. I."...
'. \ ..', / ") oj ./:"/
I / ,; I ( ,'--;-/ 1,/ ll:~5
- /1. Y.---t~. '/'~ -' .:,-. ~.
r~sfie Suelter
Financial Services Manager
Financial Services
Cc; Leslie Suelter, Financial Services
TEL ~hrJ-h33-2(,llíI fAX -(,o-('.'Ì3-!(,D
')Ii~ S Vulull A\l'tlue. Ellulliu\. (;1Iilmlll;¡ 9202¡...,r,3.) TD[) 7(Í1i-(>33-TOO
aa-.
~~ recycled paper
41\
8
8
[CITY OF ENCINITASJ
HI SCE1.IMf EO tJ SASSI GHM!N'1'
/tl,c.h,,~1 , hereinafter called ASSIGNOR, whose ad~... i.
- U . ,""';. h YO"'" CJ,tf- 91--/1/ , doe. here1>y a..1911, and .et Over
to CITY OF ENCIHIT. , heret after callel:! A.SSIGHD, all dght, tlUe, and
inter..t of what.va natu;8, of ~'iq~r, in and to the inl¥red account of
a.aiqnor in the 't!iI rÇ[.r. . -þd-Pt , eVidenced by an
account in the 8JIOunt 0 numbered q 4 ' '-I 3.:--0 -c~o,
Which :11 delivered to the a..i ee he=ew1th. Aadgnor aqrees that h1a
assignment carr~e. with 1t the right in the insurance of the account by the
FeQer.~ Savinqa and ~n Insurance Corporation, and include. and gives. the
r1g'ht ~ -.ignee to reQean, collect, and w1thd.nw the full amount of such
account at any time WI'l'HOUT NOTICE '1'0 .ASSIGNOR.
A481gnor hereby notifies :::!e¡¡. f;1(1'f«ílII!;.f1 ~ ;g GeM h-fjf this assignment.
1-7 day or ~/7 ~
Aslignor's S nature
Dated this
--------------------------------------------.---------------------------------
RECEIPT FOR NOTICE: OF ASSIG!OœN'1'
b'ceìpt is hereby aebowledged to assignee of written notice of the
...ic¡mlll8D.t to a.signee of -ch.. account .identified above, We have noted in our
recorda the ...ign.e's interest in said account .s shown by the above
".i9JUll8nt and have retained a copy of this document, We certify that we have
received no !lotice of any 11en, encumb.=ance, hold, claim, or ob11qation of the
eJ::Iove-identif'1ed account prioJ: to the assignment to the .assignee. We agree to
make payment to assignee upon request in-accordance with the laws applicable
to thi. bank.
d J .
Dated thill ,;(s' day Of'.ÅJ ~
19:fL. ~
Bys ( -~ ¡1
a~~/L:A- if ~) 6Ud~~~'
Signature and Title
----------------------------------------------------------.-------------------
REal n FOR SECURITY
Receipt is acknowledged of tne above assignment and the account
identified in the above assignment.
Dated thia
day ot
, 19_,
CITY OF ENCINI~,
By;
Auignee.
(A8.ignee or Authorized Officer)
------------------------------------------------------------------------------
NOTICE OF CANCELLATION
The above assignment i. hereby canceled, and the security thereunder i.
hereby released.
By:
, 19_,
, Assiqnee.
m154O7
8
8
.~
~~~t. 1946049350-000
WELLS FARGO BANK
~ :YJ~~
Q?~ t/ ~~6
Office [. f\ C, Y\ i .tCtS Date
"7/;).5' /qq
Amount $ .~S<a 8
Payable to C- \ +y 0 r E. (\ c.ì n ,;+Q,5 ,
Received from KG'.TI! n l~ 0 í\ '\- M I (;~,,- J ~() ì'
Renewal term qc J({~S (3 "'Ct1~hd Maturity date I .-;).~,-q '1 Interest rate 4. 0 G % Annual percentage yield 4. oCr %
Interest will be computed on a 360 day year basis. Interest will be paid Ct., ~ and [Qcredited to account number Iq 4 (QD't q .~ $'c. 0 (:Ie.
or D paid by check. ~
This certificate is non-transferable. Presentation of the original certificate, signed by the payee, is required to withdraw funds. If the deposit is withdrawn before maturity, there may
be an early withdrawal fee. At maturity, this deposit will automatically renew. The terms of the certificate, including the interest rate and annuai percentage yield, are subject to
change on the maturity date. Please refer to the Disclosure Statement for additional information abo~ acc~~nt. 1 q~
~ Bank Representative's Signature ~ \.4 .
"(~ PAVE OP
~
Member FDIC
.~ City ð.fGINEERING SERVICES DEPARTMENT
Encinitas Capital Improvement Projects
District Support Services
Field Operations
Sand Replenishment/Stormwater Compliance
Subdivision Engineering
Traffic Engineering
July 26, 2001
Wells Fargo Bank
262 North EI Camino Real
Encinitas, CA 92024
RE:
Tract 18660 (TPM)
Boundary Adjustment 94-034
Grading Penn it 5984GI
{3126 Dusty Tr/Lyon, Michael & Karen}
A.P.N. 264-222-40
Final release of security
Final release of security
Permit 5984GI authorized earthwork, private drainage improvements, and erosion
control, all as necessary to build described project. Final, acceptance, and waITanty
inspections have all been completed to the satisfaction of the Field Operations Division.
Therefore, release of the remainder of the security deposit is merited.
Certificate of Deposit Account 1946049350-000, in the amount of $7568.00, has been
cancelled by the Financial Services Manager and is hereby released for payment to
the depositor. The document original is enclosed.
Should you have any questions or concerns, please contact Steve Vargo at (760) 633-
2770 ext. 2808 or in writing, attention the Engineering Department.
Sincerely,
/1j1. M 1-
,~,...
Masih Maher
Senior Civil Engineer
Subdivision Engineering
( //ì .. If \
-- /,-1 1,( .~,,\.7
...\ ,'. II 'X'!'/'
// .¡ I :'-<;.t /' /..,..,;"5
II,,!. I. ('. , "C*c..~
).I"'~'~.'~'~ ....,'. .
'L~sfie Suelter .-
Financial Services Manager
Financial Services
Cc; Leslie Sue Iter, Financial Services
TEL 'h(¡.(,552(¡IJ() FAX ~6()-655-2(¡27
SOS S Vulcill Avenue. JOnell11!;L'. (;II,tOII1!;I 9202.¡.Y;33 Tnj) 760.(,35.DOO
oa:
~~ recycled paper
[CITY OF ENCINI'l'AS]
MISCELIMfEOtJS ASSIQHM!N'1'
!tl,c.h"t':'! ..... 4rt!:Þf . hereinafter called ASSIGNOR. who.. addres. 18
- U . . ~"): n V"" C1f- t:'/Þ/I/ , doe. hereby a..1;n. and .et over
to CITY or J!:NCIHIT , heret atter called ~SIGKEJ:, ell dght, t1Ue, and
interest of what.v* ~atu~, of ~'ig~rl in and to the in'~red account of
a.aiqnor in the 'eft f-PtY: . t:J,¡J(.H I eVidenced. by an
account in the 8JIOunt 0 numbered q 4 .()'-I 3:--0 -cco,
wh1ch 11 delivered to the aui ee herewith. Aadqnor agrees that hia
...ignment C&rr~e. with 1t the right in the insurance of the account by the
Federal. Saving. and Loan Insurance Ccr'pO:ation, and include. and ¡j.ves.the
r1g'h~ ~ ...ignee to rec1eem, collect, and wi thciraw the full amount of such
account at any ~i.IM WITHOUT NOTtCE TO ASSIGNOR.
~eignoz: hereby notifies ::};¡¡ t11(~;...(> ~ ;g Gt.:/rl h9f this assignment.
ea.... "'1.8 V? day of ..;;J;{ 7 ~
Assignor's S nature
-------------------------------------------------------------~----------------
RECEIPT !'OR NOTICE OF ASSIGHMEN'r .
J\e.ceìpt is hereby aebowledged to aasi;nee Qf written notice of the
...1.c¡mMn~ to ..signee of ~~. account ident1.fied above. We have noted in our
recorda the a..ign.e'a interest in said ac~ourit .s shown by the ~ove
".i~t and have retained a copy of this document. We certify that we have
rec:eived no notice of any lien, encumb:ance, hold, claim, or obligation of 1:he
eÐcve-ident1:fied account prior to the assignment to the ..881911'" We agree to
make payment to .ssignee ~pon request in-accordance with the laws applicable
to tIú.. bank.
d J .
Dated th1l ;(S' day of 'ÅI~
19:!L. /)
Bys ( -~ jÎ
a~~fL:Æ- i '-.-) ~-1~~.
Signature and Title
------------------------------------------------------------------------------
1U:CEI?T FOR SECURITY
Receipt is acknowledged of the above assignment and ~ne account
identified in the above assignment.
Dated thi.
day ot
, 19_.
CITY OF ENCINITAS,
By:
Au1qnee.
(Aasignee or Authorized Officer)
------------------------------------------------------------------------------
JlOTICE OF CANctLLA.'l'ION
The above assignment 1s hereby canceled, and the security thereunder 1.
hereby rele..ed.
,19-
, Assignee.
8y:
mlSIO7
WELLS FARGO BANK
~ fYJ~£J.JL:
cg~ !/ 2Jp~
~~~t. 1946049350-000
Office
E f\C\'" i .+cU; Date
-1125' /qq
Amount $ -J,5nf.tt 8
Payable to C- \ +y erE" c.î n ;+Q,S .
Received from KG:1'e' n l 0 ,,\ + l r'\
Renewal term qc J(~~~ t?7I'1'\().1~hs) Maturity date I .-,26:.,-Q'J Interest rate 4. 0 G % Annual percentage yield 4. 0(,> %
Interest will be computed on a 360 day year basis. Interest will be paid Ct\ ~ and [iJcredited to account number ¡q 4 (c¡C'í q 3 Ç'c 0 (Ie.
or 0 paid by check. ~
This certificate is non-transferable. Presentation of the original certificate. signed by the payee, is required to withdraw funds. If the deposit is withdrawn before maturity, there may
be an early withdrawal fee. At maturity, this deposit will automatically renew. The terms of the certificate, including the interest rate and annual percentage yield, are subject to
change on the maturity date. Please refer to the Disciosure Statement for additional information abouQ acc~unt. 1 e~
~ Bank Representative's Signature ¿7kA~ '
.I~ PAVE OP
~
,"P
Member FDIC
.,
""
HYDROLOGY STUDY
AND
HYDRAULIC ANALYSIS
FOR
LYON'S RESIDENCE
ENCINIT AS, CALIFORNIA
APN 264-222-40
5984-G
~ \ì@ \ì ~ 'ìfl \fT.'~.;.!
~ . \i \'
JUL 2. () \999 \'i':':
- 'EER\~~C SEfW\CFS
ENGIN.. r r.,(-"'.\..\v.,.~.)
~-~-,.._,.,_.
Prepared by:
N as land Engineering
4740 Ruffner Street
San Diego, Ca. 92111
(619) 292-7770
Job no. 199-025.1
..
.
"""'"
............
.........
.........
~~~
"""'"
000
",,00
-N
-N<I'
<1'<1'<1'
---
~~~
NNN
@
t-tYDKOLc:::bY - LYow "R~IDSf\JCE
BAsIi'J A,..
A \: l.sS" ~c:..rGS
c... ::. c> . 4 S-
L= 7oS-'
o~\~
, - «
..1 or
tt¡£. oJ A~ \ ."
,J , .
~~J~ '1
(
~\-\ -- £\DL- 3'ìD .;; Š L-
10 ('Y\:"". =- I Lf. 2-<;; i"Vl;,"",~c:::'.s
::I.:",.o := 3.'8 ,'y¡ .,.
q~ c..:r:A == {ö \-r::;-) L ó.8; ^/\,..;.)( \. :s5" c.C-Ý~~) = 2.3,1 c.+s
QIOO = 2.3 \ c..f
BAs.¡ t\J A. %.. :
A ~ = 4. 71 c.~4!:'s.
c:. = D.«-t~
(
è.\-\ -- A()I)- s'lO. 5 -: 2~, 5
T ~ =- '-t. 7S ¡,-.....,;....., + I D~;",- = 14.7S- ¡..y,;hu.+e:5
.:c ~:- 3..7S" "ÝL..r- . /'.
q :o..c:r:~ = (D,L.\S"j (~.{S i~~) ('1 .77 ~~r.es.) = 8 .DS c.t5
Q,...o = B .bS (::.:~s
"
-
.
t
0'
RUNOFF COEFFICIENTS (RATIONAL METHOD)
DEVELOPED AREAS (URBAN)
Coefficient. C
Soil Group {11
Land Use
A'
§
,Ç
D
Residential:
Single Family
.40 .45 .50 .55
.45 .50 .60 .70
.45 .50 .55 .65
.30 .35 .40 @
Multi-Units
Mobile Homes
Rural (lots greater than 1/2 acre)
Commercial (2)
80% Impervious
.70
.75
.80
,85
Industrial (2)
90% Impervious
.80
.85
.90
.95
NOTES:
(1)
Soil Group maps are available at the offices of the Department of Public Works.
(21
I
Where actual conditions deviate significantly from the tabulated imperviousness
values of 80% or 90%, the values given for coefficient C, may be reyised by
, multiplying 80% or 90% by the ratio of actual imperviousness to the tabulated
imperviousness. However, in no case shall the final coefficient be less than 0.50.
For example: Consider commercial property on D soil group.
Actual imperviousness
= 50%
Tabulated imperviousness
= 80% ,o'""r 0-'
Revised C = 50 x 0.85 = 0.53
80 .
APPENDIX IX
Updated 4/93
t
.
t
"
H
F~~I
5"000
4tJ¿)0
3000
2ð¿)¿)
3ðO
2 tJ()
lOt)
EGL1¿? TI ON
Tc. (II.~L J~ .385
lë = ;;m~ 01' Co/7c~/7lra.fio/7
L ~ L~n911J 0/ wa/~r.sh~d
II r LJi/.fP~r~/7ce in ~/~va.;ion along
~/I'é'cåY~ slo¡:J~ line (.5'~~ Jlpp~ndiX 1-B) h.
L t:
Â>'I//~s F~~¡' /,Io.v""3 Mihl.lle$
1/ ¿4tJ
10
5
4
.3
2
as
NOTE
mFOR :s.-=-~LWA TER'šHr:DSj
Zð I ADD TEN TO P
UCOMPUTEO TIME 0
CENTRATION-
:-=... -=- ~ --=-=- -= =- -=- ~ :!f
"-
"-
Sao "-
~tJt) ~
,,~
~~
'\.
"-
"-
"-
"-
"-
"-
I
SAN 01 EGO COUNTY
DEPARTMENT OF SPECIAL DISTRICT SERVICES
DES I GN MANUAL
APPROVED </.//. /,4--'~-<L~
5'0
<10
10
5
H
.3
120
18tJ
.2
I
10ð
50
8tJ
1ð
60
5"¿)
40
3t)
" 5tJ¿){)
'4~0
"-
.J' tJ tl tJ "-
"-
"-
"-
"-
20
18
1$
'N
¿oao
1800
IGaLl
14a¿)
12a¿)
1000
9ao
800
12
,""-'--'.'-
It)
,9
8
7
¡;
5'
'I-
1tJtJ
300
J
200
L
7é
NOMOGRAPH FOR DETERM I NAHON
OF TIME OF CONCENTRATION (Tc)
FCR NATURAL WATERSHEDS
DATE /2.// /69
APPENDIX X-A
.. , ,~
~ .. ~.
.
JNTENSITY,..DUM. DESIGN CHART
..
. .
.- . - -. _. - - -
- - ... .
.- .- ..- -- - - . . - - .
- - -..'.
- ---'-. -._-- - --.'.'
-- -. - . - .
, .. - . .
) - - - _.
1 ,2 - - --
-'-.-o-...u
f--.~
,=1=1 Ii
.1-
-
.,,-
-
-0..'-
-,-
d-
- H-+-
.0.
-0.
-
-
.,.
-I--J-I.-'~N -
-<.
-
-,-
II
-
. 10
15
20
30
40 50 1
Minutes
nl"."\+~ An
2
Hours
3
4
5
6
Directions for Application:
1) From precipitation naps detennine 6 hr. and
24 hr. amounts for the selected frequency.
These maps are printed in the County Hydrol(
Manual (10, 50 and 100 yr. maps included in
Design and Procedure Manual).
2) Adjust 6 hr. precipitation (if necessary) Sf
that it is within the range of 45% to 65% 01
the 24 hr. precipitation. (Not ~rrlicable
to Desert)
3) Plot 6 hr. precipitation on the ria~t $ide
of the chart.
4) Draw a line through the point parallel to th
plotted lines.
5) This line is the intensity-duration curve fo
the location being analyzed.
Application Form:
0) Se1 ected Frequency \ CO yr.
1) p 6 :: :2 09 in., p 24::: 50'S, * p 6 :::
--r; 4
in.
53x*
2) Adjusted *p :: ;;;J. ~
6
\ ...¡., 2 S" .:=. ...,.J
3) t::; 1'-1.15 min.
c
) ~.'ß c.""J
4 I:: ~. ì5" i n/ hr.
*Not Applicable to Desert Region
CL. OF SAN DIEGO
DEf'ARTt1ENT OF SANITATION &
FLOOD COUTROL
1-<-
.. '
45'
3D'
I
IS' I
330
-
. I
, \
45'
--..--....- ..-. .-- -
Prtpn f'd by
u.s. DEPARHIENlr OF COMMERCE
H^TIO~AL OCE^"IC ^~D ^T'~OSPIIEHIC ^D~:a~ISTRATlON
'P£CIAL STUDIES DRA~CII, OffiCE Of' IIi UROLOGY. NATIONAL ~'EATIIER SERVICE
3D'
-.
.-.
I'
--J
118'
45'
3D'
15 '
1170
3D'
IS'
II 6.
"
COUNTY OF SAN DIEGO
D£P^RTMENT OF SANITATION &
FlOOO CONTlWl
]3°
-.
.'..
.
115 I
3D'
151
,--
,-.-
, \
115
-'<.
"lCl'u~'<lbJ
u.s. DEPARTMENlr OF CO~MERCE
NATlONI\L OCrA:\IC AND ^r~(~I'£HIC ^U~IINI:¡TII^TION
,,'CO^,- nU"'" "'^" "'~:', "c' 0' ~ U"O"," '. "^nï~"' ",^"". "."'"
';
. .
I
I.
111:"
11!j .
)0'
I fj .
117"
I I ~; I
.lnl
I ~ I
II (,"
-,
'oj
~ .
. -
""" '"
¡"i-i-
.........
.........
:::x:::
"""'"
QQQ
.,QQ
-<"4
-~.,
.,.,.,
---
co1nn
~~~
@
I
\,
Fa£.. &cs.l~ ~I
~:^ =- 0.02..
V\. ::- 0 . Ù 2..:S;-
d .... 2- c..-r II
Q -::. 2. 3\ c-'¡::'S
~.¿..
y -= ~.ol..f 1/ ( 'f~y. = 12\~
FD¡/Ç ßA.S I ~ A
- ~)
. .
5t"""1"'- =-0,0:3,
n -= 0.0 2..S"
d:39"
Q: 8.o5c.fs
./o~{
y = 8,~b' yW\~~ ~ 12")
V=-3 .ì~+ps
Ý::-'S.87 +:p.s
~re+oreJ per Spec.,'içj
Pro"" ~ \ ~ S~",d. Arc=t
Spe~\.ç;.~\~S , ~e.. ~. S
~~c...~ ì r<j IT;: O. c&, ì)
~ p ""'p .......::>i+k. D. G::"
+ì l+er.