Loading...
1991-06 . . . RESOLUTION NO. OL-9l-006 A RESOLUTION OF THE OLIVENHAIN COMMUNITY ADVISORY BOARD APPROVING A DESIGN REVIEW PERMIT FOR THE HOMES ON 2 SINGLE FAMILY LOTS, THE ENTRY GATE, MAIL BOXES, AND STREET LANDSCAPE FOR PROPERTY BEING PARCEL 3 AS SHOWN ON CERTIFICATE OF COMPLIANCE RECORDED ON MARCH 28, 1985, FILE/PAGE NO. 85-105101 COUNTY OF SAN DIEGO AS DESCRIBED IN ATTACHMENT "A" AND LOCATED ON LONE JACK ROAD WEST OF FORTUNA RANCH ROAD (CASE NO. 90-248-DR, BRUCE D. WIEGAND, INC.) WHEREAS, Bruce D. wiegand, Inc., applied for a Design Review permit for construction of the homes on 2 single family lots, the entry gate, mail boxes, and street landscape as required by Planning Commission approval of TM-88-115 the Tentative Subdivision Map for the project, and Chapter 23.08, the city of Encini tas Design Review Ordinance; and WHEREAS, public hearings were conducted on the application by the Olivenhain Community Advisory Board on March 5, and March 19, 1991, and all persons desiring to be heard were heard: and WHEREAS, evidence was submitted and considered to include without limi~ation: a. Blue line plans for lot 2 dated October 22, 1990 with 6 sheets consisting of a site plan (pg. 1), floor plans (pg. 2), elevations (pgs. 3-6); and for lot 7 dated October 22, 1990 with 7 pages consisting of a site plan (pg. 1), floor plans (pgs. 2 & 3), elevations (pgs. 4- 7); and blue line street landscape, entry gate, and call box/mail box plans dated received by the City of Encinitas on January 21, 1991. written information submitted with the application: Oral testimony from staff, applicant, and public made a part of the record at said public hearings: CAB staff reports (90-248-DR) dated February 27, and March 11, 1991 which are on file in the office of Planning and Community Development: and Additional written documentation. b. c. d. e. Ln/CAB28-294WP 3 . NOW THEREFORE, BE IT RESOLVED by the Olivenhain Community Advisory Board of the City of Encinitas that the Design Review Permit for 90-248-DR for construction of the homes on 2 single family lots (lots 2 and 7), the entry gate, call box/mail boxes, and street landscape is hereby approved subject to the following findings: 1. 2. . . The project is compatible in structural size (bulk and mass) to adjacent properties and neighborhood, since they are of similar size to several of the estate homes on the developments to the south and in the Country Rose development to the east, and are compatible in architectural style with the rural character of Olivenhain and are compatible neighboring properties. The proposed project is in conformance with section 23.08.72 of the Design Review Ordinance, since the project is consistent with the existing General Plan in land use allowing one dwelling unit per two acres and requiring that care be given to minimal grading and of~ering of recreational trails that connect to the Recreation Element trails system, and natural environmental features are being retained since the pads are proposed on a small portion of the lots, and all utilities are available to the site; 3. The proposed project is in conformance with section 23.08.74 of the Design Review Ordinance, since the project has reduced the grading to prevent excessively high graded slopes, and reduced the overall amount of grading to retain as much of the site in its natural state as possible: 4. The proposed project is in conformance with section 23.08.76 of the Design Review Ordinance, since the exterior materials for the project have been coordinated to be compatible with each other and the surrounding area, and the proposed structures are compatible with the size and scale of other single family structures in the surrounding neighborhoods and they will be within the required height limits for the zone: 5. The proposed proj ect is in conformance with Section 23.08.077 of the Design Review Ordinance, since the street landscaping proposed will help create a buffer for Ln/CAB28-294WP 4 . the private lots and two trees are proposed per lot rather than the required one tree per lot for residential developments: graded slopes will be planted to minimize erosion: and a recreational trail is being developed as per city standards. BE IT ALSO RESOLVED, that the Design Review Permit is approved with the following conditions: A. B. . . The project is approved as submitted on the blue line plans for lot 2 dated October 22, 1990 with 6 sheets consisting of a site plan (pg. I), floor plans (pg. 2), elevations (pgs. 3-6); and for lot 7 dated October 22, 1990 with 7 pages consisting of a site plan (pg. 1), floor plans (pgs. 2 & 3), elevations (pgs. 4-7): and blue line street landscape, entry gate, and call box/mail box plans dated received by the city of Encinita~ on January 21, 1991. Prior to the city Building Department issuing a final inspection on framing, the applicant shall provide to the Department of Planning and community Development a survey from a Civil Engineer as to the building height in conformance with this Design Review approval. C. That a plan be submitted for approval by the Director of Planning and Community Development, the city Engineer, and the Encinitas Fire Protection District regarding the treatment of the site during the construction phase, and the circulation and parking of construction workers' vehicles and any heavy equipment needed for the construction of the project. D. All required plantings and approved irrigation systems shall be in place prior to use or occupancy of new buildings or structures. All required plantings shall be maintained in good growing conditions, and whenever, necessary shall be replaced with new plant materials to ensure continued compliance with applicable landscaping, buffering, and screening requirements as setforth in the landscape plan dated received by the city of Encinitas on January 21, 1991 and on file in the Department of Planning and community Development. All landscaping and associated automatic irrigation systems shall be maintained in a manner that will not depreciate adjacent property values and otherwise adversely affect adjacent properties. E. A light shall be located at the entry gate that is activated through a motion sensor rather than a timer in Ln/CAB28-294',.¡p 5 . F. G. H. . . order to activate the light only when needed for vehicle entry. The maintenance of the call box shall be accomplished through requirements setforth in the private road maintenance agreement that was required to be established for the subdivision as Condition 7,E of Planning Commission Resolution of approval PC 88-25. The height of the entry gate, call box/mailbox structure, and fencing shall be in conformance with the city of En~initas height standards. The remaining homes in the subdivision shall not be reviewed through the Design Review process at the CAB level if they are in conformance with the new Design Review regulations set forth in Chapter 23.08 of the Municipal Code. Fire Protection 1. Prior to delivery of combustible building materials on site, water and sewer systems shall satisfactorily pass all required tests and be connected to the public water and sewer systems. In addition, the first lift of asphalt paving shall be in place to provide adequate, permanent access for emergency vehicles. Said access shall be maintained to the satisfaction of the Fire District. J. All two-way traffic aisles shall be a minimum of 24 feet wide and emergency access shall be provided, maintained free and clear a minimum of 24 feet wide at all times du':ing construction in accordance with Fire District requirements. K. Submit a letter from the Fire District stating satisfaction with the type and location of fire hydrants and the minimum water flow in gallons per minute together with a letter to the appropriate agency certifying that the fire department's minimum required water flow is available to serve the project. provisions shall be made to ensure a maximum water pressure at the hydrant of 250 psi. The installation of a pressure reducing station may be required. Fire hydrants shall be of a bronze type and shall be identified by installing a "blue" reflective dot on the street surface pursuant to Fire District Standards. L. Address numbers shall be clearly visible from the street fronting the structure. Where structures are located off a roadway on long driveways, a monument shall be placed Ln/CAB28-294Wp 6 . . . at the entrance where the driveway intersects the main roadway. Permanent address numbers shall be displayed on this monument. M. structures shall be protected by automatic fire sprinkler systems. sprinkler systems shall be installed to the satisfaction of the Encinitas Fire Protection District. N. Prior to final recordation, the applicant shall submit a letter from the Fire District stating that all development impact, plan check and/or cost recovery fees have been paid or secured to the satisfaction of the District. BUILDING o. A complete plan review will be done at the time of submittal for plancheck. PASSED AND ADOPTED this 19th day of March, 1991, by the following vote, to wit: AYES: \)\)~IVl-d2-) ~Ghl\~í<.) \)0,>1- > t!¡()"-.Y '5:,lj/--.~) ~Cl2.k'NS NAYS: f'J O'V ~ ABSENT: NU/V~ .,r ABSTAIN: IV rJN«- CHUCK VIVIER, Chalrman of the Olivenhain Community Advisory Board ATTEST: {k./<" e., ('N~ (-feE- ì- LINDA S. NILES, Associate Planner Ln/CAB28-294wp 7