1988-25
RESOLUTION NO. OE-25
A RESOLUTION OF THE OLD ENCINITAS COMMUNITY ADVISORY BOARD
APPROVING A DESIGN REVIEW PERMIT FOR A PLANNED
8 RESIDENTIAL DEVELOPMENT CONTAINING 25 DETACHED
SINGLE FAMILY HOMES LOCATED AT THE NORTHWEST CORNER OF
MELBA AND GARDENA
WHEREAS, a request for a Design Review permit for a
planned residential development containing 25 single family
residences was filed by Pearson Planning, Inc., for the
property located at the northwest corner of Melba and Gardena,
legally described as;
All that portion of the Northwest quarter of the Southeast
quarter of Section 15, Township 13 South, Range 4 West,
San Bernardino Base and Meridian, in the County of San
Diego, State of California, according to Official Plat
thereof, described as follows:
Beginning at the Southwest corner of the Northwest Quarter
of the Southeast Quarter of said section 15; thence East
along the South line thereof 183.13 feet to the TRUE POINT
OF BEGINNING; thence continuing East along said South line
497.87 feet; thence North 319.8 feet; thence West on a
8 line parallel with the South line 497.87 feet to the
Northwest corner of the land described in deed to Charles
F. White, Jr. et ux, recorded February 20, 1961 as
Document No. 30450 of Official Records; thence South 319.8
feet to the TRUE POINT OF BEGINNING, and
WHEREAS, a public hearing was conducted on the application
on February 18, 1988; and
Whereas, the CAB considered:
1. The staff report dated February 11, 1988,
2. The project plans and revised elevations and
landscape plan submitted by the applicant,
3. Oral testimony submitted at the hearing,
4. written testimony submitted at the hearing; and
WHEREAS, subject to the conditions of approval the
Community Advisory Board found the proposal to be consistent
with the City's adopted design criteria and that none of the
regulatory conclusions contained in Chapter 23.08 of the City
8 of Encinitas Municipal Code can be made.
TC/06/CAB6-525Wp (3-14-88) 1
NOW THEREFORE, BE IT RESOLVED that Design Review
application 87-144DR is hereby approved subject to the
8 following conditions:
1. The developer shall substitute other colors from the
approved palette of colors for the proposed "peach" and
"grey" homes, to be verified by the Community Development
Department prior to final occupancy.
2. The applicant shall furnish the Community Development
Department with a Coastal Development Permit or Notice of
Exemption from the California Coastal Commission prior to
permit issuance.
3. That a plan be submitted for approval by the Director of
Planning and Community Development and the Encinitas Fire
Protection District regarding the treatment of the site
during the construction phase, and the circulation and
parking of construction workers' vehicles and any heavy
equipment needed for the construction of the project.
4. Project is approved as submitted and shall not be altered
without Community Advisory Board review and approval.
5. Prior to the City Building Department issuing a final
inspection on framing, the applicant shall provide a
survey from a civil engineer as to the building height.
8 Building height shall not exceed 24 feet at the peak of
the roof.
6. Prior to final occupancy, the owner shall pay all
development fees required pursuant to the City of
Encinitas Municipal Code including, but not limited to,
traffic mitigation, fire mitigation, flood control, and
park in-lieu fees.
7. Project landscaping shall be in conformance with the
revised landscape plan approved by the Old Encinitas
Community Advisory Board on February 18th, 1988, showing
Holly Oak and Carrot Wood Street trees, to be verified by
the Community Development Department prior to final
occupancy.
8. The interior elevations of the homes shall incorporate
window shelves as indicated on the revised elevations
approved by the Community Advisory Board on February 18,
1988, to be verified by the Community Development
Department prior to final occupancy.
9. The per imeter fencing along the westerly boundary of the
site shall be constructed of wood to match the wood
fencing used elsewhere throughout the site, to be verified
by the Community Development Department prior to final
8 occupancy.
TC/06/CAB6-525wp (3-14-88) 2
PASSED AND ADOPTED this 18th day of February, 1988, by the
following vote, to wit:
8 AYES: Tobias, Hano, Kauflin
NAYS: Couglar, Rollman
ABSENT: None Ha!~, C~he
Old Encinitas Community Advisory Board
-:::T~
Tom Curriden
Assistant Planner
8
8 TC/O4/CAB6-525wp (2-23-88) 3