Loading...
1990-09 r- , 8 RESOLUTION NO. NE-90-09 A RESOLUTION OF THE NEW ENCINITAS COMMUNITY ADVISORY BOARD APPROVING A DESIGN REVIEW PERMIT FOR 3 COMMERCIAL OFFICE/PROFESSIONAL ONE STORY BUILDINGS TOTALLING 37,500 SQ. FEET, PREPARATION OF 3 PADS OF 9,600 SQ. FEET FOR COMMERCIAL OFFICE/PROFESSIONAL USE; LANDSCAPING~ PARKING AND SIGN PROGRAM FOR GARDEN VIEW PLAZA, FOR PROPERTY LOCATED AT THE INTERSECTION OF GARDENVIEW ROAD AND N. EL CAMINO REAL AND AS FURTHER DESCRIBED IN ATTACHMENT A (CASE NO. 90-067-DR, BYRON WHITE) WHEREAS, Byron White, applied for a Design Review permit for 3 commercial office/professional one story buildings totalling 37,500 sq. feet; preparation of 3 pads of 9,600 sq. ft. for commercial office/professional use~ landscaping~ and parking for the first phase of Garden View Plaza, for property of 5.112 acres 8 in the Office Professional (OP) Zone, located at the intersection of Gardenview Road and N. El Camino Real, as required by Chapter 23.08, the City of Encinitas Design Review Ordinance~ and WHEREAS, public hearings were conducted on the application by the New Encinitas Community Advisory Board on June 4, July 2, and 16, and August 6, 1990, and all persons desiring to be heard were heard~ and WHEREAS, evidence was submitted and considered to include without limitation: a. site Plan (sheet 1); Floor Plans (sheets 2-5) ~ Elevations (sheets 6-8) ~ Landscape plan (sheets L-1 & L- 2) ~ Irrigation plans (sheets L-3 & L- 4) ~ Electrical plans (sheets L- 3 & L-4); and Line of Sight drawings (sheets 1 & 2 of 2) b. written information submitted with the application~ 8 LN/CAB17-218wp r 8 c. Oral testimony from staff, applicant, and public made a part of the record at said public hearings; d. CA~ staff reports (90-067-DR) dated May 29, June 27, and July 11 and 20, 1990 which are on file in the office of Planning and community Development; and e. Additional written documentation. NOW THEREFORE, BE IT RESOLVED by the New Encinitas community Advisory Board of the City of Encinitas that the Design Review permi t for 90-067-DR for 3 commercial office/professional one story buildings totalling 37,500 sq. feet~ preparation of 3 pads of 9,600 sq. ft. for commercial office/professional use; landscaping; and parking for the first phase of Garden View Plaza, for property of 5.112 acres in the Office Professional (OP) Zone, located at the intersection of Gardenview Road and N. El Camino Real is hereby approved subject to the following findings: 8 A. The project design is consistent with the General Plan, a Specific Plan or the provisions of the Municipal Code. Evidence: The final map for the project was approved by the County of San Diego. The modifications to the design of the project as reviewed by the New Encinitas Community Advisory Board are consistent with the City of Encinitas General Plan, Design Review Ordinance and the Zoning Code, in land use allowing for office professional uses and some retail in the office professional zone. B. The project is consistent with the Design Review Guidelines. Evidence: The project was reviewed by the New Encinitas Community Advisory Board and was modified to be in conformance with the City of Encinitas Design Review Guidelines. 8 LN/CAB17-218wp mm, ,_m- 8 C. The project would not adversely affect the health, safety or general welfare of the community. Evidence: The project would not adversely affect the health, safety or general welfare of the community since the project has all required utility connection approvals and will be developed within City standards. D. The project would not cause the surrounding neighborhood to depreciate materially in appearance or value. Evidence: The proposal reflects a compatible level of design appearance in conformance with the Design Review Guidelines and Design Review Ordinance and is compatible with the design of other office and commercial structures in the adjacent General Commercial Zone on El Camino Real. Additionally, the proposed design incorporates a high quality of design materials and landscaping and will not be materially detrimental to surrounding properties in this respect. E. The proposed project is in conformance with section 23.08.74 of the Design Review Ordinance, Design and site 8 Layout, since the project has provided for adequate traffic circulation on site and safe access to the existing streets adjacent to the site, adequate size, location and number of parking spaces, loading zones, trash enclosures, motorcycle and handicap parking spaces, and provided vehicular and pedestrian access to the adjacent properties. The project provides dense landscaping for the graded slopes approved by the Cümty of San Diego prior to City of Encinitas incorporation, and the project has been designed to screen a portion of the slope from the roadway by placing the structures close to the base of the slope. F. The proposed project is in conformance with section 23.08.76 of the Design Review Ordinance, Building Design, since the exterior materials for the project have been coordinated to be compatible with each other and the surrounding area, the proposed structures are preserving views to the extent possible, the roof top equipment is proposed to be screened by planting on the slopes and louvered screening around the equipment, a considerable amount of wood has been introduced into the building design and the accent hardscape for the project, and the size proposed for the structures is comparable and even smaller than the existing commercial projects to the south and southwest of the subject site. 8 LN/CAB17-218wp r 8 G. The proposed project is in conformance with section 23.08.077 of the Design Review Ordinance, Landscape Design, since the landscaping proposed will help create a lush appearance and a diverse assortment of planting between the street and the parking lot by providing scattered berming in the landscape strip, a higher percentage of planting than required in the parking lot, and adjacent to the buildings and on the steep slope behind the buildings. The amount of planting also creates an inviting atmosphere to the project and encourages a return to nature by providing considerably more planting that enhances the character of the community and provides more of a village atmosphere. H. The proposed project is in conformance with section 23.08.079 of the Design Review Ordinance, Privacy and Security, since the project has been designed to observe fire safety regulations, and the landscaping helps maintain the privacy for the projects to be constructed in the future to the north, east and south. BE IT ALSO RESOLVED, that the Design Review Permit is approved with the following conditions: 1. The project is approved as submitted on the site Plan 8 (sheet 1) ~ Floor Plans (sheets 2-5) ~ Elevations (sheets 6-8) ~ Landscape plan (sheets L-1 & L-2) ~ Irrigation plans (sheets L-3 & L-4) ~ Electrical plans (sheets L-3 & L-4) ~ and Line of Sight drawings (sheets 1 & 2 of 2) and on file in the Department of Planning and Community Development, and shall not be altered without community Advisory Board review and approval. 2. A plan shall be submitted for approval by the Director of Planning and Community Development, the City Engineer, and the Encinitas Fire Protection District regarding the treatment of the site during the construction phase, and the circulation and parking of construction workers' vehicles and any heavy equipment needed for the construction of the project. 3. Th~ wall options approved are options 1, 3, and 5 only, with a restriction that no more than 50% of the tenant spaces utilize the all glass option (option 5) at any one time. The entry doors are approved to be constructed with one lite and a clear fir frame surrounding the lite. 4. The design of the clock in the clock tower shall be submitted prior to issuance of a building permit and the sign program shall be submitted prior to final occupancy 8 LN/CAB17-218wp r 8 approval for Design Review through the community Advisory Board. The Board requested that the applicant consider and return with an appropriate lighting design when the signs are submitted other than interior lit signs. 5. A covenant shall be recorded agreeing to provide rc.-::iprocal access to the property adjacent and to the north of the subject site. 6. The roof-top screening shall be accomplished with louvered screening and with trees on the easterly slope behind the building as submitted in the revised screening and landscape plan. 7. A wood trellis shall be added around the clock tower. 8. The first leg of a stairway leading to the upper easterly pads is approved with trees and other planting to be installed to the property line with trees and planting for the rest of the slope on the easterly lot to be submitted with the upper lot submittal. 9. The property owner shall record a landscape covenant in the office of the County Recorder to run with the land, agreeing that all required plantings and irrigation systems shall be in place prior to use or occupancy of 8 new buildings or structures. All required plantings shall be maintained in good growing condition and irr-igation systems shall be maintained in good condition, and whenever necessary, shall be replaced with new equipment and/ or plant materials to ensure continued compliance with applicable landscaping, buffering, and screening requirements. All landscaping shall be maintained in a manner that will not depreciate adjacent property values and otherwise adversely affect adjacent properties. FIRE 10. Prior to delivery of combustible building materials on site, water and sewer systems shall satisfactorily pass all required tests and be connected to the public water and sewer systems. In addition, the first lift of asphalt paving shall be in place to provide adequate, permanent access for emergency vehicles. Said access shall be maintained to the satisfaction of the Fire Department. 8 LN/CAB17-218wp 8 11. All designated emergency access roads shall be posted per the Fire Department. 12. All two-way traffic aisles shall be a minimum of 24 feet wide and aemergency access shall be provided, maintained free and clear a minimum of 24 feet wide at all times during construction in accordance with Fire District requirements. 13. Submit a letter from the Encinitas Fire Protection District stating satisfaction with the type and location of Fire hydrants and the minimum required water flow in gallons per minute together with a letter from the appropriate agency certifying that the fire department's mi~imum required water flow is available to serve the project. provisions shall be made to ensure a maximum water pressure at the hydrant of 250 psi. The installation of a pressure reducing station may be required. Fire hydrants shall be of ,a bronze type and shall be identified by installing a "blue" reflective dot on the street surface pursuant to Fire District Standards. 14. Address numbers shall be clearly visible from the street fronting the structure. Where structures are located off 8 a roadway on long driveways, a monument shall be placed at the entrance where the driveway intersects the main roadway. Address numbers shall be displayed on this monument. 15. Structures shall be protected by automatic fire sprinkler systems. Sprinkler systems shall be installed to the satisfaction of the Encinitas Fire Protection District. 16. Prior to final recordation, the applicant shall submit a letter from the Fire District stating that all de~elopment impact, plan check and/or cost recovery fees have been paid or secured to the satisfaction of the District. 17. The owner/developer shall sign a covenant agreeing to pay to the Encinitas Fire Protection District a fee to mitigate the project impacts on Emergency Services. Grading Conditions 18. The developer shall obtain a grading permit prior to the commencement of any clearing or grading of the site. 19. The grading for this project is defined in Chapter 23.24 8 LN/CAB17-2l8wp 8 of the Encini tas Municipal Code. Grading shall be pE':r-formed under the observation of a civil engineer whose responsibility it shall be to coordinate site inspection and testing to ensure compliance of the work with the approved grading plan, submit required reports to the City Engineer and verify compliance with Chapter 23.24 of the Encinitas Municipal Code. 20. No grading shall occur outside the limits of the PROJECT unless a letter of permission is obtained from the owners of the affected properties. 21. A soils/geological/hydraulic report (as applicable) shall be prepared by a qualified engineer licensed by the state of California to perform such work at first submittal of a grading plan. Drainaqe Conditions 22. The developer shall exercise special care during the construction phase of this proj ect to prevent any offsi te siltation. The developer shall provide erosion control measures and shall construct temporary desiltation/detention basins of type, size and location as approved by the City Engineer. The basins and erosion control measures shall be shown and specified on the 8 grading plan and shall be constructed to the satisfaction of the City Engineer prior to the start of any other grading operations. Prior to the removal of any basins or facilities so constructed the area served shall be protected by additional drainage facilities, slope erosion control measures and other methods required or approved by the City Engineer. The developer shall maintain the temporary basins and erosion control measures for a period of time satisfactory to the City Engineer and shall guarantee their maintenance and satisfactory performance through cash deposit and bonding in amounts and types suitable to the city Engineer. 23. A drainage system capable of handling and disposing, of all surface water originating within the project, and all surface waters that may flow onto the proj ect from adjacent lands, shall be required. Said drainage system shall include any easements and structures as required by the City Engineer to properly handle the drainage. 24. co'lcentrated flows across driveways and/or sidewalks shall not be permitted. 8 LN/CAB17-2l8wp . . 8 street Conditions 25. Prior to any work being performed in the public right- of-way, a right-of-way construction permit shall be obtained from the Public Works office and appropriate fees paid, in addition to any other permits required. 26. The developer shall obtain the city Engineer's approval of the project improvement plans and enter into a secured agreement with the city for completion of said iIll¡)rovements prior to issuance of any building permit within this project. The improvements shall be constructed and accepted for maintenance by the city council prior to occupancy of any building permit for any unit within the project. The improvements are: Construct standard concrete drive approaches. 27. street trees, a minimum of (15 gallon size or 24" box) or larger, shall be installed in accordance with the city of Encinitas standards. utilities 27. The developer shall comply with all the rules, regulations and design requirements of the respective 8 utility agencies regarding services to the project. 28. The developer shall be responsible for coordination with S.D.G. & E., Pacific Telephone, and Cable TV authorities. 29. All proposed utilities within the project shall be ip.~talled underground including existing utilities unless exempt by the Municipal Code. Code Enforcement 30. All illegal leasing signs shall be removed from the site prior to submittal for building plan check. 8 LN/CAB17-2l8wp . 8 PASSED AND ADOPTED this 6th day of August, 1990, by the following vote, to wit: AYES: Boardmembers Beck, Grajek, Patton, Quinn, white NAYS: None ABSENT: None ABSTAIN: None ~ ~~~ \ Ann7 ~atton, Chairperson of the New EncJ.nJ.tas Community Advisory Board ATTEST: 8 . ..t: L DA S. NILES, Associate Planne 8 LN/CAB17-2l8wp