Loading...
2018-66 - EGProject Name: Encinitas Library Kiosk �%OTICE OF DECISION Request: Construct a new library kiosk and enclosure at an existing commercial building CEQA Determination: Exempt DECIS1011: APPROVED Project Number: 16-195 ADR PBD Number: 2018-66 Location: 501 North El Camino Real Community: New Encinitas APN: 257-470-03-00 iii vpplii 12�� IN! rf •11111WIN3 Representative: David Beck, Project Manager I San Diego County Department of General Services Decision Date: October 31, 2018 Report Approval: ROY SAPA'U, CITY PLANNER ANNA YENTILE, PRINCIPAL PLANNEI The proposed project includes a request for an Administrative Design Review Permit (ADR) to construct a new 216 square foot Encinitas Library kiosk and enclosure placed near the front entrance of the existing San Diego Credit Union building, which is located at 501 North El Camino Real. ITEM NAME: ENCHTAs LIBRARY KIOSK PROJECT NuMBER: 16-195 ADR OCTOBER 31, 2018 V ■—■■ -4-6 1 0 0 ■ s ■ ■ — ■OW �1141 III IN mole] 1N KO 0 ■ lr4toj« ln#11111U 114111 - a Ism" ill �� ll�� 11�l 11�111!1g�li M-FINUMM11r, �ftnrlmmmrrmxwmg�z M., M#. = F =.- usy; "m M0,91F.Mu=0 ME= On June 15, 1993 the New Encinitas Community Advisory Board approved Case No. 93-061 DR/EIA for the construction of a new 15,576-square foot commercial building for the San Diego County Credit Union located at 501 North El Camino Real. The New Encinitas Community Advisory Board made the findings required to approve the Design Review Permit pursuant to Encinitas Municipal Code Section 23.08. The project site has been previously developed with a two-story 15,576-square foot commercial building, occupied ■ the San Diego County Credit Union (Case No. 93-061 DR/EIA). . ................ ............... . ........ . ............................... .... .... ..... FG e Ian: ornmercial (GC) SpecificPlan: Nofl.e . . . . . . . . . ....... . . . . . . . . . ....... . . . ............................... . . . . . . ....................... . . . . . . . . . . . . . . . General CornMt�Li�!,Jqg) Zoning Overlay: ScenicNisual Corridor Overlay Zone & Cultural/Natural Resource 0 e la.3 . . ................. ............. ­.- . . . ............ . . . . . ... . . ................ ......... Communi�y..!q�!��E Context: Ne . borhood Center . ..... . ........ . ......... . . .................. ...... . . ................ ........ . ............ I., . . ...... . ......... . ..................... . .. . . .. . ........... Lpt�ff Ke City, P.1 a.n.; . . .. . . . ................. . ...... . .. . ........... . .. . ....... . ... . . . ............. o ne 090FUMMOOM None ITEm NAME: ENCHTAs LiBRARY KIOSK PROJECT NUMBER: 16-195 ADR OCTOBER 31, 2018 r_X,7Fr4TMTX'r M- The area surrounding the project site is primarily developed with office and commercial buildings, with the exception of a vacant parcel that abuts the project site to the north, and the existing open space area that exists to the west across N. El Camino Real. The project site is surrounded by a mix of land uses including retail, professional office, and open space/recreation. eneral Plan ► Community Character i - Context t . '7 eneral Commercial (GC) & .. ... . .............. I Neighborhood Center Vacant lot and retail General Commercial (GC) (Armstrong Garden . ......... . . . . . . .............. ...... . ....... . ................... . .................. ..... , . .. .. .. . ..... . .. .. .. . . . . . . . . . . . Ce ter Public/Semi-Public (P/SP), I C nt Neig—hb—o r I­o'&d_b e n t e r Instit lonal •III & (U.S. Postal Service) and Office Professional Various Medical Office ........ ............ . . . . . . .............................................. -"" . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. . . . . . . . . .. .. .. .. .. .. .. .. .. . . . bjWc"' e Professional (OP) & IL.O. Neighborhood Center Various Office Uses r2fessional II . West ........ . ....... ...... ...... ....... ... ....... ... .... ICY Open Space (OS) & . . ..... . .. ...... . ...... . . .. .. .. .. .. .. .. .. .. .. . . . . . . ................... . . . ......... eighborhood Center Open Space and Encinitas Ranch Specific Plan- Recreational Use rCT I =1 The City of Encinitas General Plan includes a number of goals and policies that guide development and land use within the City. A discussion of how the project is consistent with applicable General Plan policies is summarized below: KIMM, General Plan Goal or . ............................. ...... — ---- tx lanatinn • Pmho - Conformance . . . ........................................................ . ...... . . ... . ....................................................... LU POLICY 6.1: Permit The General Commercial (GC) general plan land use commercial land uses and other rdesignation permits a wide range of retailing, wholesaling, types Of non-residential and service activities, including the "library" land use, which development only in those areas is a permitted use in the General Commercial (GC) zone. where such development The General Commercial land use designation is presently is concentrated or implemented by the General Commercial (GC) zoning where indicated by the General standards. The proposed project is consistent with the GC Plan as long as such zoning requirements, and is therefore consistent with the development does not result in General Commercial general plan land use designation. land use conflicts with . . . . . .......... . . ................ "I ......... . . .......... . . .......... ........ .. .. . . Interior Side Yard Setback- 10 feet min. surrounding residential Yes Z No 0 development. 163 feet (existing building) ............ . . . ....... . (CONT.) LU POLICY 6. 5 : The design of The proposed design of the library kiosk and enclosure future development shall consider structure has considered the architectural design of the the constraints and opportunities existing commercial building on the site. The proposed that are provided by adjacent kiosk and enclosure structure incorporates similar colors existing development. and building materials as the existing adjacent building in order to complement the established design theme of the existing development. LU POLICY 6.7: Require The visual impact of the proposed library kiosk and commercial development to enclosure structure will be softened with new landscape provide sufficient landscaping to plantings. A combination of shrubs and groundcover will soften the visuals impacts of provide sufficient landscaping to minimize the visual impact commercial buildings and par ing of the structure on the site. areas. A discussion of how the project is consistent with General Commercial (GC) zoning standards is summarized below: Development Standard I■rqLect !!!2�sed .... .... . . . . ......... . . _., . . . . .. . . . ..................... . ...................... . ..... . ........ E—a�a-Us-e- "Library" use = permitted use in the General Commercial Zone Front Yard Setback -20 feet min. 20 feet (existing building) Yes Z Street Side Yard Setback- 20 feet min. 20 feet (existing building) . . . . . .......... . . ................ "I ......... . . .......... . . .......... ........ .. .. . . Interior Side Yard Setback- 10 feet min. 138 feet (proposed structure) Yes Z No 0 A'e" ...... ...... a ..... ..... r 'Y" . . ..... a"' d,-",S . ...... e t b ......... . a c­k­"-­'0,_ ... . . . ..... f e ei ............. m- ......... . in, . . . . ........ . . ........................... . ................. . .. . 163 feet (existing building) ............ . . . ....... . MR SE] ITEm NAME: ENCINITAS LIBRARY IS PROJECT NUMBER: 16-195 ADR OCTOBER 31, 2018 ....................................................................................................................................................................................................................................................................................... Ppy9.!2p !Dent Standard ............................................................................................................................................................................ 11 ......................... ......................... . .. . .. Pro��ect Prop2§!�g ...................................................................................................................... .................. . .. . .......... .......................... .......... . ................... !qq[9.r!1eS? . ................................................................... y c t Lot Coage- 30 peren max. p e r c a n t (11,272 ..I 1, s.f.) Yes 2 NoEl ......... ............................... ..................................... I .............. 11 .................................... I . ................................................ oor Area Ratio- 1.0 max. .................................................................................................................................................................................................................................................................. 0. 19 (15,792 s.f./81,457 s.f.) . .................................................................................................................. Yes [D No[] ...... ........ ................................................................................................................................................................................................................................................. arking ..... . .......... .... . ........... ................ ............. ........................ 15,576 s.f. (existing)/250 for ...... ... t.22,11 .......... ......... .... , . . .............. W's 0 ii "Office/Professional Services" (including fi nancial institutions) = 63 216 s.f. (r )I for "Library" us e:= 1 space Total Required: 64 spaces Total Provided: 64 spaces .................................................................. . ....... ............................ 11 ................ ­ . . . . ......... ...................... .................................... Landscaping-1 5 percent minimum .................................................................................................................................................................................................................................................................. 37 percent (30,399 s.f./81,457 s.f.) ........................................ .... .. . ................................... ... . .................... Yes No ...... ........ ....................................... ............................... . .................. ................... ... . ....... ........... . ...................... ............................................. ullding Height-30 feet ...................................................................................................................................................................................................................................................................................... ................................................................................................................................................................................................................................................................... 1 -inches .................. 11 .................... . .. . ......... ........................... .............. I ......... ....................................... . ...... . . ..................................... ........ .................. Yes No . .............................................................................................................. MR SE] PROJECT NUMBER: 16-195 ADR OCTOBER 31, 2018 The project is consistent with the applicable Design Guidelines, as summarized below: Design Guideline 77aExplanation of Proje onformance Section .. .... .. ........ I . . ............. I I— q!!1q_Rqj!q_ ......... ... .3.3: Building forms should t The proposed kiosk incorporates breaks in the wall planes designed to create visual interest. and changes in colors and materials to create a visually Changes in form accompanied by interesting building facade that also minimizes the varying levels and planes can appearance of bulk and mass. The project proposes the create a visually interesting use of stone veneer, smooth stucco, glass, and metal structure while minimizing the elements to provide visual interest. The single-story appearance of bulk. building design also minimizes the bulk and mass of the structure. ...... . ...... Section 5.5: Colors and Materials ........................ . . . . . . ......... 5.5.11: Variety in complementary' The project incorporates a variety of colors and building exterior materials and colors materials (i.e. stone veneer, smooth stucco, glass, and should be used. Additional colors, metal elements) that add architectural interest and visual materials and detailing may be dimension to the building. The project incorporates changes applied to emphasize certain in color and material to emphasize the breaks in the wall features. planes, and to add to the overall visual interest of the building. The selected colors and building materials also complement the colors and building material of the existing adjacent building on the site. Section 7: Landscape Guidelines 7.3.4: Landscaping should Landscaping will be installed around the new library klosk enhance the natural site elements and enclosure to soften its visual impact. The landscape through the careful use of flower palette includes a variety of shrubs and ground cover, N nd leaf color and texture, plant which will provide addonal color and texture. forms and plant masses. PUBLIC NOTICE AND PARTICIPATION N. FTM ---- - ----- -- --- ITEM NAME: ENCINTAs LiBRARY KIOSK PROJECT NuMBER: 16-195 ADR OCTOBER 31, 2018 111,201UM A MUM WIT11 (--I* III IVA II I(Ak-I.-Wis I Ort! 11FIMM111212001 I QW=K- The GPP meeting was held on September 8, 2016, at the project site from 6 p.m. — 7 p.m. TwI interested individuals attended the meeting. The meeting attendees inquired about the genera' operation and services that will be available at the proposed kiosk. All comments and questions were addressed at the meeting. FIT F4I,xf*TkTVP Fir-M Aie] LI I$] A I &I W L SCA The following Planning-related conditions shall be completed to the satisfaction of tt'"i Development Services Department: 1. No signage shall be permitted to be placed on the windows of the kiosk enclosure structure. r PROJECT NUMBER: 16-195 AD- •: - 31, 2018 iE,. All future signage installed at the project site shall require separate building permits, subject to the review and approval by the Development Services Department. SCB The following condition shall be completed to the satisfaction of the Encinitas Fire Department: 1. The applicant shall obtain a building permit for the proposed kiosk. SCC The following Engineering-related conditions shall be completed to the satisfaction of the Development Services Department: 1. The proposed roof shall drain to a landscaped area prior to the on-site storm drain system or parking lot. CONTACT THE DEVELOPMENT SERVICES DEPARTMENT REGARDING COMPLIANCE WITH THE FOLLOWING CONDITION(S): G2 This approval may be appealed to the City Council within 15 calendar days from the date of this approval in accordance with Chapter 1. 12 of the Municipal Code. G4 Prior to building permit issuance, the owner shall cause a covenant regarding re property to be recorded. Said covenant shall set forth the terms and conditions of this gra of approval and shall be of a form and content satisfactory to the Development Servic Director. I G5 The Owner(s) shall waive any claims of liability against the City and indemnify, hold harmless and defend the City and City's employees regarding any component of the City's approval, • executing an indemnity agreement in substantially the form as provided by thz Development Services Department prior to building permit issuance and th-� Development Services Director is hereby authorized to execute the same. i 1 ar-, ITEm NAME: ENCINITAS LIBRARY KiOSK PROJECT NUMBER D- • *: 31, 2018 G13 Prior to any use of the project site pursuant to this permit, all conditions of approval contained herein shall be completed or secured to the satisfaction of the Development Services Department. G15 A plan shall be submitted for approval by the Development Services Department and the Fire Department regarding the security treatment of the site during the construction phase, the on- and off-site circulation and parking of construction workers' vehicles, and any heavy equipment needed for the construction of the project. G21 Decorative use of neon or LED tubing or banding, such as tubing around windows or doors or banding around the building exterior, shall not be allowed unless approved through subsequent design review permit modification(s). Temporary window signs are limited to 25 percent • window area in accordance With Section 30.60.060 (N) • the Municipal Code. Wino fiV ITEM NAME: ENCHTAs UsRARY Ktospi PROJECT NUMBER: 16-195 A!- • •: 31, 2018 with new materials to ensure continued compliance with applicable landscaping, buffering, and screening requirements. All landscaping and irrigation systems shall be maintained in a manner that will not depreciate adjacent property values and otherwise adversely affect adjacent properties. All irrigation lines shall be installed and maintained underground (except drip irrigation systems). WZRILC191V Jr4l"641r. 4 CONTACT THE DEVELOPMENT SERVICES DEPARTMENT REGARDING COIIIPI-111111C;� WITH THE FOLLOWING CONDITION(S): Ammmwug• R� COATACT TAE EACIAITAS FIRE FOLLOWING CONDITION(S): ITEM NAME: ENCINITAS LIBRARY &IOSK PROJECT NUMBER: 16-195 ADR OCTOBER 31, 2018 11 Z I my—1 zi *Role] Ll 10111 Lai z .TEM NAME: ENCINITAS LIBRARY KIOSK PROJECT NUMBER' 16-195 ADR OCTOBER 31, 2018 *300PI =- =-, --n =