Loading...
2015-06 Cec 23.12 Solar Energy & Electric Vehicle ORDINANCE 2015-06 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF ENCINITAS, CALIFORNIA, AMENDING SECTION 23.12.030 AND 23.12.035 RELATED TO RESIDENTIAL SOLAR ENERGY AND ELECTRIC VEHICLE READY BUILDINGS SECTION ONE The Encinitas City Council finds and determines that the City Building Code should be updated by amending Sections 23 12 030 and 23 12 035 related to residential solar energy and electric vehicle ready buildings The Council finds that these amendments are reasonable and necessary for the public health, safety, convenience, and welfare SECTION TWO Section 23 12.030 3112 is added to the City Building Code to read as follows Section 3112 of the California Building Code is revised to read SEC. 3112 SOLAR-AND ELECTRIC VEHICLE-READY BUILDINGS Sec. 3112.1 Solar zones. Newly constructed single-family dwelling units shall include solar zone area as specified in Sections 110.10(b)1A, 110.10(b)2, 110.10(b)3, and 110.10(b)4 of the California Building Energy Efficiency Standards. Sec. 3112.2 Main electrical service panel. Newly constructed single-family dwelling units shall include a main electrical service panel meeting Sections 3112.2.1 through 3112.2.3. Sec. 3112.2.1 Minimum rating. The main electrical service panel shall have a minimum rating of 200 amps. Sec. 3112.2.2 Type. The main electrical service panel shall not be of a type with a center-fed main circuit breaker. Sec. 3112.2.3 Reserved space for future solar photovoltaic system. The main electrical service panel shall have reserved space complying with Sections 3112.2.3.1 and 3112.2.3.2 to allow for the installation of double-pole circuit breakers for a future solar photovoltaic system. Sec. 3112.2.3.1 Location. The reserved space for the solar photovoltaic circuit breaker shall be positioned at the opposite (load) end from the input feeder or main circuit breaker location. Sec 3112.2.3.2 Identification. The reserved space for the solar photovoltaic circuit breaker shall be permanently and visibly marked as "For Future Solar P hotovoltaic." Sec 3112 2 4 Reserved space for future electric vehicle charging system. The main electrical service panel shall have reserved space to allow for the installation of a circuit breaker for a future electric vehicle charging system. Sec. 3112.2.4.1 Identification. The reserved space for the electric vehicle charging circuit breaker shall be permanently and visibly marked as "EV Capable." Sec. 3112.3 Conduit for future solar photovoltaic system. Newly constructed single-family dwelling units shall include electrical conduit installed per Sections 3112.3.1 through 3112.3.3 to accommodate future installation of a roof-mounted solar photovoltaic system. Sec. 3112.3.1 Location. One conduit run shall originate at a readily accessible attic location with proximity to solar zone area complying with Section 3112.1 and terminate at a minimum 4-inch-square approved electrical junction box located within 72 inches horizontally and 12 inches vertically of a main electrical panel complyinq with Section 3112.2. A second conduit run shall originate at the electrical junction box and terminate at the main electrical panel. Sec. 3112.3.2 Size. The conduit shall be minimum 1-inch-diameter listed electrical metallic raceway. Sec. 3112.3.3 Identification. The electrical function box and the segment of conduit run in the attic shall be permanently and visibly marked as "For Future Solar P hotovoltaic." Sec. 3112.4 Conduit for future electric vehicle charginq system. Newly constructed single family dwelling units with attached garages and newly constructed detached garages with electrical service shall include electrical conduit installed per Sections 3112.4.1 through 3112.4.3 to accommodate future installation of an electric vehicle charging system. Exception Newly constructed detached garages on lots with an existing garage including either an electric vehicle charging system or electrical conduit installed per Sections 3112.4.1 through 3112.4.3 to accommodate future installation of an electric vehicle charging system. Sec 3112.4.1 Location. The conduit run shall originate at a main electrical panel complying with Section 3112.2 and terminate at a minimum 4-inch-square approved electrical junction box located on the interior of the garage at minimum 30 inches and maximum 48 inches above the garage floor. Sec. 3112.4.2 Size. The conduit shall be minimum 1-inch-diameter listed electrical metallic raceway. Sec 3112 4 3 Identification. The electrical junction box shall be permanently and visibly marked as "For Future Electric Vehicle Charging." SECTION THREE: Section 23 12.035 R332 is added to the City Building Code to read as follows SEC.23.12.035.R332 SOLAR-AND ELECTRIC VEHICLE-READY BUILDINGS Section R332 is added to the California Residential Code to read Sec. R332 Solar- and electric vehicle-ready buildings. Solar- and electric vehicle-ready construction shall be provided as specified in Section 23.12.035.3112 of the City Building Code. SECTION FOUR: As required by Health and Safety Code section 17958 7 the City Council makes express findings that amendments to the California Building Standards Code are necessary for the protection of the public health, safety and welfare due to certain climatic, topographic or geological conditions City Code is being amended to require new single family development to include an electric panel large enough for future photovoltaic and / or electric vehicle charging system, installation of conduit for future photovoltaic and electric vehicle charging system and reserving south facing roof for future solar The City finds and declares that adding the referenced code changes is necessary due to local climatic conditions As a result of high summer ambient temperatures and periods of heat waves, average load demand and peak load demand of energy used in San Diego County is an important factor concerning public safety and adverse economic impacts of power outages or reductions Facilitating the installation of an electric panel large enough for future photovoltaic and / or electric vehicle charging system, installation of conduit for future photovoltaic and electric vehicle charging system, and reserving south facing roof for future solar will have local and regional benefits in the reduction of total and peak energy use and greenhouse gas emissions SECTION FIVE: The project is exempt from CEQA pursuant to the State CEQA Guidelines Section 15061(b)(3) because it can be seen with certainty that there is no possibility that this project may have a significant effect on the environment. The proposed draft ordinance changes, should they be approved, would require increased energy efficiency in new building construction Staff has reviewed the changes and find no risk of environmental impact. EFFECTIVE DATE This ordinance shall take effect and be in force thirty days after the date of its passage and the City Clerk of the City of Encinitas is hereby authorized to use summary publication procedures pursuant to Government Code Section 36933 utilizing the Coast News, as newspaper of general circulation published in the City of Encinitas INTRODUCED at a regular meeting of the City Council of the City of Encinitas held on April 15th of 2015 PASSED AND ADOPTED this 13th day of May, 2015 by the following vote AYES Blakespear, Gaspar, Kranz, Muir, Shaffer NAYS None ABSTAIN None ABSENT None ru L NRI GASPA , yo ncinitas ATTESTATION AND CERTIFICATION I hereby certify that this is true and correct copy of Ordinance No 2015-06 which has been published pursuant to state law -Y�r4l A KATHY HOLLYWOOD, City Clerk