Loading...
1982-26 Revising Capacity Fees of the District RESOLUTION NO. R82-26 RESOLUTION OF THE BOARD OF DIRECTORS OF SAN DIEGUITO WATER DISTRICT REVISING CAPACITY FEES OF THE DISTRICT WHEREAS, it is in the interest of the District to revise its water capacity fees~ NOW, THEREFORE, IT IS HEREBY RESOLVED, DETERMINED AND ORDERED by the Board of Directors of San Dieguito Water District as follows: 1. That capacity fees for the District be and they are fixed, effective October 1, 1982, as set forth on Exhibit A which is attached hereto. 2. That the foregoing change and establishment of capacity fee charges of the District are for the purpose of providing funds for the payment of a portion of the principal and interest debt service of the $9,500,000 1982 Water Revenue Bonds, Series A, authorized by Resolution No. R82-19 adopted August 23, 1982, to construct capital projects to maintain service within existing service areas, and, therefore, the charges and establishment of such charges are exempt from the provisions of the California Environmental Quality Act. PASSED AND ADOPTED at an adjourned regular meeting of the Board of Directors of San Dieguito Water District held on the 29th day of September, 1982, by the fOllowing vote to wi t: AYES: NOES: ABSENT: Directors Weston, None Director Harris Weidner, Fahlberg re~/tf~ 58 SAN DIEGUITO WATER DISTRICT 59 EAST liD" STREm ENCINITAS, CALIFORNIA EXHIBIT "A" Resolution dated September 29, 1982. No. R82-26. Effective October 1, 1982. Char~e8 for Service Connections: , - The following charge will be paid at time of application for servicea 1. Installation of Meter and Service Pipe: Size Installation Charge Capaci ty Fee Total 3/411 5 750 51250 52000 1" 815 1700 2515 'ty.," 1115 2750 3865 2" 1325 4000 5325 2. Installation of Meter Only: Size Installation Charge Capacity Fee Total 3/4" 5 160 51250 51410 1" 210 1700 1910 'ty.," 390 2750 3140 2" 520 4000 4520 3. Installation of Service Pipe Only: Size Installation Charge Capacity Fee 5/8" or 3/4" 5 635 None 1" 680 None 'ty.," 805 None 2" 875 None 4. Installation of Fire Sprinkler Connection: Installation Charge Capacity Fee Unmetered Connection Furnished on Request 5 660 Detector Check Connection Furnished on Request 1265 Installation of Back Flow Prevention Devices: 1" 'ty.," 5390 585 620 720 775 All New Service Old Service New Service Old Service 2" Charges for Tanker Meters (Construction): S32Q.oo charge with application includes: $175.00 deposit on meter 20.00 installation charge (not refundable) 25.00 hydrant "rental" for Encinitai3 Fire District 100.00 deposit on water charges All water charged at '1.07 per hundred cubic foot. Construction of fire hydrants on existing pipelines: Residential hydrant Commercial hydrant (6-4-2)\) (6-4-2)\-2)\) 52400 2650 58(0)