1984-18 Approving Change in Contract for Construction of Water Revenue Bond Project 4
RESOLUTION NO. R84-18
RESOLUTION OF THE BOARD OF DIRECTORS OF
SAN DIEGUITO WATER DISTRICT APPROVING
CHANGE IN CONTRACT FOR CONSTRUCTION OF
WATER REVENUE BOND PROJECT 4
WHEREAS, pursuant to Resolution No. R83-37, the District
entered into a contract with Yahn Construction, Inc. for
the construction of Water Revenue Bond Project 4~ and
WHEREAS, by reason of changes requested by the District
and other unforeseen matters in conjunction with the construction
of the project, certain additional work was necessary for
its completion, the reasonable value of which was $3,518.18;
NOW, THEREFORE, IT IS HEREBY RESOLVED, DETERMINED
AND ORDERED by the Board of Directors of San Dieguito Water
District as follows:
1. That the contract with Yahn Construction, Inc.
be and it is amended by adding thereto the sum of $3,518.18
for the work described in the schedule attached hereto.
2. That payment of said sum, in accordance with the
terms of the contract, be and it is authorized.
PASSED AND ADOPTED at a regular meeting of the Board
of Directors of San Dieguito Water District held on the
23rd day of April 1984, by the following vote, to wit:
AYES:
Directors
Stone
Weston, Dashiell, Weidner, Townsend
NOES:
None
/~
ABSENT:
None
President
98
-~
.
BOND PHC\TEX...'T Ji.l
Change Order J}:
Required to extend 12" line 32' to CO)llK'cl~ to cxi;-~tin<J
12" main
d1anqc Order #2
Conflict with other utilities ."'Inti ('.:{i stint) G" nnin.
Old 6" steel min had to be rcnDvcd i11ld disp:Jscd
Change OrdCl" lj 3
Rarove t\..-o existing wh.'lrf head hydrants not indicated
on plans for rerroval
d-tangc Order J! 4
Request by District to reI1l:NC t<'C' frum G" line and
replace with l\.C. pipe
'lUl'l\L
BOND PFC\n:CI' # 7
Coordinated with property a,.mer whc) \.,a5 to il1stal1
8" pipe and had contractor inst",ll 12" pipe.
C\V'ner paid $2700.00 for 8" size and District $485.00
for oversizing
TOI'AL
Exhibit 2
$1,024.00
$1,550.00
$ 433.00
$ 51l.18
$3,518.18
$ 485.00
$ 485.00
..oM.":"1~~~l!.'~___
.
---'-'
'~.':.~'~.'~"-- ~-~.~.- ^~~..'..~.:,._.,.~.- .-.-. ""'--~ "",=,,,,,~...,,... -
,
'.
.
P'()ND I'EC\JECT ;;,1
CtkmClc Order ii 1
~.;.;J_________._._^
ReqUired to extend 12" line 32' to CO)lllC'ct to c;..:i::hmJ
12" nain
dla!K1C .9_t.-:9cr J~
Conflict \-lith other utilities and existing G" Iwin.
Old 6" steel main had to be l:cm::JVed <IDd c1isfOscd
Change Order #3
RCITDve t....-o existing whaTf head hydr.-mt:.s not i.ndica.ted
on plans for renDval
dlaI1qc _ Order Jii
ReqUest by District to rcnovc tee from (i" 1.U1C and
replace with lLC. pip.:'
'101'.'\1,
BCND PROJECT # 7
Coordinated with prop-?rty Ovmcr \'.'110 \,ns to insL.'\ll
8" pipe and rod contructOl- lnst"ll 12" pip(~.
Otmer paid $2700.00 for 8" size and District :,~485.00
for oversizir.g
'lUI'AL
Exhibit 3
$1,024.00
$1,550.00
$ 433,00
$ 511. 18
$3,518.18
$ 485.00
$ 485.00