Loading...
1984-08 Approving Change in Contract for Construction of Water Revenue Bond Project 3 RESOLUTION NO. R84-8 RESOLUTION OF THE BOARD OF DIRECTORS OF SAN DIEGUITO WATER DISTRICT APPROVING CHANGE IN CONTRACT FOR CONSTRUCTION OF WATER REVENUE BOND PROJECT 3 WHEREAS, pursuant to Resolution No. R83-17, the District entered into a contract with Yahn Construction, Inc. for con- struction of Water Revenue Bond Project 31 and WHEREAS, by reason of changes requested by the District and unforeseen matters in conjunction with the construction of the project, certain additional work was necessary for its comple- ticn, the reasonable value of which was $14,861.00; NOW THEREFORE, IT IS HEREBY RESOLVED, DETERMINED AND ORDERED by the Board of Directors of San Dieguito Water District as follows: 1. That the contract with Yahn Construction, Inc. be and it is amended by adding thereto the sum of $14,861.00 for the work described on the schedule attached hereto. 2. That payment of said sum, in accordance with the terms of the contract, be and it is authorized. PASSED AND ADOPTED at a regular meeting of the Board of Directors of San Dieguito Water District held on the 27th day of February, 1984, by the following vote, to wit: AYES: Directors Dashiell, Weidner, Townsend and Stone NOES: None ABSENT: Director Weston ~EST: .. 1/;;/:. . JUdY j /y{1;{):, Secretar I:=:/"'~' 42MkeD Vice President 87 A ~ = ~ SClIIDULE TO RESOLUTICN NO. R84-8 " , . < "'p', r- !I.: I'. <<< " <"l il ; lru ; ~_., i l DiSTRICT -"-' 'l) Sil:1 [',:1';'1\:; r:t',!if 1.0, " \'1'(1): 1:71"i,:753-11-'.5 15 February 24, 1984. TO: Directors FRCM: Manager RE: Bond Project No. 3 Yahn Construction Co. I request that the follcwing addendum be authorized as additions to the contract of $339,250. The additions will be $14,861.00. BOND PID..'J1<.rr #3 Change Orders: 1. 14" Forced. sewer min crossing (Old Highway 101). $5,205.00 2. Reconnect two 2 II seIVices not shown on plans 692.00 3. Install 45 1" new servlces 13,500.00 $19,397.00 futa1 Credit for 42 service reconnects as called for on plans 4,536.00 futa1 $14,861. 00 I request that the job be accepted as carplete, a notice of canpletion be recorded, and payrrent of retention be made 35 days after recording of notice of ccnpletion if no stop notices have been filed. , I JST:dc ~ -~ ~:--.,;;;~ ---"i~~i~~_~_~__~~___ _.___.....-c~~,'___ -. -."-"'--"__'_"_"" ..~~_, ""'~0~':~;;~-::'=;:~-':;,';';'.,